MIS. SURYACHAKRA POWER CORPORATION LTD. v. ELECTRICITY DEPARTMENT, REP. BY ITS SUPERINTENDING ENGINEER, PORT BLAIR AND OTHERS

Case / Petition Number:
Civil Appeal No. 5958 of 2015
Neutral Citation:[2016] 8 SCR 108

Case Synopsis & Summary

This appeal under Section 125 of the Electricity Act, 2003 challenges a decision of the Appellate Tribunal for Electricity. MIS. Suryachakra Power Corporation Ltd. sought condonation of a 161-day delay in filing the Supreme Court appeal following the Tribunal’s 28.11.2014 order and the 07.05.2015 withdrawal of a review petition. The appellant contends that the delay was largely caused by the time spent pursuing the review petition before the Appellate Tribunal for Electricity and by the 2015 summer vacations, and urges that Section 125 allows filing within 60 days, with a further 60 days for sufficient cause (i.e., a maximum of 120 days) and that Section 5 of the Limitation Act cannot extend beyond this limit. The Court clarifies that while Section 5 cannot override the Electricity Act’s special limitation, Section 14 of the Limitation Act may apply if the party is prosecuting another civil proceeding with due diligence and in good faith. The Bench, however, finds lack of due diligence and good faith, recalls an earlier order that condoned the delay, and dismisses the interlocutory application for condonation as well as the appeal for delay. The judgment emphasizes strict adherence to the Electricity Act’s time limits, with limited resort to general limitation principles.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • Kurian Joseph
  • R. F. Nariman
Judgment Date
2016-09-22
Court Decision / Holding
Interlocutory Application No. 1 of 2015 for condonation of delay is dismissed. Consequently, the appeal is also dismissed on the ground of delay. There shall be no order as to costs.
Final Disposition
Interlocutory Application dismissed; appeal dismissed.

Parties to the Case

Appellants / Petitioners

  • MIS. SURYACHAKRA POWER CORPORATION LTD.

Respondents

  • ELECTRICITY DEPARTMENT, REP. BY ITS S.E., PORT BLAIR AND OTHERS

Legal Representation & Advocates

Counsels for Petitioners

  • • Rakesh Khanna
  • • Ms. Ruchi Singhwani
  • • Mohit Paul
  • • Ms. Megha Bharara
  • • Vikash Arora
  • • Ms. Diksha Jhingan

Counsels for Respondents

  • • Gurukrishna Kumar (Sr. Adv.)
  • • Rohit Rao N.
  • • Mukund P. Unny
  • • Ananga Bhattacharyya

Provisions of Law Cited

Electricity Act, 2003, Section 125Limitation Act, 1963, Section 5Limitation Act, 1963, Section 14Code of Civil Procedure, 1908, Section 100Code of Civil Procedure, 1908, Order XXIII, Rule 2Limitation Act, 1963, Section 29(2)

Legal Doctrines & Maxims

  • Exclusion of time of proceeding bona fide in court without jurisdiction
  • Due diligence
  • Good faith

Submissions & Arguments

Contentions of Appellants / Petitioners

The applicants contend that the prescribed 60-day window for filing an appeal under Section 125 of the Electricity Act, 2003 may be extended by up to 60 days for sufficient cause, resulting in a maximum of 120 days. They rely on Section 14 of the Limitation Act to exclude time during pendency of the review petition and summer vacations, arguing that due diligence and good faith were exercised in pursuing proceedings. They further submit that the Tribunal’s prior condonation of delay should not foreclose relief under Section 14 and that the Court should consider the merits within the 120-day cap, as clarified by precedent such as Chhattisgarh State Electricity Board and M.P. Steel Corporation.

