M/S. RAJASTHAN ART EMPORIUM v. KUWAIT AIRWAYS & ANR.

Case / Petition Number:
Civil Appeal No. 9106 of 2012; Civil Appeal No. 9194 of 2012
Neutral Citation:/

Case Synopsis & Summary

This is a pair of cross appeals arising from an order of the National Consumer Disputes Redressal Commission (NCDRC) dated 01.10.2012 in Original Petition No. 229 of 1997. Rajasthan Art Emporium, an exporter of handicrafts to the USA, contracted shipments to M/s. Williams Sonoma Inc. The consignments (three shipments, 288 cartons, about 25,? tonnes) were booked on 24.07.1996 and promised to be delivered within seven days, but delivery extended into September 1996. The appellant alleged substantial delay and short-delivery, with 104 cartons reportedly not delivered and a portion lying with Lufthansa. The buyer’s complaint prompted the appellant to claim: refund of freight of Rs. 24.48 million, Rs. 20 lakh as business-loss compensation, US$7042 for short-delivered goods, plus 9% interest and litigation costs. The NCDRC initially held there was short delivery and calculated damages under Rule 22 of the Carriage by Air Act, directing payment of US$36,440, with interest from 01.10.1996. On remand by this Court (CA No. 8211 of 2003, 2011), the NCDRC assessed delay and awarded US$500,750 based on 25,037.5 kg at US$20/kg, exceeding Rs. 20 lakhs claimed, while awarding further costs and harassment compensation. The Supreme Court, after hearing both sides, held that delay was established, but refused to award beyond the relief prayed for in the complaint, and dismissed both appeals with costs to be borne by each party.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Landmark Cases
Hon'ble Judges
  • Prashant Kumar Mishra
Judgment Date
2023-11-09
Court Decision / Holding
Civil Appeals dismissed; parties to bear their own costs; pending applications disposed of.
Final Disposition
Appeals dismissed; both Civil Appeals; parties to bear their own costs.

Parties to the Case

Appellants / Petitioners

  • M/S. RAJASTHAN ART EMPORIUM

Respondents

  • KUWAIT AIRWAYS & ANR.

Provisions of Law Cited

Carriage by Air Act, 1972 – Section 19Carriage by Air Act, 1972 – Section 13(3)Rule 22(2) of Schedule-III of Carriage by Air Act, 1972Contract Act, 1872 – Section 186Contract Act, 1872 – Section 187Contract Act, 1872 – Section 188Contract Act, 1872 – Section 237Consumer Protection Act, 1986 – Section 21(a)(i)

Legal Doctrines & Maxims

  • Time is the essence of contract
  • Agency authority may be express or implied; authority to do an act includes necessary acts to perform it (principal–agent doctrine)
  • A principal is bound by acts of its agent if it induced third parties to believe in the agent's authority (ostensible/agency authority)
  • A party is not entitled to seek relief which he has not prayed for (trite law)

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant argued that the shipments were tendered for delivery within seven days, invoking time as the essence of the contract and alleging negligence by the carrier (Kuwait Airways). It contended that delay caused substantial loss of business and reputation, and that the NCDRC misapplied Rule 22 and the Carriage by Air Act. It stressed the carrier’s responsibility for timely delivery and sought full damages including the value of undelivered goods, interest, and costs, under Sections 19 and 13(3) of the Carriage by Air Act, as well as the consumer-complaint framework.

Contentions of Respondents

The respondents defended that there was no deficiency in service and that time was not necessarily of the essence of the contract. They argued the delay may have been attributable to flight routing and multiple stops, including via Chicago and Memphis, and asserted that the agent’s representations were not binding on Kuwait Airways. They also criticized the damages calculation and contended that the relief claimed exceeded what was prayed for and that the award was excessive.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (6)

