These five CRPs arise from land acquisition references where a decree holder, M/S Periyar and Pareekanni Rubbers Ltd., seeks enforcement of enhanced compensation and solatium. The issues relate to how the acquired land value was calculated: the dry land value adopted by the authorities and the capitalization of rubber-tree value used for the rubber plantation. The Reference Court awarded enhanced compensation for both land and trees, but one decree was reduced on appeal. The execution courts initially held that solatium was payable only on the enhanced value of the bare land, not on the land including trees, a view the Government Pleader later conceded was incorrect. The applicants argued solatium on the entire land, including the rubber trees, with appropriate credit for amounts already paid toward the trees, and urged that the decree reflect the full enhanced value to avoid duplication. The respondents contended that the decrees did not expressly provide solatium on the tree portion and urged adherence to the decree’s terms, with permissible rectification for credit already paid. The High Court, applying Supreme Court precedents Gurpreet Singh v Union of India and Sunder’s case, held that interest on solatium is recoverable in pending executions from 19 September 2001 and that execution courts may apply the ratio where solatium is not explicitly addressed in the decree. The revisions are disposed of with directions for fresh computation, credits, and appearance on 24 May 2010.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • S.S. Satheesachandran
Judgment Date
2010-04-07
Court Decision / Holding
The Civil Revision Petitions (CRP Nos. 196, 199, 201, 205, 208 of 2009) are disposed of. The execution court is directed to examine the claims and re-calculate the amount due on solatium for the enhanced compensation, including the value of rubber trees, with appropriate credits for sums already paid. The court should apply the Gurpreet Singh v Union of India principles, consider the date from which interest on solatium may be recoverable (19-09-2001), and ensure no reappropriation or duplicative payment. If necessary, decree corrections may be effected without delaying release of the amount already in deposit. The parties are to appear on 24-05-2010 to finalize the adjustments.
Final Disposition
Disposed of

Parties to the Case

Appellants / Petitioners

  • M/S Periyar and Pareekanni Rubbers Ltd.

Respondents

  • State of Kerala
  • Special Tahsildar LA, PVJ Project, Perumbavoor
  • Government Pleader

Legal Representation & Advocates

Counsels for Petitioners

  • • Joseph Kodianthara
  • • Mathews K. Uthuppachan
  • • Terry V. James

Counsels for Respondents

  • • Government Pleader Sri. M.R. Sabu

Provisions of Law Cited

Constitution of India, Article 141Constitution of India, Article 142

Legal Doctrines & Maxims

  • Execution court cannot go behind the decree
  • Reappropriation or fresh appropriation is not to be made
  • Plenary powers under Articles 141 and 142 of the Constitution

Submissions & Arguments

Contentions of Appellants / Petitioners

The applicants contended that solatium must attach to the enhanced compensation for the entire land, including rubber trees, and that credits for amounts already paid toward the trees must be taken into account. They argued that the decree should reflect the full enhanced value and prevent duplication of payment. They urged that the decrees be read in light of the Supreme Court’s rulings, and that interest on solatium in pending executions be permitted as per Gurpreet Singh and Sunder’s case. They proposed to file a statement showing credits and requested prompt release subject to proper adjustment.

Contentions of Respondents

The respondents contended that solatium on the enhanced compensation for the land including trees was not expressly included in the decrees; the execution court should reflect the decree’s terms, with rectification limited to credits already paid. They supported maintaining computation with proper credits and avoiding duplicative payments, while acknowledging the need to determine entitlement to interest on solatium as per apex court guidance.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
Gurpreet Singh v Union of India2008(1) KLJ 463 (SC)PositiveCited to support entitlement to interest on solatium from 19 Sept 2001 and application of ratio in pending executions.
Sunder's case—PositiveUsed to establish that execution courts cannot go behind decrees; ratio applied to include solatium when not expressly provided and to allow interest timing from 19 Sept 2001.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,281 words•~11 min read

