This Supreme Court Civil Appeal challenges an Allahabad High Court order that modified an arbitral award by reducing pendente lite and future interest from 18% compound interest to 9% simple interest per year. The dispute arose from a tender-based contract in which disputes led to arbitration; the Tribunal awarded 18% pendente lite and future compound interest on several claims. The Union of India challenged the award under Section 34 of the Arbitration and Conciliation Act, 1996. The District Court dismissed the challenge, and the High Court partially allowed the appeal by disallowing Claim No. 6 (₹3,00,000) and reducing the rate of interest to 9% per annum. The appellant contends that pre-amended Section 31(7)(b) of the Act, and GCC Clause 70, support 18% as the statutory rate and that the High Court had no jurisdiction to reduce it. The Respondent-State argues that the 18% rate is unjustified and that a reduction to a more reasonable rate, guided by Indian Contract Act provisions and Article 142 jurisdiction, was appropriate. The Supreme Court reaffirms that under the 1996 Act, the court’s power to modify an award is constrained, and reinstates 18% per annum on the arbitral award, directing payment within eight weeks, while upholding the denial of Claim No. 6. The decision clarifies the limited scope of appellate review and the primacy of the arbitral award’s terms.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Landmark Cases
Hon'ble Judges
  • S. Ravindra Bhat
  • Dipankar Datta
Judgment Date
2023-08-11
Court Decision / Holding
The impugned High Court judgment is set aside to the extent of modifying the rate of interest on past, pendente lite and future interest. The 18% per annum rate of interest, awarded by the arbitrator on 21.01.1999 (Claim No. 9), is reinstated. The respondent-state is directed to pay the dues within eight weeks from the date of this judgment. The appeal is disposed of in terms stated above, with no order as to costs.
Final Disposition
Appeal disposed of in terms set out above; no order as to costs.

Parties to the Case

Appellants / Petitioners

  • M/S Larsen Air Conditioning and Refrigeration Company

Respondents

  • Union of India
  • Ors.

Legal Representation & Advocates

Counsels for Petitioners

  • • Mrs. Neeraj Singh

Counsels for Respondents

  • • Mr. Vikramjit Banerjee, Additional Solicitor General

Provisions of Law Cited

Arbitration and Conciliation Act, 1996 - Section 34Arbitration and Conciliation Act, 1996 - Section 31(7)(b) (pre-amendment)Arbitration Act, 1940Article 142, Constitution of IndiaGeneral Conditions of Contract (GCC) Clause 70UP Amendment Act (Section 24) (paragraph 7-A)

Legal Doctrines & Maxims

  • Illegality must go to the root of the matter and cannot be of a trivial nature (Associate Builders v. Delhi Development Authority)
  • Limited remedy / limited judicial interference under Section 34 of the Arbitration and Conciliation Act, 1996
  • Article 142 jurisdiction of the Supreme Court to do complete justice

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant argued that the arbitrator rightly awarded 18% pendente lite and future compound interest as per Section 31(7)(b) of the pre-amendment 1996 Act, and that the GCC Clause 70 makes the award final and binding. They contended that reduction to 9% in the High Court was unwarranted, relying on Shahi v. State of UP and the State amendments and that the Court had no power to modify the award under Section 34 given the contract terms; thus the 18% rate should be reinstated.

Contentions of Respondents

The respondent-state contended that the 18% rate was excessive and unjustified. The High Court’s holistic approach, considering the Indian Contract Act, 1872 and the 1996 Act, correctly reduced the rate to 9% simple interest. They argued that the court’s power to modify an award is limited and that Article 142 jurisdiction can be invoked to adjust interest, especially where the rate is not explicitly fixed in the award or contract.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (14)

