Tenetowl LogoTenetowl
Landmark CasesDivision BenchWrit petitions dismissed; parties to bear own c...

Manohar Lal Sharma vs Narendra Damodardas Modi & ORS

Case / Petition Number:
WRIT PETITION [CRIMINAL] NO.225 OF 2018
Neutral Citation:/

Case Synopsis & Summary

This group of writ petitions, filed under the Supreme Court’s Public Interest Litigation and original jurisdiction, challenges the 2016 inter‑governmental agreement for the purchase of 36 Rafale jets for the Indian Air Force, tracing back to a long defence procurement history beginning in 2001 with proposed cash procurement of 126 fighters and a later shift to a government‑to‑government deal after the previous process stalled. The petitions allege lack of transparency, improper decision‑making, and potential bias in the offset arrangements, including the selection of an Indian offset partner (Reliance) and pricing concerns. They seek FIRs, investigation, and quashing of the IGA and related contracts. The government defends the process as appropriate for a defence procurement, emphasizing the unique features and urgency of national security, the Defence Procurement Procedure (DPP) as evolved through 2002–2013, and the role of intergovernmental agreements with offset provisions. The Court undertook a constrained, nuanced review, recognizing the special framework governing defence acquisitions and limiting its scrutiny to illegality, irrationality, and procedural propriety. It noted that while some deviations may have occurred, quashing the contract was unwarranted. Consequently, the petitions were dismissed with costs, upholding the 36‑jet deal on the court’s understanding of the decision‑making process and pricing. The judgment underscores the balance between judicial scrutiny and national security needs in defence procurement.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Landmark Cases
Hon'ble Judges
  • RANJAN GOGOI
  • SANJAY KISHAN KAUL
  • KM JOSEPH
Judgment Date
2018-12-14
Court Decision / Holding
Dismiss writ petitions; no intervention in the 36 Rafale jet deal; costs borne by the parties.
Final Disposition
Writ petitions dismissed; parties to bear own costs; no intervention in the contract for 36 Rafale jets.

Parties to the Case

Appellants / Petitioners

  • Manohar Lal Sharma

Respondents

  • Narendra Damodardas Modi & ORS.

Provisions of Law Cited

Constitution of India, Article 32Defence Procurement Procedure 2002Defence Procurement Procedure 2013Defence Offset Guidelines 2013Indian Penal Code, 1860Prevention of Corruption Act, 1988

Legal Doctrines & Maxims

  • Wednesbury Principle of Reasonableness
  • Illegality, Irrationality, and Procedural Impropriety (triad for judicial review)
  • National security/defence procurement deference to executive decision‑making

Submissions & Arguments

Contentions of Appellants / Petitioners

The applicants challenged the 2016 Inter‑Governmental Agreement (IGA) for 36 Rafale jets on grounds of non‑transparency and potential illegality in the decision‑making process. They argued that the earlier plan to procure 126 MMRCA jets was not abandoned through a transparent, consultative process and that the shift to a government‑to‑government deal bypassed standard procedures, parliamentary oversight, and full pricing disclosures. They contended that the Defence Offset Guidelines and the selection of an Indian offset partner (Reliance) lacked proper, non‑arbitrary justification, raising concerns of favouritism or impropriety. They sought registration of an FIR under the Indian Penal Code, Court‑monitored investigation, cancellation of the IGA, and scrutiny of the pricing and IOP/offset arrangements. They also pressed for greater transparency in offset arrangements and for a review of the performance and governance of the procurement process, arguing that the public interest demanded accountability and potential remedy in the courts.

Contentions of Respondents

The respondents defended the procurement as a lawful, necessary, and strategic decision, emphasizing the defence‑unique nature of procurement and the evolution of the Defence Procurement Procedure (DPP) and Defence Offset Guidelines. They argued that the IGA was executed after due process, junior to inter‑ministerial approvals (including CCS) and subject to financial controls, with the offset regime to be implemented by the OEM choosing its Indian offset partner. They submitted that the Court should limit its review to illegality, irrationality, and procedural propriety, given national security considerations and the need to avoid destabilizing defence readiness. They asserted that pricing details are sensitive and not suitable for full public disclosure; the DPP 2013 clauses (including para 71 and 72) permitted IGAs and deviations when necessary, and the government’s approach complied with applicable guidelines and approvals.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (6)