In The Court Record

M/S Periyar and Pareekanni Rubbers Ltd. v. State of Kerala

IN THE HIGH COURT OF KERALA AT ERNAKULAM PRESENT : THE HONOURABLE MR. JUSTICE S.S.SATHEESACHANDRAN WEDNESDAY, THE 7TH APRIL 2010 / 17TH CHAITHRA 1932 CRP.No. 196 of 2009() --------------------AGAINST THE ORDER DATED 15/10/2008 IN EP 152/96 IN LAR.427/1988 of I ADDL.SUB COURT,ERNAKULAM .................... REVN. PETITIONER(S): --------------------- M/S PERIYAR AND PAREEKANNI RUBBERS LTD., PALAI, REPRESENTED BY ITS DIRECTOR, MR. THOMAS MATHEW. BY ADV. SRI.JOSEPH KODIANTHARA SRI.MATHEWS K.UTHUPPACHAN SRI.TERRY V.JAMES RESPONDENT(S): --------------- STATE OF KERALA, (SPECIAL TAHSILDAR LA) PVJ PROJECT, PERUMBAVOOR. GOVERNMENT PLEADER ADV.SRI.M.R.SABU THIS CIVIL REVISION PETITION HAVING BEEN FINALLY HEARD ON 07/04/2010, ALONG WITH CRP NO. 199 OF 2009 CRP NO. 205 OF 2009 CRP NO. 208 OF 2009 CRP NO. 201 OF 2009 THE COURT ON THE SAME DAY PASSED THE FOLLOWING: ## S.S.SATHEESACHANDRAN, J ------------------------------------C.R.P Nos.196, 199, 201, 205 AND 208 OF 2009 -------------------------------Dated this the 7[th] day of April 2010 ## ORDER The revision petitioner in all these revisions are the same, a Public Limited Company, which is the decree holder in five decrees passed in land acquisition references and executed before the Sub Court, Ernakulam. Though separate orders have been passed by the execution court in execution of the decrees as common questions of law are involved all these revisions, after being heard together, they are disposed under this common order. The disputes involved in these revision lie within the narrow compass. In the acquisition of land from the revision petitioner company the land acquisition authorities adopted two methods of valuation for fixing the value of the land. In respect of the dry land covered by the acquisition the land value was taken as the basis of the assessment and in respect of the rubber plantation covered by the acquisition capitalization of the rubber trees fixing value of such trees was adopted to fix the market value of the land. Accordingly awards were passed in respect of the land covered in each of the cases. Enhanced compensation was awarded by the reference court after taking evidence of both sides. There was an appeal from one of the decrees passed, ie, in L.A.R No.463 of 1988 before this C.R.P Nos.196, 199, 201, 205 AND 208 OF 2009 Page numbers court. In that appeal enhanced compensation awarded by the reference court from that decree was reduced. The limited question that arose in execution was with respect to the solatium payable on the compensation awarded for the acquired land. The execution court was of the view that under the terms of the decree solatium was payable only on the enhanced value of compensation provided by the court in respect of the land separately valued, and not in respect of the land comprising the trees though enhanced compensation of a higher value than what was fixed by the land acquisition authorities was awarded with respect of the land comprising the trees as well by the reference court. In that view of the matter the execution court in all these cases has held that the claimant/decree holder company is entitled to claim solatium only in respect of the enhanced compensation provided for the land alone which has been separately fixed, but, not in respect of the trees (land comprising such trees) which was separately fixed under the reference court in its decree. The learned Govt. Pleader fairly conceded that the execution court was not correct in holding that solatium was payable only for the enhanced compensation provided for the land alone but not in respect of the enhanced compensation provided for the land comprising the trees, where the value of the C.R.P Nos.196, 199, 201, 205 AND 208 OF 2009 Page numbers trees had been fixed for the purpose of valuation of the land. It is submitted that the land acquisition authorities have fixed the value of the land comprising the trees on the basis of the capitalisation method with reference to the value of the trees. Statement prepared by the land acquisition officer has also been brought to my notice showing that the claimant was awarded compensation in respect of the land for the entire area, but, adopting two different methods, one for the dry land and the other for the rubber plantation with reference to the value of the trees. So it goes without saying that the claimant/decree holder in the present case is entitled to get solatium for the enhanced compensation awarded for the market value of the entire land as adjudged by the court, but, and in one case ie, L.A.R 463 of 1988 as modified in appeal by this court. The impugned order passed by the execution court in such circumstances is liable to be set aside and the case to be remitted for examining afresh the actual amount due on solatium on the enhanced compensation to the claimant company. 2. In the quantification made by the court below under the impugned order, it is submitted, interest has been calculated only on the enhanced compensation awarded for the bare land, but not the land covered by the trees and so much so a C.R.P Nos.196, 199, 201, 205 AND 208 OF 2009 Page numbers reascertainment of the actual amount due with interest has to be made afresh. In the given facts of the case another question may also arise for consideration with respect to the entitlement of the claimant/decree holder on the interest due on the sum as solatium. Whether the claimant was entitled to interest on solatium was not considered when adjudication of the enhanced compensation was made in four among five of the references covered by the proceedings. In L.A.R No.463 of 1988 though the reference court did not consider that question, it is submitted, in appeal this court has held the claimant is not entitled to interest on solatium. So much so, the claimant cannot claim interest on solatium in that case L.A.R No.463 of 1988)as there is a conclusive and final decision holding that on the compensation awarded under that decree he is not entitled to claim interest on solatium. With respect to his entitlement for interest on solatium on the enhanced value in the other decrees covered by L.A.R No.427/1988, 434/1988, 456/1988 and 458/1988 it is necessary to examine such claim with reference to the law laid down by the apex court in **“Gurpreet Singh v Union of India” (2008(1) KLJ (SC) 463).