This Supreme Court decision addresses promotion seniority in the Madhya Pradesh Public Health Engineering Department under the 1980 Gazetted Service Rules, Schedule IV and Schedule W. The core dispute centers on the promotion of Graduate Sub-Engineers completing 8 years of service to the post of Assistant Engineer (10% quota) and whether seniority for this category should be counted from the date of acquiring a graduation degree or from the date of appointment as Sub-Engineer. The State had restructured promotions in 1989, reducing direct recruitment and expanding promotion. The Departmental Promotion Committee selected Graduate Sub-Engineers and promoted several, leading to challenges by private respondents who argued that seniority must be reckoned from degree attainment. The Madhya Pradesh Administrative Tribunal had ruled in favor of counting from the degree date, following Sanaulla Sunzani. The Supreme Court reversed, holding that in the absence of specific rules, seniority among like posts in the same cadre must be based on length of service, not on the date of degree acquisition, and that counting from the degree date would negate the incentive purpose of the 8-year rule. The Court upheld the government’s promotion decisions and rejected the Tribunal’s interpretation, reaffirming government practice where applicable and distinguishing contrary precedents.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • Kuldip Singh
  • N. M. Kasliwal
Judgment Date
1992-10-15
Court Decision / Holding
Appeals allowed. Tribunal orders dated 15.10.1991, 28.11.1991, and 17.9.1991 were set aside; the Government’s orders promoting the Graduate Sub-Engineers were upheld; no order as to costs.
Final Disposition
Appeals allowed; Tribunal’s orders set aside; Government’s orders upheld; no order as to costs.

Parties to the Case

Appellants / Petitioners

  • M.B. Joshi and others

Respondents

  • Satish Kumar Pandey and others

Legal Representation & Advocates

Counsels for Petitioners

  • • U.N. Bachawat
  • • B.S. Banthia
  • • G. Prakash
  • • L.C. Agrawala
  • • K.K. Chagotra
  • • Indra Makwana

Counsels for Respondents

  • • S.S. Ray
  • • A. Raghuvir
  • • A.K. Sen
  • • Dr. N.M. Ghatate
  • • S.K. Gambhir
  • • Vivek Gambhir
  • • S.K. Jain
  • • A.P. Dhamija
  • • R.B. Misra
  • • N.D. B. Raju
  • • Anand Prasad
  • • S.V. Deshpande
  • • S.K. Agnihotri

Provisions of Law Cited

Madhya Pradesh Public Health Engineering (Gazetted) Service Rules, 1980Schedule IVSchedule WMadhya Pradesh Gazette dated 27.2.1981 (Hindi extracts)

Legal Doctrines & Maxims

  • In the absence of a specific rule, seniority among similarly placed employees must be determined by length of service rather than fortuitous circumstances.
  • Past governmental practice consistent with the rules should be upheld unless the rules require a different construction.
  • The Rules do not equate service length with the attainment of a degree; promotions incentives cannot override established seniority unless expressly provided.

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants submitted that the minimum qualification for Sub-Engineers was a diploma, but promotion to Assistant Engineer could be earned after 12 years or 8 years if the degree was obtained during service. Seniority for the 10% Graduate Sub-Engineers should be based on length of service in the Sub-Engineer cadre, not the date of degree attainment. The Departmental Promotion Committee’s panel and the 1989 executive order were proper, and accelerating 8 years by degree during service cannot nullify the longstanding seniority rule.

Contentions of Respondents

The respondents argued for counting the 8-year period from the date a diploma-holder Sub-Engineer obtained an engineering degree, i.e., from degree attainment, to qualify for the 8-year accelerated track. They relied on N. Suresh Nathan and contended that the past practice should reflect the rules and that delaying seniority would undermine incentive provisions. They argued that the scheme’s structure—50% direct recruitment and 50% promotion with specific sub-caps—demands counting service from degree attainment.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (4)

Case NameCitationTreatmentExplanation
N. Suresh Nathan & Anr. v. Union of India & Others[1992] Supp. 1 SCC 584PositiveCourt upheld the practice of counting seniority by length of service, aligning with government practice and distinguishing from rules that grant equivalence to degree attainment.
Sanaulla Sunzani v. State of M.P. & 5 OthersTA No. 771/88Distinguished Tribunal’s reliance on this case to count seniority from degree date was rejected; the Court distinguished this case due to differing rule structures.
Shri Ram Sharan Gupta & Others v. State of MP & Others(cited)Mentioned OnlyCited as related cases but not treated as controlling authority in this decision.
Shri N.N. C. Asthana & Another v. Shri Harish Kumar Ahuja & Others(cited)Mentioned OnlyCited as related but not binding on the present interpretation.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•4,493 words•~21 min read