Case NameCitationTreatmentExplanation
K. Marappan v. Superintending Engineer TBPHLC Circle Anantapur2017 (14) SCC 323Mentioned OnlyCited by counsel in argument; not directly relied upon to determine the outcome.
M/s Raveechee & Co. v. Union of India2018 (5) SCR 138Mentioned OnlyCited by counsel; used to discuss pendente lite issues but not controlling in this judgment.
Ambica Construction v. Union of India2017 (14) SCC 323Mentioned OnlyCited by counsel; not the decisive authority for the outcome.
Shahi v. State of UP & Ors1991 Supp. 3 SCR 417PositiveUsed to justify 18% pendente lite rate under Section 31(7) where applicable.
Secretary, Irrigation Department, State of Orissa v. G.C. Roy1991 Supp. 3 SCR 417PositiveCited to argue that arbitrator may award pendente lite interest where contract does not prohibit it.
Municipal Corporation of Greater Mumbai and Anr v. Pratibha Industries Ltd. & Ors.2019 (11) SCR 640PositiveCited to discuss inherent powers of the High Court as a constitutional court in related contexts.
Oriental Structural Engineers Pvt. Ltd. v. State of Kerala2019 (4) SCR 137PositiveUsed to illustrate reduction of interest under Article 142 when contract lacks rate specification.
Post Graduate Institute of Medical Education and Research, Chandigarh v. Kalsi Construction Company2019 (8) SCC 726DistinguishedThe reliance on this case by respondents was distinguished as inapt in the present context.
Associate Builders v. Delhi Development Authority2014 (13) SCR 895PositiveCited for the principle that interference under Section 34 is extremely limited and illegality must go to the root.
Ssangyong Engineering Construction Co. Ltd v. National Highways Authority of India (NHAI)2019 (7) SCR 522PositiveCited to emphasize limited remedy under Section 34.
Delhi Airport Metro Express Pvt. Ltd. v Delhi Metro Rail Corporation Ltd2021 (5) SCR 984Mentioned OnlyCited in context of discussion on power to modify awards and legislative changes.
Project Director, National Highways No. 45E and 220 National Highways Authority of India v M. Hakeem2021 (5) SCR 368PositiveSupports the view that the court cannot modify an arbitral award beyond prescribed grounds.
G.C. Roy1991 Supp. 3 SCR 417PositiveUsed to discuss positions on award of pendente lite interest when terms are silent on rate.
Kalsi Construction Company2019 (8) SCC 726DistinguishedReferred to by respondents; distinguished as inappropriate in this post-1996 Act context.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,715 words•~13 min read

In The Court Record

M/S Larsen Air Conditioning and Refrigeration Company v Union of India & Ors.