** In the above decision, the apex court, considering the entitlement of a decree holder/claimant to claim interest on solatium in execution of the decree granting enhanced C.R.P Nos.196, 199, 201, 205 AND 208 OF 2009 Page numbers compensation by the reference court has held thus: That question is whether in the light of the decision in Sunder, the awardee/decree holder would be entitled to claim interest on solatium in execution though it is not specifically granted by the decree. It is well settled that an execution court cannot go behind the decree. If, therefore, the claim for interest on solatium had been made and the same has been negatived either expressly or by necessary implication by the judgment or decree of the Reference Court or of the appellate court, the execution court will have necessarily to reject the claim for interest on solatium based on Sunder on the ground that the execution court cannot go behind the decree. But if the award of the Reference Court or that of the appellate court does not specifically refer to the question of interest on solatium or in cases where claim had not been made and rejected either expressly or impliedly by the Reference Court or the appellate court, and merely interest on compensation is awarded, then it would be open to the execution court to apply the ratio of Sunder and say that the compensation awarded includes solatium and in such an event interest on the amount could be directed to be deposited in execution. Otherwise, not. We also clarify that such interest on solatium can be claimed only in pending executions and not in closed executions and the execution court will be entitled to permit its recovery from the date of the judgment in Sunder (19.09.2001) and not for any prior period. We also clarify that this will not entail any reappropriation or fresh appropriation by the decree holder”. (emphasis supplied) The apex court has clarified the position as above making it clear that it was done under the plenary powers enjoyed by that court under Article 141 and 142 of the Constitution of India indicating that all courts in all pending execution proceedings have to consider and apply the principle evolved as the law applicable to be followed. So much so, in the present case the claimant/decree holder as indicated earlier is entitled to claim C.R.P Nos.196, 199, 201, 205 AND 208 OF 2009 Page numbers interest on solatium, ie, in all cases except L.A.R No.463/1988 in which the claim of interest on solatium was considered and negatived in appeal by this court. But such interest on solatium in the above cases is allowable only from 19.09.2001, the date of judgment in Sunder's case. Another question may also have to be adverted before closing of the proceedings as it may otherwise give rise to complications if not referred to, in the computing of the amount due to the decree holder giving credit to interest on solatium. In cases of this nature in execution proceedings care has to be taken that the interest on solatium from the date of pronouncement of Sunder's case(19.09.2001) has to be calculated under separate head and it cannot be taken together with the other claims as clarified by the appellate court that reappropriation or fresh appropriation is not to be made with respect to such claim. So much so, in arriving at the actual amount due to the judgment debtor after following the appropriation method as directed in Gurpreet Singh's case and finding out the actual sum due to the decree holder it is necessary to calculate the interest on solatium from 19.09.2001 on the solatium fixed separately and then only it has to be added to the amount arrived at. The clarification made by the apex court with respect to the sum payable towards interest on C.R.P Nos.196, 199, 201, 205 AND 208 OF 2009 Page numbers solatium from the date of pronouncement on 19.09.2001 will not entail reappropriation or fresh appropriation by the decree holder with reference to the part payments/deposits has to be taken into account by the court in ascertaining the amount due to the decree holder. The execution court is directed to examine the claims raised in the execution petition taking note of the observations as above. 3. The learned Govt. Pleader submitted that in the decree passed in this cases an apparent mistake has crept in which require to be rectified by moving a review petition as provided by law. Value of the rubber tree was fixed in all these cases by the reference court at Rs.1,802/- per tree and on that basis a decree was passed awarding enhanced compensation with respect to the trees in favour of the claimant. However in the operative portion of the decree, it is submitted by the learned Govt. Pleader, the amount already paid towards the trees which varied in each case with respect to the age and yield of the trees were not at all taken into account and so much so it has given rise to a duplication of the claim compelling the State to pay the amount which had been awarded under the award towards the trees again on the basis of the valuation made by the reference court. It is further submitted that the mistake can be easily C.R.P Nos.196, 199, 201, 205 AND 208 OF 2009 Page numbers rectified by making suitable modification in the decree providing for reduction of the amount quantified towards the value of the trees, whatever be its value with reference to age and yield, which had already been paid under the award to the claimant. The learned counsel appearing for the claimant fairly conceded that there is some force in the submission made by the learned Government Pleader. But it is pointed out that if proceedings are taken for decree correction to effect the rectifications as suggested by the Govt. Pleader it would further delay and hamper the release of the compensation amount to the claimant which is stated to be under deposit of the court. The learned counsel therefore submitted that the claimant would file a statement giving credit to whatever amount that has been paid towards the rubber trees in the award by the land acquisition authorities and in the execution after giving adjustment to that amount the balance compensation alone will be applied for. Orders being passed by the court on such statement satisfaction of the decrees can also be made by the claimant, is the submission of the learned counsel for the claimant/ revision petitioner. Submission made as above is recorded. In case a statement is filed by the claimant/decree holder in the lines indicated by the learned counsel giving credit to the amount C.R.P Nos.196, 199, 201, 205 AND 208 OF 2009 Page numbers already received towards the valuation of the trees fixed by the land acquisition authorities in the enhanced compensation for such trees fixed by the reference court the execution court can proceed with the execution without awaiting for orders on proceeding for rectification of the decree, and pass appropriate orders on quantification of the amount and its release, recording satisfaction of the decrees in the case. Subject to the above directions/observations, the revisions are disposed of. Parties are directed to appear before the court below on 24/05/2010. Sd/S.S.SATHEESACHANDRAN JUDGE //TRUE COPY// P.A TO JUDGE vdv
End of Judgment Record
Browse All High Court of Kerala (2010) Decisions
2010-09-09

