M.K. RANJITSINH & ORS. v. UNION OF INDIA & ORS.

Case / Petition Number:
Writ Petition (Civil) No. 838 of 2019; I.A. No. 85618 of 2020
Neutral Citation:[2021] 4 S.C.R. 81

Case Synopsis & Summary

The petition filed under Article 32 of the Constitution seeks protection for two endangered bird species, the Great Indian Bustard (GIB) and the Lesser Florican, which are dying due to collisions with overhead power lines. The petitioners, environmentalists, pressed for predator-proof fencing, controlled grazing in enclosures, and a ban on new overhead lines, windmills, and solar installations in identified priority habitats, along with the undergrounding of future power lines and the installation of bird divertors on existing lines. The Court emphasizes sustainable development and balancing ecological protection with power transmission, acknowledging ecocentric principles, intergenerational equity, and the public trust doctrine, as reflected in prior precedents. It recognizes that undergrounding HV lines is technically feasible only in certain areas, and in many places undergrounding of existing cables cannot be accomplished; thus it directs a phased approach: install divertors on existing lines, undertake case-by-case feasibility studies for undergrounding, and convert low-voltage lines in priority habitats to underground lines. The Court also directs eggs be protected by breeding centers and habitats be predator-proofed; recommends mobilizing CAMPA funds and CSR mechanisms to bear costs; and establishes a committee to assess HV undergrounding feasibility while ensuring energy security. Ultimately, the Court issues directions to safeguard the near-extinct birds while allowing power transmission in a balanced manner.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • S. A. Bobde
  • A. S. Bopanna
  • V. RAMASUBRAMANIAN
Judgment Date
2021-04-19
Court Decision / Holding
The Court directed that: (i) all existing overhead lines in priority and potential GIB habitats shall have bird divertors installed; (ii) the undergrounding of new lines should be undertaken where technically feasible; (iii) for low-voltage lines in priority habitats, convert to underground lines and extend undergrounding to existing low-voltage lines in such habitats; (iv) high-voltage lines in priority/potential habitats shall be converted underground if technically feasible within one year, failing which divertors shall be installed; (v) a committee consisting of named experts shall assess the feasibility of HV undergrounding and oversee technical reports; (vi) costs of undergrounding and related measures shall be borne by the relevant government authorities, with possible recoupment through regulatory mechanisms and CAMPA/CSR avenues; (vii) eggs will be transferred to breeding centers, habitat restoration and predator-proof fencing will be implemented; (viii) future overhead lines shall avoid these habitats where possible. Directions issued and orders to ensure timely implementation.
Final Disposition
Directions issued

Parties to the Case

Appellants / Petitioners

  • M.K. Ranjitsinh & Ors.

Respondents

  • Union of India
  • State of Rajasthan
  • State of Gujarat

Legal Representation & Advocates

Counsels for Petitioners

  • • Shyam Divan
  • • Prashanto Chandra Sen
  • • Sonia Dube
  • • Sugandha Yadav
  • • Shatadru Chakraborty
  • • Ria Sawhney
  • • E Surbhi Anand
  • • M/s. Legal Options (Adv.) for Petitioners

Counsels for Respondents

  • • Aishwarya Bhati
  • • Saurabh Mishra
  • • Dr. Manish Singhvi
  • • Dr. Abhishek Manu Singhvi
  • • S.B. Upadhyay
  • • M.G. Ramachandran
  • • Ranji Thomas
  • • Gurmeet Singh Makkar
  • • D.L. Chidananda
  • • Ankur Talwaar
  • • Shyam Gopal
  • • Milind Kumar
  • • Vikas Bansal
  • • Sunny Choudhary
  • • Arjun Garg
  • • Varun K. Chopra
  • • Gurtejpal Singh (M/s VKC Law Offices)
  • • Mahfooz A. Nazki
  • • Polanki Gowtham
  • • Shaik Mohamad Haneef
  • • T. Vijaya Bhaskar Reddy
  • • Amitabh Sinha
  • • Shrey Sharma
  • • Sandeep Jha
  • • Aaditya A. Pande
  • • Rahul Chitnis
  • • Sachin Patil
  • • Geo Joseph
  • • Mahesh Agarwal
  • • Arshit Anand
  • • Yojit Mehra
  • • Ms. Kamakshi G Sehgal
  • • Amit Bhandari
  • • Ms. Ashima Chauhan
  • • E.C. Agrawala
  • • Somesh Chandra Jha
  • • Rahul Narang
  • • Ms. Aastha Mehta
  • • Ms. Deepanwita Priyanka
  • • Aniruddha P. Mayee
  • • Ms. Hemantika Wahi
  • • Ms. Ranjitha Ramachandran
  • • Ms. Jesal Wahi
  • • V.N. Raghupathy
  • • Shivi Sanyam
  • • Ms. Pratishtha Vij
  • • Jappanpreet Hora
  • • A. Karthik
  • • Devendra Singh
  • • Anant Kumar Vatsya
  • • Vatsya Krishnaiya
  • • Ms. Arti Singh
  • • Aakashdeep Singh H Roda
  • • Basant Pal Singh
  • • Ms. Pooja Singh
  • • Advocates for the Respondents