Case NameCitationTreatmentExplanation
Dilawari Exporters v. Alitalia Cargo & Ors.(2010) 5 SCC 754PositiveCited to support the principle that an agent’s authority can be express or implied and that the principal is bound by its agent’s promises within the scope of authority.
Merrrs. Trojan & Co. v. RM.N.N. Nagappa ChettiarAIR 1953 SC 235Mentioned OnlyCited as part of the general proposition that relief sought must be within the prayed-for scope; not used for its specific holdings in this judgment.
Krishna Priya Ganguly v. University of Lucknow & OrsAIR 1984 SC 186Mentioned OnlyCited among authorities to illustrate the principle on limitation of relief, not for its concrete holdings in this case.
Om Prakash v. Ram Kumar & Ors.AIR 1991 SC 409Mentioned OnlyCited as supportive authority for the general principle rather than for its specific facts.
Dosukhan Samadkhan Sindhi & Ors.AIR 2010 SC 475Mentioned OnlyCited within the context of agency/contractual authority principles without direct application of its facts.
Manohar Lal (Dead) by Lrs. v. Ugrasen (Dead) by Lrs. & Ors.2010 (11) SCC 557Mentioned OnlyCited as supportive authority on general legal principles rather than its holdings.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,679 words•~13 min read

In The Court Record

M/S. RAJASTHAN ART EMPORIUM v. KUWAIT AIRWAYS & ANR.