Contentions of Respondents

The respondents stress a strict adherence to the Electricity Act’s special limitation (60 days, extendable by only 60 days to 120 days). They submit that Section 5 of the Limitation Act cannot extend beyond 120 days, and that Section 14 requires both due diligence and good faith, which they argue were not demonstrated. The respondents contend that condonation of delay beyond 60 days cannot be justified and that the Tribunal’s condonation should not override statutory limits.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
Chhattisgarh State Electricity Board v. Central Electricity Regulatory Commission and others(2010) 5 SCC 23; 2010 (4) SCR 680PositiveCited to affirm that Section 5 of the Limitation Act cannot extend beyond the 120-day limit under Section 125 of the Electricity Act; supports the special limitation framework of the Electricity Act.
M.P. Steel Corporation v. Commissioner of Central Excise(2015) 7 SCC 58PositiveCited to support the proposition that Section 14 can apply even when Section 5 is not applicable, though requiring demonstration of due diligence and good faith in the present facts.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,729 words•~13 min read

In The Court Record

MIS. SURYACHAKRA POWER CORPORATION LTD. v. ELECTRICITY DEPARTMENT, REP. BY ITS SUPERINTENDING ENGINEER, PORT BLAIR AND OTHERS

[2016) 8 S.C.R. 108 A _MIS._ SURYACHAKRA POWER CORPORATION LIMITED v. ELECTRICITY DEPARTMENT, REP. BY ITS SUPERINTENDING ENGINEER, PORT BLAIR AND OTHERS B (Civil Appeal No. 5958of2015) ## SEPTEMBER 22, 2016 ## **[KUIUAN JOSEPH AND R. F. NARIMAN, JJ.]** - _Electricity Act, 2003_ - _s.125_ - _Special limitation period_ - - - _Applicability of s.5, Limitation Act, 1963 Appeal before Supreme_ - c _Court. beyond 120 days' limitation period uls. 125, Electricity Act_ - _Condonation ojdelay sought 011 the ground that the delay ll'as mai11ly on account of time taken in prosecuti11g review petition before the Appellate Tribunal for Electricity and also because <?[vacations in Supreme Court_ - _Held: Appeal u!s. 125 has to be .filed ll'ithi11 60_ - D _days ji-0111 the date of com111z111icatio11_ <~f _decisio11 or order of the_ - - _Appellate Tribunal A further period of 60 days may be allowed by the Supreme Court, if sati.1fied that appellant wa.1· prevented by_ - - _szif}icient cause from filing the appeal Thus, the maximum period ll'ithin irhich an appeal can be filed uls. 125 is 120 days, including discretion granted to the Supreme Court to condone the delay limited_ - E - - _to 60 days Therefore, Supreme Court cannot condone the delay beyond 60 days by invoking s.5 <d' Limitation Act, ignoring the special limitation prescribed u11der the Electricity Act. 2003_ - _Furthe1;_ I _here ll'ere fe11• days leji be.fore t lw d11si11g o/ t_ hi.1· _Court .for swnmer vacations, for the appellant to jile the appeal, therej(1re_ - F _appellant not entitled even to be11ejit of pri11ciples uls . ./. Limitation Act, 1963 j(1r exclusio11_ ~f _the period il'hen court is closed_ - _Limitation Act, 1963._ _Limitation Act, 1963:_ - _s.l./_ - _Exclusio11 of time o.f prosecuting the case_ bonatide _in_ - G _Court 1101 having j11risdictio11_ - _E111itleme111_ - _Held: The lll'o main ingredients j(1r al/racting s.1-1 are (i) prosecution of another civil proceedings with due diligence (ii) such prosecutio11 has to be in_ - - _good faith In the .facts of the present case there was lack of good faith and 110 due diligence 011 the part_ ~f _appellant in conducting_ - H 108 109 _MIS._ SURYACHAKRAPOWERCORP. LTD. v. ELECTRICITY DEPT., REP. BY ITS S.E., PORT BLAIR _its case_ - _Therefore, appellant 11ot entitled to benefit u/s.14_ - _Delay/_ A _!aches._ _Applicability of s.14 when s.5 1101 applicable_ - _Held: Principles under s.14 can be applied even whe11 s.5 is 1101 applicable._ Dismissing the appeal on the ground of delay, the Court HELD:l.1 The review petition was filed on 25.02.2015 beyond the period of limitation of 30 days. After the dismissal of the review petition on 07.05.2015, the instant appeal was filed b1<fore this Court on 07.07.2015. It is stated in the application that the delay mainly occurred on account of time taken by the appellant in prosecuting a review petition before the Appellate Tribunal