M/s New India Assurance Co. Ltd. v M/s Luxra Enterprises Pvt. Ltd. & Anr. (Civil Appeal No. 9668 of 2014) and M/s Luxra Enterprises Pvt. Ltd. & Anr. v M/s New India Assurance Co. Ltd. (Civil Appeal Nos. 4371-4372 of 2015)

Case / Petition Number:
Civil Appeal No. 9668 of 2014; Civil Appeal Nos. 4371-4372 of 2015

Case Synopsis & Summary

Two connected Civil Appeals before the Supreme Court arise from a National Consumer Disputes Redressal Commission order awarding Rs 54,93,865 for fire damage to Luxra Enterprises' garment factory under a fire insurance policy. The insured factory suffered a fire on 12 July 2000, and the insurer appointed multiple surveyors to assess the loss. The first surveyor upheld Rs 54,93,865; two subsequent surveys cut the amount and the insurer repudiated the claim on grounds including manipulation of exports, stock statements, and the status of a letter of credit. The Commission, while allowing the claim worth Rs 54,93,865 to be paid, directed payment within 45 days with 10% interest, which the Insurance Company challenged in Civil Appeal No. 9668 of 2014. The cross-appeals (Civil Appeal Nos. 4371-4372 of 2015) were filed by Luxra Enterprises, contending for full payment and interest. The Supreme Court examined Section 23 of the Consumer Protection Act and Section 64-UM of the Insurance Act, 1938, and considered the principle that while a second surveyor can be appointed, cogent reasons must exist; relying on Sri Venkateswara Syndicate, the Court held there were no cogent reasons to justify repeated surveys. The Court dismissed the Insurance Company's appeal, allowed Luxra's cross-appeals, and awarded interest at 6% per annum on Rs 54,93,865 from the date of filing to payment.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Landmark Cases
Hon'ble Judges
  • Dr. Dhananjaya Y. Chandrachud
  • Hemant Gupta
Judgment Date
2019-05-01
Court Decision / Holding
Civil Appeal No. 9668 of 2014 is dismissed; The Commission’s order is upheld regarding the Rs 54,93,865 and interest; Civil Appeal Nos. 4371-4372 of 2015 are allowed; Luxra is entitled to interest on Rs 54,93,865 at 6% per annum from the date of filing of the petition till payment.
Final Disposition
Civil Appeal No. 9668 of 2014 dismissed; Cross-Appeals Nos. 4371-4372 of 2015 allowed; 6% interest awarded on Rs. 54,93,865 from date of petition till payment.

Parties to the Case

Appellants / Petitioners

  • M/s New India Assurance Co. Ltd.
  • M/s Luxra Enterprises Pvt. Ltd. & Anr.

Respondents

  • M/s Luxra Enterprises Pvt. Ltd. & Anr.
  • M/s New India Assurance Co. Ltd.

Provisions of Law Cited

Section 23 of the Consumer Protection Act, 1985Insurance Act, 1938 – Section 64-UM (2)-(4)

Submissions & Arguments

Contentions of Appellants / Petitioners

The Insurance Company contends that the Commission and the Tribunal erred by not testing the authenticity of the letter of credit and export documents. It relies on Section 64-UM of the Insurance Act, 1938, and on the principle from Sri Venkateswara Syndicate v. Oriental Insurance Co. Ltd. that while a second surveyor can be appointed, cogent reasons must exist; it argues the appointment of ABM Engineers & Consultants and the subsequent repudiation were improper and that repeated surveyor appointments were used to secure a favorable report. It asserts lack of cogent reasons for rejecting the Sunil J. Vora & Associates report and challenges the credibility of the later findings that influenced repudiation. It contends the Commission’s approach and lack of cogent reasons harmed the insured and that the proper process for surveyor appointment and loss assessment was not followed.