Provisions of Law Cited

Article 32 of the Constitution of IndiaArticle 21 of the Constitution of IndiaEnvironment (Protection) Act, 1986 (Section 2(a))Centrally Sponsored Integrated Development of Wildlife Habitats Scheme, 2009Compensatory Afforestation Fund Act, 2016 (CAF, 2016) – Sections 4, 5, 6Rule 5(2)(i) of CAMPA Rules (CAMPA, CAF Act, 2016)Section 135 of the Companies Act, 2013Section 166(2) of the Companies Act, 2013

Legal Doctrines & Maxims

  • Public trust doctrine
  • Sustainable development
  • Ecocentrism vs. Anthropocentrism
  • Intergenerational equity
  • Polluter pays principle

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioners argued for urgent, science-based conservation action for GIB and Lesser Florican, pressing for immediate predator-proof fencing, controlled grazing, and a ban on new overhead lines in priority habitats. They urged undergrounding of HV lines where technically feasible, installation of bird divertors on existing lines, and transfer of eggs to breeding centers to safeguard reproduction. They sought mobilization of CAMPA funds and CSR mechanisms to bear costs, with a time-bound plan and project-specific feasibility assessments.

Contentions of Respondents

The respondents contended that underground HV lines are not technically feasible in many areas due to enormous costs, downtime, and lack of HV cable availability. They urged a case-by-case feasibility approach, endorsing divertors where undergrounding is not feasible, and argued for balancing energy transmission with conservation. They cited WII data and sectoral constraints, while emphasizing the need to safeguard electricity supply and to leverage regulatory and funding mechanisms to support feasible conservation actions.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (3)

Case NameCitationTreatmentExplanation
T.N. Godavarman Thirumulpad v. Union of India & Ors.[2012] 3 SCR 460PositiveCited to illustrate ecocentric approach and sustainable development principles; used as supportive authority for balancing development with conservation.
Centre for Environmental Law, World Wide Fund – India v. Union of India & Ors.[2013] 6 SCR 757PositiveCited to articulate ecocentrism, Article 21 rights in environmental protection, and sustainable development concepts.
M.C. Mehta v. Kamal Nath[1997] 1 SCC 388PositiveCited for the public trust doctrine, establishing the government as custodian of natural resources for public use and conservation.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•4,406 words•~21 min read

In The Court Record

M.K. RANJITSINH & ORS. v. UNION OF INDIA & ORS.