for Electricity and also because of the summer vacations, and thus, there is a total delay of 161 days. [Paras 2, 3][41-D,E) 1.2 The appeal under Section 125 of the Electricity Act, · 2003 in Supreme Court has to be filed within 60 days from the date of communication of the decision or order of the Appellate Tribunal. llowevei·, the Supreme Court, if it is satisfied that the appellant was prevented by sufficient cause from filing an appeal within the said period of 60 days, may allow it to be filed within a further period not exceeding 60 days. Thus, the maximum period within which an appeal can be filed under Section 125 is 120 days which includes the discretion granted to the Supreme Court to condone the delay limited to 60 days. The Supreme Court cannot condone the delay beyond 60 days by invoking Section 5 of the Limitation Act, 1963 and ignoring the special limitation prescribed under the Electricity Act, 2003. [Para 5)[112-D-C] B c D E F _Chhattisgarh State Electricity Board v. Ce11tral Electricity Regulatory Commissio11 and others_ (2010) 5 SCC 23 : 2010 (4) SCR 680 - relied on. 2.1 As regards the prayer that the application may be considered in terms of the principles under Section 14 of the Limitation Act, 1963. The two main ingredients required for attracting the principles under Section 14 of the Limitation Act, 1963 are that the party should be prosecutin.g another civil proceedings with due diligence and that the prosecution should be in good faith. It is not enough that one part is satisfied. Both G H 110 [2016] 8 S.C.R. SUPREME COURT REPORTS - A due diligence and good faith must be established. (Paras 6, 8)(112F; 113-G-H] - _M.P. Steel Corporation_ v. _Commissioner of Central Excise_ (2015) 7 SCC 58 - relied on. - 2.2 In the present case, after obtaining the certified copy - B of the order on 17.12.2014, the review petition was filed only on 25.02.2015, delayed by 37 days. Even after withdrawal of the review petition on 07.05.2015, the appeal was filed before this Court only on 07.07.2015. This Court closed for summer vacations in the year 2015 only on 16.05.2015 and reopened on - c 01.07.2015. Thus, there were few days left, before the closing of the Court for summer vacations, for the appellant to file the appeal after withdrawal of the review petition. The appeal was filed only after a few days of the reopening of the Court on 01.07.2015. Therefore, the appellant is not entitled even to the benefit of the principles under Section 4 of' the Limitation Act, 1963 for exclusion - D of the period when court is closed. Merely because the Tribunal condoned the delay in filing the review petition, for the purpose of application of Section 14 before this Court for exclusion of the period, in the facts of the present case, it cannot be said that there was due diligence. Under Section 2(h) of the Limitation - E Act, 1963, nothing shall be deemed to be done in good faith which is not done with due care and attention. The facts of the present case would also show lack of good faith on the part of the appellant in conducting its case. Thus, the appellant having not prosecuted his case with due diligence and good faith is not entitled for the application of the principles under Section 14 of the Limitation - F Act, 1963. (Para 9] [114-A-D] ## Case Law Reference - 2010 (4) SCR 680 relied on Para5 (2015) _1_ sec 58 relied on Para 7 G - CIVIL APPELLATE JURISDICTION: Civil Appeal No. 5958 - of2015. From the Judgment and Order dated 28.11.2014 of the Appellate Tribunal for Electricity at New Delhi in Appeal No. 200of2013. H Rakesh Khanna, Sr. Adv., Ms. Ruchi Singhwani, Mohit Paul, _MIS._ SURYACHAKRAPOWERCORP. LTD. v. 111 ELECTRICITY DEPT., REP. BY ITS S.E., PORT BLAIR Ms. Megha Bharara, Vikash Arora, Ms. Diksha Jhingan, Advs. for the A Appellants. Gurukrishna Kumar, Sr. Adv., Rohit Rao N., Mukund P. Unny, Ananga Bhattacharyya, Advs. for the Respondent. The Judgment of the Court was delivered by **KURIAN, J.** I. This appeal is filed under Section I 25 of the Electricity Act, 2003. Interlocutory Application No. I of 20 I 5 is for con donation of 161 days' delay in filing the appeal. The main ground in the application is that the delay occurred on account of the time taken by the appellant in prosecuting a review petition before the Appellate Tribunal for Electricity. 