MODERN INDUSTRIES v. STEEL AUTHORITY OF INDIA LTD. TH. M.D. & ORS.

Case / Petition Number:
Civil Appeal Nos. 3305-3306 of 2010
Neutral Citation:[2010] 4 S.C.R. 560

Case Synopsis & Summary

Modern Industries, a supplier, challenged an ex parte award of the Industry Facilitation Council (IFC) for delayed payments against Steel Authority of India Ltd. (Rourkela Steel Plant). The dispute arose from a contract dated 15 January 1983 for manufacturing a Right Manipulator Side Guard, with varying terms and a last alteration in 1995. The 1993 Act, as amended in 1998, makes suppliers’ recovery of the principal sum and interest possible under Sections 3–6, and allows disputes to be referred to the IFC under Section 6(2). The Orissa High Court held that Section 6(1) requires the amount due from a buyer to be admitted as a plain liability, and that IFC could not entertain disputes where the liability was contested; it also questioned the Act’s applicability to earlier contracts. The Supreme Court, in a judgment by Justice Lodha (with Justice Raveendran concurring), reversed. It held that the Act’s object is to ensure prompt payment and statutory interest on default, and that the expression “amount due from a buyer” must be interpreted in light of this object, not restrictively. The word “together” means “along with,” enabling recovery of principal and interest or interest where liability is admitted or disputed. Section 6(2) empowers IFC to determine the amount due where liability is disputed, with the Arbitration and Conciliation Act, 1996 applying. The Court held the 1993 Act prospective and applicable to post-enactment changes, such as the 1995 alterations. The appeals are allowed, the High Court’s judgment is set aside, and the parties bear their own costs.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • R. V. Raveendran
  • R. M. Lodha
Judgment Date
2010-04-15
Court Decision / Holding
Appeals allowed. High Court judgment dated 18 February 2008 set aside. The impugned judgment is overruled and the IFC’s jurisdiction to adjudicate under Section 6(2) is affirmed; the matter is in line with the interpretation that ‘amount due’ includes principal and interest where liability is disputed, and the Act applies prospectively to post-enactment contracts or alterations; there is no embargo on pursuing recovery of interest and principal through IFC and related proceedings.
Final Disposition
Appeals allowed; High Court judgment set aside; Costs to be borne by the parties.

Parties to the Case

Appellants / Petitioners

  • M/S. MODERN INDUSTRIES

Respondents

  • M/S. STEEL AUTHORITY OF INDIA LTD.
  • M/S. MD. & ORS.

Legal Representation & Advocates

Counsels for Petitioners

  • • Prashant Bhushan
  • • Sumeet Sharma
  • • Y. Raja Gopala Rao

Counsels for Respondents

  • • Ashwani Kumar
  • • Sunil Kumar Jain
  • • Aneesh Mittal
  • • K.P.S. Chani
  • • Shibashish Misra
  • • D.S. Mahra

Provisions of Law Cited

Interest on Delayed Payments to Small Scale and Ancillary Industrial Undertakings Act, 1993 — Section 3Interest on Delayed Payments to Small Scale and Ancillary Industrial Undertakings Act, 1993 — Section 4 (as amended in 1998)Interest on Delayed Payments to Small Scale and Ancillary Industrial Undertakings Act, 1993 — Section 5Interest on Delayed Payments to Small Scale and Ancillary Industrial Undertakings Act, 1993 — Section 6(1)Interest on Delayed Payments to Small Scale and Ancillary Industrial Undertakings Act, 1993 — Section 6(2)Interest on Delayed Payments to Small Scale and Ancillary Industrial Undertakings Act, 1993 — Section 7Arbitration and Conciliation Act, 1996

Legal Doctrines & Maxims

  • Notwithstanding anything contained in any agreement (non-obstante clause)
  • Interpretation of statute in light of its object and purpose
  • Word 'together' means along with (not restrictedly) in Section 6(1)
  • The Act is prospective in operation
  • Arbitration and Conciliation Act, 1996 applies to IFC disputes as if under arbitration agreement

Submissions & Arguments

Contentions of Appellants / Petitioners

The suppliers urged that Section 6(2) empowers a dispute to be referred to the Industry Facilitation Council for recovery of the amount due along with interest where liability is disputed or admitted. The object of the 1993 Act is to provide a single-window remedy, enabling recovery of the principal and interest through a suit or other proceedings; IFC can determine the amount due when liability is disputed, and the Arbitration and Conciliation Act, 1996 applies to such disputes as if they arise under an arbitration agreement. The word 'together' should be read to include principal and interest; the Act is prospective and can apply to contracts last altered after 1992, where alteration falls within the Act’s scope; the High Court’s interpretation restricting 6(2) to admitted liability defeats the Act’s purpose.

Contentions of Respondents

The buyers contended that Section 6(2) only contemplates disputes where liability is admitted, settled, or determined; recovery of interest without a settled liability is not provided. They argued that the Act’s Preamble and purposes should not override the literal meaning of 'amount due' and that pre-1993 contracts should not fall within the Act’s ambit; reliance was placed on decisions like State of Kerala v. V.R. Kalliyanikutty and State of Gujarat v. Mirzapur Moti Kassab Jamat to support a restricted interpretation and to emphasize prospective operation of the Act.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (15)

Case NameCitationTreatmentExplanation
Assam State Electricity Board and Ors. v. Shanti Conductors Pvt. Ltd. and Anr.(2002) 2 GLR 550PositiveApproved by the Supreme Court; supports interpretation that 'together' means 'along with'.
State of Kerala and Ors. v. V.R. Kalliyanikutty and Anr.(1999) 3 SCC 657Mentioned OnlyCited in discussion of 'amount due' but not central to the holding.
State of Gujarat v. Mirzapur Moti Kureshi Kassab Jamat and Ors.(2005) 8 SCC 534PositiveCited to support that Preamble and purpose guide interpretation.
Bonam Satyavathi v. Adda/a Raghavulu(1994 Suppl) 2 SCC 556Mentioned OnlyListed as supporting citation in passing.
Central Bank of India v. State of Kerala and Ors.(2009) 4 SCC 94Mentioned OnlyCited in passing; not central to the ruling.
Eastern Coalfields Limited v. Sanjay Transport Agency and Anr.(2009) 7 SCC 345Mentioned OnlyCited in background.
Assam Small Scale Industries Development Corpn. Ltd. and Ors. v. J.D. Pharmaceuticals and Anr.(2005) 13 SCC 19PositiveKey authority on prospective operation and applicability to post-date transactions.
Shakti Tubes Limited v. State of Bihar and Ors.(2009) 7 SCC 673PositiveFollowed Assam Small Scale decision; supports interpretation.
Madan Mohan and Anr. v. Krishan Kumar Sood(1994 Supp (1) SCC 437Mentioned OnlyCited for general meaning of 'amount due' in statutes.
Maharashtra State Cooperative Bank Limited v. The Assistant Provident Fund Commissioner and Ors.(2009) 10 SCC 123Mentioned OnlyCited as analogy.
Secur Industries Ltd. v. Godrej & Boyce Mfg. Co. Ltd.(2004) 3 SCC 447PositiveCited for IFC acting as arbitrator/conciliator under 1996 Act.
Irish Land Commission v. Viscount Massereene and Ferrard(1904) 2 IR 1113Mentioned OnlyDictionaries cited; context not central.
Hibernian Bank v. Yourell(1919) 1 IR Ch. D. 310Mentioned OnlyCited for interpretation of ‘due’.
V.R. KalIyani kutty v. State(1999) 3 SCC 657Mentioned OnlyCited in discussion of 'amount due'.
V.R. Kalliyanikutty(2002) 2 GLR 550PositiveGauhati High Court decision approved.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•11,095 words•~51 min read

In The Court Record

MODERN INDUSTRIES v. STEEL AUTHORITY OF INDIA LTD. TH. M.D. & ORS.