81 [2021] 4 S.C.R. 81 ## M.K. RANJITSINH & ORS. A v. UNION OF INDIA & ORS. (I.A. No. 85618 of 2020) In B (Writ Petition (Civil) No.838 of 2019) APRIL 19, 2021 ## **[S. A. BOBDE, CJI, A.S. BOPANNA AND** ## **V. RAMASUBRAMANIAN, JJ.]** _Environmental laws: Wild life – Protection and conservation of endangered species – Writ petition seeking protection of birdsGreat Indian bustard (GIB) and Lesser Florican, on verge of extinction since they are getting killed on their collision with the overhead power lines – Directions sought to the State of Rajasthan and Gujarat to ensure predator proof fencing, controlled grazing in the enclosure development – Direction sought that not to permit installation of overhead power lines, further construction of windmills and installation of solar infrastructure in priority and potential habitat – Direction also sought for undergrounding all future overhead power lines; selected power lines in priority GIB habitat and installation of divertors in potential habitat – Held: In view of the sustainable development concept and on striking a balance, the protection of the rare species of birds is essentially to be made, while at the same time allowing transmission of power in an appropriate manner – It would not be feasible to lay underground power cables in certain areas and the conversion of the already existing cables also cannot be made in certain locations – In such locations, it is recommended that ‘bird divertors’ be installed on the existing power lines and the undergrounding of the new power line wherever technically feasible in the vicinity of the habitats be undertaken – Furthermore, eggs of the said species of birds to be protected, by transferring the same to the breeding centres – Laying of the underground power line more particularly of high- voltage, would require technical evaluation on case- to- case basis – Committee is constituted to assess the feasibility of laying of highvoltage underground power line – In view thereof, all low voltage_ C D E F G H 81 82 SUPREME COURT REPORTS [2021] 4 S.C.R. - A _powerlines to be laid in the priority and potential habitats of GIB, to be laid underground in future, and the existing low voltage overhead powerlines to be converted into underground powerlines – High- voltage powerlines in the priority and potential habitats of GIB, as referred herein, to be converted into underground power line._ B _T.N. Godavarman Thirumulpad vs. Union of India & Ors._ **(2012) 3 SCC 277 : [2012] 3 SCR 460;** _Centre for Environmental Law, World Wide Fund – India vs. Union of India & Ors._ **(2013) 8 SCC 234 : [ 2013] 6 SCR 757 – referred to.** C ## **Case Law Reference** ||**Case Law Reference**|| |---|---|---| ||**[2012] 3 SCR 460**<br>**referred to**|**Para 4**| ||**[2013] 6 SCR 757**<br>**referred to**|**Para 5**| |D|CIVIL ORIGINAL JURISDICTION : I.A. No. 85618 of 2020 in|| ||Writ Petition (Civil) No. 838 off 2019.|| (Under Article 32 of The Constitution Of India) - Shyam Divan, Prashanto Chandra Sen, Sr. Advs., Ms. Sonia Dube, - Ms. Sugandha Yadav, Shatadru Chakraborty, Ms. Ria Sawhney, Ms. - E Surbhi Anand, M/s. Legal Options, Advs. for the Petitioners. Ms. Aishwarya Bhati, ASG., Saurabh Mishra, AAG., Dr. Manish Singhvi, Dr. Abhishek Manu Singhvi, S.B. Upadhyay, M.G. Ramachandran, Ranji Thomas, Sr. Advs., Gurmeet Singh Makkar, D.L. Chidananda, Ankur Talwaar, Shyam Gopal, Milind Kumar, Vikas Bansal, F Sunny Choudhary, Arjun Garg, Varun K. Chopra, Gurtejpal Singh for M/s. Vkc Law Offices, Mahfooz A. Nazki, Polanki Gowtham, Shaik Mohamad Haneef, T. Vijaya Bhaskar Reddy, Amitabh Sinha, Shrey Sharma, Sandeep Jha, Aaditya A. Pande, Rahul Chitnis, Sachin Patil, Geo Joseph, Mahesh Agarwal, Arshit Anand, Yojit Mehra, Ms. Kamakshi G Sehgal, Amit Bhandari, Ms. Ashima Chauhan, E.C. Agrawala, Somesh Chandra Jha, Rahul Narang, Ms. Aastha Mehta, Ms. Deepanwita Priyanka, Aniruddha P. Mayee, Ms. Hemantika Wahi, Ms. Ranjitha Ramachandran, Ms. Jesal Wahi, V.N. Raghupathy, Shivi Sanyam, Ms. Pratishtha Vij, Jappanpreet Hora, A. Karthik, Devendra Singh, Anant Kumar Vatsya, Vatsya Krishnaiya, Ms. Arti Singh, Aakashdeep Singh H Roda, Basant Pal Singh, Ms. Pooja Singh, Advs. for the Respondents. 83 M.K. RANJITSINH & ORS. v. UNION OF INDIA & ORS. The following Order of the Court was passed: A ## **ORDER** 1. The writ petition is filed in the nature of public interest seeking to protect two species of birds namely the Great Indian Bustard (‘GIB’ for short) and the Lesser Florican, which is on the verge of extinction. The existence of overhead power lines is stated to have become a hazard due to which the said species of birds on collision are getting killed. In the pending writ petition, the application in I.A. No.85618/2020 is filed seeking interim directions to direct the State of Rajasthan (respondents No.5 and 6) and State of Gujarat (respondents No.9 to 11) to ensure predator proof fencing, controlled grazing in the enclosure development and to direct the said respondents not to permit installation of overhead power lines and also not permit further construction of windmills and installation of solar infrastructure in priority and potential habitat as identified by the Wildlife Institute of India. The petitioner is also seeking a direction to the respondents to install divertors for the powerlines which has been listed in the application. 