In The Court Record

M.B. Joshi v. Satish Kumar Pandey

A ## M.B. JOSHI AND ORS. ETC. ETC. # _v._ SATISH KUMAR PANDEY AND ORS. ETC. ETC. OCTOBER 15, 1992 (KULDIP SINGH AND N.M. KASLIWAL, JJ.] B _Civil Service:_ _Madhya Pradesh Public Health Engineering (Gautted) Service Rules,_ 1~: _Schedule W-Post ·of Assistant Engineer-Promotion--EligibilityCounting of 8 years of service-Whether from the date of acquiring degree of engineering or on the basis of length of service._ c _Madhya Pradesh Public Health Engineering (Gautted) Service Rules,_ ~ D _Schedule IV-Post of Assistant Engineer-Promotion-Eligibility counting of 8 years of service-Procedure in the absence of provisions in the Rules-Whether on the basis of length of service._ _C.A. No. 425511992 (arising out of SLP No. 2507/1992)_ E The appellants and the private respondents were Sub-Engineers In Public Health Engineering Department of the Government. The minimum period for Sub-Engineer to qualify for promotion to the post of Assistant Engineer was 12 years for diploma-holders and 8 F years for such Suh-Engineers who obtained the degree of graduation in the **course of service.** By an executive order dated 7.2.1989, quota of direct recruitment was reduced to SO per cent and the quota by promotion from the Sub-En· G gineers, Draftsman and Head Draftsman, increased to 50 per cent. The 50 per cent quota by promotion was sub-divided. The promotion quota for the category of the Graduate Sub-Engineers completing 8 years of service was 10%. The principle of counting the seniority was from the date of their continuous officiation irrespective of tho date on which such diploma· holder Sub-Engineer acquired degree of graduation in engineering. H H SUPREME COURT REPORTS [1992] SUPP. 2 S.C.R. 2 A The Departmental Promotion Committee considered the cases of 30 Graduate Sub-Engineers for promotion to the post of Assistant Engineers and by order dated 4.12.1989 it prepared a panel of 18 Graduate Sub-Engineers found suitable for promotion to the post of Assistant Engineer. On 6.12.1989 the Government promoted one M.B. Joshi and sh others as Assistant Engineer, who are appellants iii appeal arising out of Special B Leave Petition No. 2507 of 1992. The private respondents in the appeal, filed an application in the State Administrative Tribunal challenging the orders dated 4.12.1989 and 6.12.1989. They contended that the seniority for the purpose of promotion to the post of Assistant Engineers in 10 per cent quota of Graduate Sub-Engineers completing 8 years of service ought C to have been considered from the date of attaining the graduate degree of engineering and not from the date of appointment as Sub-Engineer. A B The Tribunal allowed the petition placing reliance on its earlier decision in _Sanaulla Sunzani_ v. _State of M.P._ & 5 _Ors.,_ T.A. No. 771/88. The D Tribunal held that the applicants (private respondents in the appeal) having secured the degrees in engineering prior to respondenis 3 to 9 (the appellants in the ap1ieal) would rank higher in the gradation list of Graduate Sub-Engineers. It directed the State Government and Engineerin-Cbief, Public Health Engineering Department to convene a special D.P.C. to consider the applicants for promotion to the post of Assistant E Engineers as on 4.12.1989 and if found suitable for promotion, promote them and give them seniority over respondents 3 to 9. Identical questions of law were involved in all the appeals (C.A. Nos. 4255-57 of 1992), which were preferred against the judgments of the F Tribunal. The appellants contended that so far as the post of Sub- Engineers **was concerned, the minimum qualification prescribed was diploma-holder** and the seniority was determined on the basis of the date of appointment G on the post of Sub-Engineer irrespective of the fact that the person joining such post was a degree-holder or a diploma-holder; that the scale of pay was similar and the diploma-bolder and degree-holder Sub-Engineers stood on the same footing and their gradation list was prepared on the basis of length of service in the cadre of Sub-Engineers that in the service jurisprudence where the rules were silent, th• seniority was always deter· H mined on the basis of length of service amongst the employees appointed 3 M.B. JOSHI _v._ SATISH PANDEY on a similar post in the same cadre; that obtaining a degree during the A continuation of service as Sub-Engineer simply accelerated the entitle· ment to promotion for the post of Assistant Engineer from 12 years to 8 years but it did not in any manner disturb the seniority which was already settled on the basis of length