Case NameCitationTreatmentExplanation
Jagdish Mandal vs. State of Orissa and Ors.(2007) 14 SCC 517PositiveUsed as guidance for limited judicial review focusing on the decision‑making process rather than substantive merits of commercial transactions.
Tata Cellular vs. Union of India(1994) 6 SCC 651PositiveCited for the principle that judicial review in tenders/contracts is bounded by illegality, irrationality, and procedural impropriety.
Maa Binda Express Carrier & Anr. vs North‑East Frontier Railway & Ors.(2014) 3 SCC 760PositiveReferencing the scope of review in procurement matters and the orientation toward rights of private parties vs. public procurement.
Siemens Public Communication Networks Pvt. Ltd. & Anr. vs. Union of India & Ors.(2008) 16 SCC 215PositiveUsed to emphasize that defence procurement warrants special consideration and broader leeway in judicial review.
Reliance Airport Developers (P) Ltd. vs Airports Authority of India & Ors.(2006) 10 SCC 1PositiveCited for the limitation of judicial review in matters involving national security and strategic assets.
Council of Civil Service Unions vs. Minister for the Civil Service(1985) AC 374; (1984) 3 WLR 1174Mentioned OnlyQuoted to illustrate the general principle of limited judicial review in non‑justiciable areas, without binding application.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•5,407 words•~25 min read