2. The very subject matter indicates that though such directions are sought against the respondents, the litigation is not adversarial in nature as it is community interest. In fact, the petitioners being environmentalists, are seeking to protect the rare birds which are dwindling in number. It is contended that GIB is one of the heaviest flying birds in the world, about a meter in height and wing span of around seven feet. It has disappeared from 90 per cent of habitat except parts of Rajasthan and Gujarat which is to be protected. According to the petitioners, overhead power lines are the biggest threat to the survival of the GIBs. The Wildlife Institute of India (WII) in its Report “Power Line Mitigation, 2018” has stated that every year 1 lakh birds die due to collision with power lines. The Report concluded that unless power line mortality is mitigated urgently, extinction of GIBs is certain. Surveys conducted by Wildlife Institute of India (WII) in Thar covering 80 km of power lines repeated 7 times over a year found 289 carcasses of around 30 species, including the Great Indian Bustard (GIB). The study estimated 3 bird mortalities/km/month for low-tension lines, 6 bird mortalities/km/ month for high-tension lines, and about 1 lakh birds/per year within a 4200 sq.km area in/around Desert National Park, Rajasthan. In terms of GIB, 6 mortalities have been recorded in Thar during 2017-20, all due to high-tension transmission lines – some of them connected to wind turbine. B C D E F G H 84 SUPREME COURT REPORTS [2021] 4 S.C.R. - A Therefore, petitioner seeks undergrounding all future overhead power lines; selected power lines in priority GIB habitat and installation of divertors in potential habitat. 3. In fact, it is admitted by the Ministry of Power, Union of India in their affidavit dated 15.03.2021 as follows: - B “The Great Indian Bustard (“GIB”) lacks frontal vision. Due to this, they cannot detect powerlines ahead of them, from far. As they are heavy birds, they are unable to manoeuvre across power lines within close distances. Thus, they are vulnerable to collision with power lines. In case of low voltage lines, electrocution is C often the cause of death due to smaller phase to phase separation distance. High voltage lines do not cause death due to electrocution but cause death due to collision.” 4. But, this Court while considering IA Nos.1433 and 1477 of 2005 in the case of _**T.N. Godavarman Thirumulpad Vs. Union of**_ D _**India & Ors.**_ (2012) 3 SCC 277 has observed as hereunder: - “17. Environmental justice could be achieved only if we drift away from the principle of anthropocentric to ecocentric. Many of our principles like sustainable development, polluter-pays principle, intergenerational equity have their roots in anthropocentric - E principles. Anthropocentrism is always human interest focussed and that non-human has only instrumental value to humans. In other words, humans take precedence and human responsibilities to non-human based benefits to humans. Ecocentrism is naturecentred where humans are part of nature and non-humans have intrinsic value. In other words, human interest does not take - F automatic precedence and humans have obligations to non-humans independently of human interest. Ecocentrism is therefore lifecentred, nature-centred where nature includes both humans and non-humans. The National Wildlife Action Plan 2002-2012 and the Centrally Sponsored Integrated Development of Wildlife - G Habitats Scheme, 2009 are centred on the principle of ecocentrism.” H In that context while taking note of the contention of the State relating to lack of funds, reference was made to the Centrally Sponsored Integrated Development of Wildlife Habitats Scheme, 2009 which provides for financial sharing between Centre and State. Though taken 85 M.K. RANJITSINH & ORS. v. UNION OF INDIA & ORS. note in the context of conservation of wild buffalo the pattern of funding A was taken note in para-23 which provides for 100% central assistance in respect of GIB, for both recurring and non-recurring items of expenditure. 5. Further this Court in the case of _**Centre for Environmental Law, World Wide Fund – India Vs. Union of India & Ors.**_ , (2013) 8 SCC 234 while considering the protection and conservation of endangered species has observed as hereunder: “45. We may point out that there has been wide-ranging discussions and deliberations on the international platforms and conferences for re-building of certain principles laid down in the earlier conventions on the Principles of Sustainable Development. The United Nations Commission on Environment and Development defined the “sustainable development” as follows: “Sustainable development is the development that meets the needs of the present without compromising the ability of future generations to meet their own needs.” (World Commission on Economic Development [WCED], 1987 : 43) 46. Sustainable development, it has been argued by various eminent environmentalists, clearly postulates an anthropocentric bias, least concerned with the rights of other species which live on this earth. Anthropocentrism is always human interest focussed thinking that non-human has only instrumental value to humans, in other words, humans take precedence and human responsibilities to non-human are based on benefits to humans. Ecocentrism is nature-centred, where humans are part of nature and non-humans have intrinsic value. In other words, human interest does not take automatic precedence and humans have obligations to non-humans independently of human interest. Ecocentrism