M/S. SHEIKHAR HOTELS GULMOHAR ENCLAVE & ANR. v. STATE OF U.P. & ORS.

Case / Petition Number:Civil Appeal No. 3505 of 2008
Neutral Citation:[2008] 8 S.C.R. 273

Case Details & Bench

Court
High Court
Hon'ble Judges
  • A.K. Mathur
  • Altamas Kabir
Judgment Date
2008-05-12
Court Decision / Holding
Appeal dismissed. The Supreme Court upheld the Division Bench of the Allahabad High Court, holding that invoking Section 17(4) read with Section 5-A was warranted in the circumstances, and there was no illegality in dispensing with Section 5-A objections given the objective material and public interest in decongesting traffic. There was no order as to costs.
Final Disposition
Appeal dismissed; High Court order upheld; no order as to costs.

Parties to the Case

Appellants / Petitioners

  • M/S. SHEIKHAR HOTELS & ANR.

Respondents

  • State of Uttar Pradesh and Ors.
  • Bulandshahr-Khurja Development Authority, Bulandshahr

Legal Representation & Advocates

Counsels for Petitioners

  • • R.K. Khanna
  • • Neeraj D. Gaur
  • • Piyush Sharma
  • • S.S. Nehra
  • • Dr. I.B. Gaur

Counsels for Respondents

  • • Shail Kr. Dwivedi
  • • A.A.G.
  • • Subodh Markandey
  • • G. A Sheshagiri Rao
  • • Chitra Markandeya
  • • Kamlendra Mishra
  • • Aarohi Bhalla
  • • Gunnam Venkateswara Rao

Case Synopsis & Summary

This Supreme Court judgment concerns land acquisition under the Land Acquisition Act, 1894 in the Transport Nagar project abutting the National Highway in Bulandshahr, Uttar Pradesh. The Bulandshahr-Khurja Development Authority sought to dispense with the objection mechanism under Section 5-A by invoking Section 17(4) read with Section 5-A to acquire land quickly on public interest grounds, supported by a Master Plan, approvals from the National Capital Region Planning Board, and a loan for development. The appellants (Mis. Sheikhar Hotels and others) challenged this process, arguing that Section 5-A constitutes a valuable right and cannot be dispensed with arbitrarily; they contended the writ petition was not properly plead and that the government should not circumvent the safeguards. The Allahabad High Court upheld the impugned notifications, concluding that the urgency of traffic decongestion justified dispensing with 5-A. The Supreme Court, examining precedents such as Rajasthan Housing Board v. Kishan and Union of India v. Praveen Gupta, affirmed the need to balance rapid development with safeguards. It held that in the present factual matrix the invocation of Section 17(4) read with Section 5-A was warranted and that public interest justified expediency. The appeal is dismissed with no order as to costs, thereby upholding the High Court’s order.

Provisions of Law Cited

Land Acquisition Act, 1894 - Section 17(4) read with Section 5-ALand Acquisition Act, 1894 - Section 5-ALand Acquisition Act, 1894 - Section 4(1) read with Section 17(1) and 17(4)Land Acquisition Act, 1894 - Section 6Uttar Pradesh Urban Planning and Development Act, 1973National Capital Region Planning Board Act, 1985 (Act 11 of 1985)

Legal Doctrines & Maxims

  • Right to file objection under Section 5-A is a valuable right and not to be dispensed with lightly
  • Section 5-A is a safeguard against arbitrary exercise of power
  • Urgency in public interest can justify invocation of 17(4) read with 5-A in appropriate cases
  • Traffic decongestion and public infrastructure development can constitute urgent public purposes

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants argued that dispensing with the requirement of Section 5-A under Section 17(4) of the Land Acquisition Act is not permissible without adequate material and a proper application of mind. They contended that Section 5-A provides a valuable procedural safeguard against arbitrary acquisition, and invoking 17(4) to bypass the right to object lacks justification given the earlier Master Plan and ownership concerns; the writ petition's pleadings did raise relevant issues, and the decision should not rest on expediency alone.