1 **REPORTABLE** 2023 INSC 996 **==> picture [72 x 72] intentionally omitted <==** IN THE SUPREME COURT OF INDIA CIVIL APPELLATE JURISDICTION ## **CIVIL APPEAL NO. 9106 OF 2012** ## **M/S. RAJASTHAN ART EMPORIUM** ## **…. APPELLANT** ## **VERSUS** **KUWAIT AIRWAYS & ANR.** **...RESPONDENTS** ## **WITH** ## **CIVIL APPEAL NO. 9194 OF 2012** ## **J U D G M E N T** ## **PRASHANT KUMAR MISHRA, J.** These two appeals are cross appeals preferred against the order passed by the National Consumer Disputes Redressal Commission[1] dated 01.10.2012 in Original Petition No. 229 of Signature Not VerifiedDigitally signed by 1997 whereby the complaint filed by the appellant/complainant SWETA BALODI Date: 2023.11.09 16:22:05 IST Reason: was disposed of while directing respondent no. 1 to pay the > 1 (for short ‘the NCDRC’) 2 appellant/complainant US$ 500750/- or Rs. 20 lakhs is less along with 9% per annum compensation with effect from 31.07.1996 till its realization. 2. The case of the appellant/complainant is that it is an exporter of all kinds of handicrafts goods to several countries including USA. The appellant/complainant had received an order from M/s. Williams Sonoma Inc. USA for supply of handicraft goods. Accordingly, the appellant/complainant had to send three shipments of 1538 packages weighing 26,859.5 kg. to the consignee on an urgent basis, which was specifically informed to the respondents. On 22.07.1996, the goods were tendered to respondent no. 1 through respondent no. 2 after getting an assurance that the shipments will reach destination at Memphis within 7 days and delivery schedule was handed over to the appellant/complainant. As per the schedule, the entire consignment was supposed to reach at Memphis by 31.07.1996. 3. The consignments did not reach the destination at Memphis (USA) as per the delivery schedule. On enquiry, respondent no. 1 expressed its inability to deliver the consignments as per the delivery schedule provided to the 3 appellant and a revised delivery schedule was given on 05.08.1996, which mentioned the date of delivery on 06.08.1996. However, the consignment did not reach at the destination even as per the revised delivery schedule. 4. On non-receiving the goods, the consignee expressed its anguish by sending a letter dated 23.08.1996 and informed the complainant that the goods are not received in toto, and respondent no. 1 was unable to tell where the remaining cartons are. 5. It is also on record that 69 cartons were lying with Lufthansa. The respondent no. 1, by its letter dated 30.08.1996 addressed to respondent no. 2, accepted the short delivery. On 07.09.1996, the appellant/complainant made a modest claim against the respondents for refund of full freight. In response to the said claim, respondent no. 2 confirmed having short delivered 104 cartons out of 288 cartons but did not state whether the other cartons had arrived at the destination. The appellant served the legal notice dated 04.08.1997 on the respondents, which evoked no response. 6. Ultimately, the appellant/complainant lodged a complaint before the NCDRC with the prayer that respondent no. 1 be 4 directed to refund a sum of Rs. 24,48,345/- being the fair charges for the consignments; pay a sum of Rs. 20 lakhs as compensation for loss of business and reputation; pay US$ 7042.00 being the value of the goods short delivered; pay interest @ 18% as well as cost of litigation, which was disposed of as abovesaid. Hence these appeals. 7. Learned counsel for the appellant would submit that admittedly, the shipments booked by the appellant on 24.07.1996, which were to be delivered by 31.07.1996, were delivered to the handling agent of the Consignee only in the month of September, 1996 from 03.09.1996 to 12.09.1996 with delay of more than 40 days. 8. Learned counsel submitted that the goods were tendered to respondent no. 1 on a specific representation that the same will be delivered within seven days, therefore, time is the essence of the contract between the parties. It is next argued that in the case in hand, it is clear from the material on record that respondent no. 1 has been highly negligent in rendering its services to the appellant. 9. Learned counsel further submits that once the NCDRC arrives at the conclusion that there is delay in delivery of 5 consignment due to negligence of respondent no. 1, fair, just and reasonable compensation must be awarded in accordance with conditions of the contract and statutory provisions of the Carriage by Air Act, 1972. 10. _Per contra_ , learned counsel for respondent no. 1 submitted that there was no deficiency in service rendered by respondent no. 1. All reasonable care in performing its duties under the contract of carriage were discharged diligently. He would submit that no specific instructions were given by the appellant with regard to the time by which the consignments had to reach its destination, therefore, time was not the essence of contract entered into between the parties. 11. Learned counsel next submits that respondent no. 1 should not be held liable for delay in service, as in spite of being aware of the fact, the appellant sent the consignment through Kuwait Airways, which has various stops over at Kuwait, Chicago and Memphis, which would consume a lot of time period to deliver the consignment. 12. Learned counsel lastly submits that the compensation awarded by the NCDRC is excessive, unjust and unfair and is based on the conjectures and surmises. 6 13. We have heard learned counsel for the appellant as well as the respondents at length and perused the material placed on record meticulously. 14. Initially, the NCDRC passed a final order on 21.05.2003 holding that there has been a short delivery of 104 pieces equal to 1822 Kgs. Therefore, in view of Rule 22 of Carriage by Air Act, multiplying this weight by US $ 20 per Kg., the amount payable work out to US $ 36440 which becomes payable by the respondent to the complainant for the loss of goods. This amount was directed to be paid by the respondent along with interest @ 9% from 01.10.1996. In so far as the issue concerning delay in delivering the consignment, the NCDRC found that in the absence of any communication emanating from the respondent No.1-Kuwait Airways promising to deliver the goods by any particular date, the plea raised by the complainant regarding delay in delivering the goods is not sustainable. 15. Challenging the above order dated 21.05.2003 of the NCDRC, the complainant preferred Civil Appeal bearing C.A.No. 8211 of 2003 which was allowed by this Court on 15.03.2011. 7 This Court observed that the issue concerning delay in delivery of goods has been decided by NCDRC without appreciating the material and evidence available on record. Resultantly, the matter was remitted back to NCDRC for fresh consideration of the complainant case vis-à-vis delay in delivering the consignment. 16. After the remand, the present impugned order has been passed holding that there was delay in delivering the consignment on time for which the complainant is entitled to compensation of 25037.5 Kg. multiplied by US $ 20 Kg. each which comes to US $ 500750 which exceed the sum of Rs. 20 lakhs claimed by the complainant therefore the complainant was only entitled to have compensation of Rs. 20 lakhs along with interest @ 9% w.e.f. 31.07.1996 till its realization as also the litigation charges and compensation for harassment and mental agony in the sum of Rs. 5 lakhs. 17. Basing on the material available on record, the NCDRC has held that the fax message sent by respondent No.2-agent through whom the consignment was booked to be shipped by the respondent No.1 goes to show that the goods shall be 8 delivered at Chicago Memphis on 29.07.1996, 31.07.1996 and 31.07.1996. However, when the consignment did not reach the destination, appellant - M/s Rajasthan Art Emporium informed the respondents whereafter, the respondent no. 2 provided a revised schedule, however, the shipments did not reach the destination even as per the revised schedule, according to which the goods were to reach the destination on 06.08.1996. 