is, therefore, lifecentred, nature-centred where nature includes both humans and non-humans.” “48. Article 21 of the Constitution of India protects not only the human rights but also casts an obligation on human beings to protect and preserve a species becoming extinct, conservation and protection of environment is an inseparable part of right to life. In _M.C. Mehta_ v. _Kamal Nath_ [(1997) 1 SCC 388] , this Court enunciated the doctrine of “public trust”, the thrust of that theory B C D E F G H 86 SUPREME COURT REPORTS [2021] 4 S.C.R. A is that certain common properties such as rivers, seashores, forests and the air are held by the Government in trusteeship for the free and unimpeded use of the general public. The resources like air, sea, waters and the forests have such a great importance to the people as a whole, that it would be totally unjustified to make them a subject of private ownership. The State, as a custodian of B the natural resources, has a duty to maintain them not merely for the benefit of the public, but for the best interest of flora and fauna, wildlife and so on. The doctrine of “public trust” has to be addressed in that perspective. A 49. We, as human beings, have a duty to prevent the species from going extinct and have to advocate for an effective species protection regimes. NWAP 2002-2016 and the Centrally-sponsored scheme, 2009 indicate that there are many animal species which are close enough to extinction and some of the other species have already disappeared from this earth. No species can survive on the brink of extinction indefinitely and that the continued existence of any species depends upon various factors like human-animal conflict, epidemics, forest fire and other natural calamities, etc.” C D The State as well as the Central Government therefore, have a duty cast to preserve the endangered species and as such the expenses E incurred will have to be provided by them either under the schemes available or by earmarking the same in such manner. Needless to mention that in the instant case the preservation is by undergrounding the powerlines and in that context if cost is incurred, it would also be permissible to pass on a portion of such expenses to the ultimate consumer subject to approval of the Competent Regulatory Authority. F 6. The respondents though are sensitive to the issue, have contended that the high-voltage lines do not cause GIB deaths due to electrocution but cause death due to collision. It is contended that the underground high-voltage line is not technically feasible due to several factors such as (i) high cost (ii) high downtime to repair any failed cable G (iii) non-availability of cables at 765 Kv level and (iv) increase in the number of joints with length of run. The petitioners/applicants in order to controvert the same and contend that the undergrounding of high-voltage line is not a novel move but has been undertaken in other cases, have referred to the tender notification issued by Power Transmission H Corporation of Uttarakhand Limited for 220 KV transmission line and 87 M.K. RANJITSINH & ORS. v. UNION OF INDIA & ORS. the one issued by Delhi Transport Limited for 220 KV underground cable. 7. In addition, the petitioners have also referred to the invitation of public comments for laying underground cable transmission line of 220 KV by the Government of India, Ministry of Road Transport and Highways. The report published by the Power Grid Corporation is referred to indicate that the undergrounding of 220 KV power line is possible and is being done in India. It is specifically contended that the 10 km long power lines were made underground by GETCO for the safety of Greater Flamingos in the Khadir Region of Kutch. Similar such instances of underground power lines being laid is also referred by Mr. Shyam Divan, learned senior counsel for the petitioner. Ms. Aishwarya Bhati, learned ASG and Dr. Manish Singhvi, learned senior counsel appearing on behalf of the respondents however sought to indicate that the instances referred, wherein the tender notifications were issued for underground power lines cannot be made comparable in all cases inasmuch as the same would be possible depending on the area, terrain and the distance for which such cable line is to be laid which cannot be of universal application. 8. In that background, keeping in view, the sustainable development concept and on striking a balance the protection of the rare species of birds is essentially to be made, the effort being to save every bird while at the same time allowing transmission of power in an appropriate manner. Even as per the study/survey conducted by the Wildlife Institute of India, it would not be feasible to lay underground power cables in certain areas and the conversion of the already existing cables also cannot be made in certain locations. In such of the locations, it is recommended that ‘bird divertors’ be installed on the existing power lines and the undergrounding of the new power line wherever technically feasible in the vicinity of the habitats of the rare species of birds be undertaken. A B C D E F 9. The report dated 11.07.2019 was submitted by the Wildlife Institute before the National Green Tribunal to that effect and para 4.2 of the report reads as hereunder: G “4.2. Mitigate all power transmission lines passing through priority bustard habitats identified by WII (Please refer Annexure 10) by undergrounding cables (where technically/technologically feasible) or installing bird divertors to make them prominent to birds. The priority areas where this intervention is required has been mapped by the Wildlife Institute of India and a technical-cum-financial H 88 SUPREME COURT REPORTS [2021] 4 S.C.R. - A proposal has been submitted to RVPNL for necessary approvals from Rajasthan Energy Department for mitigation. This action must be expeditiously implemented in the short-term (1-3 years), as power-line mortality is currently the biggest threat to the species.” 