Contentions of Respondents

The respondents asserted that the urgency of traffic decongestion in the National Capital Region and the presence of a prepared Master Plan, Board approvals, and loan sanctions justified dispensing with objections under Section 5-A. They argued that public interest and rapid development can override procedural safeguards when the State’s actions are objectively justified and the authorities are satisfied by material evaluating urgency.

Cited Precedents (3)

Case NameCitationTreatmentExplanation
Rajasthan Housing Board & Ors. v. Shri Kishan & Ors.1993 (2) SCC 84PositiveCited to illustrate the principle that safeguards under Section 5-A are important, yet case law recognizes situations where urgency and development needs may warrant a departure from normal safeguards.
Union of India & Ors. v. Praveen Gupta & Ors.(1997) 9 SCC 78PositiveCited as recognizing urgency in traffic decongestion and public interest as a basis for speedy acquisition under Section 17(4).
Union of India & Ors. v. Mukesh Hans(2004) 8 SCC 14DistinguishedThe Court distinguished this decision on its facts, noting it did not govern the present case’s circumstances and the reasons for dispensing with 5-A here were different.

Diagnostic Tool

Beta

Does this judgment govern your specific facts?

Don't risk relying on a distinguishable precedent. Enter your facts or proposition below. We will test it against M/S. SHEIKHAR HOTELS GULMOHAR ENCLAVE & ANR. v. STATE OF U.P. & ORS. and instantly map out authorities that support, challenge, or govern your position.

Extracted Judgment Text

Exact text extracted from official judgment records.