T.K. Biju and Gangaprasad S. v. State of Kerala and The Director, Institute of Human Resources Development (IHRD)

This batch of writ petitions challenges the Institute of Human Resources Development’s (IHRD) recruitment process for the Last Grade Service under notification RECT/03/09/HRD (dated 21.1.2009). The core questions concern the validity of the 23.8.2009 written test, the 23.10.2009 short list (main and supplementary) drawn therefrom, and the 19.3.2010 rank list published after interviews. Petitioners—mostly former daily wage/ad hoc employees—also pursue regularisation, arguing that the selection framework and weightage for past service were either discriminatory or inadequately applied. Ext.P4 had disposed of earlier petitions by directing IHRD to finalise recruitment under a resolution dated 9.7.2007, and Ext.P5 laid down the recruitment rules: an objective written test (70 marks) and an interview (30 marks) with category-wise cut-offs (Rule 5.3) and a rank list valid for three years (Rule 5.4). The court holds that deviations such as clause 8 in the hall ticket do not render the process void in the absence of prejudice, and upholds the short-list’s legality to a large extent. However, drawing on Umadevi (3) and Satya Prakash, the court ultimately directs a limited revisiting of the rank list to grant weightage under Rule 5.2 to those petitioners who would have been included, while denying general regularisation. All petitions are disposed with these directions.

