Messers Bhima Jewels v. Chief Engineer (Commercial & Tariff), Kerala State Electricity Board, Thiruvananthapuram; Special Officer (Revenue), Kerala State Electricity Board; Assistant Executive Engineer, Electrical Major Section, College Ground, Ernakulam

Case / Petition Number:
OP 37150/2001 (V)
Neutral Citation:/

Case Synopsis & Summary

Messers Bhima Jewels, a commercial electricity consumer, challenged a demand for arrears raised by the Kerala State Electricity Board after a fault in its P.T. (potential transformer) unit. An inspection on 27-11-2000 found the P.T. Unit faulty, and the petitioner replaced it on 12-12-2000 as directed by Ext. P1. The board issued an arrears bill for consumption from February 1999 onwards, based on readings indicating reduced usage during the fault period. The petitioner sought to challenge the demand on the ground that the Electrical Inspector should have been referenced under Section 26(6) of the Indian Electricity Act before recovery of arrears, and that arrears could be claimed only for the six months preceding the fault. The respondents argued that the petitioner, by replacing the faulty unit, acknowledged fault and that arrears for the period of the meter's inaccuracy were recoverable, supported by the R1(a) energy consumption data from March 1998 to December 2001. The High Court held that the meter was faulty from February 1999 to November 2000, rejected the petitioner’s invocation of prior Supreme Court precedents as inapplicable here, and directed arrears to be computed on the basis of average consumption from April 1998 to January 1999 for the relevant period. A fresh demand was to be issued and paid in ten equal monthly instalments along with monthly bills.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • S. Siri Jagan
Judgment Date
2009-09-08
Court Decision / Holding
Arrears to be computed on the basis of the average consumption for the period from April 1998 to January 1999 for calculating arrears for the period February 1999 to November 2000. Fresh demand for arrears to be issued expeditiously and payable by the petitioner in ten equal monthly installments along with monthly bills. Original petition disposed of accordingly.
Final Disposition
Original petition disposed of with directions as stated in the operative portion; arrears calculation method and instalment plan ordered.

Parties to the Case

Appellants / Petitioners

  • Messers Bhima Jewels

Respondents

  • Chief Engineer (Commercial & Tariff), Thiruvananthapuram
  • Special Officer (Revenue), Kerala State Electricity Board, Vyduthibhavan, Pattom Palace, Thiruvananthapuram
  • Assistant Executive Engineer, Electrical Major Section, College Ground, Ernakulam

Legal Representation & Advocates

Counsels for Petitioners

  • • P. R. Venkatesh, Advocate

Counsels for Respondents

  • • P. S. Anthal-ingam, SC, KSEB; C. K. Karunakaran, SC for KSEB

Provisions of Law Cited

Section 26(6) of the Indian Electricity Act, 1910

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioner argued that the dispute about the meter fault had not been referred to the Electrical Inspector under Section 26(6) before arrears were recovered. They contended that the meter was recording correctly and, even if arrears were payable, liability could extend only for six months prior to the fault. Since the petitioner did not dispute the meter fault before replacing the unit, the ratio of earlier Supreme Court decisions could not be applied to this case.

Contentions of Respondents

The respondents contended that the petitioner, by replacing the P.T. Unit, acknowledged the meter fault and thus cannot deny arrears for the period of faulty readings. They pointed to Ext. R1(a) showing reduced consumption during the fault period and argued that arrears are recoverable; the dispute, if any, was not properly raised as a consumer dispute, and reference to the Electrical Inspector was not essential in their view because the consumer himself did not dispute the fault before replacement.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
Belwal Spinning Mills Ltd. v. U.P. State Electricity BoardAIR 1977 SC 2793DistinguishedThe court noted those decisions but found their ratio inapplicable to this case since the petitioner did not raise a dispute about the meter fault before replacement; hence the ratio could not be extended to this scenario.
M.P.E.B. & others v. Smt. BasantibaiAIR 1998 SC 71DistinguishedSimilarly distinguished; the court rejected applying the ratio from Basantibai to a case where the meter fault was not disputed by the consumer prior to action.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•1,507 words•~7 min read