In The Court Record

Manohar Lal Sharma vs Narendra Damodardas Modi & ORS

1 # **REPORTABLE** ## IN THE SUPREME COURT OF INDIA CIVIL/CRIMINAL ORIGINAL JURISDICTION WRIT PETITION [CRIMINAL] NO.225 OF 2018 ## MANOHAR LAL SHARMA ## …. PETITIONER(S) ## VERSUS ## NARENDRA DAMODARDAS MODI & ORS. … RESPONDENTS(S) ## WITH W.P.(C) NO.1205/2018 W.P. (CRL) NO.297/2018 W.P. (CRL) NO.298/2018 ## **J U D G M E N T** ## RANJAN GOGOI, CJI 1. The issues arising in this group of writ petitions, filed as Public Interest Litigations, relate to procurement of 36 Rafale Signature Not Verified Digitally signed by CHETAN KUMAR Date: 2018.12.14 15:05:01 IST Fighter Jets for the Indian Airforce. The procurement in Reason: question, which has been sought to be challenged, has its origins 2 in the post­Kargil experience that saw a renewed attempt to advance the strategic needs of the armed forces of the country. 2. As far back as in the month of June of the year 2001, an in­principle approval was granted for procurement of 126 fighter­jets to augment the strength of the Indian Airforce. Simultaneously, a more transparent Defence Procurement Procedure (“DPP”) was formulated for the first time in the year 2002. A robust ‘offset clause’ was included in the DPP in the year 2005 so as to promote Indigenisation and to that effect Services Qualitative Requirements (“SQRs”) were prepared in June 2006. On 29[th] June 2007 the Defence Acquisition Council (“DAC”) granted the “Acceptance of Necessity” for the procurement of 126 Medium Multi Role Combat Aircrafts (for short “MMRCA”) including 18 direct fly­away aircrafts (equivalent to a single squadron) to be procured from the Original Equipment Manufacturer (“OEM”) with the remaining 108 aircrafts to be manufactured by Hindustan Aeronautics Limited (for short “HAL”) under licence, to be delivered over a period of 11 years from the date of signing. The bidding process commenced in August 2007. Six (06) vendors submitted proposals in April, 3 2008. The proposals were followed by technical and field evaluations; a Staff Evaluation Report and a Technical Oversight Committee Report. All these were completed in the year 2011. The commercial bids were opened in November, 2011 and M/s Dassault Aviation (hereinafter referred to as “Dassault”) was placed as the L­I sometime in January 2012. Negotiations commenced thereafter and continued but without any final result. In the meantime, there was a change of political dispensation at the centre sometime in the middle of the year 2014. 3. According to the official respondents negotiation continued **.** A process of withdrawal of the Request for Proposal in relation to the 126 MMRCA was initiated in March 2015. On 10[th] April, 2015 an Indo­French joint statement, for acquisition of 36 Rafale Jets in fly­away condition through an Inter­ Governmental Agreement (hereinafter referred to as “IGA”), was issued and the same was duly approved by the DAC. The Request for Proposal for the 126 MMRCA was finally withdrawn in June 2015. Negotiations were carried out and the process was completed after Inter­Ministerial Consultations with the approval 4 of the Cabinet Committee on Security (for short “CCS”). The contract along with Aircraft Package Supply Protocol; Weapons Package Supply Protocol; Technical Arrangements and Offset contracts was signed in respect of 36 Rafale Jets on 23[rd] September, 2016. The aircrafts were scheduled to be delivered in phased manner commencing from October 2019. 4. Things remained quiet until sometime in the month of September, 2018 when certain newspapers reported a statement claimed to have been made by the former President of France, Francois Hollande, to the effect that the French Government were left with no choice in the matter of selection of Indian Offset Partners and the Reliance Group was the name suggested by the Government of India. This seems to have triggered of the writ petitions under consideration. The first writ petition i.e. Writ Petition (Criminal) No.225 of 2018 has been filed by one Shri Manohar Lal Sharma, a practicing lawyer of this Court. What is sought for in the said writ petition is registration of an FIR under relevant provisions of the Indian Penal Code, 1860 and a Court Monitored Investigation. The further relief of quashing the Inter­ 5 Governmental Agreement of 2016 for purchase of 36 Rafale Jets has also been prayed for. Writ Petition (Civil) No.1205 of 2018 has been filed by one Shri Vineet Dhanda claiming to be a public spirited Indian. The petitioner states that he was inspired to file the writ petition being agitated over the matter on the basis of the newspaper articles/reports. The third writ petition bearing Writ Petition (Criminal) No.297 of 2018 has been filed by one Shri Sanjay Singh, a Member of Parliament alleging illegality and non­transparency in the procurement process. The said writ petition seeks investigation into the reasons for “cancellation of earlier deal” and seeks a scrutiny of the Court into the alteration of pricing and, above all, how a ‘novice’ company i.e. Reliance Defence came to replace the HAL as the Offset partner. Cancellation of Inter­ Governmental Agreement and registration of an FIR has also been prayed for. The fourth and the last writ petition bearing Writ Petition (Criminal) No.298 of 2018 has been filed by Shri 6 Yashwant Sinha, Shri Arun Shourie and Shri Prashant Bhushan claiming to be public spirited Indians. They are aggrieved by non­ registration of FIR by the CBI pursuant to a complaint made by them on 4[th] October, 2018 which complaint, according to the petitioners, disclose a prima facie evidence of commission of a cognizable offence under the provisions of the Prevention of Corruption Act, 1988. The prayer, _inter alia_ , made is for direction for registration of an FIR and investigation of the same and submitting periodic status reports to the Court. 