10. In addition to the death of the birds due to collision and B electrocution, the conservation strategy also requires protecting the eggs of the said species of birds and the same being transferred to breeding centres for the purpose of hatching. In that regard, for conservation, the habitat restoration and for making it predator proof, appropriate fencing is to be provided to the breeding grounds. In that regard, pictorial C representation of the priority and potential area is indicated in Annexure A-7 (page 74) of I.A. No.85618/2020 which is also depicted here below. 11. In the above background, there cannot be disagreement whatsoever that appropriate steps are required to be taken to protect the said species of birds. In that view, insofar as the existing overhead D powerlines are concerned the respondents shall take steps forthwith to install divertors and in respect of existing overhead powerlines all future cases of installing the transmission lines a study shall be conducted with regard to the feasibility for the lines to be laid underground. In all such cases where it is feasible, steps shall be taken to lay the transmission line underground. For the lines to be laid in future if as per the technical E report the overhead line alone is feasible and the same is ratified by the Committee, in such event the installation of the divertors shall also be a condition attached in the contract to be entered with generating companies. Insofar as, the cost incurred in the said process, the concerned respondents No. 5 to 8 and 9 to 11 shall work out and provide for the - F same and the respondents No.1 to 4 aid in this regard. It would be open to them to muster the resources in accordance with law. In cases where the power generators are required to bear the additional amount adding to the cost of production, it would be open to regulate the manner in which the cost would be mitigated in accordance with contractual terms. Irrespective of the cost factor the priority shall be to save the near extinct - G birds. 12. In fact, a few suggestions were made in the course of arguments, as to how financial resources can be mobilised. One of the options that could be explored, is to invite the attention of each electricity utility engaged in the generation of power, to Section 135 of the Companies H Act, 2013, which imposes corporate social responsibility upon companies 89 M.K. RANJITSINH & ORS. v. UNION OF INDIA & ORS. having a specified net worth or turnover or net profit. Section 166(2) of the Companies Act, 2013 ordains the Director of a Company to act in good faith, not only in the best interest of the Company, its employees, the shareholders and the community, but also for the protection of environment. The word “environment”, though not defined in the Companies Act, has to be given the meaning assigned to it under the Environment (Protection) Act, 1986. Section 2(a) of the Environment (Protection) Act, 1986, defines the word “environment” to include the _“inter- relationship which exists among and between water, air and land, and human beings, other living creatures, plants, microorganisms and property”_ Moreover, with the implementation of the Compensatory Afforestation Fund Act, 2016 (CAF, 2016), substantial funds are available with the National and State Authorities. Sections 4, 5 and 6 of the Act, provide for the utilisation of the fund for measures to mitigate threats to wildlife. The State of Rajasthan has already set up a Compensatory Afforestation Fund Management and Planning Authority (CAMPA) on 12.11.2009. Rule 5(2)(i) of these Rules permit the use of the State Fund for the improvement of wildlife habitat. It appears, according to the petitioners that a sum of Rs.47,436 crores, out of a total of Rs.54,685 crores CAMPA Fund have been transferred by the Union Environment Ministry to the States for afforestation projects. 13. With regard to the conservation of the habitat to secure the safety of the eggs laid by the birds, the area earmarked and indicated as islands and shown in Annexure-A-7 and in light colour in sketch here below shall be fenced and protected from invasion by predators so that the eggs laid in these areas are protected. The power supply line regarding which underground passage is to be made should also avoid these areas. 