2. lt is seen from the application for condonation of delay that the original order of the Appellate Tribunal was passed on 28.11.2014. A certified copy of the order was obtained on 17.12.2014. Review petition was filed on 25.02.2015 beyond the period oflimitation of30 days. We are informed that the Appellate Tribunal had condoned the delay and entertained the review petition. B c D 3. Be that as it may, on 07.05.2015, the review petition was dismissed as withdrawn. According to the appellant and as stated in the application for condonation of delay before this Court, the review petition was withdrawn with a view to filing the present appeal before this Court. After the dismissal of the review petition on 07.05.2015, the present appeal is filed before this Court on 07.07.2015. It is stated in the application that the delay occurred on account of the summer vacatio'ns, and thus, there is a total delay of 161 days. 4. Section 125 of the Electricity Act, 2003 provides for appeals to the Supreme Court of India. The provision reads as follows: **"125. Appeal to Su11reme** Court.-Any person aggrieved by any decision or order of the Appellate Tribunal, may, file an appeal to the Supreme Court within sixty days from the date of communication of the decision or order of the Appellate Tribunal, to him, on any one or more of the grounds specified in section 100 of the Code of Civil Procedure, 1908 (5 of 1908): E F G Provided that the Supreme Court may, if it is satisfied that the appellant was prevented by sufficient cause from filing H 112 [2016] 8 S.C.R. SUPREME COURT REPORTS A the appeal within the said period, allow it to be filed within a further period not exceeding sixty days." 5. The appeal under Section 125 of the Electricity Act, 2003 in Supreme Court has to be filed within 60 days from the date of communication of the decision or order of the Appellate Tribunal. B However, the Supreme Court, if it is satisfied that the appellant was prevented by sufficient cause from filing an appeal within the said period of 60 days, may allow it to be filed within a further period not exceeding 60 days. Thus, the maximum period within which an appeal can be filed under Section 125 is 120 days which includes the discretion granted to the Supreme Court to condone the delay limited to 60 days. The Supreme c Court cannot condone the delay beyond 60 days by invoking Section 5 of the Limitation Act, 1963 and ignoring the special limitation prescribed under the Electricity Act, 2003. This Court, in **Chhattisgarh State Electricity Board v. Central Electricity Regulatory Commission and others',** at paragraph-32, has settled this issue: - D **"32.** In view of the above discussion, we hold that Section 5 of the Limitation Act cannot be invoked by this Court for entertaining an appeal filed against the decision or order of the Tribunal beyond the period of 120 days specified in Section 125 of the Electricity Act and its proviso. Any interpretation of Section 125 of the Electricity Act which - E may attract the applicability of Section 5 of the Limitation Act read with Section 29(2) thereof will defeat the object of the legislation, namely, to provide special limitation for filing an appeal against the decision or order of the Tribunal and proviso to Section 125 will become nugatory." - F 6. Learned Senior Counsel at this juncture prays that the application may be considered in terms of the principles under Section 14 of the Limitation Act, 1963. Section 14 of the Limitation Act, 1963 reads as follows: - "14. Exclusion of time of proceeding bona fide in court without jurisdiction.- (1) In computing the period of - G limitation for any suit the time during which the plaintiff has been prosecuting with due diligence another civil proceeding, whether in a court of first instance or of appeal or revision, against the defendant shall be excluded, where the proceeding relates to the same matter in issue and is - H 1 (2010) _s_ sec 23 MIS. SURYACHAKRAPOWERCORP. LTD. v. ELECTRICITY DEPT., REP. BY ITS S.E., PORT BLAIR [KURIAN, J.) 113 prosecuted in good faith in a court which, from defect of jurisdiction or other cause of a like nature, is unable to entertain it. (2) In computing the period oflimitation for any application, the time