[2010] 4 S.C.R. 560 ## A ## M/S. MODERN INDUSTRIES _v._ M/S. STEEL AUTHORITY OF INDIA LTD. TH. M.D. & ORS. (Civil Appeal Nos. 3305-3306 of 2010) APRIL 15, 2010 B ## **[R.V. RAVEENDRAN AND R.M. LODHA, JJ.]** _Interest on Delayed Payments to Small Scale and Ancillary Industrial Undertakings Act, 1993:_ c _**s. 6(1) and** (2)_ - _Object and purpose of_ - _Expression 'amount due from_ a _buyer', followed by expression 'together with the amount of interest' u/s 6(1)- Interpretation of- Held: Object and the purpose of the Act is to ensure that buyer promptly pays the amount due towards the goods supplied_ D _or services rendered by the supplier_ - _It also provides for payment of interest statutorily on the outstanding money in case of default- Said expression must be interpreted keeping in mind the purpose and the object of the Act and its provisions_ - _Restricted meaning is not justified_ - _s. 6(1)_ E _provides that the amount due from buyer together with amount of interest calculated as per ss.4 and 5 shall be recoverable by supplier from buyer by way of suit or other proceeding under any law for the time being in force_ - _Scheme of s. 6 rl w ss. 3, 4 and 5 does not envisage multiple proceedings_ - _On_ F _facts, order of High Court that expression 'amount due from. a buyer' would be amount admitted to be due in its plain and natural meaning and when admitted due amount is not paid by buyer, ss.3 to 6 along with other provisions of the Act would_ - _be applicable, cannot be accepted and is set aside The Act_ G _is applicable to the instant case, since parties entered into contract in 1983 which got altered from time to time and was last altered in 1995, and by that time the Act had come into force._ 560 H ## MODERN INDUSTRIES _v._ STEEL AUTHORITY OF 561 INDIA LTD. TH. M.D. & ORS. **s.** _**6(1) and (2)**_ - _Action contemplated ins. 6 by way of_ A _suit or any other legal proceeding uls. 6(1) or by making reference to Industry Facilitation Council u/s. 6(2)_ - _Maintainability of, only if it is for recovery of principal sum along with interest as per ss. 4 and 5 and not for interest alone_ - _Held: Uls. 6(2) action by way of reference to IFC could be_ B _maintained for recovery of principal amount and interest or only for interest where liability is admitted or has been disputed in respect of goods supplied or services rendered_ - _IFC has competence to determine the amount due for goods supplied or services, rendered in cases where the liability is_ c _disputed by the buyer- On facts, order of High Court that since buyer has alleged breach of contract by supplier, there was no amount admitted to be due or settled amount and, thus, there_ wa~ _no question of delayed payment and reference of .the dispute to IFC uls. 6(2) was without jurisdiction, cannot be_ D _accepted and is set aside._ D ## _Words and Phrases:_ _**Word 'together'**_ - _Meaning of, ill the context of s. 6(1) of the Interest on Delayed Payments to Small Scale and_ E _Ancillary Industrial Underlakings Act, 1993_ - _Held: Word 'together' ordinarily means conjointly or simultaneously but the said meaning may not be apt in the context of s. 6_ - _Word 'together' ins. 6(1) would mean 'along with' or 'as well as'._ F _**Word 'Due'**_ - _Meaning of_ - _Held: Has different meanings in different context_ - _In narrow sense, word 'due' may imporl a fixed and settled obligation or liability_ - _In wider context, amount can be said to be 'due', which may be recovered by action_ - _Amount that can be claimed as 'due' and recoverable by an action may sometimes be also covered by expression_ G _'due'._ **The questions which arose for consideration in these appeals are as to the meaning of the expression, 'amount due from a buyer, together with the amount of interest'** **H** [2010] 4 S.C.R. ## 562 SUPREME COURT REPORTS A under sub-section (1) of s. e of the Interest on Delayed Payments to Small Scale and Ancillary Industrial Undertakings Act, 1993 and as to whether the Industry Facilitation Council cannot go beyond the scope of interest on delayed payments upon the matter being B referred to it by any party to dispute under sub section (2) of s. 6 of the Act. ## Allowing the appeals, the Court HELD: 1. The wholesome purpose and object behind C the Interest on Delayed Payments to Small Scale and Ancillary Industrial Undertakings Act, 1993 as amended in 1998 is to ensure that buyer promptly pays the amount due towards the goods supplied or the services rendered by the supplier. It also provides for payment of interest D statutorily on the outstanding money in case of default. Section 4 fixes the rate of interest at one-and-half time of Prime Lending Rate charged by the SBI in case of default by the buyer in making payment of the amount to the supplier. The rate of interest fixed in section 4 overrides E any agreement between the buyer and supplier to the contrary. Section 5 imposes a liability on the buyer to pay compound interest at the rate mentioned in section 4 on the amount due to the supplier. Section 6 is a crucial provision. Sub-section l1) thereof provides that the F amount due from buyer together with amount of interest calculated in accordance with the provisions of sections 4 and 5 shall be recoverable by supplier from the buyer by way of a suit or other proceeding under any law for the time being in force. It thus provides for enforcement G of right relating to recovery of amount due and the amount of interest which supplier may be entitled to in accordance with sections 4 and 5. The mode of such enforcement is by way of suit or any other proceeding under any law for the time being in force. Sub-section (2), however, overrides the mode of enforcement of right H MODERN INDUSTRIES _v._ STEEL AUTHORITY OF 563 INDIA LTD. TH. M.D. & ORS. provided in sub-section (1) by enabling any party to a A dispute to make a reference to the Industry Facilitation Council (IFC) for recovery of amount due together with amount of interest as provided in sections 4 and 5. Once such dispute is referred, IFC acts as an arbitrator or conciliator and the provisions of Arbitration and B Conciliation Act, 1996 get attracted as if the arbitration and conciliation were being conducted pursuant to an arbitration agreement referred to in sub-section (1) of section 7 of that Act. A plain reading of section 6 would show that nature of dispute to be adjudicated by the IFC c as an arbitrator or resolution thereof as a conciliator is in respect of the matters referred to in sub-section (1), i.e., the amount due from a buyer together with the amount of interest calculated in accordance with the provisions of sections 4 and 5. [Para 19] [576-F;. 577-A-H; 573-A] B D 2.1. The word 'due' has variety of meanings, in different context It may have different meanings. In its narrowest meaning, the word 'due' may import a fixed and settled obligation or liability. In a wider context the amount can be said to be 'due', which may be recovered E by action. The amount that can be claimed as 'due' and recoverable by an action may sometimes be also covered by the expression 'due'. The expression 'amount due . from a buyer' followed by the expression 'together with the amount of interest' under sub-section (1) of section F 6 of 1993 Act must be interpreted keeping the purpose and object of 1993 Act and its provisions, particularly sections 3, 4 and 5 in mind. This expression does not deserve to be given a restricted meaning as that would defeat the whole purpose and object of 1993 Act. [Para G 34] [584-G-H; 585-A-C] E 2.2. The scheme of section 6 of 1993 Act read with sections 3, 4 and 5 does not envisage multiple proceedings. Rather, whole idea of section 6 is to _ H 564 SUPREME COURT REPORTS [2010] 4 S.C.R. - A provide single window to the supplier for redressal of his grievance where the buyer has not made payment for goods supplied or services rendered in its entirety or part of it or such payment has not been made within time prescribed in section 3 for whatever reason and/or for - B recovery of interest as per sections 4 and 5 for such default. It is for this reason that sub-section (1) of section 6 provides that 'amount due from the buyer together with the amount of interest calculated in accordance with the provisions of sections 4 and 5' shall be recoverable by - c the supplier from buyer by way of a suit or other legal proceeding. Sub-section (2) of section 6 talks of a dispute baing referred to IFC in respect of the matters referred to in sub-section (1), i.e. the dispute concerning amount due from a buyer for goods supplied or services rendered by - 0[the supplier to buyer ][and ][the amount ][of ][interest to which ] supplier has become entitled under sections 4 and 5. [Para 34] [585-F-H; 586-A-B] 2.3. It i~ true that word 'together' ordinarily means conjointly or simultaneously but this ordinary meaning E put upon the said word may not be apt in the context of section 6. It cannot be said that the action contemplated in section 6 by way of suit or any other legal proceeding under sub-section (1) or by making reference to IFC under sub-section (2) is maintainable only if it is for F recovery of principal sum along with interest as per sections 4 and 5 and not for interest alone. The word 'together' in section 6(1) would mean 'alongwith' or 'as well as'. Seen thus, the action under section 6(2) could be maintained for recovery of principal amount and G interest or only for interest where liability is admitted or has been disputed in respect of goods supplied or services rendered. Under section 6(2) action by way of reference to IFC cannot be restricted to a claim for recovery of interest due under sections 4 and 5 only in H cases of an existing determined, settled or admitted MODERN INDUSTRIES _v._ STEEL AUTHORITY OF 565 INDIA LTD. TH. M.D. & ORS. liability. IFC has competence to determine the amount A due for goods supplied or services rendered in cases where the liability is disputed by the buyer. Construction put upon section 6(2) by the buyer does not deserve to be accepted as it will not be in conformity with the intention, object and purpose of 1993 Act. Preamble to B 1993 Act, does not persuade to hold otherwise. It is so because Preamble may not exactly correspond with the enactment; the enactment ma~· go beyond Preamble. [Para 34) [586-B-G] B c _Assam State Electricity Board and Ors. v. Shanti Conductors Pvt. Ltd. and Anr._ (2002) 2 GLR 550, approved. _State of Kera/a_ and Ors. v. _V.R. Kalliyanikutty and Anr._ (1999) 