Contentions of Respondents

Luxra Enterprises contends that the insurer’s investigation was necessary to verify complex loss details, including stock statements, letters of credit, and export documentation. It argues that multiple surveyors were warranted given inconsistencies and potential fraud signals raised by the insurer’s own notices and investigations. The insured seeks full payment of the loss and appropriate interest, arguing that the Commission’s order recognizing the loss and directing payment should be upheld while ensuring fair remediation, and that the insurer’s actions should not undermine the insured’s claim or lead to unjust denial.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (1)

Case NameCitationTreatmentExplanation
Sri Venkateswara Syndicate v. Oriental Insurance Company Limited(2009) 8 SCC 507PositiveThe Court relies on this decision to acknowledge that Section 64-UM allows appointment of a second surveyor but requires cogent reasons; the present judgment applies this principle to assess the legitimacy of successive surveyor appointments.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•4,588 words•~21 min read

In The Court Record

M/s New India Assurance Co. Ltd. v M/s Luxra Enterprises Pvt. Ltd. & Anr. (Civil Appeal No. 9668 of 2014) and M/s Luxra Enterprises Pvt. Ltd. & Anr. v M/s New India Assurance Co. Ltd. (Civil Appeal Nos. 4371-4372 of 2015)

**REPORTABLE** ## **IN THE SUPREME COURT OF INDIA CIVIL APPELLATE JURISDICTION** ## **CIVIL APPEAL NO. 9668 OF 2014** M/s New India Assurance Co. Ltd. …… Appellant vs. M/s Luxra Enterprises Pvt. Ltd. & Anr. .…..Respondents WITH ## **CIVIL APPEAL NOS. 4371-4372 OF 2015** M/s Luxra Enterprises Pvt. Ltd. & Anr .….. Appellants vs. M/s New India Assurance Co. Ltd. .……Respondent ## **J U D G M E N T** ## **Hemant Gupta, J.** 1. This order shall dispose of Civil Appeals filed under Section 23 of the Consumer Protection Act, 1985[1] preferred by both the parties against an order passed by the National Consumer Disputes Redressal Commission[2] Signature Not Verified Digitally signed byNEELAM GULATI against its order dated 01.08.2014 wherein, a sum of Rs. 54,93,865/- has Date: 2019.05.01 17:08:18 IST Reason: 1 1985 Act 2 Commission 1 been awarded as compensation for loss suffered on account of damage by fire to the Complainant, subject to the condition that the said amount will be paid within 45 days by the Insurance Company otherwise it will carry interest at the rate of 10 % per annum till its realisation. 2. For the facility of reference, the respondent in Civil Appeal No. 9668 of 2014 will be called hereinafter as the Complainant, whereas the Appellant- New India Assurance Co. Ltd. will be called as Insurance Company. Civil Appeal Nos. 4371-72 of 2015 are filed by the Complainant. 3. The Complainant is an Industrial Unit engaged in manufacture of garments. The Complainant obtained a policy of insurance for the risk of fire for the period 27.3.2000 to 26.3.2001 with the assured sum of Rs. 85,00,000/-. It was on 12.07.2000 at about 3.45 AM, the factory of the Complainant was engulfed in fire. It is thereafter, the Complainant lodged a claim for loss due to fire incident in its factory. 4. M/s R.N. Sharma & Co., was appointed as an investigator to conduct a preliminary investigation by the Insurance Company. The preliminary investigation report was submitted on 20.07.2000. It is thereafter, M/s Sunil J. Vora & Associates was appointed as the Surveyor by the Head Office of the Insurance Company on July 28, 2000. The said Surveyor submitted detailed report and accepted the claim of the Complainant for Rs. 54,93,865/-. Out of the said amount, Rs. 1,65,430.53 was the claim on account of damage to building; Rs. 3,93,779.78 was the claim towards the damage to the machinery and Rs. 49,44,657.67 was the claim towards the damage to the stocks. The amount was rounded off to Rs. 54,93,865/-. 5. The Insurance Company issued a communication dated 09.04.2001 to the Complainant asking for certain information after the said report was 2 submitted to the Insurance Company on 12.02.2001. The information sought is as under:- - “1. List of Machineries (copy of assets register) 2. Loss and profit accounts 3. Purchase details of raw materials 4. Verified copy of Balance Sheet for last 2 years. 5. Original copy of LC & LC with extended date of expiry 6. Details of Financial arrangements for increasing the turn over. 7. Clarify the status of insurable interest on building.” 6. The Surveyor in his report has given loss to the machinery giving details of the machinery damaged in fire and the amount admissible in respect of its loss. The Insurance Company also communicated a letter to its Senior Branch Manager on 26.09.2001 that the letter of credit dated 11.05.2000 of Singapore Branch of Bank of India was established for Gurcharan Singh & Co. Pvt. Ltd., but the said letter of credit expired without receipt of any document. It was also mentioned that the Complainant is neither a beneficiary nor a notified party of said letter of credit. 