during which the applicant has been prosecuting with due diligence another civil proceeding, whether in a co mt of first instance or of app'eal or revision, against the same party for the same relief shall be excluded, where such proceeding is prosecuted in good faith in a court which, from defect of jurisdiction or other cause of a like nature, is unable to entertain it. (3) Notwithstanding anything contained in rule 2 of Order XXIII of the Code of Civil Procedure, 1908 (5of1908), the provisions of sub-section (I) shall apply in relation to a fresh suit instituted on pennission granted by the court under rule I of that Order where such permission is granted on the ground that the first suit must fail by reason of a defect in the jurisdiction of the court or other cause of a like nature. Explanation.- For the purposes of this section,- (a) in excluding the time during which a former civil proceeding was pending, the day on which that proceeding was instituted and the day on which it ended shall both be counted; A B c D E (b) a plaintiff or an applicant resisting an appeal shall be deemed to be prosecuting a proceeding; ( c) misjoinder of parties or of causes of action shall be deemed to be a cause of a like nature with defect of jurisdiction." F 7. That the principles under Section 14 of the Limitation Act, 1963 can be applied even when Section 5 of the Act is not applicable, is no more _res integra,_ in view ofM.P. Steel Corporation v. Commissioner of Central Excise[2] • G 8. The two main ingredients required for attracting the principles under Section 14 of the Limitation Act, 1963 are that the paity should be prosecuting another civil proceedings with due diligence and that the prosecution should be in good faith. It is not enough that one part is satisfied. Both due diligence and good faith must be established. ' (20I5J _1_ sec 58 H 114 [2016] 8 S.C.R. SUPREME COURT REPORTS - A 9. In the case before us, after obtaining the certified copy of the order on 17.12.2014, the review petition was filed only on 25.02.2015, delayed by 37 days. Even after withdrawal of the review petition on 07.05.2015, the appeal was filed before this Court only on 07.07.2015. This Court closed for summer vacations in the year 2015 only on 16.05.2015 and reopened on 01.07.2015. Thus, there were few days - B left, before the closing of the Court for summer vacations, for the appellant to file the appeal after withdrawal of the review petition. The appeal was filed only after a few days of the reopening of the Court on 01.07.2015. Therefore, the appellant is not entitled even to the benefit of the principles under Section 4 of the Limitation Act, 1963 for exclusion - c of the period when court is closed. Merely because the Tribunal condoned the delay in filing the review petition, for the purpose of application of Section 14 before this Court for exclusion of the period, in the facts of the present case, it cannot be said that there was due diligence. Under Section 2(h) of the Limitation Act, 1963, nothing shall be deemed to be done in good faith which is not done with due care and attention. The - 0 facts as narrated above would also show lack of good faith on the pa11 of the appellant in conducting its case. Thus, the appellant having not prosecuted his case with due diligence and good faith is not entitled for the application of the principles under Section 14 of the Limitation Act, 1963. E 10. By order dated 03.08.2015, it is seen that this Cou11 had condoned the delay without noticing the bar under Section 125 of the Electricity Act, 2003 for condoning delay beyond 60 days after expiry of the limitation period. Therefore, the order dated 03.08.2015 condoning the delay of 161 days in filing the appeal is recalled.Since, the Supreme F Court cannot condone the delay beyond 60 days under Section 125 of the Electricity Act, 2003, and in the facts of the present case, since the principles of Section 14 of the Limitation Act, 1963 are not attracted, Interlocutory Application No. I of 2015 for con donation of delay is dismissed. Consequently, the appeal is also dismissed on the ground of delay. G ## 11. There shall be no order as to costs. Divya Pandey Appeal dismissed. H
End of Judgment Record
Browse All Supreme Court of India (2016) Decisions
2016-03-16

