MR. ANAND RAO KORADA RESOLUTION PROFESSIONAL v. M/S. VARSHA FABRICS (P) LTD. & ORS.

Case / Petition Number:
Civil Appeal Nos. 8800-8801 of 2019
Neutral Citation:[2019] 14 S.C.R. 695

Case Synopsis & Summary

These Civil Appeals challenge interim orders of the Odisha High Court directing the sale of a large land asset owned by Hirakud Industrial Works Ltd. during the pendency of the Corporate Insolvency Resolution Process (CIRP) against the corporate debtor. The appellant, the Resolution Professional appointed by the National Company Law Tribunal (NCLT), contends that once CIRP was admitted and a moratorium under Section 14 of the Insolvency and Bankruptcy Code, 2016 (IBC) was declared, the High Court had no jurisdiction to order alienation of assets or to conduct an auction, as such actions would undermine the CIRP and jeopardize stakeholder value. The High Court had earlier directed sale of land to satisfy workmen’s arrears following Labour Court directives and older orders dating from 2012-2017. The NCLT admitted the Section 7 petition on 04.06.2019, and declared moratorium. The Supreme Court held that the High Court’s interim orders dated 14 August 2019 and 5 September 2019 were not proper in view of the moratorium and the overriding provisions of the IBC. It set aside the High Court orders to prevent parallel proceedings and clarified that asset disposal must be governed by the IBC, while allowing Hirakud Workers’ Union to pursue claims under Regulation 9 before the interim resolution professional. The decision reinforces CIRP primacy and protects stakeholder interests.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • Indu Malhotra
  • R. Subhash Reddy
Judgment Date
2019-11-18
Court Decision / Holding
Appeals allowed. The impugned interim orders of the Odisha High Court directing sale/auction of assets during the CIRP are set aside. The sale/liquidation of assets will be governed by the IBC, and workers’ dues may be pursued under Regulation 9 before the interim resolution professional. The Civil Appeals are allowed in the terms stated; the parties may pursue remedies under law.
Final Disposition
Appeals allowed

Parties to the Case

Appellants / Petitioners

  • MR. ANAND RAO KORADA, Resolution Professional

Respondents

  • M/S. VARSHA FABRICS (P) LTD.
  • India Finance Ltd.
  • Mudrika Commercial Pvt. Ltd.
  • Hirakud Industrial Works Ltd.
  • Industrial Development Corporation of Orissa Ltd.
  • Hirakud Workers’ Union

Legal Representation & Advocates

Counsels for Petitioners

  • • Siddharth Bhatnagar, Sr. Adv.; Ashok Jain; Pankaj Jain; Amit A Kasera; Bijoy Kumar Jain; Aditya Sidhra, Advs.

Counsels for Respondents

  • • Vikramjeet Banerjee, ASG; C.U. Singh, Sr. Adv.; Shibashish Misra; S. Debabrata Reddy; Ashish Prasad; Ms. Mukta Dutta; Rajesh J.; Avinash Tripathi; Zain Maqbool; Rohit Sharma; Mahfooz Ahsan Nazki; Rajesh K. Singh; R.R. Rajesh; Anshul Gupta; Sudhakar Kulwant; Raj Bahadur Yadav; Ms. Archana Pathak Dave; Sandeep Pathak

Provisions of Law Cited

Section 7 of the Insolvency and Bankruptcy Code, 2016Section 12 of the Insolvency and Bankruptcy Code, 2016Section 13 of the Insolvency and Bankruptcy Code, 2016Section 14 of the Insolvency and Bankruptcy Code, 2016Section 15 of the Insolvency and Bankruptcy Code, 2016Section 31(1) of the Insolvency and Bankruptcy Code, 2016Section 33 of the Insolvency and Bankruptcy Code, 2016Section 238 of the Insolvency and Bankruptcy Code, 2016Section 231 of the Insolvency and Bankruptcy Code, 2016Regulation 9 of the Insolvency and Bankruptcy Board of India (Insolvency Resolution Process for Corporate Persons) Regulations, 2016

Legal Doctrines & Maxims

  • Moratorium under Section 14 of the IBC
  • Exclusive jurisdiction of NCLT and NCLAT under Section 238
  • Bar of jurisdiction under Section 231
  • Overriding effect of the IBC over other laws under Section 238