7. Subsequently, M/s ABM Engineers & Consultants was appointed as the second Surveyor by the Insurance Company. The said Surveyor accepted the loss of Rs. 24,76,585/- in its report dated 28.02.2002. The second surveyor has taken into consideration stocks statement submitted by the Complainant to Canara Bank on 30.4.2000, 31.05.2000 and 01.07.2000 respectively. Though, the Manager of Canara Bank is said to have pointed out that these statements are like statutory requirements but the surveyor brushed them aside for the reason that these documents 3 cannot be treated as documents for finalising the stock value. It was further observed that if the stocks statement is to be referred to, there is no reason as to why letter of credit could not be materialized. The relevant extracts from the report of the second surveyor are as under:- “(i) Stock statement as on 1.7.2000, 31.5.2000, 30.4.2000 submitted by insured to bank. These statements are just like statutory requirement (Refer opinion of Canara Bank Manager, 13B, Investigation verification). These documents cannot be treated as document for finalizing stock value. If we refer to the quantity in these stock statements then there was no reason why LC could not materialize. Further these documents contradict with purchase invoices of items purchased by Luxara Enterprises Pvt. Ltd. From their vendors.” 8. The Insurance Company was still not satisfied by the report and thereafter appointed Mr. R.G.Verma, a Chartered Accountant as its third surveyor. The said surveyor recommended total repudiation of claim in its report on 28.05.2002 under Clause 8 of the Insurance Policy on the ground that there were enough valid circumstantial reasons on the part of the Insured to manipulate the fire. It is after the said report furnished on 28.06.2002, the claim was repudiated by the Insurance Company on the same day i.e. 28.6.2002, inter-alia, on the ground that the Complainant had no export order and the letter of credit does not show the name and address of the buyer. It is mentioned therein that as per stocks statement furnished to Canara Bank on 05.07.2000, 34,800 shirts were ready as on 01.07.2000 and that the letter of credit was expiring on 09.07.2000. Therefore, the Complainant did not explain as to why the said consignment was not shipped on or before 01.07.2000. Another reason 4 given was that the letter of credit was alleged to have been extended up to 08.08.2000 in favour of somebody else. Therefore, there was no reason for extension of letter of credit when the goods were allegedly ready on 01.07.2000 and that the garment could not be exported without endorsement of invoice by Apparel Export Promotion Council but no such endorsement was obtained by the Complainant. The Surveyor further gave another reason, that 104203 meters of fabric was purchased from M/s S.V. Traders but the address given on the invoice and the challans was not of fabric shop but that of a photocopy shop. Still further, another reason communicated was that the letter of credit was opened by M/s Sirdanwal Overseas of Ajay Verma who is facing a criminal case under Sections 420, 406, 120(B) of IPC in FIR No. 98 dated 06.04.2002. 9. The Complainant in his complaint filed on 16.5.2002, has inter-alia averred that he has taken a credit facility from Canara Bank to the tune of Rs. 50,00,000/- and that the loan amount was disbursed in the months of March and May, 2000. Such advance was secured by primary security of stocks and goods lying in the factory of the Complainant apart from the personal guarantee of the Directors of the Complainant and equitable mortgage/residential house of one of the Directors and plant & machinery installed at the above said factory as collateral security. The Bank also got insured the factory building as well as the stocks from the Insurance Company for which premium was paid by debiting the account of Complainant by the Bank. 10. The grievance of the Complainant is that the Insurance Company has appointed one surveyor after another. The first surveyor- M/s Sunil J. Vora & Associates has accepted the damage preferred by the Complainant 5 to the extent of Rs. 54,93,865/- whereas, the second surveyor- M/s ABM Engineers & Consultants reduced the amount to Rs. 24,76,585/- and the third surveyor-R.G. Verma repudiated the total claim. 11. In respect of second survey report, it is pointed out that Shri B. S. Aggarwal of the surveyor- M/s ABM Engineers & Consultants attended the meeting in the office of the Complainant which was attended by the Officers of the Insurance Company. The Complainant submitted a letter to the Regional Manager of the Insurance Company as well as to the Branch Office at Delhi apart from the Grievance Cell, Mumbai on 15.01.2002. Shri B.S. Aggarwal communicated a letter dated 30.01.2002 pointing out that the letter dated 15.01.2002 submitted by the Complainant was misleading as the Complainant could not make available accounting records to the Surveyor. 12. The Complainant again submitted a letter dated 18.3.2002 aggrieved against the actions of the surveyor to the various officers of the Insurance Company. The Complainant also pointed out that the Insurance Company could not appoint one surveyor after another. It was open to the Insurance Company to apply to the Insurance Regulatory and Development Authority to appoint an independent Surveyor under Section 64 UM (3) of the Insurance Act, 1938[3] but the Insurance Company could not appoint one surveyor after another till such time, it is successful in getting a report of total repudiation of the claim of the Complainant. The relevant provisions of the 1938 Act read as under:- “(2) No claim in respect of a loss which has occurred in India and requiring to be paid or settled in India equal to or exceeding twenty thousand rupees in value on any policy of insurance, arising or intimated to an 3 1938 Act 6 insurer at any time after the expiry of a period of one year from the commencement of the Insurance (Amendment) Act, 1968, shall, unless otherwise directed by the Authority, be admitted for payment or settled by the insurer unless he has obtained a report, on the loss that has occurred, from a person who holds a licence issued under this section to act as a surveyor or loss assessor (hereafter referred to as "approved surveyor or loss assessors) : Provided that nothing in this sub-section shall be deemed to take away or abridge the right of the insurer to pay or settle any claim at any amount different from the amount assessed by the approved surveyor or loss assessor. (3) The Authority may, at any time, in respect of any claim of the nature referred to in sub-section (2), call for an independent report from any other approved surveyor or loss assessor specified by him and such surveyor or loss assessor shall furnish such report to the Authority within such time as may be specified by the Authority or if no time limit has been specified by him within reasonable time and the cost of, or incidental to, such report shall be borne by the insurer. (4) The Authority may, on receipt of a report referred to in sub-section (3), issue such directions as he may consider necessary with regard to the settlement of the claim including any direction to settle a claim at a figure less than, or more than, that at which it is proposed to settle it or it was settled and the insurer shall be bound to comply with such directions: Provided that where the Authority issues a direction for settling a claim at a figure lower than that at which it has already been settled, the insurer shall be deemed to comply with such direction if he satisfies the Authority that all reasonable steps with due regard to the question whether the expenditure involved is not disproportionate to the amount required to be recovered, have been taken with due dispatch by him: Provided further that no direction for the payment of a lesser sum shall be made where the amount of the claim has already been paid and the Authority is of opinion that the recovery of the amount paid in excess would cause undue hardship to the insured: Provided also that nothing in this section shall relieve the insurer from any liability, civil or criminal, to which he would have been subject but for the provisions of this sub-section.” 7 13. In the written statement filed before the Commissioner, the Insurance Company explained the reason for appointing another Surveyor after the report of Surveyor- M/s Sunil J. Vora & Associates was submitted on 01.02.2001. It was, inter-alia, asserted that quantum of loss has been assessed without verifying and providing any documents and that the clarification sought from the Surveyor has not led to any response. The Insurance Company concluded the reasons for appointing another Surveyor in para 3.9 of its reply which reads as under:- “Respondent No.1 sought clarification from the Surveyors as well as the insured on certain points but neither the Surveyors nor the insured submitted the clarification or the desired documents. In the absence of the said clarification/documents, Respondent No. 1 was not able to ascertain the cost of the shirts. The Surveyors had taken the value of the shirts at Rs. 235/- but it was not clear from where he had taken the said value. On the other hand, the Complainant had taken the order @ 5.9 US$ i.e. Rs. 271/- and adding overhead expenses the cost comes Rs. 295/- per shirt. The Preliminary Surveyor in his report dated 20[th] July, 2000, also did not give the basis of the estimate of loss at Rs. 75,00,000/-. The letters dated 11[th] May, 2001 was written to the Preliminary Surveyor asking about the basis of the figure of Rs. 75,00,000/- which was not responded. This was followed by reminder dated 28[th] June, 2001 which was also not responded. The letters dated 11[th] May, 2001 and 28[th] June, 2001 is Annexure R-14 and R-15 hereto”. 14. Such are the only reasons available in the written statement as to why another Surveyor was appointed. No other record has been furnished for appointment of M/s ABM Engineers & Consultants, second surveyor on 22.08.2001. The Commission in its order held as under:- 8 “22. There is no evidence on record that the appointment of Surveyor Nos. 2, 3 & 4 was with the consent of the Head Quarters. After the second Surveyor, there is no reasoning given as to why third and fourth Surveyors were appointed. This is an admitted fact that the fire broke out in the premises of the complainant. All the first three Surveyors spoke about this fact in one voice. Even the Investigator/Fourth Surveyor, did not deny the happening of incident and admitted in no uncertain terms that shirts worth rupees few lakhs must have been burnt. There can be no conflictions on the point that some loss was occurred to the complainant. Whether the Order or LCs were fake or manipulated or the Order for import of shirts could not be proved or Mr. Ajay Verma was involved in a criminal case has got no bearing on this case. There is no inkling on evidence of record that Mr. Ajay Verma was involved in this particular case. 23. It cannot be laid down as a rule of thumb that the Surveyor cannot ask for other documents after he has informed the complainant that the documents are complete. There lies no rub. 24. Under these circumstances, we have no hesitation to accept the second Surveyor, M/s Sunil J. Vohra’s report. The same is partly accepted and we allow the complaint and direct the Insurance Company, OP1, to pay a sum of Rs. 54,93,865/- to the complainant, within 45 days from the receipt of this order, otherwise, it will carry interest @ 10% p.a., till its realization. In view of peculiar facts of this case, there is no order as to costs or pendente lite interest.” 