of service on the post of Sub-Engineer; and that the D.P.C. rightly prepared the. panel of selection and the Govern· B ment took a correct decision in issuing the order dated 6.12.1989. The respondents contended that It was necessary to obtain .the degree of engineering for being qualified for promotion to the post of Assistant Engineer within a period of 8 years instead of 12 years; that the period of 8 years to be counted from the date when the diploma-holder Sub-Engineer acquired the degree of engineering and not prior to said date. ## Allowing the appeals, this Court, HELD : 1.1. I tis a well settled principle of service jurispru<lence that D in the absence of any specific rule, the seniority amongst persons holding similar posts in the same cadre bas to be determined on the basis of the length of service and not on any other fortuitous circumstance. [U-B] 1.2. The Government itself bas been adopting the practice and making promotion as contended by the appellants. Sncb practice is E upheld by the Court. [12-A] 1.3. The Rules do not contemplate any equivalence of any period of service with the qualification of acquiring degree of graduation in engineering. The Rules clearly provide that the diploma-holders having obtained a degree of engineering while continuing in service as Sob-En· gineer shall be eligible for promotion to the post of Assistant Engineer in 8 years of service and quota of 10 per cent posts has been earmarked for such category of persons. [11-C-D] F 1.4. If the period of 8 years is counted from the date of acquiring G degree then this incentive of adding the qualification during the continua· tion of service and getting the. advantage of acceleration in promotion in 8 years would for all practical purposes become nugatory and of no benefit. [11-G-H] 1.5. The Tribunal was wrong in determining the seniority from the H 4 SUPREME COURT REPORTS [1992] SUPP. 2 S.C.R. - A date of acquiring degre< of engineering and it ought to have been determined on the basis of length of service on the post of Sub-Engineer and the State Government was right in doing so and there was no infirmity in the orders passed by the Government. [12-D-E) _N. Suresh Nathan_ & _Anr._ v. _Union of India_ & _Ors.,_ [1992) Supp.1 B sec 584, explained. > CIVIL APPELLATE JURISDICTION : Civil Appeal Nos. 4255c57 of 1992. From the Judgment and Order. dated 15.10.1991, 28.11.1991 and C 17.9.1991 of the Madhya Pradesh Administrative Tribunal, Jabalpur in 0.A. Nos. 140 of 1990 and 3024 of 1991 and T.A. No. 35 of 1988. U.N. Bachawat, B.S. Banthia, G. Prakash, L.C. Agrawala, K.K. Chagotra and Indra Makwana for the Appellants. D S.S. Ray, A. Raghuvir, A.K. Sen, Dr. N.M. Ghatate, S.K. Gambhir, Vivek Gambhir, S.K. Jain, A.P. Dhamija, R.B. Misra, N.D. B. Raju, Anand Prasad, S.V. Deshpande and S.K. Agnihotri for the Respondents. The Judgment of the Court was delivered by ## E ## KASLIWAL, J. Special leave granted in all the above cases. All the above appeals are disposed of by a common order, as identical questions of law are involved in these cases. For the purpose of understanding the controversy raised in all these cases, we are stating the F facts of appeal arising out of special leave petition No. 2507 of 1992. The appellants and the private respondents were Sub-Engineers in Public Health Engineering Department of Government of Madhya Pradesh. They are governed by Madhya Pradesh Public Health Engineering (Gazetted) Service Rules 1980 {hereinafter referred to as 'the Rules'). Under Schedule IV of the Rules, the next higher post for promotion from the post of - G Sub-Engineers in Civil or Mechanical is the post of Assistant Engineers. The minimum period for Sub-Engineer to qualify for promotion to the post of Assistant Engineer is 12 years for diploma-holders and 8 years for such Sub-Engineers who obtain degree of graduation in the course of service. Earlier 60 per cent quota for the posts of Assistant Engineers was fixed by - H direct recruitment and 40 per cent by promotion from the Sub-Engineers, 5 M.B. JOSHI _v._ SATISH PANDEY [KASLIWAL. J.] Draftsman and Head Draftsman. By an executive order dated 7.2.1989, A quota of direct recruitment was reduced to 50 per cent and the quota by promotion increased to 50 per cent. This 50 per cent quota by promotion with which we are concerned in the above cases has been sub-divided in the following maoner: - **==> picture [301 x 151] intentionally omitted <==** **----- Start of picture text -----**<br> ||||| |---|---|---|---| |B| |(i)|Diploma holder Sub-Engineers completing| |12 years of service|35%| |(ii)|Draftsman|&|Head Draftsman