5. Adequate Military strength and capability to discourage and withstand external aggression and to protect the sovereignty and integrity of India, undoubtedly, is a matter of utmost concern for the Nation. The empowerment of defence forces with adequate technology and material support is, therefore, a matter of vital importance. 6. Keeping in view the above, it would be appropriate, at the outset, to set out the parameters of judicial scrutiny of governmental decisions relating to defence procurement and to indicate whether such parameters are more constricted than what the jurisprudence of judicial scrutiny of award of tenders 7 and contracts, that has emerged till date, would legitimately permit. 7. Parameters of judicial review of administrative decisions with regard to award of tenders and contracts has really developed from the increased participation of the State in commercial and economic activity. In _**Jagdish Mandal**_ vs. _**State of Orissa and Ors.1**_ this Court, conscious of the limitations in commercial transactions, confined its scrutiny to the decision and on the of making process parameters unreasonableness and mala fides. In fact, the Court held that it was not to exercise the power of judicial review even if a procedural error is committed to the prejudice of the tenderer since private interests cannot be protected while exercising such judicial review. The award of contract, being essentially a commercial transaction, has to be determined on the basis of considerations that are relevant to such commercial decisions, and this implies that terms subject to which tenders are invited are not open to judicial scrutiny unless it is found that the same have been tailor­made to benefit any particular tenderer or a 1 (2007) 14 SCC 517 8 class of tenderers. [See _**Maa Binda Express Carrier & Anr.**_ Vs. _**­ 2 North East Frontier Railway & Ors.**_ ~~]~~ 8. Various Judicial pronouncements commencing from _**3 Tata Cellular**_ vs. _**Union of India**_ ~~,~~ all emphasise the aspect that scrutiny should be limited to the Wednesbury Principle of Reasonableness and absence of mala fides or favouritism. 9. We also cannot lose sight of the tender in issue. The tender is not for construction of roads, bridges, etc. It is a defence tender for procurement of aircrafts. The parameter of scrutiny would give far more leeway to the Government, keeping in mind the nature of the procurement itself. This aspect was even emphasized in _**Siemens Public Communication Networks Pvt. Ltd. & Anr.**_ Vs. _**Union of India & Ors.4**_ ~~.~~ The triple ground on which such judicial scrutiny is permissible has been consistently held to be “illegality”, “irrationality” and “procedural impropriety”. > 2 (2014) 3 SCC 760 3 (1994) 6 SCC 651 4 (2008) 16 SCC 215 9 ## 10. In _**Reliance Airport Developers (P) Ltd.**_ vs. _**Airports**_ _**Authority of India & Ors.5**_ the policy of privatization of strategic national assets qua two airports came under scrutiny. A reference was made in the said case to the commentary by Grahame Aldous and John Alder in their book ‘Applications for Judicial Review, Law and Practice’: “There is a general presumption against ousting the jurisdiction of the courts, so that statutory provisions which purport to exclude judicial review are construed restrictively. There are, however, certain areas of governmental activity, national security being the paradigm, which the courts regard themselves as incompetent to investigate, beyond an initial decision as to whether the Government's claim is bona fide. In this kind of non­justiciable area judicial review is not entirely excluded, but very limited. It has also been said that powers conferred by the royal prerogative are inherently unreviewable but since the speeches of the House of Lords in Council of Civil Service Unions Vs. Minister for the Civil Service [1985 AC 374: (1984) 3 WLR 1174 (HL): (1984) 3 All ER 935] this is doubtful. Lords Diplock, Scaman and Roskili (sic.)[6] appeared to agree that there is no distinction between based general powers, upon whether their source is statutory or prerogative but that judicial review can be limited by the subject­matter of a particular power, in that case national security. Many prerogative powers are in fact concerned with ­ sensitive, non justiciable areas, for example, 5 (2006) 10 SCC 1 6 To be read as ‘Roskill’ 10 foreign affairs, but some are reviewable in principle, including where national security is not involved. Another non­justiciable power is the Attorney General's prerogative to decide whether to institute on legal proceedings behalf of the public interest." [emphasis supplied] 11. It is our considered opinion/view that the extent of permissible judicial review in matters of contracts, procurement, etc. would vary with the subject matter of the contract and there cannot be any uniform standard or depth of judicial review which could be understood as an across the board principle to apply to all cases of award of work or procurement of goods/material. The scrutiny of the challenges before us, therefore, will have to be made keeping in mind the confines of national security, the subject of the procurement being crucial to the nation’s sovereignty. 