3 SCC 657; _State of Gujarat v. Mirzapur Moti Kureshi Kassab Jamat and Ors._ (2005) 8 SCC 534; _Bonam Satyavathi v. Adda/a Raghavulu_ 1994 (Suppl) 2 SCC 556; _Central Bank of India v. State of Kera/a and Ors._ (2009) 4 SCC 94; _Eastern Coalfields Limited v._ Sanjay _Transport Agency and Anr._ (2009) 7 SCC 345; _Assam_ Small _Scale Industries Development Corpn. Ltd. and Ors._ v. _J.D. Pharmaceuticals and Anr._ (2005) 13 SCC 19; _Shakti Tubes Ltd._ v. _State of Bihar and Ors._ (2009) 7 SCC 673; _Madan Mohan and Anr._ v. _Krishan Kumar_ Sood 1994 Supp (1) SCC 437; _Maharashtra State Cooperative Bank Limited v. The Assistant Provident Fund Commissioner and Ors._ (2009) 10 SCC 123; _Secur Industries Ltd._ v. _Godrej_ & _Boyce Mfg._ Co. _Limited and Anr._ (2004) 3 sec 447, referred to. D E F _Irish Land Commission_ v. Viscount _Massereene and Ferrard_ (1904) 2 l.R. 1113; _Hibernian Bank_ v. _Yourell_ (1919) 1 l.R. Ch. D. 310, referred to. G _Webster Comprehensive Dictionary,_ International Edition; _Concise Oxford English Dictionary_ 10th Edition, Revised ; _Black's Law Dictionary_ Eighth Edition; _Wharton's Law Lexicon_ Fourteenth Edition; _Law Lexicon by P._ H 566 SUPREME COURT REPORTS [2010] 4 S.C.R. A _Ramanatha Aiyar;_ 2nd Edition Reprint 1997; _Jowitt's Dictionary of English Law_ 2nd Edition (Vol. 1); _Stroud's Judicial Dictionary' of Words and Phrases,_ Referred to. 3. The reasoning of the High Court that expression 8['amount due from a buyer' would ][be ][amount admitted to ] be due in its plain and natural meaning and when admitted due amount is not paid by the buyer, the provisions of sections 3 to 6 along with other provisions of 1993 Act would be applicable; and that High Court's finding that since the buyer has alleged breach of C contract by the supplier, there was no amount admitted to be due or settled amount and, therefore, there was no question of delayed payment and reference of the dispute to the IFC under sub-section(2) of section 6 was without jurisdiction, cannot be accepted. The interpretation put D by the High Court upon the expression 'amount due from . the buyer' is fallacious. [Paras 36 and 37] [587-D; 588-CE] . 4. It cannot be said that 1993 Act is not applicable to E the instant case as contract was entered into on January 15, 1983 and 1993 Act came into effect on September 23, 1992. Such a contention was not raised before the High Court; it is canvassed before this Court for the first time. Secondly, and more importantly, from the available F material, it transpires that although the initial contract was entered into between the parties in January 1983 but it got altered from time to time in view of negotiations between the parties about supply of raw-materials by the buyer free of cost; the defect in drawings and assignment G of additional works and last of such alteration was on April 29, 1995. By that time, the 1993 Act had already come into force. The 1993 Act is prospective in operation. [Paras 38, 39 and 41] [588-F-H; 589-A] _Assam_ Small _Scale Industries Development Corporation_ H _Ltd. and Ors. v. J.D. Pharmaceuticals and Anr._ (2005) 13 SCC MODERN INDUSTRIES _v._ STEEL AUTHORITY OF 567 INDIA LTD. TH. M.D. & ORS. 19; _Shakti Tubes Limited v. State of Bihar and Ors._ (2009) 7 sec 673, referred to. A 5. It was submitted on behalf of the buyer that IFC's award was delivered ex-parte and no reasons have been given in support thereof; the award does not reflect any 8 application of mind; and that if appeals are allowed and award is sustained that would cause grave prejudice to the buyer inasmuch as the original contract was for a sum of Rs. 8.19 lakhs, out of which Rs. 6.07 lakhs have already been paid in July, 1997 and goods worth balance amount were given to the supplier and yet buyer is saddled with C the liability for an amount of Rs. 24,86,998/- with interest at the rate of 18 per cent compounded with monthly rests from September 24, 1997 which may run into crores of rupees. The situation in which the buyer has been placed is their own creation. They chose not to contest the claim D of the supplier before IFC on merits. No written statement was filed despite opportunity granted by IFC·. The buyer did not challenge nor disputed diverse claims made by the supplier (including additional work) before IFC. Even before the High Court, no submission seems to have E been made on merits of the award at all. In the circumstances, the buyer does not deserve any indulgence from this Court. Pertinently, though 1993 Act provides a statutory remedy of appeal against the award but the buyer did not avail the statutory remedy and F instead challenged the. award passed by IFC before High Court in extraordinary jurisdiction under Article 226 of the Constitution bypassing statutory remedy which, was not justified. [Para 42] [591-D-H; 592-A-Bl D G ## Case Law Reference: (2005) 8 sec 534 Referred to. Para 17 1994 (Suppl) 2 SCC 556 Referred to. Para 17 H SUPREME COURT REPORTS [2010] 4 S.C.R. 568 A B c D |(2009) 4sec94|Referred to.|Para 17| |---|---|---| |(2009)_1_sec345|Referred to.|Para 17| |(1904) 2 l.R. 1113|Referred to.|Para 27| |(1919) 1 l.R. Ch.D.310 Referred to.||Para28| |1994 Supp (1)sec437 Referred to.||Para 29| |(1999) 3sec657|Referred to.|Para 30| |(2009) 1osec123|Referred to.|Para31| |(2002) 2 GLR 550|Approved.|Para 34| |(2004) 3sec447|Referred to.|Para 35| |(2005) 13sec19|Referred to.|Para 39, 40| |(2009)_1_sec673|Referred to.|Para 40| CIVIL APPELLATE JURISDICTION : Civil Appeal Nos. 3305-3306 of 2010. From the Judgment & Order dated 18.2.2008 of the High E Court of Orissa, Cuttack in OJC Nos. 4271 and 9111 of 2000. Prashant Bhushan, Sumeet Sharma, Y. Raja Gopala Rao for the Appellant. F Ashwani Kumar, Sunil Kumar Jain, Aneesh Mittal, K.P.S. Chani, Shibashish Misra, D.S. Mahra for the Respondent. The Judgment of the Court was delivered by R.M. LODHA, J. 1. Leave granted. G 2. Two main questions arise for consideration - first, as to the meaning of the expression, 'amount due from a buyer, together with the amount of interest' under sub-section (1) of Section 6 of the Interest on Delayed Payments to Small Scale H MODERN INDUSTRIES _v._ STEEL AUTHORITY OF 569 INDIA LTD. TH. M.D. & ORS. [R.M. LODHA, J.] and Ancillary Industrial Undertakings Act, 1993 (for short, '1993 Act') and then, as to whether the Industry Facilitation Council (IFC) cannot go beyond the scope of interest on delayed payments upon the matter being referred to it by any party to dispute under sub-section (2) of Section 6. A B 3. M/s. Modern Industries, Rourkela (for short, 'supplier') got an order from the Steel Authority of India Limited - Rourkela Steel Plant (for short, 'buyer') on January 15, 1983 for manufacture of Right Manipulator Side Guard. The order . value was Rs. 8.19 lakhs. Inter alia, the terms and conditions of the order were : (i) the job should be done exactly as specified in the drawings; (2) the alignment of bearing housings be made by the supplier and for this purpose, a spare shaft assembly would be issued against indemnity bond for checking the perfect alignment and free rotation of the shaft ; (3) the essentiallty certificate would be issued by the buyer; (4) O.S.TJ T.O.T. 5% to be paid extra and (5) 90 per cent payment to be made against the proof of dispatch ·(R/R) and inspection certificate, balance 10 per cent paymerit would be made within thirty days after receipt of materials at site in good condition. It appears that initially buyer did not issue raw-materials but later on the buyer on May 28, 1985 agreed to supply the materials free of cost. The supplier also informed the buyer that the drawings were defective. According to the supplier, there was delay in supply of materials and removal of defects from drawings. The buyer ultimately extended the period of supplies till June 4, 1997. It is admitted case of the parties that supplies were made within extended period. The buyer ordered for release of Rs. 6,07, 493/- as an interim payment but deducted the balance payment of Rs. 2, 11,506/- out of Rs. 8.19 lakhs of the original order as the cost of the supply of materials. The supplier, accordingly, raised a dispute in respect of balance payment together with interest on delayed payment before IFC under Section 6(2) of 1993 Act. C D E F G 4. IFC took cognizance of the dispute referred to it by the H 570 SUPREME COURT REPORTS [2010] 4 S.C.R. A supplier and issued notice to the buyer on September 21, 1999. On October 23, 1999, nobody appeared for buyer before IFC. However, IFC directed the buyer to settle the claims of the supplier within thirty days of receipt of the communication and gave an opportunity to submit their defence within ten days of B receipt of the said communication and also depute a duly authorized officer to attend the proceedings. Vide its letter dated December 20, 1999, the buyer objected to the jurisdiction of IFC in dealing with the matter. It appears that on February 15, 2000, a representative of the buyer appeared before the c IFC. On that date, the IFC again directed the buyer to settle the dispute amicably in the presence of Joint Director of Industries (Planning), Rourkela and also file its written statement regarding its outcome on March 24, 2000. On March 24, 2000, the representative of the buyer was not present before IFC nor any D written statement was filed as directed on February 15, 2000. In the circumstances, IFC passed an ex-parte award against the b.uyer in the sum of Rs. 24,86,998/- with interest at the. rate of 18 per cent being one-and-half times of Prime Lending Rate of the SBI compounded with monthly rests. IFC also directed E that the interest would be payable with effect from September 24, 1997 (the date of last delivery, i.e., May 28, 1997 plus maxim um 120 days of credit period) till the date of full payment. 5. The ex-parte award passed against the buyer was kept in abeyance by IFC on May 6, 2000 for one month at the F instance of the buyer to enable it to discuss and settle the matter with the supplier. However, no settlement took place between the parties and IFC on July 11, 2000 reiterated its exparte award dated March 24, 2000. G 6. Two writ petitions came to be filed by the buyer before the High Court of Orissa. In the first writ petition, ex-parte award dated March 24, 2000 was challenged and in the other, award dated July 11, 2000 as well as ex-parte award dated March 24, 2000 was assailed. In both writ petitions, the buyer also H challenged the validity of the Interest on Delayed Payments to MODERN INDUSTRIES _v._ STEEL AUTHORITY OF 571 INDIA LTD. TH. M.D. & ORS. [R.M. LODHA, J.] Small Scale and Ancillary Industrial Undertakings (Amendment) A Act 1998 (for short, '1998 Amendment Act'). 