completing| |12 years of service|5%| |c| |(iii)|Graduate Sub-Engineers completing| |8 years of service|10%| |In the above cases we the above cases we we|are now concerned with the third category of| |cases which deal with the promotion of Graduate Sub-Engineers complet-| |D| **----- End of picture text -----**<br> In the above cases we the above cases we we are now concerned with the third category of cases which deal with the promotion of Graduate Sub-Engineers completing 8 years of service. The State Government had been applying the principle of counting the seniority of Graduate Sub-Engineers from the date of their continuous officiation irrespective of the date on which such diploma-holder Sub-Engineer acqJJired degree of graduation in engineering. On this basis, the Departmental Promotion Committee took into consideration 30 Graduate E Sub-Engineers for promotion to the post of Assistant Engineers. The D.P.C. by order dated 4.12.1989 prepared a panel of 18 Graduate Sub-Engineers found suitable for promotion to the post of Assistant Engineer. The Government by order dated 6.12.1989 promoted M.B. Joshi and six others as Assistant Engineer who are appellants in appeal arising out of special F leave petition No. 2507 of 1992. The private respondents in this appeal filed application No. 140/90 in Madhya Pradesh Administrative Tribunal, Jabalpur challenging the aforesaid orders dated 4.12.1989 and 6.12.1989. The contention of these persons before the Tribunal was that the seniority for the purpose of promotion to the post of Assistant Engineers in 10 per cent G - quota of Graduate Sub-Engineers completing 8 years of service ought to have been considered from the date of attaining the Graduate degree of engineering and not from the date of appointment as Sub-Engineer. The Tribunal placing reliance on its earlier decision in T.A. No. 771/88 _Sanaul/a Sunzani_ v. _State of M.P. & 5 others,_ held that the seniority of diploma-holder Sub-Engineers acquiring the degrees of graduation in engineering for H 6 SUPREME COURT REPORTS [1992) SUPP. 2 S.C.R. - A inclusion in the gradation list of Sub-Engineers should be counted from the dates of acquisition of graduation in engineering or of any other equivalent degree and not from the dates of their initial entries as Sub-Engineers. Applying the aforesaid principle laid down in _Sanaulla's_ case, the Tribunal held that the applicants (private respondents in the appeal) having secured B the degrees in engineering prior to respondents 3 to 9 (the appellants in the appeal) will rank higher in the gradation list of Graduate Sub-Engineers. The Tribunal as such allowed the petition filed before them and directed the State Government and Engineer-in-Chief, Public Health Engineering Department to convene a special D.P.C. to consider the applicants for promotion to the post of Assistant Engineers as on 4.12.1989 C and if found suitable for promotion, promote them and give them seniority over respondents 3 to 9 within 4 months of the date of receipt of the order. The short controversy arising in these cases relates to the determination of seniority amongst the diploma-holder Sub-Engineers who acquired D the degree of graduation in engineering during the period of service qualifying them for promotion in 8 years to the post of Assistant Engineer. It is an admitted position that there is no specific rule governing such situation. Relevant extracts of Schedule IV of the Rules as published in the Madhya Pradesh Gazette dated 27.2.1981 issued in Hindi read as under: E "ll!if ~ mq;r, fc;.rtcn 27 'QiTc!fT 1981 3i1f!~.;1 'i:IR (f.t<rir 13 ~) |||(f.t<rir13~)|~)|| |---|---|---|---|---| |f«'ll'T<br>'!ii'fTll|wiPrr'l<::'!ii<br>'fTll<br>~<br>tRRfu<br>q,'\<br>"!RT~I|'!ii3fTl1l1ft~'li::'R<br>~<br>~~·<br>q,'\"ITTq,'\'""it '""<br>'fiTW!ft<|'R_WIT_'1r'li::'!ii'fTll<br>~~·<br>f;rn'R~<br>q,'\<br>it '"""!RT~I|'fTllf«'ll'imW"lft!<br>q,'\mllfuif;~<br>if;<br>'fTll~<br>~<br>R"l'l13)| |1<br>|2|3|4|5| |ffi<br>~ <br>~<br>f«'ll'T|<br>d11lffi(':!"