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant contends that once the Corporate Insolvency Resolution Process had commenced and a moratorium declared under the IBC, the High Court could not direct auction or alienation of the debtor's assets. The CIRP must be allowed to run free of parallel proceedings; the moratorium under Section 14 bars enforcement actions and asset transfers except as provided; The NCLT order declaring moratorium in June 2019 halted disposals; The High Court's interim orders dated 14 August 2019 and 5 September 2019 were beyond its power and would jeopardize the value maximization objective of the Code. The appropriate remedy is to stay writ petitions pending the CIRP and permit claims to be pursued under Regulation 9 before the interim resolution professional; The Court should reaffirm the primacy of the CIRP and withdraw the auction process from the High Court's jurisdiction.

Contentions of Respondents

The respondents contend that the High Court's order to auction assets was a lawful mechanism to recover workmen’s arrears and dues, rooted in Labour Court directives and prior orders from 2012-2017. They argue that the moratorium protects the corporate debtor from new proceedings but does not disable workers’ claims or the Labour Court’s mechanisms to recover dues; they urge that Regulation 9 permits pursuing workers’ claims before the interim resolution professional; They maintain that the High Court’s involvement was proper to safeguard workers’ rights and to obtain price discovery, and that CIRP should not automatically preclude all asset realization under existing statutes; they seek to preserve continuity of remedies for arrears.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,230 words•~15 min read

In The Court Record

MR. ANAND RAO KORADA RESOLUTION PROFESSIONAL v. M/S. VARSHA FABRICS (P) LTD. & ORS.