7. The Division Bench of the High Court vide its judgment dated February 18, 2008 allowed these writ petitions and quashed and set aside the awards dated March 24, 2000 and B July 11, 2000. It is from this judgment that present appeals by special leave have arisen. · 8. 1993 Act was sequel to a policy statement on small scale industries made by the Government in Parliament that suitable legislation would be brought to ensure prompt payment of money by buyers to the small industrial units. It was felt that inadequate working capital in a small scale and ancillary industrial undertaking was causing an endemic problem and · such undertakings were very much affected. The Small Scale Industries Board - an apex advisory body on policies relating to small scale industrial units - also expressed its views that prompt payments of money by buyers should be statutorily ensured and mandatory provisions for payment of interest on the outstanding money, in case of default, should be made. It was felt that the buyers, if required ur.der law to pay interest, would refrain from withholding payments to small scale and ancillary industrial undertakings. With these objects and reasons, initially an Ordinance, namely, the Interest on Delayed Payments to Small Scale and Ancillary Industrial Undertakings Ordinance, 1992 was promulgated by the President on September 23, 1992 and then Bill was placed before both the Houses of Parliament and the said Bill having been passed, 1993 Act was enacted. The Preamble to the 1993 Act reads, 'An Act to provide for and regulate the payment of interest on delayed payments to small scale and ancillary industrial undertakings and for matters connected therewith or incidental thereto'. C D E F G 9. By 1998 Amendment Act, with effect from August 10, 1998, 1993 Act was amended whereby few new provisions were inserted and some existing provisions amended. H [2010] 4 S.C.R. ## SUPREME COURT REPORTS A 10. Section 2(c), (e) and (f) define "buyer", "small scale industrial undertaking" and "supplier'' as follows : - "S.2.- _Definitions._ - In this Act, unless the context otherwise requires, - - B - (c) "buyer" means whoever buys any goods or receives any services from a supplier for consideration; - (e) "Small scale industrial undertaking" has the meaning assigned to it by clause 0) of section 3 of - c the Industries (Development and Regulation) Act, 1951 (65 of 1951); - (f) "supplier'' means an ancillary industrial undertaking or a small scale industrial undertaking holding a permanent registration certificate issued by the - D Directorate of Industries of a State (or Union territory and includes, - - (i) the National Small Industries Corporation, being a company, registered under the Companies Act, - E 1956 (1 of 1956); F - (ii) the Small Industries Development Corporation of a State or a Union territory, by whatever name called, being a company registered under the Companies Act, 1956 ( 1 of 1956).]" 11. Section 3 fastens liability on buyer to make payment for the goods supplied or the services rendered by the supplier to him within the time mentioned therein. It reads : - G "S.3.- _Liability of buyer to make payment.-Where_ any supplier supplies any goods or renders any services to any buyer, the buyer shall make payment therefor on or before the date agreed upon between him and the supplier in writing or, where there is no agreement in this behalf, before the appointed day:" - H MODERN INDUSTRIES _v._ STEEL AUTHORITY OF 573 INDIA LTD. TH. M.D. & ORS. [R.M. LODHA, J.) 12. Section 4 imposes a liability of interest upon the buyer on failure to make payment of the amount due to the supplier. Originally in 1993 Act, Section 4 was as follows : "S.4.- _Date from which and rate at which interest is_ payab/e.-Where any buyer fails to make payment of the amount to the supplier, as required under Section 3, the buyer shall, notwithstanding anything contained in any agreement between the buyer and the supplier or in any law for the time being in force, be liable to pay interest to the supplier on that amount from the appointed day or, as the case may be, from the date immediately following the date agreed upon, at such rate which is five per cent points above the floor rate for comparable lending. _Explanation.-For_ the purposes of this section, "floor rate for comparable lending" means the highest of the minimum lending' rates charged by scheduled banks (not being co operative banks) on credit limits in accordance with the directions given or issued to banking companies generally by the Reserve Bank of India under the Banking Regulation Act, 1949 (10 of 1949)." A B C D E After amendment in 1998, Section 4 reads : "S.4.- _Date from which and rate at which interest is_ payab/e.-Where any buyer fails to make payment of the amount to the supplier, as required under section 3, the buyer shall, notwithstanding anything contained in any agreement between the buyer and the supplier or in any law for the time being in force, be liable to pay interest to the supplier on that amount from the appointed day or, as the case may be, from the date immediately following the ·date agreed upon, at one-and-half time of Prime Lending Rate charged by the State Bank of India. _Explanation.-For_ the purposes of this section, "Prime Lending Rate" means the Prime Lending Rate of F G H 574 SUPREME COURT REPORTS [2010] 4 S.C.R. - A the State Bank of India which is available to the best borrowers of the bank." 13. Section 5 imposes a liability on the buyer to paycompound interest. It reads : B "S.5.- _Liability of buyer to pay compound interest.-_ Notwithstanding anything contained in any agreement between a supplier and a buyer or in any law for the time being in force, the buyer shall be liable to pay compound interest (with monthly rests) at the rate mentioned in c section 4 on the amount due to the supplier." 14. The mode of recovery of amount due is provided in Section 6. Erstwhile Section 6 in 1993 Act read: D . "S.6-. _Recovery of amount due.-The_ amount due. from a buyer, together with the amount of interest calculated in accordance with the provision.s of Sections 4 and 5, shall be recoverable by the supplier from the buyer by way of a suit or other proceedings under any law for the time being in force." E After amendment in 1998, Section 6 provides : F "S.6.- _Recovery of amount due.-(1)_ The amount due from a buyer, together with the amount of interest calculated in accordance with the provisions of sections 4 and 5, shall be recoverable by the supplier from the buyer by way of a suit or other proceeding under any law for the time being in force. G H (2) Notwithstanding anything contained in sub-section (1), any party to a dispute may make a reference to the Industry Facilitation Council for acting as an arbitrator or conciliator in respect of the matters referred to in that sub-section and the provisions of the Arbitration and Conciliation Act, 1996 (26 of 1996) shall apply to such disputes as if the arbitration or conciliation were pursuant to an arbitration MODERN INDUSTRIES _v._ STEEL AUTHORITY OF 575 INDIA LTD. TH. M.D. & ORS. [R.M. LODHA, J.] agreement referred to in sub-section (1) of section 7 of that A Act." 15. Section 7 provides that no appeal against any decree, award or other order will be entertained by any court or other authority unless the appellant (not being a supplier) has deposited with it seventy-five per cent of the amount in terms of the decree, award or, as the case may be, other order in the manner directed by such court or, as the case may be, such authority. B 16. Mr. Prashant Bhushan, learned counsel for the supplier urged that the IFC under Section 6(2) has jurisdiction to decide the dispute between supplier and buyer relating not only in respect of interest but also the principal amount payable by buyer to supplier. He submitted that the interpretation put by the High Court upon the provisions of 1993 Act is erroneous and that jurisdiction of IFC in resolving the dispute under Section 6 (2) is ·not only confined to the dispute relating to interest·but would also be available where there is dispute regarding the principal amount payable by the buyer to the supplier. He submitted that the High Court seriously erred in holding that the requirement of 'settled amount' between the supplier and buyer is _sine qua non_ for the applicability of 1993 Act. C D E 17. On the other hand, Mr. Ashwani Kumar, learned senior counsel for the buyer submitted that findings of the High Court on the applicability of 1993 Act and the issue of jurisdiction of the IFC are meritorious in law for the reasons given in the judgment. He submitted that the entire scheme and structure of 1993 Act, including the Preamble and the Statement of Objects and Reasons when construed harmoniously, would show that Section 6(2) can only be invoked in cases of an existing determined, settled or admitted liability. He would submit that the use of word 'due' in Section 6 indicates that . penal interest provisions in Sections 4 and 5 of 1993 Act get attracted where the principal amount payable is not in dispute, is settled or admitted or has been found by a competent forum F G H 576 SUPREME COURT REPORTS [2010] 4 S.C.R. - A to be 'due'. According to him, special law does not intend to substitute the regular procedure for determining a disputed liability where there is a bona fide dispute as to the amount due. He referred to the Blacks Law Dictionary, Stroud's Judicial Dictionary of Words and Phrases and Aiyer's Law Lexicon and B also invited our attention to the decision of this Court in _State of Kera/a_ and Others v. _V.R. Kalliyanikutty and Another[1 ]_ in support of his argument that the expression 'amount due' in Section 6 pre-supposes an existing determined, settled or admitted liability. He would submit that the Preamble and the c Statement of Objects and Reasons and the headings of Section can be referred to in determining the applicability and scope of a statutory enactment. In this regard, he relied upon decisions of this Court in _State of Gujarat_ v. _Mirzapur Moti Kureshi Kassab Jamat and Others[2] , Bonam Satyavathi_ v. D _Adda/a Raghavulu,_[3 ] _Central Bank of India_ v. _State of Kera/a and Others[4 ]_ and _Eastern Coalfields Limited_ v. _Sanjay Transport Agency and Another6._ 18. Mr. Ashwani Kumar would also submit that 1993 Act even otherwise is not applicable to the present case as the E contract pertaining to which the buyer has been saddled with a monetary liability was executed on January 15, 1983 and that 1993 Act came into effect much later. He relied upon two decisions of this Court, namely, _Assam_ Small _Scale Industries Development Corpn. Ltd. and Others_ v. _J.D. Pharmaceuticals_ F _and Another_ and _Shakti Tubes Ltd.,_ v. _State of Bihar and Others.