!T- <br>00ftWIB|12~~- <br>ftWIB~if;fWD3~<br>6'!d441f~>!Jif;~<br>it_WITitm _~<br>Wi'tl!T1<f<Ri\~|M14'h>HIq-r\<br>~~(.fuflIB;|~~m m~~| ||~<br>'1rqif;f1'hiii<br>~it)||if;~qif;f1'hiii)<br>~|| M.B. JOSHI _v._ SATISH PANDEY [KASLIWAL. J.] 7 Mr. S.S. Ray, learned senior counsel appearing on behalf of the A appellants contended that so far as the post of Sub-Engineers is concerned, the minimum qualification prescribed is diploma-holder. Initially, in the Public Health Engineering Department till 1980, fresh degree-holders used to get job directly as Assistant Engineers and the diploma-holders used to be appointed as Sub-Engineers. Thereafter on account of unemployment, the degree-holders a1'o started seeking appointments as Sub-Engineers. However, so far as the post of Sub-Engineer was concerned, the seniority was determined on the basis of the date of appointment on the post of Sub-Engineer irrespective of the fact that the person joining such post was a degree-holder or a diploma-holder. The scale of pay was similar and the c diploma-holder and degree-holder Sub-Engineers stood on the same footing and their gradation list was prepared on the basis of length of service in the cadre of Sub-Engineers. The next higher post for promotion from the post of Sub-Engineer is the post of Assistant Engineer. Every diplomaholder Sub-Engineer became eligible for promotion to the post of Assistant Engineer after having completed 12 years of service. The Government D however, considered it proper to reduce this period of 12 years to 8 years in case of such diploma-holder Sub-Engineers who obtained a degree of **engineering during the continuance of their service as Sub-Engineer as a** sort of incentive to improve the qualification while continuing in service. It was thus, submitted by Mr. Ray that it is a well-settled principle of service E jurisprudence that where the rules are silent, the seniority is always determined on the basis of length of service amongst the employees appointee\ on a similar post in the same cadre. It was thus, submitted that obtaining a degree during the continuation of service as Sub-Engineer simply accelerated the entitlement to promotion for the post of Assistant Engineer F from 12 years to 8 years but it did not in any manner disturb the seniority which was already settled .on the basis of length of service on the post of Sub-Engineer. It was submitted that the D.P.C. rightly prepared the panel of selection and the Government took a correct decision in issuing the order dated 6.12.1989. B . c E F G Mr. Ashok Sen, learned senior counsel appearing on behalf of the respondents contended that it was necessary to obtain the degree of engineering for being qualified for promotion to the post of Assistant Engineer within a period of 8 years instead of 12 years. It was further H 8 SUPREME COURT REPORTS [1992] SUPP. 2 S.C.R. A argued that the period of s years can only be counted from the date when the diploma-holder Sub-Engineer acquired the degree of engineering and not prior to said date. Mr. Sen further placed reliance on _N. Suresh Nathan .& Another_ v. _Union of India & Others,_ [1992] Supp. 1 SCC 584, and submitted that this case clillches the issue raised in these cases and is no B[longer open for consideration. ] We have given our careful consideration to the arguments advanced on behalf of learned counsel for the parties. We may first deal with _N. Suresh Nathan's_ case (supra) on which strong reliance is placed by Mr. Ashok Sen. In this case, th" Recruitment Rules for the post of Assistant C Engineer in the Public Works Department, Pondicherry, prescribing the educational and other qualifications for appointment by direct recruitment and promotion came for consideration. For direct recuits, the qualification prescribed was a Degree in. Civil Engineering of a recognised University or Diploma i11 Civil Engineering from a recognised institution with three years, professional experience. For appointment by promotion of Section D Officers now called Junior Engineers, the qualification prescribed was as under: E "l. Section Officers possessing a recognised Degree in Civil Engineering or equivalent with three years' service in the grade failing which Section Officers holding Diploma in Civil Engineering with six years' service in the grade - 50 per cent. F 2. Section Officers possessing a recognised Diploma in Civil Engineering with six years' service in the grade - 50 **per cent."** The dispute in the above case was whether a diploma-holder Junior Engineer who obtains a degree while in service becomes eligible for appointment as Assistant Engineer by promotion on completion of three G years' service including therein the period of service prior to obtaining the degree or the three years' service as a degree-holder for this purpose is to be reckoned from the date he obtains the degree. The Central Administrative Tribunal held that the applicants diploma-holders were entitled to be considered for promotion to the post of Assistant Engineer on par with the other degree-holder Junior Engineers taking due note of their total length H of serviee rendered in the grade of Junior Engineer. Such a consideration M.B. JOSHI _v._ SATISH PANDEY [KASLIWAL J.] 9 should be