" ·• A , ., .}\ • _+_ ## [2008] 8 S.C.R. 273 # MIS. SHEIKHAR HOTELS GULMOHAR ENCLVE. & ANR. v. STATE OF U.P. & ORS. (Civil Appeal No. 3505 Of 2008) MAY 12, 2008 B [A.K. MATHUR AND ALTAMAS KABIR, JJ.] _Land Acquisition Act, 1894_ - s. _17 (4) rlw_ s. _5-A_ - _Land_ - - _acquisition Dispensing with requirement uls 5-A Propriety of- Held: In the facts of the_ case, _invocation of_ s. _17 (4) r/w_ 5- c _A_ is _warranted_ - _Invocation of_ s. _5-A_ was _not for ulterior pur-_ pose _or for arbitrary exercise of power_ Land of the appellants was acquired under Land Acquisition Act, 1894 dispensing with requirement of s. 5A of the Act. Appellant filed writ petition. High Court held D •.hat the urgency shown for invoking ~. 5A was justified and there was no infirmity in Notifications issued for acquiring the land. Hence the present appeal. -.; > Dismissing the appeal, the Court E HELD: 1. The right to file objection under Section 5A of Land Acquisition Act, 1894 is a valuable right and the Governments are not given a free hand to dispense with Section 5-A. Section 5-A is only a safeguard against the arbitrary exercise of the power by the State. But one F should also not lose sight of the fact that invocation of such a provision is also sometimes imperative as in order to meet the urgency of the situation, it needs to be invoked in public interest. Sometimes it may not be neeessary at all and the State functionaries may sometime, G out of over zealousness may invoke this provision which would seriously jeopardize the interest of the people. Therefore, it depends upon case to case where in a given situation Section 5-A has been correctly invoked and the F H 273 274 SUPREME COURT REPORTS [2008] 8 S. C.R. ... • _"1_ A authorities were satisfied in an objective manner. [Para 4] [278-A-D] 2. In the present case invocation of Section 17 (4) read with Section 5-A of the Act was well warranted and B[there is no reason to interfere with the order passed ][by ] the Division Bench of the High Court. In order to keep pace with the speed of growth of Indian economy, invocation of Section 5-A has become imperative. Traffic congestion is a common experience of one and all and it is very difficult to negotiate with the traffic congestion in c Delhi an.d National Capital region. Therefore, in the present situation, it cannot be said that the invocation of Section 5-A was for ulterior purpose or was arbitrary exercise of the power. Since the Master Plan has already been prepared and it has been approved by the Planning Board D and they have sanctioned the amount for the developme,...t of this Transport Nagar and widening of the National High Way. Therefore, the proposal was approved by the Board and it got the sanction from the National Capital Regional Planning Board and ultimately the Government E[invoked the power under Section ][17 ][(4) ][read with Section ] 5-A of the Act dispensing with the objections. [Paras 4 and 5] [280-D; 278-DG] _Rajasthan Housing Board and Ors. v. Shri Kishan and Ors._ 1993 (2) SC 84; _Union of India and Ors. v. Praveen Gupta_ - _and Ors._ 1997 (9) sec 78 relied on. F > )!. "" - ,... _Union of India and_ Ors. _v. Mukesh Hans_ 2004 (8) SCC 14 - distinguished. CIVILAPPELLATE JURISDICTION: Civil Appeal No. 3505 G of 2008 From the final Judgment dated 6/12/2006 of the High Court Judicature at Allahabad in CMWP No. 65687/2006 -- R.K. Khanna, Neeraj D. Gaur, Piyush Sharma, S.S. Nehra H and Dr. l.B. Gaur for the Appellants. M/S. SHEIKHAR HOTELS & ANR. v. STATE OF 275 U.P. & ORS. [A.K. MATHUR, J] ; .l\ • ... Shail Kr. Dwivedi, A.A.G., Subodh Markandey, G. A Sheshagiri Rao, Chitra Markandeya, Kamlendra Mishra, Aarohi Bhalla and Gunnam Venkateswara Rao for the Respondents. The Judgment of the Court was delivered by --->- A.K. **MATHUR,** J. 1. Leave granted. B 2. This appeal is directed against the order dated 6.12.2006 passed by the Division Bench of the Allahabad High Court whereby the High Court affirmed the notification dated 15.6.2006 issued under Section 4 (1) read with Section 17(1) and 17(4) of the Land Acquisition Act (hereinafter referred to as C 'the Act') and the notification dated 19.10.2006 issued under Section 6 of the Act. A preliminary objection was raised before the High Court on behalf of the respondent- Bulandshahr-Khurja Development Authority, Bulandshahr that the writ petition was . not maintainable at the instance of the appellants and secondly D it was contended that the writ petition was bereft of basic pleadings with regard to the challenge of dispensing with Section 5- A of the Act. 3. The first question which was agitated before the High Court was that dispensing with requirement of Section 5-A of E the Act was arbitrary. The Division Bench of the High Court after referring to couple of decisions of this Court took the view that the urgency shown for invoking Section 5-A was justified as it was necessary to remove the traffic congestion. It was also found that there was no co-relation between the argument and F the pleadings contained in the writ petition. The High Court found that there was no infirmity in the impugned notifications. Hence this appeal on grant of special leave. F G 4. We have heard learned counsel for the parties and perused the record. Before we address to the main issue it will be relevant to mention a few facts. Respondent No.3- Bulandshahr Khurja Development Authority, Bhuandshahr ( hereinafter