[7 ]_ 19. The wholesome purpose and object behind 1993 Act 1. (1999) 3 sec 657. - G 2. (2005) a sec 534. 3. 1994 (Suppl) 2 sec 556. 4. (2009) 4 sec 94. 5. (2009) _1_ sec 345. 6. (2005) 13 sec 19. - H _1._ (2009) _1_ sec 673. MODERN INDUSTRIES _v._ STEEL AUTHORITY OF 577 INDIA LTD. TH. M.D. & ORS. [R.M. LODHA, J.] as amended in 1998 is to ensure that buyer promptly pays the A amount due towards the goods supplied or the services rendered by the supplier. It also provides for payment of interest statutorily on the outstanding money in case of default. Section 3, accordingly, fastens liability upon the buyer to make payment for goods supplied or services rendered to the buyer on or B before the date agreed upon in writing or before the appointed day and when there is no date agreed upon in writing, the appointed day shall not exceed 120 days from the day of acceptance. Section 4 fixes the rate of interest at one-and-half time of Prime Lending Rate charged by the SBI in case of c default by the buyer in making payment of the amount to the supplier. The rate of interest fixed in Section 4 overrides any agreement between the buyer and supplier to the contrary. Section 5 imposes a liability on the buyer to pay compound interest at the rate mentioned in Section 4 on the amount due D to the supplier. Section 6 is a crucial provision. Sub-section (1) thereof provides that the amount due from buyer together with amount of interest calculated in accordance with the provisions of Sections 4 and 5 shall be recoverable by supplier from the buyer by way of a suit or other proceeding under any law for the time being in force. It thus provides for enforcement of right E relating to recovery of amount due and the amount of interest which supplier may be entitled to in accordance with Sections 4 and 5. The mode of such enforcement is by way of suit or any other proceeding under any law for the time being in force. Sub-section (2), however, overrides the mode of enforcement F of right provided in sub-section (1) by enabling any party to a dispute to make a reference to the IFC for recovery of amount due together with amount of interest as provided in Sections 4 and 5. Once such dispute is referred, IFC acts as an arbitrator or conciliator and the provisions of Arbitration and Conciliation G Act, 1996 get attracted as if the arbitration and conciliation were being conducted pursuant to an arbitration agreement referred to in sub-section (1) of Section 7 of that Act. A plain reading of Section 6 would show that nature of dispute to be adjudicated by the IFC as an arbitrator or resolution thereof as a conciliator H 578 SUPREME COURT REPORTS [2010] 4 S.C.R. - A is in respect of the matters referred to in ~ub-section (1), i.e., the amount due from a buyer together with the amount of interest calculated in accordance with the provisions of Sections 4 and 5. 20. What exactly is the meaning of words 'amount due from - 8 a buyer' which are followed by the expression 'together with the amount of interest' under sub-section (1) of Section 6 of 1993 Act? Do these words mean an admitted sum due? Or do they mean the amount claimed to be due? - c 21. The meaning of the word 'due' has been explained in Webster Comprehensive Dictionary, (International Edition) as follows: - "1. Owing and demandable; owed; especially, payable because of the arrival of the time set or agreed upon. 2. - D That should be rendered or given; justly claimable; appropriate." 22. Concise Oxford English Dictionary (10th Edition, Revised) explains 'due' as follows : E "DUE • .................. ?(of a person) at a point where something is owed or merited. ?required as a legal or moral obligation. 2 proper; appropriate ........... . F -ORIGIN ME: from OFr. _deu_ 'owed', based on L. _debitus_ 'owed', from debere 'owe' ". 23. In Black's Law Dictionary (Eighth Edition), the word G 'due' is explained : "adj. 1. Just, proper, regular, and reasonable <due care> <due notice>. 2. Immediately enforceable <payment is due on delivery>. 3. Owing or payable; constituting a debt. .... " H 24. Wharton's Law Lexicon (Fourteenth Edition) makes the MODERN INDUSTRIES _v._ STEEL AUTHORITY OF 579 INDIA LTD. TH. M.D. & ORS. [R.M. LODHA, J.] following comment with regard to word 'due' : A "anything owing. That which one contracts to pay or perform to another; that which law or justice requires to be paid or done." 25. P. Ramanatha Aiyar in 'Law Lexicon'; 2nd Edition B (Reprint 1997) explains the word 'due'; as a noun: an existing obligation; an indebtedness; a simple indebtedness without reference to the time of payment : a debt ascertained and fixed though payable in future; as an adjective : capable of being justly demanded; claimed as of right; owing and unpaid, remaining C unpaid; payable; regular; formal; according to rule or form. 26. Jowitt's Dictionary of English Law; 2nd Edition (Vol. 1) defines 'due'; 'anything owing, that which one contracts to pay or perform to another. As applied to a sum of money, 'due' means either that it is owing or that it is payable; in other words, it may mean that the debt is payable. at once or at a future time. It is a question of construction which of these two meanings the word 'due' bears in a given case'. D 27. In _Irish Land Commission_ v. Viscount _Massereene and Ferrard,_[8 ] Gibson J. stated that word 'due' may mean immediately payable (its common signification), or a debt contracted, but payable in future. It was also highlighted that the interpretation of the word 'due' must be according to the reason and context of the statute. E F 28. In the case of _Hibernian Bank_ v. _Youre/19,_ O'Connor M. R. construed the word 'due' in Section 24(8) of the Conveyancing and Law of Property Act, 1881 as due and legally recoverable. G 29. The expression 'amount due' occurring in different statutes has come up for consideration before this Court. In 8. (1904) 2 l.R. 1113. 9. (1919) I l.R. Ch. D. 310. H 580 SUPREME COURT REPORTS [2010] 4 S.C.R. - A _Madan Mohan and Another_ v. _Krishan Kumar_ Sood[10] , this Court while dealing with the expression 'amount due' occurring in the third proviso to clause (i) of sub-section (2) of Section 14 of H.P. Urban Rent Control Act, 1987, held that the expression 'amount due' in the context wiH mean the amount - B due on and up to the date of the order of eviction; it wiH take into account not merely #le arrears of rent which gave cause _ of action to file a petition for eviction but will include the rent which accumulated during the pendency of the eviction petition as well. - c 30. A three-Judge Bench of this Court in _V.R. Kal/iyanikutty[1 ]_ had an occasion to interpret the words 'amounts due' used in Section 71 of Kerala Revenue Recovery Act, 1968. Section 71 of Kerala Act provided thus : - D "S.71.- _Power of Government to declare the Act applicable to any institution.-The_ Government may, by notification in the Gazette, declare, if they are satisfied that it is necessary to do so in public interest, that the provisions of this Act shall be applicable to the recovery - E of amounts due from any person or class of persons to any specified institution or any class or classes of institutions, and thereupon all the provisions of this Act shall be applicable to such recovery." - After referring to Wharton in Law Lexicon and Black's Law - F Dictionary, it was held that the words 'amounts due' in Section · 71 did not include time barred debt. This Court, however, highlighted that in every case the exact meaning of the word 'due' will depend upon the context in which the word appears. G 31. In _Maharashtra_ State _Cooperative Bank Limited_ v. _The Assistant Provident Fund Commissioner and Others[1] 1,_ before a three-Judge Bench of this Court interpretation of the 10. 1994 supp (1) sec 437. H 11. (2009) 10 sec 123. MODERN INDUSTRIES _v._ STEEL AUTHORITY OF 581 INDIA LTD. TH. M.D. & ORS. [R.M. LODHA, J.] expression 'any amount due from an employer' used in Section A 11 (2) of the Employees Provident Fund and Miscellaneous Provisions Act, 1952 came up for consideration. Section 11 (2) of the said Act is as follows: "S.11.- _Priority of payment of contributions over other_ 8 _debts.-(1)_ Where any employer is adjudicated insolvent or, being a company, an order for winding up is made, the amount due- (a) * * * * * (b) * * * * * c (2) Without prejudice to the provisions of sub-section (1), if any amount is due from an employer whether in respect of the employee's contribution (deducted from the wages D of the employee) or the employer's contribution, the amount so due shall be deemed to be the first charge on the assets of the establishment, and shall, notwithstanding anything contained in any other law for the time being in force, be paid in priority to all other debts." E While interpreting the said expression 'any amount due from an employer', this Court referred to Section 11 (1) besides the other provisions of the said Act, namely, Sections 7 A, 70, 148 and 15(2) and held that the said expression cannot be accorded restricted meaning confining it to the amount determined under F Section 7(A) or the contribution payable under Section 8. This is what this Court said : "67. The expression "any amount due from an employer" appearing in sub-section (2) of Section 11 has to be interpreted keeping in view the object of the Act and other G provisions contained therein including sub-section (1) of Section 11 and Sections 7-A, 7-Q, 14-B and 15(2) which provide for determination of the dues payable by the employer, liability of the employer to pay interest in case the payment of the amount due is delayed and also pay H 582 SUPREME COURT REPORTS [2010] 4 S.C.R. - A damages, if there is default in making contribution to the Fund. If any amount payable by the employer becomes due and the same is not paid within the stipulated time, then the employer is required to pay interest in terms of the mandate of Section 7-Q. Likewise, default on the - B employer's part to pay any contribution to the Fund can visit him with the consequence of levy of damages. 