alongside other Junior Engineers who might have acquired the A necessary degree qualification earlier than the applicants, while holding the post of Junior Engineer. This Court allowed the appeal and set aside the above order of the Tribunal. While allowing the appeal, this Court held as under: "In our opinion, this appeal has to be allowed. There is sufficient material including the admission of respondents diploma-holders that the practice followed in the department for a long time was that in the case of diploma-holder Junior Engineers who obtained the degree during service, the period of three years' service in the grade for eligibility for promotion as degree-holders commenced from the date of obtaining the degree and the earlier period of service as diploma-holders was not counted for this purpose. This earlier practice was clearly admitted by the respondents diploma-holders in para 5 of their application made to the Tribunal at page 115 of the paper book. This also appears to be the view of the Union Public Service Commission contained in their letter dated December 6, 1968 extracted at pages 99-100 of the paper book in the counter-affidavit of respondents 1 to 3. The real question, therefore, is whether the construction made of this provision in the rules on which the past practice extending over a long period is based is unten_able to -require upsetting it. If the past practice is based on one of the possible constructions which can be made of the rules then upsetting the same now would not be appropriate. It is in this perspective that the question raised has to be determined." B c D E F This Court then considered the Recruitment Rules applicable in the said case and then held that the entire scheme did indicate that the period of three years' service in the grade required for degree-holders according to Rule 11 as the qualification for promotion in that category must mean G three years' service in the grade as a degree-holder, and therefore, that period of three years can commence only from the date of obtainiog the degree and not earlier. It was further held that the service in the grade as a diploma-holder prior to obtaining the degree cannot be counted as service in the grade with a degree for the purpose of three years' service H JO SUPREME COURT REPORTS [1992] SUPP. 2 S.C.R. A as a degree-holder. This Court then observed:- B c "In our opinion, the contention of the appellants degreeholders that the rules must be construed to mean that the three years' service in the grade of a degree-holder for the purpose of Rule 11 is three years from the date of obtaining the degree is quite tenable and commends to us being in conformity with the past practice followed consistently. has also been so understood by all concerned till the raising of the present controversy recently by the respondents. The Tribunal-was, therefore, not justified in taking the contrary view and unsettling the settled practice in the **department. 11** A perusal of the above observations made by this Court clearly show that the respondents diploma-holders in that case had admitted the pracD tice followed in that department for a long time and the case was mainly decided on the basis of past practice followed i11 that department for a long time. It was clearly laid down in the above case that if the past practice is based on one of the possible constructions which can be made of the rules then upsetting the same now would not be appropriate. It was clearly said "it is in this perspective that the question raised has to be determined." It E was also observed as already quoted above that the Tribunal was not justified in taking the contrary view and unsettling the settled practice in the department. That apart the scheme of the rules in _N. Suresh Nathan's_ case was entirely different from the scheme of the Rules before us. The rule in that case prescribed for appointment by promotion of Section F Officers/Junior Engineers provided that 50 per cent quota shall be from Section Officers possessing a recognised degree in Civil Engineering or equivalent with three years' service in the grade failing which Section Officers holding Diploma in Civil Engineering with six years' service in the .grade. The aforesaid rule itself provided in explicit terms that Section Off'icers possessing a recognised Degree in Civil Engineering was made G eqtiivalent with three years' service in the grade. Thus, in the scheme of such rules the period of three years' service was rightly counted from the date of obtaining such degree. In the cases in hand before us, the scheme of the rules is entirely