15. The learned counsel for the Appellant-Insurance Company argued that the Commission has gravely erred in law in not examining the question whether letter of credit was fake or manipulated or that the order of import of shirts could not be proved or Mr. Ajay Verma was involved in a criminal case as it was held that such facts have no bearing on this case. Learned counsel for the Appellant-Insurance Company relies upon an 9 order passed by this Court as reported in **Sri Venkateswara Syndicate** **vs. Oriental Insurance Company Limited[4]** which case has examined Section 64 UM of the 1938 Act to hold that there is no prohibition in the Act for appointment of another Surveyor- M/s ABM Engineers & Consultants by the Insurance Company except that the Insurance Company has to record reasons for not accepting the report of the Surveyor- M/s Sunil J. Vora & Associates. Therefore, the Insurance Company has rightly appointed another Surveyor. 16. The Insurance Company relied upon newspaper report dated 09.05.2002 published in Punjab Kesari that the Delhi Police has arrested three persons on the basis of forged documents duping exporters. It was the said newspaper report which was made basis of appointing yet another Surveyor. The relevant extract from the written statement reads as under:- “3.12 On 9[th] May, 2002, it was reported in the “Punjab Kesari” newspaper that Delhi Police has arrested a gang of three persons who had duped the exporters of crores of rupees on the basis of forged documents. It also came to the notice of Respondent No. 1 that Mr. Ajay Verma of M/s. Sirdanwal Overseas from whom, the Complainant is alleged to have dealings for LC and procurement of the export order had been arrested in a cheating case in FIR No. 98 dated 6[th] April, 2002, P.S. Chitranjan Park, under Sections 420/406/12B of the Indian Penal Code. The newspaper report dated 9[th] May, 2002 is Annexure R-25 hereto. Respondent No. 1 appointed Shri R.G. Verma, Chartered Accountant to conduct an investigation of the claim. Shri R.G. Verma conducted the detailed investigation and submitted his report dated 28[th] May, 2002 in which he observed that the claim was fraudulent. The report of Shri R.G. Verma is Annexure R-26 hereto. The following documents were collected by the investigator:- 4 (2009) 8 SCC 507 10 - i. List of bail applications dated 24[th] May, 2002. - ii. FIR NO. 98 dated 6[th] April, 2002. - iii. Application for request for judicial custody by the Accused. - iv. Respondent No. 1 took the photographs of the office of S.V. Traders which are Annexure R-27 hereto”. 17. On the other hand, learned counsel for the Complainant rebutted the arguments raised and referred to communication dated 07.12.2001 addressed by the Head Office of the Insurance Company to its Delhi Regional Office, inter-alia, to the facts that Head Office has appointed M/s Sunil J. Vohra & Associates as the final Surveyor and that the Head Office is unable to understand as to why and who has appointed M/s ABM Engineers & Consultants as Surveyor. The extracts from the said letter read as under: - ## “07.12.2001 ## DELHI RO II Kind Attn. : MR. S. MAMMAN, ASSTT. GEN. MANAGER, Re: Fire Claim under Policy No. 11/310830/99/9010 A/c M/s. Luxra Enterprises Pvt. Ltd. Date of Loss : 11/12.7.2000 We note from our record that based on your request vide letter dt. 24.7.2000, HO had appointed Sunil J. Vora & Associates as the Final Surveyor and we have communicated the decision to you vide our letter dt. 27.7.2000. we understand that surveyor had already submitted their report also. We have received a bunch of papers dt. 20.11.01 from M/s ABM Engineers and Consultants pertaining to this claim. We are unable to understand what for they are appointed and who has appointed them. Please note that once HO has appointed a surveyor, you cannot appoint surveyor 11 or investigator without consulting HO. Please let us have your explanation to enable us to apprise Management. We note that correspondence by M/s. ABM Engineers and Consultants are directly addressed to the Senior Branch Manager only and copies are seen forwarded to various higher offices. Kindly inform us the current status of this claim also for our records.” 18. Before considering the respective contentions of the parties, the judgment in **Sri Venkateswara (supra)** is required to be examined. In the said judgment, this Court has upheld the right of the Insurance Company to appoint Surveyor but such right can be exercised for valid reasons or if the report is found to be arbitrary and that Insurance Company must give cogent reasons without which it is not free to appoint the second Surveyor. The relevant extracts of the judgment read as under: - “33. Scheme of Section 64-UM, particularly of subsections (2), (3) and (4) would show that the insurer cannot appoint a second surveyor just as a matter of course. If for any valid reason the report of the surveyor is not acceptable to the insurer may be for the reason if there are inherent defects, if it is found to be arbitrary, excessive, exaggerated, etc., it must specify cogent reasons, without which it is not free to appoint the second surveyor or surveyors till it gets a report which would satisfy its interest. Alternatively, it can be stated that there must be sufficient ground to disagree with the findings of surveyor/surveyors. There is no prohibition in the Insurance Act for appointment of second surveyor by the insurance company, but while doing so, the insurance company has to give satisfactory reasons for not accepting the report of the first surveyor and the need to appoint second surveyor. xxx xxx xxx 35. In our considered view, the Insurance Act only mandates that while settling a claim, assistance of a surveyor should be taken but it does not go further and say that the insurer would be bound by whatever the surveyor has assessed or quantified; if for any reason, the insurer is of the view that 12 certain material facts ought to have been taken into consideration while framing a report by the surveyor and if it is not done, it can certainly depute another surveyor for the purpose of conducting a fresh survey to estimate the loss suffered by the insured. **==> picture [91 x 7] intentionally omitted <==** 37. The option to accept or not to accept the report is with the insurer. However, if the rejection of the report is arbitrary and based on no acceptable reasons, the courts or other forums can definitely step in and correct the error committed by the insurer while repudiating the claim of the insured. We hasten to add, if the reports are prepared in good faith, with due application of mind and in the absence of any error or ill motive, the insurance company is not expected to reject the report of the surveyors”. 