14. In the light of the contentions urged on this aspect of the matter, we are conscious that the laying of the underground power line more particularly of high-voltage though not impossible, would require technical evaluation on case-to-case basis and an omnibus conclusion cannot be reached laying down a uniform method and directions cannot be issued unmindful of the fact situation. Though that be the position the consensus shall be that all low voltage powerlines to be laid in the priority and potential habitats of GIB shall in all cases be laid underground in future. In respect of low voltage overhead powerlines existing presently in the priority and potential habitats of GIB, the same shall be converted into underground powerlines. In respect of high-voltage powerlines in A B C D E F G H 90 SUPREME COURT REPORTS [2021] 4 S.C.R. - A the priority and potential habitats of GIB, more particularly the powerlines referred in the prayer column of I.A. No.85618/2020 and indicated in the operative portion of this order shall be converted into underground power line. The potential and priority area in Kutch and Thar respectively are as per the sketch shown below: - B While considering the laying of underground power line the said habitats shall be kept in perspective and steps be taken for the safety of the GIB in the said habitat. - C - D - E F **==> picture [8 x 9] intentionally omitted <==** **----- Start of picture text -----**<br> G<br>**----- End of picture text -----**<br> H **==> picture [279 x 215] intentionally omitted <==** **==> picture [268 x 204] intentionally omitted <==** 91 M.K. RANJITSINH & ORS. v. UNION OF INDIA & ORS. 15. As already taken note above, the laying of high-voltage A underground power line would require expertise to assess the feasibility of the same. For this specific purpose of assessing the feasibility after taking into consideration all technical details, we deem it proper to constitute a committee consisting of the following members: (i) Dr. Rahul Rawat, Scientist, Room No.021, Block-14, Ministry of New and Renewable Energy, CGO Complex, Lodi Road, New Delhi. B C - (ii) Dr. Sutirtha Dutta, Scientist, Wildlife Institute of India, Dehradun. - (iii) Dr. Devesh Gadhavi, Deputy Director, The Corbett Foundation. D The above committee may also obtain technical reports if need be, from experts in the field of electricity supply to arrive at their decision. The Government of India shall provide all assistance to the Committee. E 16. The details of the powerlines from Kutch for installation of bird divertors is as follows: **==> picture [311 x 156] intentionally omitted <==** F G H 92 SUPREME COURT REPORTS [2021] 4 S.C.R. |A<br>B<br>C<br>D<br><br>|The details of the powerlines for installation of divertors from<br>Rajasthan are as follows:|The details of the powerlines for installation of divertors from<br>Rajasthan are as follows:|The details of the powerlines for installation of divertors from<br>Rajasthan are as follows:|The details of the powerlines for installation of divertors from<br>Rajasthan are as follows:|The details of the powerlines for installation of divertors from<br>Rajasthan are as follows:| |---|---|---|---|---|---| ||**a) **|**List of powerlines for installation of divertors**<br>**from Rajasthan**|||**Capacity**| ||1)|<br> Jaisalmer–Ramgarh-1 (40 Km)||132 kv|| ||2)|Jaisalmer–Ramgarh-2 (40 Km)||132 kv|| ||3)|Askandra (Pokran to Askandra ) (30 Km)||132 kv|| ||4)|Askandra (Pokran to Askandra ) (20 Km)||132 kv|| ||5)|Amarsagar–Ramgarh (40 Km)||220 kv|| ||6)|Amarsagar–Lilo (8 Km)||220 kv|| ||7)|Amarsagar–Phalodi (54 Km)||220 kv|| ||8)|Amarsagar–Phalodi (71 Km)||220 kv|| ||9)|Ramgarh Dechu (49 Km)||220 kv|| ||10)|Ramgarh Dechu (43 Km)||220 kv|| ||11)|Ramgarh Dechu (50 Km)||220 kv|| ||12)|Akai–Ramgarh (55 Km)||400 kv|| ||13)|Tejuva–Kuchadi (138 km)||33 kv|| ||14) Kaladongar (70 Km)|||33 kv|| ||15) Mokla–Habur–Sanu (301 km)|||33 kv|| ||16)<br>Tejuva–Kuchadi (25 km)|||132 kv|| ||17)<br>Kaladongar (47 km)|||132/220 kv|| ||18)<br>Mokla–Habur–Sanu (43 km)|||132/220 kv|| ||19) Chandan Via Bhagu ka Gaon to Mohangarh (70 km)|||33 kv|| ||20) Amarsagar–Ramgarh (40 km)|||220 kv|| ||21) Amarsagar–Ludarva (4 km)|||33 kv|| E The details of the powerlines to be converted to underground subject to feasibility, if not, to immediately install divertors; **==> picture [333 x 186] intentionally omitted <==** **----- Start of picture text -----**<br> Lines from Kutch<br>F<br>G<br>H<br>**----- End of picture text -----**<br> 93 M.K. RANJITSINH & ORS. v. UNION OF INDIA & ORS. **==> picture [9 x 8] intentionally omitted <==** **----- Start of picture text -----**<br> A<br>**----- End of picture text -----**<br> **==> picture [9 x 8] intentionally omitted <==** **----- Start of picture text -----**<br> B<br>**----- End of picture text -----**<br> C D Lines from Rajasthan E 17. The respondents No.5, 6 and 9 to 11 while arranging to lay the powerlines underground in respect of the powerlines, the feasibility of which is not in doubt shall proceed with the work right away. However, in cases where the respondents find that there are issues relating to feasibility, the matter shall be referred to the committee with all relevant material and particulars. The committee shall assess the matter and arrive at a conclusion as to whether the underground powerline is feasible or not. Based on the report to be rendered by the committee the further action shall be taken by the respondent. F G 18. In all cases where the overhead powerlines exist as on today in the priority and potential GIB area the respondents shall take steps forthwith to install divertors pending consideration of the conversion of the overhead cables into underground powerlines. In all such cases where H 94 SUPREME COURT REPORTS [2021] 4 S.C.R. - A it is found feasible to convert the overhead cables into underground powerlines the same shall be undertaken and completed within a period of one year and till such time the divertors shall be hung from the existing powerlines. 19. Ordered accordingly. B Nidhi Jain Directions issued. C D E F G H
End of Judgment Record
Browse All Supreme Court of India (2021) Decisions
2021-01-05