12. Adopting such an approach, on 10[th] October, 2018 when the first two writ petitions were initially listed before the Court, the Court had specifically observed in its order that it is proceeding in the matter by requiring the Government of India to apprise the Court of the details of the steps taken in the decision­ making process notwithstanding the fact that the averments in 11 the writ petitions were inadequate and deficient. The Court had also indicated that it was so proceeding in the matter in order to satisfy itself of the correctness of the decision­making process. It was also made clear that the issue of pricing or matters relating to technical suitability of the equipment would not be gone into by the Court. The requisite information was required to be placed before the Court by the Government of India in sealed cover. Before the next date of hearing fixed i.e. 31[st] October, 2018, the other two writ petitions came to be filed. 13. On 31[st] October, 2018, the Court in its order had recorded that in none of the writ petitions the suitability of the fighter jets and its utility to the Indian Airforce had been called into question. Rather what was doubted by the petitioners is the bona fides of the decision­making process and the price/cost of the equipment at which it was proposed to be acquired. 14. Pursuant to the order dated 10[th] October 2018, a note in sealed cover delineating the steps in the decision­making process was submitted to the Court and by order dated 31[st] October 2018 this Court had directed that such of the information which has been laid before the Court, which can 12 legitimately be brought into the public domain, be also made available to the petitioners or their counsels. Details with regard to the induction of the Indian Offset Partner (IOP), if any, was also required to be disclosed. The Court also directed that the details with regard to pricing; the advantages thereof, if any, should also be submitted to the Court in a sealed cover. 15. It is in the backdrop of the above facts and the somewhat constricted power of judicial review that, we have held, would be available in the present matter that we now proceed to scrutinise the controversy raised in the writ petitions which raise three broad areas of concern, namely, (i) the decision­making process; (ii) difference in pricing; and (iii) the choice of IOP. ## **Decision Making Process** 16. The details of the steps in the decision­making process leading to the award of the 36 Rafale fighter aircrafts’ order have been set out in response to the order dated 10[th] October, 2018. The Government states that the DPP 2002 has been succeeded by periodical reviews in 2005, 2006, 2008, 2011, 2013 and 2016. 13 The preamble to DPP has been referred to capture its essence, which emphasises that – “Defence acquisition is not a standard open market commercial form of procurement and has certain unique features such as supplier constraints, technological complexity, foreign suppliers, high cost, foreign exchange implications and geo­political ramifications. As a result, decision making pertaining to defence procurement remains unique and complex.” It also states that – “Defence procurement involves long gestation periods and delay in procurement will impact the preparedness of our forces. The needs of the armed forces being a non­negotiable and an uncompromising aspect, flexibility in the procurement process is required, which has also been provisioned for.” It is DPP 2013 which is stated to have been followed in the procurement in question. It is no doubt true that paragraph 77 of the DPP 2013 reads as follows: “77. This procedure would be in supersession of Defence Procurement Procedure 2011 and will come into effect from 01 June 2013. There are, however, cases which would be under various stages of processing in accordance with provision of earlier versions of DPP at the 14 time of commencement of DPP­2013. The processing of these cases done so far under the earlier procedure will be deemed to be valid. Only those cases in which RFP is issued after ­ 01 June, 2013, will be processed as per DPP 2013.” In other words when it is stated that only those cases in which RFP is issued after 1[st] June 2013 will be processed as per DPP 2013, in this case where the RFP was issued much prior to 1[st] April 2013 and it was withdrawn, as already noted, in June 2015, a question may arise as to how it could be claimed that DPP 2013 was followed. We, however, also notice clause 75 of DPP 2013 which reads as follows: “75. Any deviation from the prescribed procedure will be put up to DAC through DPB for approval.” 17. Also, we notice that the official respondents have sought support from paragraph 71 of the DPP 2013. Para 71 of DPP 2013, in respect of the IGA has been referred to, which postulates possibilities of procurement from friendly foreign countries, necessitated due to geo­strategic advantages that are likely to accrue to the country. Such procurement would not classically follow the Standard Procurement Procedure or the 15 Standard Contract Document, but would be based on mutually agreed provisions by the Governments of both the countries based on an IGA, after clearance from the Competent Financial Authority (hereinafter referred to as “CFA”). Of the total procurement of about Rs.7.45 lakh crores since 2002 under DPP, different kinds of IGAs, including Foreign Military Sales and Standard Clauses of Contract account for nearly 40%. With the object of promoting indigenization, a robust offset clause is said to have been included since 2005. As per the Defence Offset Guidelines of 2013, the vendor/Original Equipment Manufacturer (hereinafter referred to as “OEM”) is free to select its IOPs for implementing the offset obligation. 18. As far as the endeavour to procure 126 fighter aircrafts is concerned, it has been stated that the contract negotiations could not be concluded, inter alia, on account of unresolved issues between the OEM and HAL. These have been set out as under: “i) Man­Hours that would be required to produce the aircraft in India: HAL required 2.7 times higher Man­Hours compared to the French side for the manufacture of Rafale aircraft in India. 