In The Court Record

Messers Bhima Jewels v. Chief Engineer (Commercial & Tariff), Kerala State Electricity Board, Thiruvananthapuram; Special Officer (Revenue), Kerala State Electricity Board; Assistant Executive Engineer, Electrical Major Section, College Ground, Ernakulam

## **IN THE HIGH COURT OF KERALA AT ERNAKULAM** **PRESENT :** **THE HONOURABLE MR. JUSTICE S.SIRI JAGAN** **TUESDAY, THE 8TH SEPTEMBER 2009 / 17TH BHADRA 1931** **OP.No. 37150 of 2001(V)** **----------------------------------** ## **PETITIONER(S):** **-----------------------** **MESSERS BHIMA JEWELS, M.G.ROAD, KOCHI-11, REP.BY ITS MANAGING PARTNER, BINDHU MADHAV, AGED 1 , S/O. BHIMA BHATTAR.** **BY ADV. MR.P.R.VENKETESH** **RESPONDENT(S):** - **----------------------------** **1. THE CHIEF ENGINEER(COMMERCIAL & TARIFF), THIRUVANANTHAPUAM.** **2. THE SPECIAL OFFICER (REVENUE), KERALA STATE ELECTRICITY BOARD, VYDUTHIBHAVAN, PATTOM PALACE, THIRUVANANTHAPURAM.** **3. THE ASSISTANT EXECUTIVE ENGINEER, ELECTRICAL MAJOR SECTION, COLLEGE GROUND, ERNAKULAM.** **R1 TO R3 BY ADV. MR.P.SANTHALINGAM, SC, KSEB R1 TO R3 BY MR. C.K.KARUNAKARAN, SC FOR KSEB** **THIS ORIGINAL PETITION HAVING BEEN FINALLY HEARD ON 08/09/2009, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING:** ## **OP. NO.37150/2001** ## **APPENDIX** ## **PETITIONER'S EXHIBITS** ## **P1:- COPY OF THE REPORT OF THE 3RD RESPONDENT DTD. 27.1.2000.** ## **P2:- COPY OF THE UNDERTAKING MADE BY THE PETITIONER ON 27.11.2000.** **P3:- COPY OF THE COMMUNICATION DTD. 12.12.2000.** **P4:- COPY OF THE ADDITIONAL BILL ISSUED BY THE 2ND RESPONDENT.** **P5:- COPY OF THE JUDGMENT DTD. 14.6.01 IN OP. 17446/01 ON THE FILES OF THIS HONOURABLE COURT.** **P6:- COPY OF THE APPEAL PREFERRED BY THE PETITIONER BEFORE THE IST RESPONDENT.** **P7:- COPY OF THE ORDER DTD. 26.9.01 ISSUED BY THE IST RESPONDENT AND RECEIVED BY THE PETITIONER ON 24.10.01.** ## **RESPONDENT'S EXHIBITS** **R1(a):- STATEMENT SHOWING ENERGY RECORDED FROM 3/98 TO 12/2001.** **TRUE COPY** **P.S.TO JUDGE** ## **tss** S. Siri Jagan, J. =-=-=-=-=-=-=-=--=-=-=-=-=-=-=-=-=-= O.P. No. 37150 of 2001 =-=-=-=-=-=-=-=-=--=-=-=-=-=-=-=-=-= Dated this, the 8[th] September, 2009. **==> picture [108 x 14] intentionally omitted <==** The petitioner is a commercial consumer of electricity from the Kerala State Electricity Board. On 27-11-2000, the Assistant Executive Engineer of the High Tension Meter Testing Unit inspected the electrical installation of the petitioner and found that the P.T Unit installed in the petitioner's premises was faulty. By Ext. P1, the petitioner was directed to replace the P.T. Unit with a new one. The petitioner replaced the same on 12-12-2000. Thereafter, the petitioner was served with Ext. P4 bill for arrears of electricity charges for the period from 2/1999 onwards. The petitioner filed an original petition against that demand, which was disposed of by Ext. P5 judgment permitting the petitioner to file an appeal. The petitioner's appeal was rejected by Ext. P7 order. The petitioner is challenging Exts.P4 and P7 in this original petition. 2. The contention of the petitioner is that without referring the dispute regarding fault in the meter to the Electrical Inspector as required under Section 26(6) of the Indian Electricity Act, the respondents cannot recover arrears of electricity charges from the petitioner. The petitioner contends that the meter was recording the correct consumption. It is further contended that even assuming that arrears can be recovered, that can only be for the period of six months prior to the date of detecting fault in the meter. 