68. As mentioned earlier, sub-section (2) was inserted in Section 11 by Amendment Act 40 of 1973 with a view to ensure that payment of provident fund dues of the workers c are not defeated by the prior claims of the secured and/or of the unsecured creditors. While enacting sub-section (2), the legislature was conscious of the fact that in terms of existing Section 11 priority has been given to the 'amount due from an employer in relation to an establishment to D which any scheme or fund is applicable including damages recoverable under Section 14-B and accumulations required to be transferred under Section 15(2). The legislature was also aware that in case of delay the employer is statutorily responsible to pay interest in terms E of Section 17. Therefore, there is no plausible reason to give a restricted meaning to the expression "any amount due from the employer" and confine it to the amount determined under Section 7-A or the contribution payable under Section 8. F 69. If interest payable by the employer under Section 7-Q and damages leviable under Section 14 _(sic_ Section 148) are excluded from the ambit of expression "any amount due from an employer", every employer will conveniently refrain from paying contribution to the Fund and other dues G and resist the efforts of the authorities concerned to recover the dues as arrears of land revenue by contending that the movable or immovable property of the establishment is subject to other debts. Any such interpretation would frustrate the object of introducing the H MODERN INDUSTRIES _v._ STEEL AUTHORITY OF 583 INDIA LTD. TH. M.D. & ORS. [R.M. LODHA, J.] deeming provision and non obstante clause in Section A 11 (2). Therefore, it is not possible to agree with the learned Senior Counsel for the appellant Bank that the amount of interest payable under Section 7-Q and damages leviable under Section 14-B do not form part of the amount due from an employer for the purpose of Section 11 (2) of the Act." B 32. In _Assam State Electricity Board and Ors._ v. _Shanti Conductors Pvt. Ltd. and Another[12] ,_ inter-alia, the question that fell for consideration before the Full Bench of Gauhati High Court was as to whether the suit for recovery of a mere interest under C 1993 Act is maintainable. The argument on behalf of the appellant therein was that no suit merely for the recovery of the interest under 1993 Act is maintainable under the provisions of Section 6. It was contended that both principal sum and the interest on delayed payment simultaneously must co-exist for maintaining a suit under Section 6 of the 1993 Act. D D 33. The Full Bench held that the suit is maintainable for recovery of the outstanding principal amount, if any, along with the interest on delayed payments as calculated under Sections 4 and 5 of the 1993 Act. It said : · E 'The opening words of Section 6(1) "the amount due from the buyer, together with the amount of interest.. ... " can only mean that the principal sum due from the buyer as well as or along with the amount of interest calculated under the provisions of the Act, are recoverable. The word 'together' F here would mean 'as well as' or 'alongwith'. This cannot mean that the principal sum must be due on the date of the filing of the suits. The suits are maintainable for recovery of the outstanding, principal amount, if any, along with the amount of interest on the delayed payments as calculated G under Sections 4 and 5 of the Act. We are unable to agree with that if the principal sum is not due, no suit would lie for the recovery of the interest on the delayed payments, H 12. (2002) 2 GLR 550 SUPREME COURT REPORTS [2010] 4 S.C.R. 584 A which might have already accrued. If such an interpretation is given the very object of enacting the Act would be frustrated. The Act had been enforced to see that small scale industries get the payment regarding supply made by them within the prescribed period and in case of delay B in payments the interest would be at a much higher rate (1 1/2 times of lending rate charged by the State Bank of India). The obligation of payment of higher interest under the Act is mandatory. Sections 1 and§ of the Act of 1993 contain a non-obstante clause i.e. "Notwithstanding any c thing contained in any agreement between the buyer and the supplier". In other words, the parties to the contract cannot even contract out of the provisions of the 1993 Act. Even if such provision that interest under the Act on delay meant would not be chargeable is incorporated in the D contract, Sections 1 and§ of the Act of 1993 would still prevail as the very wording of these sections indicate. Take for instance that the buyer has not paid the outstanding amount of the supply by the due date. After much delay he offers the outstanding amount of the supply to the supplier. If the argument of the learned counsel for the appellant is E to be accepted, then, if the supplier accepts entire amount he would be losing, his right to recover the amount of interest on the delayed payment under the Act. Therefore, he would have to refuse to accept the amount of payment and then file a suit for recovery of the principal amount and F the interest on the delayed payment under the Act. The Act does not create any embargo against supplier not to accept principal amount at any stage and thereafter file a suit for the recovery or realization of the interest only on the delayed payments under the Act." G 34. The word 'due' has variety of meanings, in different context it may have different meanings. In its narrowest meaning, the word 'due' may import a fixed and settled obligation or liability. In a wider context the amount can be said H MODERN INDUSTRIES _v._ STEEL AUTHORITY OF 585 INDIA LTD. TH. M.D. & ORS. [R.M. LODHA, J.] to be 'due', which may be recovered by action. The amount that A can be claimed as 'due' and recoverable by an action may sometimes be also covered by the expression 'due'. The expression 'amount due from a buyer' followed by the expression 'together with the amount of interest' under subsection (1) of Section 6 of 1993 Act must be interpreted B keeping the purpose and object of 1993 Act and its provisions, particularly Sections 3, 4 and 5 in mind. This expression does not deserve to be given a restricted meaning as that would defeat the whole purpose and object of 1993 Act. Sub-section (1) of Section 6 provides that the amount due from buyer c together with amount of interest calculated in accordance with the provisions of Sections 4 and 5 shall be recoverable by the supplier from the buyer by way of suit or other proceeding under any law for the time being in force. If the argument of senior counsel for the buyer is accepted, that would mean that where D the buyer has raised some dispute in respect of goods supplied or services rendered by the supplier or disputed his liability to make payment then the supplier shall have to first pursue his remedy for recovery of amount due towards goods supplied or services r.endered under regular procedure and after the E amount due is adjudicated, initiate action for recovery of amount of interest which he may be entitled to in accordance with Sections 4 and 5 by pursuing remedy under sub-section (2) of Section 6. We are afraid the scheme of Section 6 of 1993 Act read with Sections 3,4 and 5 does not envisage multiple proceedings as canvassed. Rather, whole idea of Section 6 F is to provide single window to the supplier for redressal of his grievance where the buyer has not made payment for goods supplied or services rendered in its entirety or part of it or such payment has not been made within time prescribed in Section 3 for whatever reason and/or for recovery of interest as per G Sections 4 and 5 for such default. It is for this reason that subsection (1) of Section 6 provides that 'amount due from the buyer together with the amount of interest calculated in accordance with the provisions of Sections 4 and 5' shall be H 586 SUPREME COURT REPORTS (2010] 4 S.C.R. A recoverable by the supplier from buyer by way of a suit or other legal proceeding. Sub-section (2) of Section 6 talks of a dispute being referred to IFC in respect of the matters referred to in sub-section (1 ), i.e. the dispute concerning amount due from a buyer for goods supplied or services rendered by the B supplier to buyer and the amount of interest to which supplier has become entitled under Sections 4 and 5. It is true that word 'together' ordinarily means conjointly or simultaneously but this ordinary meaning put upon the said word may not be apt in the context of Section 6. Can it be said that the action contemplated c in Section 6 by way of suit or any other legal proceeding under sub-section (1) or by making reference to IFC under sub-section (2) is maintainable only if it is for recovery of principal sum along with interest as per Sections 4 and 5 and not for interest alone? The answer has to be in negative. We approve the view of 0 Gauhati High Court in _Assam State Electricity Board12_ that word 'together' in Section 6(1) would mean 'alongwith' or 'as well as'. Seen thus,. the action under Section 6(2) could be maintained for recovery of principal amount and interest or only for interest where liability is admitted or has been disputed in E respect of goods supplied or services rendered. In our opinion, under Section 6(2) action by way of reference to IFC cannot be restricted to a claim for recovery of interest due under Sections 4 and 5 only in cases of an existing determined, settled or admitted liability. IFC has competence to determine the amount due for goods supplied or services rendered in F cases where the liability is disputed by the buyer. Construction put upon Section 6(2) by learned senior counsel for the buyer does not deserve to be accepted as it will not be in conformity with the intention, object and purpose of 1993 Act. Preamble to 1993 Act, upon which strong reliance has been placed by G learned senior counsel, does not persuade us to hold otherwise. It is so because Preamble may not exactly correspond with the enactment; the enactment may go beyond Preamble. H MODERN INDUSTRIES _v._ STEEL AUTHORITY OF 587 INDIA LTD. TH. M.D. & ORS. [R.M. LODHA, J.] 35. In _Secur Industries Ltd._ v. _Godrej_ & _Boyce Mfg._ Co. A _Limited and Another[13] ,_ this Court observed that sub-section (2) of Section 6 expressly incorporates the provisions of the Arbitration and Conciliation Act, 1996 and it further creates a legal fiction whereby disputes referred to IFC are to be deemed to have been made pursuant to an arbitration agreement as B defined in sub-section (1) of Section 7 of that Act. There is, thus, no reason as to why IFC, which acts as an Arbitrator or Conciliator under the provisions of Arbitration and Conciliation Act, 1996, cannot deal with the dispute concerning principal amount due to the supplier for the goods supplied or services c rendered. 