**REPORTABLE** 2023 INSC 708 **==> picture [72 x 72] intentionally omitted <==** ## **IN THE SUPREME COURT OF INDIA CIVIL APPELLATE JURISDICTION** ## **CIVIL APPEAL NO(S). 3798 OF 2023** **M/S LARSEN AIR CONDITIONING AND REFRIGRATION COMPANY …APPELLANT(S)** ## **VERSUS** **UNION OF INDIA & ORS. …RESPONDENT(S)** ## **J U D G M E N T** ## **S. RAVINDRA BHAT, J.** 1. Aggrieved by the impugned judgment[1] of the Allahabad High Court, the appellant has approached this court with a simple question of law, as to whether the High Court erred in modifying the arbitral award to the extent of reducing the interest, from compound interest of 18% to 9% simple interest per annum. ## _**Facts**_ 2. The dispute between the appellant and Union of India (hereafter ‘respondent-state’) arose from a contract entered into pursuant to being awarded Signature Not Verified Digitally signed by NEETA SAPRA Date: 2023.08.12 the tender. In the course of work, certain disputes arose. On 22.04.1997, the 11:53:57 IST Reason: > 1 Judgment dated 17.07.2019 passed by Allahabad High Court in First Appeal from Order No. 1227/2003. 1 respondent-state referred the dispute to arbitration, and the proceedings closed on 24.10.1998. The tribunal published its award on 21.01.1999 and directing the first four respondents to pay 18% _pendente lite_ and future compound interest on the award in respect of Claim Nos. 1-8. 3. The respondent-state challenged the award under Section 34 of the Arbitration and Conciliation Act, 1996 (hereafter ‘the Act’). The district court[2] , dismissed the challenge on the ground that it could not sit in appeal over the award and since the respondent-state had failed to file any proof of the grounds alleged. Aggrieved, the respondent-state, preferred an appeal before the High Court in 2003. In the interim, the respondent-state deposited ₹10,00,000 in the District Court, Kanpur on 06.06.2003 against ₹1,82,878.11 due at the time. 4. Partly allowing the appeal, the High Court disapproved the reasoning in the award on Claim No. 6; it held that the sum of ₹3 lakhs awarded towards compensation for loss caused due to non-issue of tender document and paralysing business could not have been granted. The High Court held that it could not be said that the proceedings (in the present case) were under the Arbitration Act, 1940, and therefore, the rate of interest granted should not be 18%. The High Court referred to this court’s judgments in _K. Marappan v. Superintending Engineer TBPHLC Circle Anantapur[3]_ , _M/s Raveechee & Co. v. Union of India_[4] > 2 Judgment dated 06.03.2003 passed by the District Judge, Kanpur Nagar in Misc. Case No. 64/70 of 1999. 3 [2019] 5 SCR 152 > 4 [2018] 5 SCR 138 2 and _Ambica Construction v. Union of India[5]_ while deciding this question of _pendente lite_ interest; it was held that the bar to award interest on the amounts payable under the contract would not be sufficient to deny the payment of interest _pendente lite_ . The High Court proceeded to reduce the rate of interest from 18% (as ordered by the arbitrator), to 9% per annum. The remaining amount was directed to be deposited by the appellants as expeditiously as possible, with the interest accrued, not later than 12 weeks from the date of the judgment. On other grounds, it was held that there was no scope for interference in the arbitral award. ## _**Contentions of parties**_ 5. The ground pressed by the appellant in the present proceedings, relates to the modification of the rate of interest (relating to award in Claim No. 9), and the scope of this appeal is limited to this question. 6. Mrs. Neeraj Singh, counsel appearing on behalf of the appellant, submitted that their claim was in fact for 24% _pendente lite_ interest, and the arbitrator had already reduced it to the 18% granted. Pointing to pre-amended Section 31(7)(b) of the 1996 Act, it was contended that the High Court erred in reducing the ‘statutory interest rate’; this provision prescribed that in the event the Arbitrator did not give any specific directions as regards rate of interest on amount awarded, such amount ‘ _shall_ ’ carry interest of 18% per annum. The Arbitrator had properly considered the matter and accordingly granted 18% past _pendente lite_ and future > 5 (2017) 14 SCC 323 3 compound interest on 8 claims, which was affirmed by the district court. Counsel also pointed out Clause 70 of the General Conditions of Contract (GCC), which stipulates that the award of the arbitrator shall be final and binding on both parties. It was urged, therefore, that there was no justification for judicial interference so as to reduce the statutory interest rate from 18% to 9% per annum. Counsel drew attention to _Shahi v. State of UP & Ors_ .[6] wherein this court, in light of Section 31(7), upheld 18% per annum as rate of interest, as justifiable. 7. Further, reliance was placed on this court’s judgment in _Secretary, Irrigation Department, State of Orissa v. G.C. Roy[7]_ to argue that when the agreement between the parties does not prohibit grant of interest and where the party claims interest in the dispute referred to an arbitrator, then the arbitrator does have the power to award interest _pendente lite_ . 8. Mr. Vikramjit Banerjee, Additional Solicitor General (ASG), appearing on behalf of the Respondent-state, argued that the impugned judgment had taken a holistic view of the matter, and rightfully reduced the interest from 18% compound interest to 9% simple interest, in addition to disallowing Claim No. 6 of ₹3,00,000 awarded by the arbitrator for non-issuance of tender. The High Court, it was urged, had considered all the aspects of the Indian Contract Act, > 6 [2019] 11 SCR 640 > 7 [1991] Supp. 3 SCR 417 4 1872 and the Arbitration and Conciliation Act, 1996 before deciding to reduce the interest to a more reasonable rate. 9. It was asserted that even the counsel for the appellants at the time, before the High Court, had agreed that the statutory rate of interest should be 1 or 2% higher or lower than the bank rate, which in the last decade has been about 7-8%. As a result, 18% compound rate of interest was completely unjustified, and warranted revision. 10. The ASG relied on several judgments of this court: _Municipal Corporation of Greater Mumbai and Anr v. Pratibha Industries Ltd. & Ors._[8] to stress on the scope of the inherent powers of the High Court as a constitutional court; _Oriental Structural Engineers Pvt. Ltd. v. State of Kerala[9]_ wherein the contract did not stipulate a rate of interest, and 18% awarded by the tribunal was held to be excessive and therefore, reduced to 8% simple interest by this court; and similarly _Post Graduate Institute of Medical Education and Research, Chandigarh v. Kalsi Construction Company_[10] wherein this court reduced the rate of interest from 18% awarded by the tribunal, to 9% simple interest, despite 18% having been the agreed upon rate of interest, given that the award was passed roughly 20 years prior. > 8 [2018] 14 SCR 1143 > 9 [2021] 4 SCR 137 > 10 (2019) 8 SCC 726 5 ## _**Analysis and conclusion**_ 11. Section 31(7)(b) of the 1996 Act, was amended by Act 3 of 2016, w.e.f. 23.10.2015. The pre-amended provision, empowers the arbitrator to award both pre-award and post-award interest, and specifies that the awarded sum would carry an interest of 18% per annum, unless provided otherwise, from the date of award till the date of payment. The pre-amended section, as it stood on the date of award by the arbitrator (21.01.1999), read as follows: ## _“_ _**31. Form and contents of arbitral award**_ _[…]_ _(7) (a) Unless otherwise agreed by the parties, where and in so far as an arbitral award is for the payment of money, the arbitral tribunal may include in the sum for which the award is made interest, at such rate as it deems reasonable, on the whole or any part of the money, for the whole or any part of the period between the date on which the cause of action arose and the date on which the award is made._ _(b) A sum directed to be paid by an arbitral award shall, unless the award otherwise directs, carry interest at the rate of eighteen per centum per annum from the date of the award to the date of payment.”