19. In view of above, the question to be examined is whether the Insurance Company has reasons or there were inherent defects in the survey report of Surveyor- M/s Sunil J. Vora & Associates or that such report is arbitrary, excessive and exaggerated, before another Surveyor could be appointed. 20. The Surveyor- M/s Sunil J. Vora & Associates was appointed by Head Office of the Insurance Company. The Head Office of the Insurance Company has communicated to the Regional/ Branch Office as to why another Surveyor has been appointed. In view of said fact, the appointment of another surveyor could not be justified when a conscious decision has been communicated by the Head Office of not approving the appointment of second surveyor. 21. Still further, the reasoning given by the local office is that the Surveyor- M/s Sunil J. Vora & Associates has not clarified certain points 13 when clarification was sought for. The said reason stands answered even in the report of Surveyor- M/s ABM Engineers & Consultants. Such surveyor has considered the report of the Canara Bank in respect of stocks statement. Such stocks statement was brushed aside for the reason that if said stocks statement was correct then as to why letter of credit could not be materialised. The Complainant has explained that it was on 15.06.2000, it has been communicated to the consignee to have inspection of the stocks before exporting the consignment. The consignee has not inspected the stocks which led to the extension of letter of credit up to 08.08.2000. It was argued that letter of credit is to facilitate receipt of money from the exporter and once the stock of the Complainant has been verified by the Canara Bank, which had the first charge over the property, therefore, such verification of stock could not be doubted by the Insurance Company only for the reason that letter of credit could not be materialised. The verification of the stocks by the Canara Bank which had primary charge on the stocks could not be doubted in the manner, the surveyor- M/s ABM Engineers & Consultants has reported. 22. Still further, it is explained in the affidavit that the letter of credit was by M/s Sirdanwal Overseas which was endorsed to Gurcharan Singh Company Pvt. Ltd. PTE Singapore. Therefore, the letter of credit was a valid document which could not be said not to be genuine only on the basis of reason that such letter of credit was not in favour of the Complainant when the order was placed on the Complainant by the above said Singapore based firm. 14 23. Mr. Ajay Verma is an accused in FIR in which there is no allegation in respect of export by the Complainant. The allegation against Ajay Verma is of duping the exporters whereas, there is no such or similar allegation against the Complainant. The Complainant has also averred that there was endorsement by the Apparel Export Promotion Council, therefore factually such assertion of the Insurance Company is incorrect. 24. Thus, we find that there was no valid reason for the Insurance Company not to accept the report of the surveyor- M/s Sunil J. Vora & Associates nor there is any proof that such report is arbitrary & excessive. There are no cogent reasons to appoint Surveyors time and again till such time one Surveyor gives a report which could satisfy the interest of the Insurance Company. 25. In fact, in the present case it is evident that the claim of Rs. 54,93,865/- was accepted by the surveyor- M/s Sunil J. Vora & Associates. The second surveyor- M/s ABM Engineers & Consultants accepted the claim in the sum of Rs. 24,76,585/-. The third surveyor - R.G. Verma recommended total repudiation of claim. It is the third Surveyor’s report which sub-served the interest of the Insurance Company which was made basis of repudiation of the claim of the Complainant on the same day, when the report was furnished. We find that in view of the judgment in **Sri Venkateswara (supra),** it is not open to appoint another Surveyor till such time, it gets a report in its favour. In fact, the appointment of the Surveyors was to repudiate the claim of the Complainant on one pretext or the other. 15 26. Thus, we do not find any illegality in the order passed by the Commission. Consequently, Civil Appeal No. 9668 of 2014 is dismissed. 27. However, we find that the Commission has not granted interest on the amount found due and payable to the Complainant. Therefore, Civil Appeal Nos.4371-72 0f 2015 preferred by the Complainant are allowed. The Complainant shall be entitled to the interest on the amount of Rs. 54,93,865/- at the rate of 6% per annum from the date of filing of petition till the payment of the amount. **==> picture [255 x 26] intentionally omitted <==** …………………..………………..……………….J. (Hemant Gupta) New Delhi May 1, 2019 16
End of Judgment Record
Browse All Landmark Cases Judgments
2019-01-22