36. The High Court, in the impugned order, however, held that expression 'amount due from a buyer' would be amount admitted to be due in its plain and natural meaning and when admitted due amount is not paid by the buyer, the provisions D . of Sections 3 to 6 along with other provisions of 1993 Act would be applicable. In the opinion of High Court since the buyer has alleged breach of contract by the supplier, there was no amount admitted to be due or settled amount and, therefore, there was no question of delayed payment and reference of the dispute E to the IFC under sub-section(2) of Section 6 was without jurisdiction. The High Court in the impugned order held thus : "16. Therefore, the said matter before the IFC would be limited to the amount due from the buyer together with F amount of interest calculated only in accordance with the provisions of Sections 4 and 5 of the Act. Section 4 applies only when Section 3 is applied. Therefore, the ultimate focus in the Act is on Section 3 as already discussed above. Section 3 speaks about the settled G amount and not th~ amount which may be calculated according to the calculations of the supplier disputed by the buyer or where there is dispute ·regarding delayed supply causing loss to the buyer or defective supply of the F 13. c2004) 3 sec 447. H 588 SUPREME COURT REPORTS [2010] 4 S.C.R. - A materials. Therefore "the amount due from a buyer would be interpreted in its plain and natural manner i.e. amount admitted to be due" and when it is not paid by the buyer, the provisions of Section 3 to 6 along with other provisions of the Act would be applicable. - 8 17. In the instant case, the buyer i.e. the petitioner has alleged that the supply was not made by the opposite party No. 2 in time and there was delay in supply of materials which caused loss to the petitioner and by the time of supply of materials, technology has already been changed. c Therefore, in nutshell, the petitioner has alleged breach of contract by opposite party No. 2 and therefore, in case of allegation of breach of contract, it cannot be said that there is any amount admitted to be due or settled amount. Hence, there is no question of delayed payment and D referring the dispute to the I F'C under the provisions of Subsection 2 of the Section 6, to our mind, would be without j1 irisd°iction." 37. We find it difficult to accept the reasoning of the High E Court. The interpretation put by the High Court upon the expression 'amount due from the buyer' is fallacious for the reasons indicated above which we need not respect. 38. Now, the submission of learned senior counsel for the buyer with regard to the applicability of the 1993 Act to the F present case may be considered. His argument is that 1993 Act is not applicable to the present case as contract was entered into on January 15, 1983 and 1993 Act came into effect on September 23, 1992. The argument does not appeal us for more than one reason. In the first place, this contention - G was not raised before the High Court; it is canvassed before us for the first time. Secondly, and more importantly, from the available material, it transpires that although the initial contract was entered into between the parties in January 1983 but it got altered from time to time in view of negotiations between the - H MODERN INDUSTRIES _v._ STEEL AUTHORITY OF 589 INDIA LTD. TH. M.D. & ORS. [R.M. LODHA, J.] · parties about supply of raw-materials by the buyer free of cost; the defect in drawings and assignment of additional works and last of such alteration was on.April 29, 1995. 39. That 1993 Act is prospective in operation is settled by. two decisions of this Court.. In _Assam Small Scale lndus't(ie$ Development Corporation Ltd. and Others6,_ this Court~~: ' "37. We have held herein before that clause 8 of the terms and conditions rel.ates to the payments of balance 10%. It is not in dispute that the plaintiff had demanded both the principal amount as also the interest from the Corporation. Section 3 of the 1993 Act imposes a statutory liability upon the buyer to make payment for the supplies of any goods either on or before the agreed date or where there is no agreement before the appointed day. Only when payments are not made.in terms of Section 3, Section 4 would apply. The 1993 Act came into effect from 23-9-1992 and will not apply to transactions which took place prior to that date. We find that out of the 71 suit transactions,· SI. Nos. 1 to 26 (referred to in the penultimate para of the trial court · judgment), that is supply orders between 5-6-1991 to 287-1992, were prior to the date of the 1993 Act coming into force. Only the· transactions at SI. Nos. 27 to 71 (that is supply orders between 22-10-1992 to 19-6-1993), will attract the prov:sions of the 1993 Act. 38. The 1993 Act, thus, will have no application in relation to the transactions entered into between June 1991 and 23-9-1992. The trial court as also the High Court, therefore, committed a manifest error in directing payment of interest at the rate of 23% up to June 1991 and 23.5% thereafter." 40. _Assam Small Scale Industries Development Corporation Ltd. and Others6_ has been followed recently by this Court in the case of _Shakti Tubes Limited7_ . In _Shakti Tubes LimitecF,_ this Court said : A 8 C D E F G H 590 SUPREME COURT REPORTS [2010] 4 S.C.R. A "18. In our considered opinion, the ratio of the aforesaid decision in _Assam Small Scale Industries case, (2005) 13 sec 19,_ is clearly applicable and would squarely govern the facts of the present case as well. The said decision was rendered by this Court after appreciating the entire B facts as also all the relevant laws on the issue and therefore, we do not find any reason to take a different view than what was taken by this Court in the aforesaid judgment. Thus, we respectfully agree with the aforesaid decision of this Court which is found to be rightly arrived c at after appreciating all the facts and circumstances of the case. c D E F G 21. We have considered the aforesaid rival submissions. This Court in _Assam Small Scale Industries case,(2005)13 sec 19_ has finally set at rest the issue raised by stating that as to what is to be considered . relevant is the date of supply order placed by the respondents and when this Court used the expression "transaction" it only meant a supply order. The Court made it explicitly clear in para 37 of the judgment which we have already extracted above. In our considered opinion there is no ambiguity in the aforesaid judgment passed by this Court. The intent and the purpose of the Act, as made in para 37 of the judgment, are quite clear and apparent. When this Court said "transaction" it meant initiation of the transaction i.e. placing of the supply orders and not the completion of the transactions which would be completed only when the payment is made. Therefore, the submission made by the learned Senior Counsel appearing for the appellant-plaintiff fails. 22. Consequently, we hold that the supply order having been placed herein prior to the coming into force of the Act, any supply made pursuant to the said supply orders would be governed not by the provisions of the Act but by the provisions of Section 34 CPC. H MODERN INDUSTRIES _v._ STEEL AUTHORITY OF 591 . INDIA LTD. TH. M.D. & ORS. [R.M. LODHA, J.] 31. Even otherwise, we are of the considered view that there was neither any alteration of the contract nor any novation of the contract in the present case. The correspondence between the parties clearly disclosed that after the respondents issued the supply order, the appellant-plaintiff did not supply the pipes in terms of the · supply order and it urged mainly for the increase in the price of the goods. Subsequently, they relied upon the price escalation clause and asked for increase in the price of pipes." A B c 41. These two decisions, however, do not help the case of the buyer for what we have indicated above viz., that in the present case the original contract got altered from time to time and it was last altered on April 29, 1995. By that time, 1993 Act had already come into force. D 42. Lastly, it was submitted by learned senior counsel for the respondents that IFC's award was delivered ex-parte and no reasons have been given in support thereof; the award does not reflect any application of mind. He would submit that if appeals are allowed and award is sustained that would cause E grave prejudice to the buyer inasmuch as the original contract was for a sum of Rs. 8.19 lakhs, out of which Rs. 6,07 lakhs have already been paid in July, 1997 and goods worth balance amount were given to the supplier and yet buyer is saddled with · the liability for an amount of Rs. 24,86,998/- with interest at the F rate of 18 per cent compounded with monthly rests from September 24, 1997 which may run into crores of rupees. The situation in which the buyer has been placed is their own creation. They chose not to contest the claim of the supplier before IFC on merits. No written statement was filed despite G opportunity granted by IFC. The buyer did not challenge nor disputed diverse claims made by the supplier (including additional work) before IFC. Even before the High Court, no submission seems to have been made on merits of the award at all. In the circumstances, the buyer does not deserve any H F H :j 592 SUPREME COURT REPORTS [2010] 4 S.C.R. A indulgence from this Court. Pertinently, though 1993 Act provides a statutory remedy of appeal against the award but the buyer did not avail of the statutory remedy and instead challenged the award passed by IFC before High Court in extraordinary jurisdiction under Article 226 of the Constitution B bypassing statutory remedy which, in our view, was not justified. 43. The result is that appeals are allowed and impugned judgment dated February 18, 2008 passed by the High Court is set aside. Partres shall bear their own costs. N.J. Appeals allowed.
End of Judgment Record
Browse All Supreme Court of India (2010) Decisions
2010-09-24