_ _(emphasis provided)_ 12. This court in _Shahi & Associates_ (supra), which was relied upon by the appellants, dealt with a similar situation as the present factual matrix, and is squarely applicable: _“11. Section 31(7)(b) of the 1996 Act clearly mandates that, in the event the arbitrator does not give any specific directions as regards the rate of interest on the amount awarded, such amount “shall” carry interest @ 18% p.a. from the date of award till the date of payment. Since the Arbitration Act, 1940 has been repealed by way of Section 85 of the 1996 Act, the Schedule to the Arbitration Act, including the State amendment, also stands repealed. The only exception is provided in sub-section (2)(a) of Section 85 where a proceeding which had commenced when the Arbitration Act of 1940 was in force and continued even after coming into force of the 1996 Act, and all parties thereto agreed for application of the old Act of 1940. Therefore, the provisions of Arbitration Act, 1940 including the State amendment, namely,_ 6 _para 7-A inserted by Section 24 of the U.P. Amendment Act will have no application to the proceedings commenced after coming into force of the 1996 Act._ _12. In the instant case, though the agreement was earlier to the date of coming into force of the 1996 Act, the proceedings admittedly commenced on 27-101999 and were conducted in accordance with the 1996 Act. If that be so, para 7-A inserted by Section 24 of the U.P. Amendment Act has no application to the case at hand. Since the rate of interest granted by the arbitrator is in accordance with Section 31(7)(b) of the 1996 Act, the High Court and the District Judge were not justified in reducing the rate of interest by following the U.P. Amendment Act.”_ 13. In the present case, given that the arbitration commenced in 1997, i.e., after the Act of 1996 came into force on 22.08.1996, the arbitrator, and the award passed by them, would be subject to this statute. Under the enactment, i.e. Section 31(7), the statutory rate of interest itself is contemplated at 18% per annum. Of course, this is in the event the award does not contain any direction towards the rate of interest. Therefore, there is little to no reason, for the High Court to have interfered with the arbitrator’s finding on interest accrued and payable. Unlike in the case of the old Act, the court is powerless to modify the award and can only set aside partially, or wholly, an award on a finding that the conditions spelt out under Section 34 of the 1996 Act have been established. The scope of interference by the court, is well defined and delineated [refer to _Associate Builders v. Delhi Development Authority_[11] , _Ssangyong Engineering Construction Co. Ltd v. National Highways Authority of India (NHAI)_[12] and _Delhi Airport Metro Express Pvt. Ltd. v Delhi Metro Rail Corporation Ltd_[13] ]. > 11 [2014] 13 SCR 895 12 [2019] 7 SCR 522 > 13 [2021] 5 SCR 984 7 14. The reliance on _Kalsi Construction Company_ (supra) by the respondentstate, is inapt, given that this court had exercised its Article 142 jurisdiction in light of three pertinent factors – the award had been passed 20 years prior, related to construction of a Paediatrics Centre in a medical institute, and that the parties in that case had left the matter to the discretion of the court. Similarly, in _Oriental Structural Engineers_ (supra) this court held that since the contract stipulated interest entitlement on delayed payments, but contained no mention of the rate of interest applicable – the Tribunal ought to have applied the principles laid down in _G.C. Roy_ (supra), and therefore, in exercise of Article 142, this court reduced the rate of interest awarded by the tribunal on the sum left unpaid. The judgment in _Municipal Corporation of Greater Mumbai_ (supra) no doubt discusses the inherent powers of the High Court as a superior court of record, but relates specifically to the jurisdiction to recall its own orders, and offers little assistance in the present dispute. 15. The limited and extremely circumscribed jurisdiction of the court under Section 34 of the Act, permits the court to interfere with an award, _sans_ the grounds of patent illegality, i.e., that _“illegality must go to the root of the matter and cannot be of a trivial nature”_ ; and that the tribunal _“must decide in accordance with the terms of the contract, but if an arbitrator construes a term of the contract in a reasonable manner, it will not mean that the award can be set aside on this ground”_ [ref: _Associate Builders_ (supra)]. The other ground would 8 be denial of natural justice. In appeal, Section 37 of the Act grants narrower scope to the appellate court to review the findings in an award, if it has been upheld, or substantially upheld under Section 34. It is important to notice that the old Act contained a provision[14] which enabled the court to modify an award. However, that power has been consciously _omitted_ by Parliament, while enacting the Act of 1996. This means that the Parliamentary intent was to exclude power to modify an award, _in any manner,_ to the court. This position has been iterated decisively by this court in _Project Director, National Highways No. 45E and 220 National Highways Authority of India v M. Hakeem[15]_ : _“42. It can therefore be said that this question has now been settled finally by at least 3 decisions [McDermott International Inc. v. Burn Standard Co. Ltd., (2006) 11 SCC 181] , [Kinnari Mullick v. Ghanshyam Das Damani, (2018) 11 SCC 328 : (2018) 5 SCC (Civ) 106] , [Dakshin Haryana Bijli Vitran Nigam Ltd. v. Navigant Technologies (P) Ltd., (2021) 7 SCC 657] of this Court. Even otherwise, to state that the judicial trend appears to favour an interpretation that would read into Section 34 a power to modify, revise or vary the award would be to ignore the previous law contained in the 1940 Act; as also to ignore the fact that the 1996 Act was enacted based on the Uncitral Model Law on International Commercial Arbitration, 1985 which, as has been pointed out in Redfern and Hunter on International Arbitration, makes it clear that, given the limited judicial interference on extremely limited grounds not dealing with the merits of an award, the “limited remedy” under Section 34 is coterminous with the “limited right”, namely, either to set aside an award or remand the matter under the circumstances mentioned in Section 34 of the Arbitration Act, 1996.”_ > 14 _“_ _**15. Power of court to modify award** .—The court may by order modify or correct an award—_ > _(a) where it appears that a part of the award is upon a matter not referred to arbitration and such part can be separated from the other part and does not affect the decision on the matter referred; or_ > _(b) where the award is imperfect in form, or contains any obvious error which can be amended without affecting such decision; or_ > _(c) where the award contains a clerical mistake or an error arising from an accidental slip or omission.”_ > 15 [2021] 5 SCR 368 9 16. In view of the foregoing discussion, the impugned judgment warrants interference and is hereby set aside to the extent of modification of rate of interest for past, _pendente lite_ and future interest. The 18% per annum rate of interest, as awarded by the arbitrator on 21.01.1999 (in Claim No. 9) is reinstated. The respondent-state is hereby directed to accordingly pay the dues within 8 weeks from the date of this judgment. 17. The present appeal, and pending application(s) if any, stand disposed of in the above terms, with no order as to costs. **………………….……………..……J. [S. RAVINDRA BHAT]** **………………………………....…..J. [DIPANKAR DATTA]** **NEW DELHI AUGUST 11, 2023.** 10
End of Judgment Record
Browse All Landmark Cases Judgments
2019-01-22