3. A statement has been filed on behalf of the respondents, in which they would take the contention that insofar as the petitioner never sought reference of the dispute regarding the meter to the Electrical Inspector and they acknowledged the fact that the meter is faulty by replacing the P.T Unit by themselves. Therefore, they cannot now contend that they are not liable to pay arrears of electricity charges for the period when on account of the fault in the O.P. No. 37150/2001 -: 2 :- P.T Unit, the meter was not recording the correct consumption of electricity. They would further contend that as is clear from the petitioner's pattern of consumption of electricity, it is abundantly clear that the reading drastically came down in February, 1999 and again drastically increased after the P.T Unit was re-commissioned on 9-1-2001. They have produced Ext. R1(a) statement regarding the consumption of electrical energy by the petitioner every month from March, 1998 onwards till December, 2001. The respondents would, therefore, contend that the petitioner is liable to pay the arrears of electricity charges. 4. I have considered the rival contentions in detail. 5. It is not as if the petitioner was not aware of the fact that according to the respondents the meter was faulty. In fact, when by Ext. P1 the petitioner was directed to change the P.T Unit on the ground that it is faulty, without any objection, the petitioner replaced the P.T Unit. If the petitioner had a contention that the P.T Unit was not faulty, the petitioner would certainly have disputed Ext. P1, instead of replacing the P.T Unit in accordance with the directions in Ext. P1. Therefore, the petitioner was aware of the fact that recording of electrical energy in the petitioner's premises was not correct. If the petitioner had any dispute regarding that fact, it was perfectly open to the petitioner to seek a reference of the matter to the Electrical Inspector under Section 26(6) of the Act before changing the P.T Unit. By changing the P.T Unit by themselves, the petitioner themselves made it impossible to get the matter referred to the Electrical Inspector. That being so, the petitioner cannot now contend that no arrears can be recovered from the petitioner without referring the matter to the Electrical Inspector. 6. The pattern of consumption of electrical energy by the ## O.P. No. 37150/2001 ## -: 3 :- petitioner is given in Ext. R1(a), which corresponds to the readings given by the petitioner in the original petition itself up to 13-12-2000. Ext. R1(a) reads thus: |----------------------------------------------------------------------------|----------------------------------------------------------------------------| |---|---| |MONTH|UNITS| ||CONSUMED| |----------------------------------------------------------------------------|| |3/98|14672| |4/98|14796| |5/98|15584| |6/98|13607| |7/98|15313| |8/98|16552| |9/98|14946| |10/98|17816| |11/98|16748| |12/98|15900| |1/99|16988| |2/99|9288| |3/99|9972| |4/99|9352| |5/99|8444| |6/99|7952| |7/99|7668| |8/99|9504| |9/99|6452| |10/99|7632| |11/99|8276| |12/99|9256| |O.P. No.|37150/2001|-:|4 :-| |---|---|---|---| ||1/2000||9620| ||2/2000||7844| ||3/2000||8860| ||4/2000||11292| ||5/2000||12392| ||6/2000||9212| ||7/2000||8708| ||8/2000||8628| ||9/2000||8996| ||10/2000||8592| ||11/2000||PT dismantled for| ||||repairs on 27-11-2000| ||12/2000||P T recommissioned| ||||on 9-1-2001| ||1/2001||10056 units from 9.1.2001| ||||to 31.1.2001.