695 [2019] 14 S.C.R. 695 MR. ANAND RAO KORADA RESOLUTION PROFESSIONAL A v. M/S. VARSHA FABRICS (P) LTD. & ORS. (Civil Appeal Nos. 8800-8801 of 2019) NOVEMBER 18, 2019 B ## **[INDU MALHOTRA AND R. SUBHASH REDDY JJ.]** _Insolvency and Bankruptcy Code, 2016 – ss.7, 13, 14, 231 and 238 – Respondent No.5 divested its 100% shareholding in respondent No.4 in favour of respondent Nos.1 to 3 – Respondent No.4 shut down its factory – Respondent No.13-Workers’ Union filed writ petition and sought payment of arrears and current salaries of the workmen – High Court directed Labour court to quantify the amount payable to workmen – During the pendency of the writ petition, a financial creditor filed petition u/s 7 of the IBC, 2016 before NCLT for initiation of the Corporate Insolvency Resolution Process (CRPF) against respondent No.4 – NCLT declared moratorium u/s.14 of the IBC – During the pendency of moratorium, in the pending writ petition High Court directed valuation of a land owned by respondent No.4 and passed the orders for carrying out auction of the assets of the respondent No.4 – Propriety of – Held: Not proper – In view of the provisions of the IBC, the High Court was not justified in passing the orders for carrying out auction of the assets of the respondent No.4, once the proceedings under the IBC had commenced and an order declaring moratorium was passed by the NCLT – Alienation of the assets of the respondent No.4 during the pendency of the proceedings under the IBC would jeopardise the interest of all the stakeholders – However, it is open for the respondent No.13 to file an application u/regulation 9 of the IBC for payment of arrears, salaries before the competent authority – Therefore, orders passed by the High Court set aside._ C D E F G ## **Allowing the appeals, the Court** **HELD: 1. The Insolvency and Bankruptcy Code, 2016 was published in the Gazette of India on 28.05.2016. It was framed as a complete code to consolidate and amend the laws relating to insolvency resolution of corporate entities, partnership firms,** H 695 696 SUPREME COURT REPORTS [2019] 14 S.C.R. - A **and individuals in a time-bound manner, for maximisation of the value of the assets of such persons, and balance the interest of all the stakeholders. The Corporate Insolvency Resolution Process (“CIRP”) could be initiated when a corporate debtor commits a default, either by a financial creditor, or an operational creditor, or the corporate debtor itself. Section 12 of the IBC** - B **provides a time-frame to complete the CIRP. As per Section 13 of the IBC, the Adjudicating Authority i.e. the National Company Law Tribunal (“NCLT”) shall declare a moratorium for the purposes referred to in Section 14 of the IBC. [Para 6] [699G-H; 700-A-B]** - C **2. In view of the provisions ss.14, 231 and 238 of the IBC,** - **the High Court ought not to have proceeded with the auction of the property of the Corporate Debtor – Respondent No. 4 herein, once the proceedings under the IBC had commenced, and an Order declaring moratorium was passed by the NCLT.** - D **The High Court passed the impugned Interim Orders dated 14.08.2019 and 05.09.2019 after the CIRP had commenced in this case. The moratorium having been declared by the NCLT on 04.06.2019, the High Court was not justified in passing the Orders dated 14.08.2019 and 05.09.2019 for carrying out auction of the assets of the Respondent No. 4 – Company i.e. the** - E **Corporate Debtor before the NCLT. The subject matter of the auction proceedings before the High Court is a vast chunk of land admeasuring about 330 acres, including Railway lines and buildings. If the assets of the Respondent No. 4 – Company are alienated during the pendency of the proceedings under the IBC,** - F **it will seriously jeopardise the interest of all the stakeholders. As a consequence, this Court set aside the impugned Interim Orders dated 14.08.2019 and 05.09.2019 passed by the High Court, as parallel proceedings with respect to the main issue cannot take place in the High Court. The sale or liquidation of the assets of Respondent No. 4 will now be governed by the** - G **provisions of the IBC. [Para 9] [702-B-F]** CIVIL APPELLATE JURISDICTION : Civil Appeal Nos 88008801 of 2019. - From the Judgment and Order dated 14.08.2019 & 05.09.2019 - H of the High Court of Orissa at Cuttack in W.P. (C) No. 7939 of 2011. ## MR. ANAND RAO KORADA RESOLUTION PROFESSIONAL 697 v. M/S. VARSHA FABRICS (P) LTD. Siddharth Bhatnagar, Sr. Adv., Ashok Jain, Pankaj Jain, Amit A Kasera, Bijoy Kumar Jain, Aditya Sidhra, Advs. for the Appellant. Vikramjeet Banerjee, ASG, C.U. Singh, Sr. Adv., Shibashish Misra, S. Debabrata Reddy, Ashish Prasad, Ms. Mukta Dutta, Rajesh J., Avinash Tripathi, Zain Maqbool, Rohit Sharma, Mahfooz Ahsan Nazki, Rajesh K. Singh, R.R. Rajesh, Anshul Gupta,. Sudhakar Kulwant, Raj Bahadur Yadav, Ms. Archana Pathak Dave, Sandeep Pathak, for the Respondents. B The Judgment of the Court was delivered by ## **INDU MALHOTRA, J.