State of Himachal Pradesh & Anr. v. Pinju Ram & Others; State of Himachal Pradesh & Ors. v. Ganesh Dutt & Anr.

This batch of appeals concerns regularisation and monetary benefits of part‑time employees in Himachal Pradesh who were converted to daily‑wage status. The State had issued a policy on 27 February 2004: part‑time Class‑IV employees who had completed ten years of continuous service as on 31 December 2003 would be made daily wagers with prospective effect, and posts vacated by such employees would stand abolished; Education and Ayurveda were excluded from the policy. Revenue Chowkidars, engaged by Panchayats, were not covered by that policy and received separate treatment. Following writ petitions and an order of the Himachal Pradesh High Court and in light of later developments, the State drew‑up directions in 2011 (22 September) to give seniority to Revenue Chowkidars on the basis of ten years of service, but with wages from the date of actual appointment and without back‑dated monetary benefits; 7 July 2012 further instructions reiterated this stance for remaining part‑time employees, with monetary benefits not guaranteed in the interregnum. The respondents pressed for back wages dating from 1 January 2007 and broader coverage. The Supreme Court held that the 2007 back‑pay direction was unsustainable, clarified that seniority would count from ten years without past benefits, and that the 2011 policy and Moti Singh principle should guide the approach. The appeals are allowed; no costs. The related writ petitions are to be disposed of consistent with these directions.