| ||2/2001||14496| ||3/2001||13436| ||4/2001||19212| ||5/2001||19020| ||6/2001||14152| ||7/2001||14512| ||8/2001||19696| ||9/2001||14980| ||10/2001||14764| ||11/2001||15248| ||12/2001||14884| From the same, it is for anybody to see that up to January, 1999, the consumption of electrical energy by the petitioner was between 14000 O.P. No. 37150/2001 -: 5 :- and 17000 units. In February,1999, the same drastically came down to 9288. Thereafter, it ranged between 6452 to 9972 until January, 2001, except for two months in April and May, 2000 in which months, the consumption was 11292 and 12390. Again, after the P.T Unit was recommissioned on 9-1-2001, from January 2001 onwards, it suddenly increased to 10056 units and thereafter ranged between 19696 and 14152. The petitioner does not dispute the readings given in Ext. R1(a). Therefore, that evidence is clear to the effect that during February 1999 to November,2000, the meter was really faulty. I am of opinion that, therefore, the petitioner is liable to pay the difference in electricity charges for that period. 7. Of course, the petitioner would strenuously contend that in view of the Supreme Court decisions on the subject (see Belwal Spinning Mills Ltd. v. U.P. State Electricity Board and others, AIR 1977 SC 2793 and M.P.E.B. & others v. Smt. Basantibai, AIR 1998 SC 71), the respondents cannot demand arrears of electricity charges without referring the dispute to the Electrical Inspector. I am of opinion that the ratio of those decisions cannot be applied to the present case insofar as in this case, the petitioner did not raise a dispute regarding the fault in the meter at all. On the other hand, as directed in Ext. P1, the petitioner readily replaced the P.T Unit by a new one, which would go to show that the petitioner was satisfied that the meter was in fact faulty. The decisions referred can be applied only in cases where the consumer had, in fact, a dispute regarding the fault in the meter. When the consumer himself did not have a dispute regarding the fault in the meter, the ratio of that decision cannot be applied. Further, it is not the respondents who made the reference to the Electrical Inspector, but the petitioner themselves. The procedure prescribed in Section 26(6) is applicable O.P. No. 37150/2001 -: 6 :- only when there is a dispute as to whether the meter is faulty or not. In any event, in view of my above findings, there cannot be absolutely any doubt whatsoever that the meter was faulty for the period between February, 1999 to November, 2000. 8. But, I am not inclined to accept the method of calculation of arrears adopted by the respondents in the matter. In the peculiar circumstances of the case, I am of opinion that the arrears should be computed on the basis of the average consumption for the period from April, 1998 to January, 1999 for calculating arrears for the period from February, 1999 to November, 2000. Fresh demand for arrears, as calculated above, shall be issued to the petitioner expeditiously, on receipt of which the petitioner shall pay the same after adjusting the amounts already paid, in ten equal monthly instalments along with the monthly bills. The original petition is disposed of as above. Sd/- S. Siri Jagan, Judge. Tds/
End of Judgment Record
Browse All High Court of Kerala (2009) Decisions
2009-06-26