2010-01-21

State of Kerala and District Collector, Kollam v. K. Raghavan

This is a review petition filed by the State of Kerala and the District Collector, Kollam, challenging the High Court’s 23 March 2009 judgment in W.P.(C).29695 of 2005, which directed the Government to consider a freedom fighter’s pension claim and to grant pension from the date of application. The petition traces a long history: the applicant, aged about 75 at the time of filing on 29.12.1995, faced earlier adverse orders in 1987 and 1989; after litigation, the 2005 judgment directed reconsideration and culminated in a 2009 order granting pension in December 2009 but from the date of sanction rather than from the date of application. The review petition contends that the Supreme Court’s decision in State of M.P. and Another v. Devkinandan Maheshwari (2003) and a Division Bench decision followed in W.A. Nos.1419/2006 & 1818/2006 require pension from the date of sanction, not the application date, and thus the judgment should be recalled. It also relies on Dokka Samuel v. Dr. Jacob Lazarus Chelly (1997) to assert that omitting authorities is not a ground for review. The Court, however, finds that omission to cite authorities cannot ground a review and that the government’s delay in compliance violates the Court’s directions, warranting dismissal of the review petition with costs.

2010-02-23

Anitha Rajan v. Revenue Divisional Officer, Thrissur; Thasildar, Chavakkad; Village Officer, Nattika; Sub Registrar, Thriprayar

Anitha Rajan, the petitioner, purchased 50 cents of land in Re-Survey No.166/1, Nattika village, Thrissur district, from the legal heirs of late Gangadharan via Ext.P3 sale deed registered at Triprayar. The conveyance, through power of attorney documents Ext.P1 (executed by Ajayan in Dubai in favor of his mother Rathnabhai) and Ext.P2 (executed by Usha in India), prompted mutation proceedings before the Revenue Divisional Officer (RDO). The RDO refused to effect mutation unless the original Ext.P1 POA was produced for adjudication of stamp duty under the Kerala Stamp Act, 1959, claiming non-compliance with stamping and the need to determine stamp duty under sections 31 and 32. The petitioner contends that it is not mandatory to submit every PoA executed outside India for adjudication; only instruments chargeable with duty which cannot be stamped by private persons must be taken to the Collector under section 18(2). Ext.P1, though executed abroad, is on Indian stamp paper and was presented at registration, having been stamped Rs.150 under Article 44(f). The court analyzed sections 18(1), 18(2), 31 and 32 and held that section 18 applies to instruments executed outside India; since Ext.P1 is duly stamped, Section 18 has no application and Sections 31-32 cannot be invoked to compel production. Relying on Madras High Court decisions Manoharan v. Velu and R.B.K. Rajeswari Nachiar, the court held the Village Officer erred in requiring Ext.P1 before the RDO, quashed Exts.P4 and P6, and directed mutation actions to be completed within two months of certified judgment copy.

2010-03-23

V. Mohanan Nair v. Babu Pillai and others

This writ petition arises from a complex land dispute in Nedumangad where the petitioner, V. Mohanan Nair, challenged a trial court order that set aside a commissioner's report and remitted for a fresh report. In O.S. 380/2005 the plaintiff sought a permanent injunction; in O.S. 542/2005 the second respondent sought declaration of title and possession based on deeds executed in 2005. To resolve the location of the plaint schedule property, a commission was appointed, and Ext. P2 report and plan were filed. Subsequently, I.A. 4808/2009 was filed by the second respondent seeking to set aside the commission report and plan and remit for a fresh report. The trial court remitted the matter; Ext.P8 records the order, which the petitioner challenged in this Writ Petition. The respondents relied on a decision in Sarojini v. Karthiyani Amma to contend that Article 227 petitions against commission reports are not maintainable, while the petitioner argued lack of justification for remitting and the undue delay in filing the petition. The Kerala High Court, while recognizing the normal reluctance to exercise visitorial jurisdiction, held that exceptional circumstances permit interference under Article 227 and remanded the matter for fresh consideration, directing that the trial court assess sufficiency of Exts. C1, C1(a), C1(b) and allow further inspection if needed. The result is a remand to ensure a fair adjudication on the commission report."