2018-08-14

Union Bank of India and Others v. C.G. Ajay Babu and Anr.

This is a Supreme Court of India appeal concerning the forfeiture of gratuity under the Payment of Gratuity Act, 1972. The respondent was a branch manager of the appellant bank and was dismissed on 3 June 2004 after disciplinary proceedings. A show-cause notice sought to forfeit gratuity due to misconduct involving moral turpitude, which was ordered on 20 April 2004. The High Court upheld the dismissal but held that gratuity could be paid since there was no financial loss to the bank, and that a bipartite settlement between the bank and employees permitted forfeiture only where misconduct caused financial loss. The Division Bench, however, held that forfeiture under Section 4(6) must be read together with Section 4(5) and that no loss was proven, thus entitling the employee to gratuity in accordance with the bipartite settlement. The Supreme Court agreed with the High Court that forfeiture is not automatic; it is controlled by Sections 4(5) and 4(6) of the Act and by the bipartite settlement, which requires loss to justify forfeiture. The Court emphasized that an act must constitute an offence involving moral turpitude and that conviction is generally required for forfeiture under 4(6)(b)(ii). The appeal is dismissed with no costs.

2018-09-25

Reema Salkan v. Sumer Singh Salkan

This is a Supreme Court of India criminal appeal under the Criminal Appellate Jurisdiction arising from a maintenance dispute under Section 125 Cr.P.C. The parties, married in 2002, had a protracted litigation history. The Family Court granted maintenance to the wife from 17 July 2003 to 8 December 2010, and held no maintenance thereafter. The High Court, in revision, partly allowed the application, directing Rs.9,000 per month from 9 December 2010 onward, while upholding the earlier period’s Rs.10,000 per month. This Court had earlier granted interim maintenance of Rs.20,000 per month in 2014 (Criminal Appeal Nos. 2347-2349 of 2014). The appellant contends there has been no change in circumstances since the interim order and that the respondent’s substantial assets, education, and overseas earnings establish the capacity to pay higher maintenance. The respondent defends the High Court’s reasoning, arguing that the Family Court’s assessment, demeanor observations, and the principle that maintenance should not be perpetual require careful scrutiny, and that the notional minimum wage approach used by the High Court is flawed. The overarching issue is the quantum of monthly maintenance payable to the appellant and whether the interim amount should be augmented beyond the period up to 2010.”

2019-12-03

M/s Embassy Property Developments Pvt. Ltd. v State of Karnataka & Ors.

This judgment concerns three Civil Appeals filed by a Resolution Applicant, the Corporate Debtor (through its Resolution Professional) and the Committee of Creditors, challenging an Interim Order of the Karnataka High Court staying an NCLT order in proceedings under the Insolvency and Bankruptcy Code, 2016. The NCLT Chennai had admitted an application under Section 7 of the IBC against M/s Tiffins Barytes Asbestos & Paints Ltd. and directed a moratorium under Section 14. The Interim Resolution Professional then sought a deemed extension of a mining lease under MMDR Act, 1957 and the Government of Karnataka rejected it. The NCLT, by an order dated 11.12.2018, set aside the Government’s order and directed execution of Supplement Lease Deeds for the period up to 31.03.2020. The Government of Karnataka challenged this in a High Court writ petition, which stayed the impugned NCLT order. The core issues were: (i) whether the High Court may interfere under Article 226/227 with an NCLT order in IBC when an appeal lies to the NCLAT, and (ii) whether fraud can be inquired into by NCLT/NCLAT in CIRP. The Court reiterates that IBC is a complete, umbrella code with a three‑tier mechanism (NCLT, NCLAT, Supreme Court) and that public‑law disputes arising from MMDR Act obligations lie outside IBC. It ultimately holds that while NCLT/NCLAT may inquire into fraud, they cannot adjudicate MMDR‑related public legal disputes; and the High Court’s writ jurisdiction in public‑law contexts remains permissible. The appeals are dismissed.