Department of Telecommunications v. Gujarat Co-operative Milk Marketing Federation Ltd.

This Supreme Court decision concerns a billing dispute arising from two bi-monthly telephone bills totaling Rs. 4,54,652 raised against the Managing Director of the Gujarat Co-operative Milk Marketing Federation Ltd. for calls categorized as international “party” or “sex talk” calls. The respondent subscriber alleged mischarging and that calls were made from another number, prompting a complaint to the Department. Verification upheld the bills; an administrative appeal was dismissed; the matter was referred to arbitration under section 7B of the Indian Telegraph Act, 1885, following a High Court direction. The arbitrator, Vineet Bhatia, concluded the bills were proper. The respondent challenged this award by writ petition, which the High Court (Single Judge) quashed, holding that the arbitrator was junior to the appellate authority, and proceeded to find the award invalid on presumptions and inferences unsupported by evidence; a Letters Patent Appeal was dismissed. The Supreme Court reversed, holding that the High Court exceeded its judicial review scope, misapplied the standard for review of arbitral awards under section 7B, and erred in imputing bias based on rank. It affirmed that the arbitrator’s findings were grounded in the department’s records and meters, and that independence was maintained. The appeal is allowed and the writ petition dismissed, with the High Court orders set aside.

2010-11-23

BHAGWAN BUDHA PRATHMIK TECHNICAL TRAINING COLLEGE NIRMALI v. STATE OF BIHAR

This is a consolidated Supreme Court decision in Civil Appeal Nos. 9896 and 9897 of 2010 arising out of Bihar. Bhagwan Budha Prathmik Technical Training College, Nirmali, a minority Buddhist institution established in 1987, challenged Bihar’s and other authorities’ recognition/approval decisions for its teacher-training course in light of the National Council for Teacher Education Act, 1993 (NCTE Act). The central issue is whether, after the NCTE Act’s appointed day (1 July 1995), State Governments retain power to grant recognition to teacher-education institutes and whether students of unrecognized colleges may sit for qualifying examinations. The matter traces a long litigation history: initial directions in the early 1990s required the Government to decide recognition while allowing students to appear at their own risk; subsequent orders and representations culminated in a 16 March 2007 order recognizing the college from 1987-89 on the ground that inspection warranted it, followed by a 2 September 2008 order withdrawing that recognition in light of NCTE’s sole jurisdiction post-appointed day. The High Court affirmed the sequence, but this Court held that a power to issue an order includes a power to withdraw it for valid reasons, and that recognition is vested in the NCTE after the appointed day. The judgment emphasizes that the NCTE Act must be implemented with full force to protect standards in teacher education. Ultimately, the Supreme Court dismissed the appeals, modified a cost order, and held there should be no further costs in these appeals, while acknowledging the students’ plight and the need for orderly implementation of the regulatory regime.

2010-06-03

State of Punjab & ors. v. G.S. Randhawa

This Civil Appeal arises from a petition challenging a demand for additional price under the Punjab Urban Estate (Sale of Sites) Rules, 1965. The Supreme Court hears counsel for the appellant and notes that the respondent did not enter appearance. Relying on the decision in Smt. Fuljit Kaur v. State of Punjab & Ors., (2010) 7 SCR 317, the Court states that, for the reasons recorded in Civil Appeal No. 5292 of 2004 (the Fuljit Kaur decision) decided on this date, the appeal must be allowed. The High Court’s December 6, 2006 order is set aside and the Demand Notice is upheld. The appellant is entitled to recover the additional price in accordance with law. The decision clarifies that liability to pay additional price under the Punjab Urban Estate Rules can be enforced consistent with the Fuljit Kaur framework, upholding the validity of the demand and permitting recovery by the State. The judgment thus resolves the previous split on allotment price adjustments and prescribes a uniform approach for enforcing such recoveries in analogous cases going forward.

2010-07-15

Harish Singh Nagra & Ors. v. Kapil Sibal & Ors.

Mehfil-e-Wukala, a Supreme Court cultural-literal association of lawyers, published a souvenir containing messages, articles, and poems by judges and senior advocates. Kapil Sibal, a senior advocate and then a candidate for President of the Supreme Court Bar Association, sent a message criticizing the junior Bar and urging reforms, which was circulated within Mehfil’s members but not released to the press or sold publicly. Petitioners, five practicing advocates from the Punjab and Haryana High Court, filed criminal contempt proceedings under Article 215 of the Constitution alleging that Sibal conspired with others to bring the administration of justice into disrepute. The High Court transferred the case to this Court. The central issue was whether the message, read in its proper context, amounted to contempt under Section 2(c) of the Contempt of Courts Act, 1971. The Court held that the message, read in its prospective context, did not scandalize or tend to scandalize any court, nor obstruct the administration of justice; it was a fair critique aimed at improving the system. Citing P.N. Duda, Mulgaokar, Ambard, Vishwanath, and others, the Court reaffirmed that freedom of expression under Article 19(1)(a) protects fair, reasoned criticism of judgments and judicial institutions. It noted that the Times of India article excerpt misrepresented the message, but the souvenir’s limited internal distribution and the respondent’s apology supported dismissal. Accordingly, the contempt petition was dismissed and notices discharged.