16 ii) Dassault Aviation as the seller was required to undertake necessary contractual obligation for 126 aircraft (18 direct fly­away and 108 aircraft manufactured in India) as per RFP requirements. Issues related to contractual obligation and responsibility for 108 aircraft manufactured in India could not be resolved.” 19. The aforesaid issues are stated to have been unresolved for more than three years. Such delay is said to have impacted the cost of acquisition, as the offer was with ‘in­built escalation’ and was influenced by Euro­Rupee exchange rate variations. The stalemate resulted in the process of RFP withdrawal being initiated in March 2015. In this interregnum period, adversaries of the country, qua defence issues, inducted modern aircrafts and upgraded their older versions. This included induction of even 5[th] Generation Stealth Fighter Aircrafts of almost 20 squadrons, effectively reducing the combat potential of our defence forces. In such a situation, government­ to­government negotiations resulted in conclusion of the IGA for the supply of 36 Rafale Aircrafts, as part of a separate process. The requisite steps are stated to have been followed, as per DPP 2013. An INT[7] was constituted to negotiate the terms and 7 Indian Negotiating Team 17 conditions, which commenced in May 2015 and continued till April 2016. In this period of time, a total of 74 meetings were held, including 48 internal INT meetings and 26 external INT meetings with the French side. It is the case of the official respondents that the INT completed its negotiations and arrived at better terms relating to price, delivery and maintenance, as compared to the MMRCA offer of Dassault. This was further processed for inter­ministerial consultations and the approval of the CCS was also obtained, finally, resulting in signing of the agreement. This was in conformity with the process, as per para 72 of DPP 2013. 20. The petitioners, on the other hand, seek to question the very fulfilment of the prerequisites for entering into an IGA. The Government of France, giving only a ‘Letter of Comfort’ and not a ‘Sovereign Guarantee’ has been questioned. 21. It is a say of the petitioners that para 71 envisages three eventualities, where the question of entering into an IGA would arise, which have not arisen in the present case: 18 (a) Proven technology and capabilities belonging to a friendly foreign country is identified by our Armed Forces while participating in joint international exercises; (b) Large value weapon system/platform in service in a friendly foreign country is available for transfer or sale normally at a much lesser cost; or (c) Requirement of procuring a specific state­of­the­art equipment/platform where the Government of the OEM’s country might have imposed restriction on its sale and thus the equipment cannot be evaluated on ‘No Cost No Commitment’ basis. 22. We have studied the material carefully. We have also had the benefit of interacting with senior Air Force Officers who answered Court queries in respect of different aspects, including that of the acquisition process and pricing. We are satisfied that there is no occasion to really doubt the process, and even if minor deviations have occurred, that would not result in either setting aside the contract or requiring a detailed scrutiny by the Court. We have been informed that joint exercises have taken 19 place, and that there is a financial advantage to our nation. It cannot be lost sight of, that these are contracts of defence procurement which should be subject to a different degree and depth of judicial review. Broadly, the processes have been followed. The need for the aircrafts is not in doubt. The quality of the aircraft is not in question. It is also a fact that the long negotiations for procurement of 126 MMRCAs have not produced any result, and merely conjecturing that the initial RFP could have resulted in a contract is of no use. The hard fact is that not only was the contract not coming forth but the negotiations had come practically to an end, resulting in a recall of the RFP. We cannot sit in judgment over the wisdom of deciding to go in for purchase of 36 aircrafts in place of 126. We cannot possibly compel the Government to go in for purchase of 126 aircraft. This is despite the fact that even before the withdrawal of RFP, an announcement came to be made in April 2015 about the decision to go in only for 36 aircrafts. Our country cannot afford to be unprepared/underprepared in a situation where our adversaries are stated to have acquired not only 4[th] Generation, but even 5[th] Generation Aircrafts, of which, we have none. It will not be 20 correct for the Court to sit as an appellate authority to scrutinize each aspect of the process of acquisition. 23. We may also note that the process was concluded for 36 Rafale fighter jet aircrafts on 23[rd] September, 2016. Nothing was called into question, then. It is only taking advantage of the statement by the ex­President of France, Francois Hollande that these set of petitions have been filed, not only qua the aspect which formed the statement, that is, the issue of IOPs but also with respect to the entire decision­making process and pricing. We do not consider it necessary to dwell further into this issue or to seek clause­by­clause compliances. ## **Pricing** 24. The challenge to the pricing of the aircrafts, by the petitioners, is sought to be made on the ground that there are huge escalations in costs, as per the material in public domain, as found in magazines and newspapers. We did initially express our disinclination to even go into the issue of pricing. However, by a subsequent order, to satisfy the conscience of the Court, it was directed that details regarding the costs of the aircrafts should also be placed in sealed covers before the Court. 