Union of India v. Mis. Ambica Construction

This judgment addresses whether an arbitrator can award pendente lite interest when a contract expressly bars such interest, within the framework of Indian arbitration law. The Union of India approached this dispute after two arbitrators failed to publish an award and after a long procedural history in the Calcutta High Court and various SLPs. The core issue is whether pendente lite interest can be awarded where the contract contains explicit clauses barring such interest, and how this interacts with the implied terms of arbitration under the Arbitration Act, 1940 and, for post-1996 matters, the Arbitration and Conciliation Act, 1996. The Court traces a lineage of decisions (GC Roy; NC Budharaj; Sayeed Ahmed; Harish Chandra; Balimela; Engineers-De-Space-Age; Tehri Hydro) and clarifies that while arbitrators are generally creatures of the contract, their power to award pendente lite interest is bounded by express contractual bars. It concludes that no pendente lite interest can be awarded if the contract expressly prohibits it. The judgment also recognizes Tehri Hydro’s reasoning and clarifies the status of earlier decisions, holding certain observations as overruled or limited prospectively. The result is that the High Court and the award are to be modified to reflect the absence of pendente lite interest, with a reference answered and no costs awarded.”

2016-08-29

Madhya Pradesh State Road Transport Corporation v. Manoj Kumar & Anr.

This is a civil appeal challenging the voluntary retirement scheme (VRS) introduced by the Madhya Pradesh State Road Transport Corporation (MPSRTC) to downsize its workforce as the company faced losses and declining business. The scheme opened on July 1, 2005 and closed on August 1, 2005, with employees permitted to submit their option for voluntary retirement (VRS) within that window. The scheme included a clause stating that once an employee’s option was submitted it could not ordinarily be withdrawn, yet the scheme was a funded, time-bound arrangement requiring the employer to create a fund and to lay out a process for acceptance and settlement. In October 2006, the Corporation issued an amendment extending the period to October 28, 2006, prompting questions whether this extension created a new scheme or was merely an extension of the original. Several employees who had submitted applications sought withdrawal after August 1, 2005, and in some cases after the extension, while the Corporation accepted their VRS applications and disbursed terminal dues. The High Court of Madhya Pradesh upheld the employees’ right to withdraw within the relevant periods, but the Supreme Court concluded that VRS schemes, being contractual and funded, are invitations to offer governed by the Indian Contract Act, and withdrawals are permissible only within the valid period; the extension does not automatically grant a right to withdraw beyond the original window. The Court accordingly set aside some reinstatement orders and disposed of the appeals in favor of the Corporation in most respects.

2016-07-01

Mahipal Singh Rana, Advocate v. State of Uttar Pradesh

The appeal arises from a High Court of Allahabad judgment (Criminal Contempt Petition No.16 of 2004) finding the appellant, an advocate, guilty of criminal contempt for intimidating and berating a Civil Judge, Etah, on two dates (16 April 2003 and 13 May 2003). The Allahabad High Court sentenced him to two months’ simple imprisonment and imposed a fine, with a direction to Bar Council authorities to consider disciplinary action for professional misconduct. On admission to this Supreme Court, the matter was referred to a larger bench to decide whether a case of criminal contempt by a lawyer could also implicate professional misconduct beyond the contempt regime, and whether the Court could exercise suo motu jurisdiction under the Advocates Act if Bar Councils fail to act. The Court examined the separation of powers between contempt proceedings and Bar Council disciplinary processes, the scope of Article 142/129, and the ability to regulate appearance in courts (including the right to practice vs. the right to appear). It held that contempt conviction was justified and upheld the High Court’s finding, but set aside the imprisonment sentence due to the appellant’s advanced age. It sustained a two-year enrollment suspension under Section 24A of the Advocates Act and directed the Bar Councils to suspend the licence for an additional five years, with further appearance restrictions until the contemnor purges himself of contempt. The judgment emphasizes reform of regulatory mechanisms governing the legal profession and the State Bar Councils’ failings in acting on earlier notices.

2016-03-10

CHARANJIT KAUR v. BIKRAM SINGH & ANR.

Charanjit Kaur, wife of Bikram Singh, faced dowry-related harassment under sections 498A and 406 IPC. The trial court convicted the husband and imposed a one-year RI for each offence, with the sentences to run concurrently and a fine of Rs. 1,000/- with default imprisonment. The wife appealed against the conviction and also sought enhancement of punishment; the husband cross-appealed. The mother-in-law was acquitted; the father-in-law had died. The Sessions Court at Kapurthala modified the sentence by permitting the husband to deposit Rs. 2,50,000 payable to the appellant within one month, so that he could obtain the benefit of probation under Section 4(1) of the Probation of Offenders Act, 1958. The wife’s revision before the High Court of Punjab & Haryana at Chandigarh was dismissed in a summary manner, reportedly influenced by the deposit. The Supreme Court, noting the summary disposal and the deposit-driven rationale, held that the impugned order required setting aside so that the matter could be re-heard on merits. It directed remand to the High Court for a fresh decision strictly in accordance with law, without entering into the merits of rival submissions in this order. The decision was delivered by a Single Judge, Justice Shiva Kirti Singh, on March 10, 2016.