State of Himachal Pradesh & Anr. v. Pinju Ram & Others; State of Himachal Pradesh & Ors. v. Ganesh Dutt & Anr.

This batch of appeals concerns regularisation and monetary benefits of part‑time employees in Himachal Pradesh who were converted to daily‑wage status. The State had issued a policy on 27 February 2004: part‑time Class‑IV employees who had completed ten years of continuous service as on 31 December 2003 would be made daily wagers with prospective effect, and posts vacated by such employees would stand abolished; Education and Ayurveda were excluded from the policy. Revenue Chowkidars, engaged by Panchayats, were not covered by that policy and received separate treatment. Following writ petitions and an order of the Himachal Pradesh High Court and in light of later developments, the State drew‑up directions in 2011 (22 September) to give seniority to Revenue Chowkidars on the basis of ten years of service, but with wages from the date of actual appointment and without back‑dated monetary benefits; 7 July 2012 further instructions reiterated this stance for remaining part‑time employees, with monetary benefits not guaranteed in the interregnum. The respondents pressed for back wages dating from 1 January 2007 and broader coverage. The Supreme Court held that the 2007 back‑pay direction was unsustainable, clarified that seniority would count from ten years without past benefits, and that the 2011 policy and Moti Singh principle should guide the approach. The appeals are allowed; no costs. The related writ petitions are to be disposed of consistent with these directions.