** Leave granted. 1. The present Civil Appeals have been filed by the Appellant – Resolution Professional appointed by the National Company Law Tribunal for the Corporate Debtor – M/s Hirakud Industrial Works Ltd., to challenge the interim Orders dated 14.08.2019 and 05.09.2019 passed by the Odisha High Court in W.P. (Civil) No. 7939/2011. C D 2. This Court _vide_ Order dated 23.09.2019 issued Notice to all the parties, including the Writ Petitioners i.e. the Hirakud Workers’ Union – Respondent No. 13 herein. The Appellant was directed to serve _Dasti_ Notice to all the Respondents, and the auction proceedings before the High Court were directed to be stayed. 3. Pursuant to the issuance of Notice, all the Respondents were served by the Appellant, and proof of service was filed on 04.11.2019. Respondent No. 13 – Hirakud Workers’ Union was however not represented by Counsel. The Civil Appeals were taken up for hearing on 13.11.2019 before this Court. 4. The factual matrix in which the present Civil Appeals have been filed is as under :– 4.1 M/s Varsha Fabrics Pvt. Ltd. (Respondent No. 1), India Finance Ltd. (Respondent No. 2), Mudrika Commercial Pvt. Ltd. (Respondent No. 3), Hirakud Industrial Works Ltd. (Respondent No. 4), and Industrial Development Corporation of Orissa Ltd. (Respondent No. 5) entered into a Share Purchase Agreement (“SPA”) dated 10.07.2006. As per the SPA, Respondent No. 5 divested its 100% shareholding in Respondent No. 4 in favour of Respondent Nos. 1 to 3. Respondent No. 4 shut down its factory on 08.05.2007. E F G H 698 SUPREME COURT REPORTS [2019] 14 S.C.R. - A B - 4.2 Subsequently, Respondent Nos. 1 to 3 sold their stake in Respondent No. 4 to Indo Wagon Engineering Ltd. Respondent No. 13 – the Hirakud Workers’ Union filed W.P. (Civil) No. 12479/2009 before the Odisha High Court praying _inter alia_ for cancellation of the SPA dated 10.07.2006, and payment of the arrears and current salaries of the workmen. - 4.3 Respondent No. 13 filed another Writ Petition bearing W.P. (Civil) No. 7939/2011 on 28.03.2011 for payment of their dues before the Odisha High Court. C - 4.4 The High Court _vide_ Order dated 14.03.2012 directed the Deputy Labour Commissioner, Sambalpur Division (Respondent No. 10 herein) to recover the workmen’s dues by sale of the assets of Respondent No. 4 – Company through a public auction. - 4.5 These proceedings culminated in the Order dated - D 03.08.2015 passed by this Court, wherein it was directed that the issue of quantifying the compensation payable to the workmen should be determined by the Labour Court. It was further directed that if Respondent Nos. 1 to 3 fail to make the payment of compensation to the workmen, the - E assets of Respondent No. 4 would be sold through public auction, and the proceeds would be used for disbursement of the arrears of the workmen. - F - 4.6 The Labour Court, Sambalpur _vide_ Order dated 11.11.2016 quantified the amount payable to the workmen as Rs. 45,66,67,133/-. - 4.7 The High Court _vide_ Order dated 12.01.2017 directed the Deputy Labour Commissioner, Sambalpur Division to sell a parcel of Respondent No. 4’s land admeasuring 157.27 acres to the Hirakud Dam Project. G - Upon receipt of the sale proceeds of Rs. 10,04,12,105/from the Government of Orissa, this amount was disbursed towards the arrears of the workmen’s dues. - 4.8 During the pendency of proceedings before the High Court in W.P. (Civil) No. 7939/2011, M/s Nandakini Contractors Pvt. Ltd – a Financial Creditor filed a Petition under - H Section 7 of the IBC, 2016 bearing CP (IB) No. 01/CTB/ ## MR. ANAND RAO KORADA RESOLUTION PROFESSIONAL v. M/S. VARSHA FABRICS (P) LTD. [INDU MALHOTRA, J.] 699 2019, before the National Company Law Tribunal, Cuttack A Bench (“NCLT”) for initiation of the Corporate Insolvency Resolution Process (“CIRP”) against the Corporate Debtor – Respondent No. 4, since it had committed a default in paying the financial debt of Rs. 24,11,975/-. - 4.9 The NCLT _vide_ Order dated 04.06.2019 admitted the insolvency petition, and declared a moratorium in accordance with the provisions of Sections 13 and 15 of the IBC. The moratorium was declared for the purpose referred to in Section 14 of the IBC. The Appellant herein was appointed as the Insolvency Resolution Professional. - 4.10 During the pendency of the moratorium, W.P. (Civil) 7939/ 2011 was posted for hearing on 14.08.2019 before the High Court. The Additional Government Advocate submitted that the valuation of the land in Mouza – Tara Nagar owned by Respondent No. 4 was Rs. 6,05,000/- per acre. The High Court directed the Additional