18. The evidence on record shows that the parts of the shipments were received at Memphis on 30.08.1996 as admitted by the respondent No.1 in its letter dated 24.09.1996. Referring to the documents showing business relation between complainant and his buyer, the NCDRC would observe that the buyer was the largest customer of the complainant. Thus, the complainant has suffered huge loss due to transaction and the goods were received in the first week of September, 1996. 19. We have perused and examined the material available on record and we are satisfied that the NCDRC has not committed any illegality or perversity in recording the finding that there was delay in delivery of consignment. As a matter of fact, it is an admitted position that the consignment which was booked 9 on 24.07.1996, was delivered after one and a half month i.e. from 03.09.1996 to 12.09.1996. 20. In its reply before the NCDRC, the agent-respondent No.2 (Dagga Air Agents) admitted that at the time of booking, the complainant was informed about the tentative date of arrival of goods at Memphis by 31.07.1996 and thereafter a revised schedule was also given to the complainant. Once the agent has issued a time schedule for delivery of consignment, it cannot be said that there is no material indicating that there was no agreement for delivery of the consignment in time. respondent no.1 – Kuwait Airways has never taken the stand in any of the communication arising from its office that the respondent No.2 is not its agents or that there was no agreement or promise by its agent that the consignment will be delivered in 07 days. The NCDRC has rightly noted that the appellant has paid air freight which is ten times more than the sea freight only to ensure that the consignment reaches its destination within a week because sea cargo would have taken 25 to 30 days for delivery and the appellant has paid such huge freight charges for ensuring early delivery, hence, the delay in delivery of consignment has necessarily inflicted damage to the 10 appellant which is liable to be satisfied by the respondent No.1 as provided under Section 19 and 13(3) of the Carriage by Air Act 1972. 21. The provisions contained in Section 19 and 13 (3) of the Carriage by Air Act 1972 read as follows: “19. The carrier is liable for damage occasioned by delay in the carriage by air of passengers, luggage or goods.” “13 (3). If the carrier admits the loss of the goods, or if the goods have not arrived at the expiration of seven days after the date on which they ought to have arrived, the consignee is entitled to put into force against the carrier the rights which flow from the contract of carriage.” By virtue of the above provisions, the consignee is entitled to seek damages for delay in delivering the consignment. It is not the case of the respondent No.1 that the respondent No.2 had acted beyond the terms of agency. Neither it is averred that the respondent no.2 was not the agent of respondent No.1. 22. Section 186 of the Contract Act, 1872 provides that authority of an agent may be expressed or implied. Similarly, Section 188 of the Contract Act, 1872 prescribes that an agent, 11 having an authority to do an act, has authority to do every lawful thing which is necessary in order to do such act. In _**Dilawari Exporters v. Alitalia Cargo & Ors.[2]**_ this Court has observed in Paragraph 17 to 20 as follows: - **“** 17. Section 186 of the Contract Act, 1872 (for short “the Contract Act”) lays down that the authority of an agent may be expressed or implied. As per Section 187 of the Contract Act, an authority is said to be express when it is given by words spoken or written, and an authority is said to be implied when it is to be inferred from the circumstances of the case; and things spoken or written, or the ordinary course of dealing, which may be accounted circumstances of the case. 18. Section 188 of the Contract Act prescribes that: “188. Extent of agent's authority.—An agent, having an authority to do an act, has authority to do every lawful thing which is necessary in order to do such act.” 19. Section 237 of the Contract Act provides that: “237. Liability of principal inducing belief that agent's unauthorised acts were authorised.—When an agent has, without authority, done acts or incurred obligations to third persons on behalf of his principal, the principal is bound by such acts or obligations if he has by his words or conduct induced such third persons to believe that such acts and 2 _(2010) 5 SCC 754_ 12 obligations were within the scope of the agent's authority.” 20. There is no gainsaying that onus to show that the act done by an agent was within the scope of his authority or ostensible authority held or exercised by him is on the person claiming against the principal. This, of course, can be shown by practice as well as by a written instrument. Thus, the question for consideration is whether on the evidence obtaining in the instant case, can it be said that Respondent 3 had an express or implied authority to act on behalf of Respondent 1 as their agent? If Respondent 3 had such an authority, then obviously Respondent 1 was bound by the commitment Respondent 3 had made to the appellant.” 23. In the case at hand, in the absence of a plea by the respondent No.1, that the respondent no. 2 was not its agent or that he had no authority to give schedule of delivery of consignment, the onus has not been discharged. Therefore, the respondent No.1 is bound by the promise held by its agent - respondent No.2, that the goods shall be delivered within one week and when the time schedule expired and the goods were, in fact, delivered after one and a half month, there was negligent delay in delivery of consignment. 13 24. The grievance of the appellant in this appeal is mainly on account of the NCDRC not allowing the entire claim for compensation by calculating the total weight of the subject consignment at 2507.5 Kg. multiplied by US $ 20 per Kg. According to the appellant, in view of Rule 22 (2) of Schedule-III of the Carriage by Air Act, 1972 (as amended by the Hague Protocol) the amount thus calculated would exceed the sum of Rs. 20 lakhs. The appellant would thus claim the entire amount equivalent to US $ 50070 without limiting it to Rs. 20 lakhs. However, on this point also, we approve and sustain the order passed by the NCDRC for the reason that in its complaint under Section 21(a)(i) of the Consumer Protection Act, 1986, the complainant/appellant has sought damages for Rs. 20 lakhs only as compensation for loss of business and reputation. It is a trite law that a party is not entitled to seek relief which he has not prayed for. For this proposition we may profitably refer to this Court’s judgments in _**Merrrs. Trojan & Co. Vs. RM.N.N. Nagappa Chettiar[3] , Krishna Priya Ganguly etc. etc. Vs. University of Lucknow & Ors[4]**_ ., _**Om Prakash & Ors. Vs. Ram Kumar & Ors[5] .**_ , _**Bharat Amratlal Kothari Vs.**_ > 3 _AIR 1953 SC 235_ > 4 _AIR 1984 SC 186,_ 5 _AIR 1991 SC 409_ 14 _**Dosukhan Samadkhan Sindhi & Ors[6]**_ ., **Manohar Lal (Dead) by Lrs. Vs. Ugrasen (Dead) by Lrs. & Ors** .[7] 25. In view of the forgoing reasons, we are not inclined to interfere with the Order passed by the NCDRC and resultantly both the Civil Appeals deserve to be and are hereby dismissed. The parties shall bear their own costs. Pending application(s), if any, shall stand disposed of **==> picture [219 x 29] intentionally omitted <==** ………………………………………J. (PRASHANT KUMAR MISHRA) NOVEMBER 09, 2023. NEW DELHI. 6 _AIR 2010 SC 475_ 7 _2010 (11) SCC 557_
End of Judgment Record
Browse All Landmark Cases Judgments
2019-01-22