2018-08-14

Union Bank of India and Others v. C.G. Ajay Babu and Anr.

This is a Supreme Court of India appeal concerning the forfeiture of gratuity under the Payment of Gratuity Act, 1972. The respondent was a branch manager of the appellant bank and was dismissed on 3 June 2004 after disciplinary proceedings. A show-cause notice sought to forfeit gratuity due to misconduct involving moral turpitude, which was ordered on 20 April 2004. The High Court upheld the dismissal but held that gratuity could be paid since there was no financial loss to the bank, and that a bipartite settlement between the bank and employees permitted forfeiture only where misconduct caused financial loss. The Division Bench, however, held that forfeiture under Section 4(6) must be read together with Section 4(5) and that no loss was proven, thus entitling the employee to gratuity in accordance with the bipartite settlement. The Supreme Court agreed with the High Court that forfeiture is not automatic; it is controlled by Sections 4(5) and 4(6) of the Act and by the bipartite settlement, which requires loss to justify forfeiture. The Court emphasized that an act must constitute an offence involving moral turpitude and that conviction is generally required for forfeiture under 4(6)(b)(ii). The appeal is dismissed with no costs.

2018-09-25

Reema Salkan v. Sumer Singh Salkan

This is a Supreme Court of India criminal appeal under the Criminal Appellate Jurisdiction arising from a maintenance dispute under Section 125 Cr.P.C. The parties, married in 2002, had a protracted litigation history. The Family Court granted maintenance to the wife from 17 July 2003 to 8 December 2010, and held no maintenance thereafter. The High Court, in revision, partly allowed the application, directing Rs.9,000 per month from 9 December 2010 onward, while upholding the earlier period’s Rs.10,000 per month. This Court had earlier granted interim maintenance of Rs.20,000 per month in 2014 (Criminal Appeal Nos. 2347-2349 of 2014). The appellant contends there has been no change in circumstances since the interim order and that the respondent’s substantial assets, education, and overseas earnings establish the capacity to pay higher maintenance. The respondent defends the High Court’s reasoning, arguing that the Family Court’s assessment, demeanor observations, and the principle that maintenance should not be perpetual require careful scrutiny, and that the notional minimum wage approach used by the High Court is flawed. The overarching issue is the quantum of monthly maintenance payable to the appellant and whether the interim amount should be augmented beyond the period up to 2010.”

2019-12-03

M/s Embassy Property Developments Pvt. Ltd. v State of Karnataka & Ors.

This judgment concerns three Civil Appeals filed by a Resolution Applicant, the Corporate Debtor (through its Resolution Professional) and the Committee of Creditors, challenging an Interim Order of the Karnataka High Court staying an NCLT order in proceedings under the Insolvency and Bankruptcy Code, 2016. The NCLT Chennai had admitted an application under Section 7 of the IBC against M/s Tiffins Barytes Asbestos & Paints Ltd. and directed a moratorium under Section 14. The Interim Resolution Professional then sought a deemed extension of a mining lease under MMDR Act, 1957 and the Government of Karnataka rejected it. The NCLT, by an order dated 11.12.2018, set aside the Government’s order and directed execution of Supplement Lease Deeds for the period up to 31.03.2020. The Government of Karnataka challenged this in a High Court writ petition, which stayed the impugned NCLT order. The core issues were: (i) whether the High Court may interfere under Article 226/227 with an NCLT order in IBC when an appeal lies to the NCLAT, and (ii) whether fraud can be inquired into by NCLT/NCLAT in CIRP. The Court reiterates that IBC is a complete, umbrella code with a three‑tier mechanism (NCLT, NCLAT, Supreme Court) and that public‑law disputes arising from MMDR Act obligations lie outside IBC. It ultimately holds that while NCLT/NCLAT may inquire into fraud, they cannot adjudicate MMDR‑related public legal disputes; and the High Court’s writ jurisdiction in public‑law contexts remains permissible. The appeals are dismissed.