different. H In the cases before us 50 per cent of the posts of Assistant Engineers M.B. JOSHI _v._ SATISH PANDEY [KASLIWAL. l.J 11 > has to be filled by direct recruitment of persons having degree of graduaA tion in engineering. The remaining 50 per cent of the vacant posts are to be filled by promotion from the lower cadre of Sub-Engineer and Drafts~an. Out of this 50 per cent, 35 per cent quota is fixed for diplomaholders who have completed 12 years of service on the post of Sub-Engineer, 5 per cent quota for Draftsman who have completed 12 years of B service and the remaining 10 per cent with which we are concerned has been kept for such Suh'Engineers who during the continuation of their service obtained a degree of graduation or equivalent in engineering and in that case the period of service is reduced from 12 years to 8 years. The Rules in our case do not contemplate any equivalence of any period of service with the qualification of acquiring degree of graduation in engineering as was provided in express terms in _N. Suresh Nathan's_ case making three years service in the grade equivalent to degree in engineering. In our opinion, in the rules applicable in the cases before us clearly provide that the diploma-holders having obtained a degree of engineering while continuing in service as Sub-Engineers shall be eligible for promotion to the D post of Assistant Engineer in 8 years of service and quota of 10 per cent posts has been earmarked for such category of persons. B c If we accept the contention of Mr. Ashok Sen, it would defeat the very scheme and the purpose of giving incentive of adding educational qualification by diploma-holders while continuing in service in case the E period of 8 years' is counted from the date of obtaining graduate degree in engineering. It may be noted that no such argument was raised even from the side of the respondents before the Tribunal. If such interpretation as now sought to be advanced by Mr. Ashok Sen, learned senior counsel is accepted, no relief could have been granted to the respondent F Satish Kumar Pandey. We would illustrate the above position on admitted facts that Shri Satish Kumar Pandey had joined as Sub-Engineer on 23.8.1980, but had acquired the degree of engineering in May, 1987. In that situation, Mr. Satish Kumar becomes eligible only in May 1995 and he could not be considered as eligible in December 1989 when these Sub-Engineers were considered for promotion as Assistant Engineers. Even G otherwise, if this period of 8 years is counted from the date of acquiring degree then this incentive of adding the qualification during the continua- **tion of service and getting the advantage of acceleration in promotion in 8** years would for all practical purposes become nugatory and of no benefit. F H SUPREME COURT REPORTS [1992) SUPP. 2 S.C.R. 12 A B D ·E It is further important to note that in the cases before us, the Government itself has been adopting the practice and making promotion as contended by the appellants and we are upholding such practice. In _N. Suresh Nathan's_ -case also this Court had upheld the practice followed by the Government. It is also well settled principle of service jurisprudence that in the absence of any specific rule, the seniority amongst persons holding similar posts in the same cadre has to be determined on the basis of the length of service and not on any other fortuitous circumstance. Though, in the cases of special leave petitions filed by _Shri Ram Sharan Gupta & Others_ v. _The State of M.P. & Others_ and _Shri N.N._ C _Asthana & Another_ v. _Shri Harish Kumar Ahuja & Others,_ the parties belonged to the Irrigation Department of the State of Madhya Pradesh and were governed with different set of rules, but the controversy arising in these cases is amply covered with the view taken by us and determined in the manner indicated above. In these circmnstances mentioned above, we are clearly of the view. that the Tribunal was wrong in determining the seniority from the date of acquiring degree of engineering and it ought to have been determined on the basis of length of service Oil the post of Sub-Engineer and the State Govemment was right in doing so and there was no infirmity in the orders passed by the Government. In the result, we allow these appeals, set aside the orders of the Tribunal dated 15.10.1991, 28.11.1991 and 17.9.1991 and upheld the orders passod by the Govemment in all these cases. In the fact~ and circmnstances of the case, no order as to costs. ## V.P.R. Appeals allowed.
End of Judgment Record
Browse All Supreme Court of India (1992) Decisions
1992-01-07