Government Advocate to file an affidavit with respect to the valuation conducted. - 4.11 The High Court by a further Order dated 05.09.2019, recorded the submission of the Appellant – Resolution Professional that there were other companies which had expressed an interest to participate in the public auction. The matter was posted for further hearing on 17.09.2019. - 4.12 The Appellant – Resolution Professional filed the present Civil Appeals to challenge the Interim Orders dated 14.08.2019 and 05.09.2019 passed by the Odisha High Court in W.P. (Civil) No. 7939/2011 on the ground that since the CIRP against Respondent No. 4 had commenced, the proceedings before the High Court in W.P. (Civil) No. 7939/2011 ought to be stayed. 5. We have heard the learned Counsel appearing for the Appellant – Resolution Professional, Respondent Nos. 1 to 3, and Respondent No. 8 – HINDALCO. 6. The IBC was published in the Gazette of India on 28.05.2016. It was framed as a complete code to consolidate and amend the laws relating to insolvency resolution of corporate entities, partnership firms, and individuals in a time-bound manner, for maximisation of the value of the assets of such persons, and balance the interest of all the - B C D E F G H 700 SUPREME COURT REPORTS [2019] 14 S.C.R. - A stakeholders. The Corporate Insolvency Resolution Process (“CIRP”) could be initiated when a corporate debtor commits a default, either by a financial creditor, or an operational creditor, or the corporate debtor itself. - Section 12 of the IBC provides a time-frame to complete the - CIRP. - B As per Section 13 of the IBC, the Adjudicating Authority i.e. the National Company Law Tribunal (“NCLT”) shall declare a moratorium for the purposes referred to in Section 14 of the IBC. - Section 14 provides that on the insolvency commencement date, - C the Adjudicating Authority shall by order, declare a moratorium prohibiting the institution of suits, or continuation of pending suits or “proceedings” against the corporate debtor, including execution of any judgment, decree, or order in any court of law, tribunal, arbitration panel, or any other authority. Section 14 reads as follows : - D ## _“_ _**14. Moratorium. –**_ - _(1) Subject to provisions of sub-sections (2) and (3), on the insolvency commencement date, the Adjudicating Authority shall by order declare moratorium for prohibiting all of the following, namely: -_ - E _(a) the institution of suits or continuation of pending suits or proceedings against the corporate debtor including execution of any judgement, decree or order in any court of law, tribunal, arbitration panel or other authority;_ - F G H - _(b) transferring, encumbering, alienating or disposing off by the corporate debtor any of its assets or any legal right or beneficial interest therein;_ - _(c) any action to foreclose, recover or enforce any security interest created by the corporate debtor in respect of its property including any action under the Securitisation and Reconstruction of Financial Assets and Enforcement of Security Interest Act, 2002 (54 of 2002);_ - _(d) the recovery of any property by an owner or lessor where such property is occupied by or in the possession of the corporate debtor._ ## MR. ANAND RAO KORADA RESOLUTION PROFESSIONAL 701 v. M/S. VARSHA FABRICS (P) LTD. [INDU MALHOTRA, J.] - _(2) The supply of essential goods or services to the_ A _corporate debtor as may be specified shall not be terminated or suspended or interrupted during moratorium period._ - _(3) The provisions of sub-section (1) shall not apply to —_ - _(a) such transaction as may be notified by the Central_ B _Government in consultation with any financial regulator;_ - _(b) a surety in a contract of guarantee to a corporate debtor._ - _(4) The order of moratorium shall have effect from the date of such order till the completion of the corporate insolvency resolution process:_ _Provided that where at any time during the corporate insolvency resolution process period, if the Adjudicating Authority approves the resolution plan under sub-section (1) of section 31 or passes an order for liquidation of corporate debtor under section 33, the moratorium shall cease to have effect from the date of such approval or liquidation order, as the case may be.”_ 7. Section 238 gives an overriding effect to the IBC over all other laws. The provisions of the IBC vest exclusive jurisdiction on the NCLT and the NCLAT to deal with all issues pertaining to the insolvency process of a corporate debtor, and the mode and manner of disposal of its assets. Section 238 reads as follows : - C D E ## _“_ _**238. Provisions of this Code to override other laws. –**_ _The provisions of this Code shall have effect, notwithstanding anything inconsistent therewith contained in any other law for the time being in force or any instrument having effect by virtue of any such law.”