to be referred to as the Development Authority) in its 25[1] h Board meeting held on 3.5.2002 decided to establish at the present site, H 276 SUPREME COURT REPORTS [2008] 8 S.C.R. .., A "Transport Nagar" abutting to the National Highway No.91. Under the regional plan of the National Capital Regional Plan~ning Board (hereinafter to be referred to as the Board) National Highway No.91 is proposed to be made a four lane road. Out of the plots described in the paper-book, plot Nos. 424, 424-M, 430, B 443, 449M and 492 are not under acquisition under notification dated 10.7.2006. Plot No.428-M was purchased by Mis. Allied Construction under sale deed dated 5.12.2003, plot No.429 was purchased by Krishan Kumar son of Shankar Lal vide sale deed dated 18.9.2003, plot No.442 was purchased by Smt. Asha C under sale deed dated 18.9.2003. Plot No.430 was purchased by Vipul Kaushik and Vinay Kaushik both minors. Plot No.449 was purchased by Chandrasekhar, Naresh Kumar and Kishan Kumar under sale deed dated 18.9.2002 and plot No.450 was purchased by the same vendees under two sale deeds dated 18.9.2003 and 12.2.2004. Same was the case with regard to 0 Plot No.478. It was contended that all these plots were purchased after the resolutio.1 was passed by the Board to set up the Transport Nagar. None of the plots were recorded either in the name of M/s.Sheikhar Hotels or Shri Chandrasekhar Sharma, the appellants herein. Therefore, a preliminary objecE tion was raised on behalf of the respondents before the High Court that the writ petition was not maintainable at the instance of the writ petitioner-appellants, who not being the owners of the plot, cannot file the objection under Section 5-A of the Act. It was also pointed out that the U P. Urban Planning and DevelF opment Act, 1973 ( hereinafter to be referred to as 'the Development Act') had come into force on 12.6.1973 with the object of development of certain areas. A Master Plan was prepared under the Development Act and after the same was published and objections and suggestions were invited. Thereafter, the G Master Plan was finalized. In the said Master Plan this area was ear-marked for the Transport Nagar. At present the State Road Transport Bus Terminal is situated in the thickly populated area and there is really traffic congestio:i. The Master Plan contemplated acquisition of total area of 501.58 hectares of land H for the integrated plan for the purpose of alleviation of all the "'~ _. _ > ~ --"'"' • MIS. SHEIKHAR HOTELS & ANR. v. STATE OF 277 U.P. & ORS. [A.K. MATHUR, J.] .... > traffic problems inter alia by constructing the Transport Nagar A new Bus Stand at Delhi-Khureja and Shikarpur Roads and widening of the roads. For the purpose of establishing Transport Nagar the National Capital Regional Planning Board (hereinafter to be referred to as the Board) sanctioned a loan of Rs.20.65 crores the Development Authority for construction. But because B ~[of ][the litigation it could not proceed further and the Board is ] incurring heavy interest. It was contended that compensation to the tune of Rs.17.42 crores have already been spent. It was also pointed out that the Parliament has enacted the National Capital Region Planning Board Act (Act 11 of 1985) which came c into force on 9.2.1985. The aim of this Act is for providing common plan for National Capital Region, which includes the District Bulandshahr of State of Uttar Pradesh. This Act of 1985 was passed by resolutions of the States of Haryana, Rajasthan and Uttar Pradesh under Article 256 of the Constitution. ThereD fore, in order to have the development of the said region of the Capital Region a Corporate Body has beer, constituted with the Union Minister for Urban Development as the Chairperson and the Chief Ministers of Haryana, Rajasthan and Uttar Pradesh and Lt. Governor of Delhi as its members. Therefore, for the E development of the National Capital Region such project has been undertaken and this Planning Body has already sanctioned the aforesaid amount. In pursuance of this exercise the afore• said notification was issued dispensing with the requirement of .. Section 5-A of the Act for filing of objection as there was an > urgent need of decongesting the traffic problem and to make F the smooth traffic flow in the National Capital Region area also. Therefore, Section 5-A of the Act was dispensed with. Learned > senior counsel for the appellants submitted that dispensation of Section 5-A of the Act in the present situation was not proper and there was no proper application of mind. In support of that G > "'~ learned senior counsel invited our attention to a decision of this Court in _Union of India_ & _Ors. v. Mukesh Hans_ [(2004) 8 SCC 14]. As against this, learned senior counsel for the respondents > invited our attention to a decision of this Court in _Rajasthan Housing Bord_ & _Ors. v Shri Kishan_ & _Ors_ [(1993) 2 SCC 84] H 278 SUPREME COURT REPORTS [2008] 8 S.C.R. ..t[, ] A and another decision in _Union of India_ & _Ors. v. Praveen Gupta_ & _Ors._ [(1997) 9 SCC 78]. There is no gainsaying in the fact that this right to file objection under Section 5-A is a valuable right and the Governments are not given a free hand to dispense with Section 5-A. Section 5-A is only a safeguard against B[the arbitrary exercise ][of ][the power by the State. But one should ] also not loose sight bf the fact that invocation of such a provision