Jaiswal v. Debi Mukherjee

Dr. P. K. Jaiswal challenged a UPSC process for the post of Assistant Director General (Prevention of Food Adulteration). The Union Government had initially asked UPSC to fill the post by direct recruitment but, before advertisements, informed it to withhold the process while examining possible promotion from Assistant Secretary and amending recruitment rules to create higher tiers. Despite this, the UPSC advertised the post and the appellant was interviewed. Debi Mukherjee, then Assistant Secretary and seeking promotion upon the rule-amendment, obtained an interim stay from the Central Administrative Tribunal and later a direction to provide promotional avenues. In the meantime, two higher-pay tiers were created, without separate designations, under an amendment directed by the Court in a related matter. The appellant argued that once the selection process begins, the Government and Tribunal cannot freeze it and that the Commission should complete the selection; and that overlooking the two new layers amended later was erroneous. The respondents contended on points of vested rights and the proper policy- and rule-based framework for promotions versus direct recruitment. The Supreme Court held that the Government can withdraw the requisition before the advertisement if it intends to amend rules to permit promotion, that the Government’s pre-advertisement decision is permissible, and that a right to be considered for selection crystallizes only after advertisement and interview. The appeal was dismissed.

1992-09-24

S.B. Dogra v. State of Himachal Pradesh and Ors.

This Civil Appeal concerns the seniority of S.B. Dogra in the Himachal Pradesh Police Service in the wake of the demobilised armed forces concession. After HP State was formed, Rule 5(1) of the Demobilised Armed Forces Personnel (Reservation of Vacancies in the HP State Non-Technical Services) Rules, 1972, provided that the seniority of officers appointed against reserved vacancies shall be determined on the assumption that they joined the service at the first opportunity after their military service or training prior to commission. Dogra, who had military service and later joined the HP Police Service against a reserved vacancy for Demobilised Armed Forces Personnel, was placed with a notional entry year (1964) and thus ahead of some officers, including Durga Shanker Amist. The dispute escalated through High Court proceedings and a Central Administrative Tribunal decision relying on earlier cases. The Supreme Court, comparing Rule 5(1) with Punjab/Haryana rules and distinguishing the applicable statutory framework, held that the Tribunal erred in confining the seniority to the period of actual military service during the emergency. It noted that the rules are not pari materia with Haryana’s rules and that the language of Rule 5(1) permits a broader interpretation for notional entry. The Court distinguished certain earlier rulings (A.S. Parmar; Narendra Nath Pandey) as inapplicable here, while applying the State of Madhya Pradesh v. Rameshwar Prasad approach to preserve fair seniority. Ultimately, the appeal was allowed, the Tribunal’s seniority order was set aside, and the prior position was restored with directions for implementation of the judgment.

1992-12-11

State of Maharashtra v. Rattanlal

This is a Supreme Court decision interpreting the revisional powers of the State Government under the Maharashtra Agricultural Land (Ceiling and Holdings) Act, 1961. The respondent-declarant had a declaration under Sec. 12; the Surplus Land Determination Tribunal found surplus land (9 acres 8 guntas). On appeal, the Revenue Tribunal modified the resumption from Survey No. 11 to Survey No. 29, which was upheld. Later, after undisclosed lands came to light, the Additional Commissioner issued a show cause, remitted the matter to the primary Tribunal for redetermination and delimitation, and the High Court held that once an appeal under Sec. 21 is filed and an order is made, the Commissioner or the State Government lacks jurisdiction to determine the ceiling area. The State Government challenged this view. The Court held that under Sec. 45(2) and (3), the Commissioner has revisional powers, either suo motu or on an aggrieved person’s application, to call for records of inquiries under Secs. 17–21 and to pass orders after a hearing, subject to provisos including time limits and restrictions when appeals are pending. The decision also clarifies that suo motu revisional action can correct fraud or suppression of material facts, and that finality does not bar such action in cases of concealed lands. The High Court’s view was set aside and the Commissioner's order restored, with the appeal allowed along with costs.

1992-10-13

State of Madhya Pradesh and Anr. v. Syed Naseem Zahir and Others

State of Madhya Pradesh and Anr. v. Syed Naseem Zahir and Others concerns the legality and timing of the 'sealed cover' procedure used by the Departmental Promotion Committee (DPC) for recommending promotions when disciplinary proceedings were contemplated. Syed Naseem Zahir, who rose to Superintending Engineer, was included in a 1987 panel for promotion to Chief Engineer, but his name was kept in sealed cover due to potential misconduct. A charge-sheet was issued in 1988. The Madhya Pradesh Administrative Tribunal later directed promotion based on the sealed-cover recommendation, prompting the State's special leave appeal. The Supreme Court held that the departmental enquiry had been completed and the charges proved, and while it emphasized that Jankiraman's case governs sealed-cover use, the peculiar facts allowed keeping the sealed cover unopened until the disciplinary proceedings concluded. The Court outlined that if exonerated, the sealed-cover would be opened and the respondent would be notionally promoted from the date a junior was promoted, with consequential benefits, including back wages; if punished, action would be taken in accordance with Jankiraman's guidelines. The Court set aside the Tribunal's order and allowed the State's appeal, directing that no promotion be granted until proceedings end, and that the sealed-cover mechanism be used consistent with the facts.