_ F 8. Section 231 of the IBC bars the jurisdiction of civil courts in respect of any matter in which the Adjudicating Authority i.e. the NCLT G or the NCLAT is empowered by the Code to pass any Order. Section 231 is set out hereinbelow for ready reference : ## _“_ _**231. Bar of jurisdiction. –**_ _No civil court shall have jurisdiction in respect of any matter in which the Adjudicating Authority or the Board is_ H 702 SUPREME COURT REPORTS [2019] 14 S.C.R. - A _empowered by, or under, this Code to pass any order and no injunction shall be granted by any court or other authority in respect of any action taken or to be taken in pursuance of any order passed by such Adjudicating Authority or the Board under this Code.”_ - B 9. In view of the provisions of the IBC, the High Court ought not to have proceeded with the auction of the property of the Corporate Debtor – Respondent No. 4 herein, once the proceedings under the IBC had commenced, and an Order declaring moratorium was passed by the NCLT. The High Court passed the impugned Interim Orders dated 14.08.2019 and 05.09.2019 after the CIRP had commenced in - C this case. The moratorium having been declared by the NCLT on 04.06.2019, the High Court was not justified in passing the Orders dated 14.08.2019 and 05.09.2019 for carrying out auction of the assets of the Respondent No. 4 – Company i.e. the Corporate Debtor before the D NCLT. The subject matter of the auction proceedings before the High Court is a vast chunk of land admeasuring about 330 acres, including Railway lines and buildings. E If the assets of the Respondent No. 4 – Company are alienated during the pendency of the proceedings under the IBC, it will seriously jeopardise the interest of all the stakeholders. As a consequence, we set aside the impugned Interim Orders dated 14.08.2019 and 05.09.2019 passed by the Odisha High Court, as parallel proceedings with respect to the main issue cannot take place in the High Court. The sale or liquidation of the assets of Respondent No. 4 will now be governed by the provisions of the IBC. F 10. It is open for Respondent No. 13 – Hirakud Workers’ Union to file an application under Regulation 9 of the Insolvency and Bankruptcy Board of India (Insolvency Resolution Process for Corporate Persons) Regulations, 2016 for payment of arrears, salaries and other dues before the competent authority. Regulation 9 reads as G follows :– ## _“_ _**9. Claims by workmen and employees.**_ H _(1) A person claiming to be a workman or an employee of the corporate debtor shall submit claim with proof to the interim resolution professional in person, by post or by electronic means in Form D of the Schedule:_ 703 ## MR. ANAND RAO KORADA RESOLUTION PROFESSIONAL v. M/S. VARSHA FABRICS (P) LTD. [INDU MALHOTRA, J.] _Provided that such person may submit supplementary_ A _documents or clarifications in support of the claim, on his own or if required by the interim resolution professional, before the constitution of the committee._ _(2) Where there are dues to numerous workmen or employees of the corporate debtor, an authorised representative may_ B _submit one claim with proof for all such dues on their behalf in Form E of the Schedule._ _(3) The existence of dues to workmen or employees may be proved by them, individually or collectively on the basis of -_ - _(a) records available with an information utility, if any; or_ C - _(b) other relevant documents, including -_ - _(i) a proof of employment such as contract of employment for the period for which such workman or employee is claiming dues;_ - _(ii) evidence of notice demanding payment of unpaid_ D _dues and any documentary or other proof that payment has not been made; or_ - _(iii) an order of a court or tribunal that has adjudicated upon the non-payment of a dues, if any.”_ 11. Mr. C.U. Singh, Senior Advocate appeared for Respondent No. 8 – HINDALCO, which had participated in the public auction of the aforesaid chunk of land before the High Court. The Counsel raised serious objections to the stay of the auction proceedings. He sought permission to file an application before the appropriate authority for deciding the objections raised by Respondent No. 8. E F Mr. Siddharth Bhatnagar, Senior Advocate who was representing the Appellant – Resolution Professional, reserved his right to raise all pleas and contentions, including the plea of _locus standi_ , if such an application is filed by Respondent No. 8. The parties are granted liberty to pursue whatever remedies are available in accordance with law. G The Civil Appeals are allowed in the aforesaid terms. H Ankit Gyan Appeals allowed.
End of Judgment Record
Browse All Supreme Court of India (2019) Decisions
2019-09-03