State of Himachal Pradesh & Anr. v. Pinju Ram & Others; State of Himachal Pradesh & Ors. v. Ganesh Dutt & Anr.

This batch of appeals concerns regularisation and monetary benefits of part‑time employees in Himachal Pradesh who were converted to daily‑wage status. The State had issued a policy on 27 February 2004: part‑time Class‑IV employees who had completed ten years of continuous service as on 31 December 2003 would be made daily wagers with prospective effect, and posts vacated by such employees would stand abolished; Education and Ayurveda were excluded from the policy. Revenue Chowkidars, engaged by Panchayats, were not covered by that policy and received separate treatment. Following writ petitions and an order of the Himachal Pradesh High Court and in light of later developments, the State drew‑up directions in 2011 (22 September) to give seniority to Revenue Chowkidars on the basis of ten years of service, but with wages from the date of actual appointment and without back‑dated monetary benefits; 7 July 2012 further instructions reiterated this stance for remaining part‑time employees, with monetary benefits not guaranteed in the interregnum. The respondents pressed for back wages dating from 1 January 2007 and broader coverage. The Supreme Court held that the 2007 back‑pay direction was unsustainable, clarified that seniority would count from ten years without past benefits, and that the 2011 policy and Moti Singh principle should guide the approach. The appeals are allowed; no costs. The related writ petitions are to be disposed of consistent with these directions.