HARI OM @ HERO v. STATE OF U.P.

This is a Supreme Court appeal arising from six accused tried in multiple trials for offences under IPC sections 396 and 412, the SC/ST Act (3(2)(v)) and the Arms Act. The Trial Court convicted Hari Om @ Hero of the 396 IPC offence and awarded death, while other accused received varying outcomes. The High Court confirmed Hari Om’s death sentence and upheld some convictions, while acquitting three co-accused. The Supreme Court, in a Division Bench led by Justice Uday Umesh Lalit, allowed the appeals by Hari Om and others, finding serious infirmities in the prosecution case, especially the testimony of PW5, a five-year-old child witness (Ujjwal). The Court held that corroboration of a child witness is a prudential rule rather than a hard requirement and that, given glaring inconsistencies and lack of reliable corroboration, the evidence could not sustain a conviction under Section 396 IPC against Hari Om. It also highlighted ambiguities in fingerprint evidence—its collection, handling, and interpretation—and noted the absence of robust link evidence connecting the accused to the crime. Consequently, Hari Om, Sanjay @ Sonu and Saurabh @ Sanju were acquitted and ordered to be set at liberty, with the Court emphasizing careful, circumspect evaluation of child-witness testimony and forensic evidence.

2021-01-22

INDIAN BANK AND ANOTHER v. MAHAVEER KHARIWAL

This appeal concerns an Indian Bank employee who sought voluntary retirement under the Indian Bank Employees Pension Regulations, 1995 (Regulation 29), including a request for waiver of the three-month notice. The bank rejected the request on the ground that the employee was not eligible under Regulation 29, and initiated departmental proceedings which culminated in penalties. The employee challenged the rejection in a writ petition; the Single Judge dismissed it to the extent challenged here, but the Division Bench quashed the rejection and directed the bank to release retiral dues under the Pension Regulations. The Supreme Court, upholding the employer’s challenge, held that the voluntary retirement application dated 21.01.2004 was absolutely in consonance with Regulation 29 and that the 20.04.2004 rejection was illegal and contrary to Regulation 29. It held that the employee is entitled to all retiral benefits on the basis of voluntary retirement, and that the subsequent departmental enquiry would be non est since there would be no employer–employee relationship after retirement. The Court analyzed Regulation 29, including the three-month notice, the need for acceptance by the appointing authority, and the curtailment mechanism under Sub-Regulation 3, as well as the proviso to Sub-Regulation (1) relating to deputation. The appeal is dismissed with no costs, and the employee’s retiral benefits are secured while any further proceedings are void.

2021-11-29

Hasmat Ali v. Amina Bibi & ORS.

This is a Civil Appeal under Section 100 of the Code of Civil Procedure, 1908, arising from a suit in which the plaintiff sought a declaration that the defendant was a tenant up to 31.03.2003, eviction of the defendant from the suit shop, and other reliefs. The Trial Court partly decreed the suit directing the defendant to vacant possession; the Appellate Court dismissed the appeal, and the High Court, in Regular Second Appeal No. 403 of 2017, dismissed the appeal in limine without giving reasons. The essential issue is whether the High Court could dismiss a second appeal in limine without recording reasons and whether the appeal should be admitted for consideration of substantial questions of law under Section 100(1)–(5). The Supreme Court examines the interplay between Section 100 and Order XLII, clarifying that a second appeal lies only if the High Court formulates a substantial question of law under Section 100(4) and that the appeal must be heard on that question under Section 100(5). It reinforces that a dismissal in limine requires explicit reasons and that “so far as may be” in Order XLII indicates procedural alignment with Order XLI. Applying these principles, the Court sets aside the High Court’s order for lack of reasons, allows the appeal, and remits the matter to the High Court for fresh disposal in accordance with law, with no costs. The decision underscores the mandatory requirement of reasoned orders in second-appeal dismissals.

2021-02-15

Sudipta Chakrobarty & Anr. v. Ranaghat S.D. Hospital & Ors.

This Civil Appeal concerns the practice of delivering a final operative order without accompanying reasons in proceedings before the National Consumer Disputes Redressal Commission (NCDRC) and the consequences of delaying reasons. The National Commission pronounced the operative order in 2019 but took eight months to issue a reasoned judgment, prompting scrutiny under Article 21 of the Constitution. The Supreme Court recalls established authority that the right of aggrieved parties to challenge an order on its merits is prejudiced when reasons are withheld or delayed, and that due process requires timely, reasoned decisions. Citing State of Punjab & Ors. v. Jagdev Singh Talwandi (1984), Anil Rai v. State of Bihar (2001) and Zahira Habibulla M. Sheikh & Ors. v. State of Gujarat (AIR 2004 SC 3467), among others, the Court reiterates that pronouncing the operative portion without reasons undermines the fruits of litigation and defeats subsequent remedies. In the instant case, there was a hiatus of eight months between the operative order dated 26.04.2019 and the accompanying reasons. The Court orders that the President of the National Commission examine the matter and take steps to discontinue this practice, ensuring that reasoned judgments are delivered together with operative orders. The appeal and pending applications are disposed of.