Uber India Systems Pvt. Ltd. v. Competition Commission of India & Ors.

Uber India Systems Pvt. Ltd. v. Competition Commission of India & Ors. concerns allegations that Uber, in its ride‑hailing network, abused a dominant position under the Competition Act, 2002. The case arose on appeals challenging the Competition Appellate Tribunal’s order in Appeal No. 31 of 2016, which upheld the Director General’s inquiry into whether Uber’s pricing and incentive practices violated Section 4. The Supreme Court analysed whether the information before it sufficed to constitute a prima facie case under Section 26(1) and whether there was abuse of a dominant position in the National Capital Region. It focused on the two ingredients for abuse: the existence of a dominant position and its misuse. The court considered, based on a statement summarizing driver incentives and a period when Uber reportedly paid high incentives to fleet owners, that Uber may have pursued a pricing strategy that would affect its competitors. Under Section 4(2)(a), abuse includes an unfair price, including predatory pricing. The Court accepted that there is a prima facie case for infringement, yet did not itself interfere with the Appellate Tribunal’s order and dismissed the appeals. It directed the Director General to complete the investigation within six months from today.

2019-07-19

STATE OF BIHAR & ORS. v. DR. CHAITRAYA KUMAR SINGH & ORS.

This civil appeal concerns the reorganization of the erstwhile Bihar into Bihar and Jharkhand in 2000 and the post-allocation transfer of an employee. The first respondent, Dr. Chaitraya Kumar Singh, was initially allocated to Jharkhand in 2007 as an Ayurvedic Medical Officer and, following Union guidelines permitting transfer after final allocations, was re-allocated to Bihar on 6 September 2010 with mutual consent of both States. Bihar issued formal orders, and the respondent joined Jharkhand in 2007; however, he remained in Jharkhand and continued to work there until his retirement on 30 April 2017. A few days before retirement, he filed a writ petition in Jharkhand seeking relief to join Bihar and to be relieved by Jharkhand so that Bihar could accept joining. The Jharkhand High Court confirmed a Single Judge’s order directing Bihar to absorb him. The appellants contend that after the 2010 allocation there was no vacancy, the respondent did not pursue available remedies promptly, and seven years of service in Jharkhand after allocation render absorption in Bihar inappropriate. The Court agrees, noting the allocation to Bihar continued to hold and the petitioner failed to pursue remedies in time; his superannuation in Jharkhand eliminates the basis for absorption. The relieving order issued post-retirement is irrelevant. The appeal is allowed, the High Court’s order set aside, and there shall be no costs; pending applications are disposed.

2019-01-07

PUNJAB FINANCIAL CORPORATION v. M/S PAULBRO LEATHERS PVT. LTD.

Punjab Financial Corporation (lender) filed against Paulbro Leathers Pvt. Ltd. after Paulbro defaulted on a loan. The dispute was settled under the Corporation’s One Time Settlement (OTS) policy on 01.04.2003, and a court-ordered reference to a Chartered Accountant (CA) was made to determine the remaining outstanding balance. After the CA submitted his report, a new dispute arose about the precise liability and how much had been paid, prompting the Corporation to issue a demand for Rs. 49,86,713 which Paulbro disputed in a writ petition before the Punjab and Haryana High Court. The High Court allowed the petition on the ground that the entire exercise had been carried out with consent and no objection had been raised, effectively barring re-opening of the settlement. The appellant challenged these rulings in this Court. The Supreme Court held that the settlement created a fresh dispute arising out of its terms and that the matter must be decided on its merits under the law. It emphasized that the High Court should record how and on what basis Paulbro satisfied the settlement and discharged liability, and if needed, refer the report to another CA. The Court remanded the case to the High Court to decide the writ petition afresh on merits, with a directions to decide expeditiously (preferably within six months).

2019-12-06

RAJESH KUMAR DWIVEDI v. STATE OF U.P. & ANR.

Rajesh Kumar Dwivedi challenges the rejection of his candidature for the post of Instructor in Fitter at Government Industrial Training Institutes in Uttar Pradesh. An advertisement of 17 March 2008 required candidates to possess a certificate in the respective trade from the NCVT, in addition to experience. Dwivedi possessed three National Trade Certificates from Model Industrial Training Institute, Haldwani (one-year basic training in Mechanical, six-month Fitter General module, six-month Metrology and Engineering Inspection), but did not hold a two-year NCVT certificate. The High Court had dismissed his writ petition, holding that three separate courses could not be treated as equivalent to the NCVT qualification. Dwivedi relied on (i) the 16 December 1983 circular clarifying equivalence between the Restructured and Conventional patterns of the Craftsmen Training Scheme, and (ii) 1988 and 1992 UP circulars recognizing MITI, Haldwani training as equivalent to NCVT, including a two-year Fitter trade certificate. The State argued that the amended UP ITI Rules require NCVT certification and that the reliance on circulars cannot override the Rules. The Supreme Court held that the eligibility condition is to have a certificate in the respective trade from NCVT, and that if the State had earlier treated certain qualifications as equivalent through its circulars, such equivalence cannot be disregarded. Consequently, the appellant’s candidature could not be validly rejected, and the State was directed to appoint him within two months. The decision underscores how State-issued equivalence can complement or override rigid Rule-based qualifications when consistently recognized.