2018-08-14

Union Bank of India and Others v. C.G. Ajay Babu and Anr.

This is a Supreme Court of India appeal concerning the forfeiture of gratuity under the Payment of Gratuity Act, 1972. The respondent was a branch manager of the appellant bank and was dismissed on 3 June 2004 after disciplinary proceedings. A show-cause notice sought to forfeit gratuity due to misconduct involving moral turpitude, which was ordered on 20 April 2004. The High Court upheld the dismissal but held that gratuity could be paid since there was no financial loss to the bank, and that a bipartite settlement between the bank and employees permitted forfeiture only where misconduct caused financial loss. The Division Bench, however, held that forfeiture under Section 4(6) must be read together with Section 4(5) and that no loss was proven, thus entitling the employee to gratuity in accordance with the bipartite settlement. The Supreme Court agreed with the High Court that forfeiture is not automatic; it is controlled by Sections 4(5) and 4(6) of the Act and by the bipartite settlement, which requires loss to justify forfeiture. The Court emphasized that an act must constitute an offence involving moral turpitude and that conviction is generally required for forfeiture under 4(6)(b)(ii). The appeal is dismissed with no costs.

2018-09-25

Reema Salkan v. Sumer Singh Salkan

This is a Supreme Court of India criminal appeal under the Criminal Appellate Jurisdiction arising from a maintenance dispute under Section 125 Cr.P.C. The parties, married in 2002, had a protracted litigation history. The Family Court granted maintenance to the wife from 17 July 2003 to 8 December 2010, and held no maintenance thereafter. The High Court, in revision, partly allowed the application, directing Rs.9,000 per month from 9 December 2010 onward, while upholding the earlier period’s Rs.10,000 per month. This Court had earlier granted interim maintenance of Rs.20,000 per month in 2014 (Criminal Appeal Nos. 2347-2349 of 2014). The appellant contends there has been no change in circumstances since the interim order and that the respondent’s substantial assets, education, and overseas earnings establish the capacity to pay higher maintenance. The respondent defends the High Court’s reasoning, arguing that the Family Court’s assessment, demeanor observations, and the principle that maintenance should not be perpetual require careful scrutiny, and that the notional minimum wage approach used by the High Court is flawed. The overarching issue is the quantum of monthly maintenance payable to the appellant and whether the interim amount should be augmented beyond the period up to 2010.”

2019-12-03

M/s Embassy Property Developments Pvt. Ltd. v State of Karnataka & Ors.

This judgment concerns three Civil Appeals filed by a Resolution Applicant, the Corporate Debtor (through its Resolution Professional) and the Committee of Creditors, challenging an Interim Order of the Karnataka High Court staying an NCLT order in proceedings under the Insolvency and Bankruptcy Code, 2016. The NCLT Chennai had admitted an application under Section 7 of the IBC against M/s Tiffins Barytes Asbestos & Paints Ltd. and directed a moratorium under Section 14. The Interim Resolution Professional then sought a deemed extension of a mining lease under MMDR Act, 1957 and the Government of Karnataka rejected it. The NCLT, by an order dated 11.12.2018, set aside the Government’s order and directed execution of Supplement Lease Deeds for the period up to 31.03.2020. The Government of Karnataka challenged this in a High Court writ petition, which stayed the impugned NCLT order. The core issues were: (i) whether the High Court may interfere under Article 226/227 with an NCLT order in IBC when an appeal lies to the NCLAT, and (ii) whether fraud can be inquired into by NCLT/NCLAT in CIRP. The Court reiterates that IBC is a complete, umbrella code with a three‑tier mechanism (NCLT, NCLAT, Supreme Court) and that public‑law disputes arising from MMDR Act obligations lie outside IBC. It ultimately holds that while NCLT/NCLAT may inquire into fraud, they cannot adjudicate MMDR‑related public legal disputes; and the High Court’s writ jurisdiction in public‑law contexts remains permissible. The appeals are dismissed.