Nishana Mol.N v Alappuzha Municipality & Secretary, Alappuzha Municipality

This writ petition concerns the registration of a marriage under the Kerala Registration of Marriages (Common) Rules, 2008 (Common Rules). The petitioner Nishana Mol.N, whose marriage was solemnized on 8 March 2009, sought registration of her marriage by the Local Registrar. Her husband was abroad, and she submitted Form No. 1 along with documents; however, the Local Registrar demanded the presence of both spouses for registration, a point contested by the petitioner. The court recalls the apex court’s directions in Seema v. Ashwani Kumar (2006) to frame rules ensuring compulsory registration to protect women and provide evidence of marriage, while noting that registration under the Rules does not itself create a marriage but evidences one solemnized otherwise. The Rules specify that registration is mandatory for marriages solemnized within the state, with various procedural requirements (Rules 5, 6, 9, 10, 11, 13, 16, 17) and mechanisms for correction, appeal, and re-registration. The court clarifies that the presence of both parties is not ordinarily required; the registrar may require appearance only in cases where there is reasonable doubt about identity, and even then as an exception rather than a rule. Ultimately, the court directs that registration and certificate issuance be completed within one month from copy of the judgment, without insisting on joint appearance, provided the memorandum is in order.

2009-07-27

Abdul Majeed Kalathil v. District Collector, Malappuram & Others

This batch of writ petitions concerns the constitutional validity of Section 17 of the Kerala Anti-Social Activities (Prevention) Act, 2007, and the power of District Magistrates to confiscate vehicles used in anti-social activities. The petitions challenge the absence of a substantive prohibition against using vehicles for anti-social activities and the lack of a defined procedure for confiscation or an appellate remedy. In W.P.C. No. 9925 of 2009 (the lead case), Abdul Majeed Kalathil contends that his goods carriage KL 11-B/6651 was seized by the Sub Inspector of Pandikkad Police and reported to the District Collector, Exts.P1–P2. The court scrutinizes Section 17's scope, defining anti-social activity (Section 2(a)) and whether the District Collector’s power to confiscate is constitutionally tenable. It finds Section 17 to be vague and violative of Articles 14, 19(1)(g) and 21, as it rests on subjective police satisfaction with no clear standards or process. It also notes environmental objectives but concludes that fundamental rights must prevail. The court does not sustain confiscation under Section 17; instead, it directs that such vehicles be dealt with under the Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001 and Rules, with interim release under specified conditions. It further directs initiation of Sand Act proceedings within a month and finalization within another month. The writ petitions are disposed of accordingly, preserving the rule of law and environmental protection.

2009-06-11

WA No. 671 of 2006 (Fertilizers and Chemicals Travancore Ltd v Union of India)

This writ appeal concerns the pay revision and pensionary benefits of employees of the Fertilizers and Chemicals Travancore Ltd (FACT). The long-term settlement covering terms of employment expired on 31 December 1996. A fresh settlement was concluded (notified 28 August 2001) and made retroactive to 1 January 1997, with revisions in wages and benefits. Clause 29 of Ext. P1 provides that arrears relating to wage revision and dearness allowance for the period 1 January 1997 to 30 June 2001 will be reviewed and decided by management/government only when the company earns profits for at least three consecutive years; Clause 33.1 provides that employees who retired on or after 1 January 1997 will be eligible for arrears calculated from 1 January 1997 to the date of retirement, subject to adjustments for interim relief already paid, with any unclaimed amount transferred to a Welfare Fund. The appellants—the retirees who fall in the 1 January 1997 to 1 July 2001 window—argue that they were denied arrears and were paid pensionary benefits at pre-revised rates, creating discrimination. Respondents contend Ext. P1 binds the parties and arrears depend on profits, and that pay revision administered to others does not compel retroactive change. The court held that Ext. P1 terms survive as terms of employment and directed the management to consider terminal benefits at revised rates within two months and to release arrears when paid to current workers, with connected matters following."

2009-05-29

M/S. Palm Fibers & Yars Trading Co. v. State of Kerala & Others

The petitioner, a Small Scale Industrial unit, ran two LT power connections (No.13070 and No.13427) with commercial production starting in July 1994 and July 1995. On 06/02/1992, the Government issued Ext.P1 guaranteeing concessional tariffs (pre-1992 tariff) for five years from the date of commencement or substantial capacity expansion, certified by the District Industries Centre. Ext.P2 certified eligibility for this concession. Subsequently, the petitioner increased power demand to 300 KVA and was reclassified/advised to HT status from 15/05/1998, converting LT supply to HT. The petitioner argued that Ext.P1 benefits should extend for the full five-year period, covering the LT quantities certified in Ext.P2, and that the HT conversion was a mere reclassification directed by the Board, not a cessation of eligibility. The Board argued Ext.P1 targets only those who commenced production during 1992–1996 and that HT conversion from 15/05/1998 falls outside the Ext.P1 window, rendering the petitioner eligible only up to 15/05/1998. Earlier orders (Ext.P3) had set aside a cut-off date for merits, and Ext.P6/Ext.P4 handled appeals. Ultimately, the Court held that the HT conversion was outside Ext.P1’s period, but directed that the LT benefits for the two LT connections be extended only until 23/05/1998 (LT dismantling date) and without reimbursement from the Industries Department, as held in OP No.7622/1998. The petition was disposed of as above.