is also sometimes imperative as in order to meet the urgency of the situation it needs to be invoked in public interest. It depends upon cases to case. Sometimes it may not be necesc[sary at all and the State functionaries may sometime out ][of ][over ] jealousness may invoke this provision which would seriously jeopardize the interest of the people. Therefore, it depends upon case to case where in a given situation Section 5-A has been correctly invoked and the authorities were satisfied in an objecD[tive manner. ][In ][the present case, there is no two opinion that ] because of the globalization of economy Indian economy is progressir:g with fast speed, therefore in order to keep pace with the speed, invocation of Section 5-A has become imperative. Traffic congestion is a common experience of one and all and it is very difficult to negotiate with the traffic congestion in Delhi E and National Capital region. Therefore, in the present situation, it cannot be said that the invocation of Section 5-A was for ulterior purpose or was arbitrary exercise of the power. Since the Master Plan has already been prepared and it has been approved by the Planning Board and they have sanctioned a sum F of Rs.20.65 crores for the development of this Transport Nagar and widening of the National High No.91 into four lanes. Therefore, the proposal was approved by the Board and it got the sanction from the National Capital Region Planning Board and ultimately the Government invoked the power under Section G 17(4) read with Section 5-A of the Act dispensing with the objections. In the light of these facts it cannot be said that invoking of power was in any way improper exercise. There is need for decongestion of the traffic and it is really the dire need of the hour and earliest it is implementBd, better for the people at large. H[In ][this connection learned senior counsel for the appellants in-] ,. " ~- ~ ~- 279 M/S. SHEIKHAR HOTELS & ANR. v. STATE OF U.P. & ORS. [AK. MATHUR, J] . " ~ _'+-_ vited our attention to the decision of this Court in Union of India A & Ors (supra) have held that Section 5-A is not an empty formality but it is a substantive right which can be taken away only for good and valid reason and within the limitations prescribed under Section 17 (4) of the Act. But in the present case the notification was struck down on the facts that no material was B placed on record and secondly, it was also held that discontinuance of festival for want of land and any hindrance in using the land was not there. It was also pointed out that earlier an attempt was made to acquire the land for the very same purpose for holding such festival and it was allowed to lapse by efflux of c time and consequently the Court found that there was no reference in the file to the need of invoking Section 17(4) and therefore, in a given situation. Their Lordships held that invocation of Section 17(4) of the Act was vitiated by non-application of mind by the authorities. Therefore, this case was decided on the quesD tion of fact. As against this, learned senior counsel for the respondents submitted that traffic congestion has been recognized by this Court in Union of India & Ors. v. Praveen Gupta & Ors. (supra) as urgent need. In this case, land was acquired in order to shift the timber business from the walled city of Old E Delhi as it had become the source of traffic congestion. Therefore, it was required to be urgently shifted from the existing place to relieve the congestion by acquiring the concerned land for the public purpose, namely, for establishment of timber depot. In that context, their Lordships held as follows: F " Since the acquisition is for shifting of timber business from the walled city to the outskirts of the city, shifting itself is for urgent purpose, viz., to relieve the traffic congestion in the walled city. Under those circumstances, the exercise of power under Section 17(4) cannot be said to be G unwarranted in this case. " Similarly, in Rajasthan Hosing Board & Ors. (supra) the question was with regard to acquisition of waste and arable land for housing purpose. It was observed that Government's satisfaction regarding, being subjective, when there is material H > 280 SUPREME COURT REPORTS [2008] 8 S.C.R. • • - A upon which it could have been formed fairly, court would not interfere nor would it examine the material as an appellate authority to see existence of urgency. The proposed acquisition for urban housing for weaker section and middle income group of people by Housing Board where there is a great scarcity of - B house was held to be good purpose for invoking Section 17(4) dispensing with the objection under Section 5-A. Therefore, such invocation of Section 5-A was upheld by this Court. 5. Now, reverting to the facts of this case also as pointed out above, this acquisition was made under the Master Plan C prepa,·ed under the U.P. Urban Planning and Development Act and the same got approval of the National Capital Region Planning Board and loan was sanctioned by the Board and out of which Rs.17.42 crores have already been spent. In this given case, we are of opinion that invocation of Section 17(4) read with Section 5-A of the Act was well warranted and we see no reason to interfere with the orrfer passed by the Division Bench of the High Court. Consequently, the appeal is dismissed with no order as to costs. K.K.T. Appeal dismissed.