21 25. The material placed before us shows that the Government has not disclosed pricing details, other than the basic price of the aircraft, even to the Parliament, on the ground that sensitivity of pricing details could affect national security, apart from breaching the agreement between the two countries. The pricing details have, however, been shared with the Comptroller and Auditor General (hereinafter referred to as “CAG”), and the report of the CAG has been examined by the Public Accounts Committee (hereafter referred to as “PAC”). Only a redacted portion of the report was placed before the Parliament, and is in public domain. The Chief of the Air Staff is stated to have communicated his reservation regarding the disclosure of the pricing details, including regarding the weaponry which could adversely affect national security. The pricing details are stated to be covered by Article 10 of the IGA between the Government of India and the Government of France, on purchase of Rafale Aircrafts, which provides that protection of classified information and material exchanged under the IGA would be governed by the provisions of the Security Agreement signed between both the Governments on 25[th] January, 2008. Despite this reluctance, the 22 material has still been placed before the Court to satisfy its conscience. 26. We have examined closely the price details and comparison of the prices of the basic aircraft along with escalation costs as under the original RFP as well as under the IGA. We have also gone through the explanatory note on the costing, item wise. Suffice it to say that as per the price details, the official respondents claim there is a commercial advantage in the purchase of 36 Rafale aircrafts. The official respondents have claimed that there are certain better terms in IGA qua the maintenance and weapon package. It is certainly not the job of this Court to carry out a comparison of the pricing details in matters like the present. We say no more as the material has to be kept in a confidential domain. ## **Offsets** 27. The issue of IOP is what has triggered this litigation. The offset contract is stated to have been governed by the Defence Offset Guidelines of DPP 2013. Two of the said contracts 23 were signed with Dassault and M/s MBDA Missile Systems Limited on 23[rd] September, 2016, the same day on which the IGA was signed between the Government of India and the Government of France. These are the French industrial suppliers of the Aircraft package and Weapon Package respectively. There are stated to be no offset obligations in the first three years, but the offset obligations are to commence from October 2019 onwards. 28. The complaint of the petitioners is that the offset guidelines contemplate that the vendor will disclose details about the Indian Offset partner however, in order to help the business group in India in question, an amendment was carried out in paragraph 8 of the Offset Guidelines that too with retrospective effect. By virtue of the said amendment it is contended that cloak of secrecy is cast about the Offset partner and the vendor is enabled to give the details at a much later point of time. It is contended, however, that other provisions of the Offset Guidelines remain unamended, and, therefore, Government cannot pretend ignorance about the Indian Offset partner as has been done in the affidavit filed. It is complained that favouring 24 the Indian business group has resulted in offence being committed under the Prevention of Corruption Act. 29. As per clause 8 of DPP 2013, dealing with the processing of offset proposals, it has been stated in clause 8.2 as under: ## “8. **Processing of Offset Proposals** 8.2 The TOEC[8] will scrutinize the technical offset proposals (excluding proposals for Technology Acquisition by DRDO as per para 8.3) to ensure conformity with the offset guidelines. For this purpose, the vendor may be advised to undertake changes to bring his offset proposals in conformity with the offset guidelines. The TOEC will be expected to submit its report within 4­8 weeks of its constitution.” 30. It has been categorically stated that the vendor/OEM is yet to submit a formal proposal, in the prescribed manner, indicating the details of IOPs and products for offset discharge. A press release in the form of a ‘Clarification on Offset Policy’, posted on 22[nd] September, 2018 has also been placed before us. _Inter alia,_ it states that the Government reiterates that it has no role to play in the selection of the IOP. As per the Defence Offset > 8 Technical Offset Evaluation Committee 25 Guidelines, the OEM is free to select any Indian company as its IOP. A joint venture is stated to have come into being between Reliance Defence and Dassault in February 2017, which is stated to be a ‘purely commercial arrangement’ between the two private companies. Media reports of February 2012 are stated to suggest that Dassault, within two weeks of being declared the lowest bidder for procurement of 126 aircrafts by the previous Government, had entered into a pact for partnership with Reliance Industries (Another business group) in the Defence sector. Dassault has also issued a press release stating that it has signed partnership agreements with several companies and is negotiating with over hundred other companies. As per the guidelines, the vendor is to provide details of the IOPs, either at the time of seeking offset credit or one year prior to discharge of offset obligation, which would be due from 2020 onwards. The aforesaid press release is in conformity with the clause dealing with IOPs which reads as under: ## “4. **Indian Offset Partner** 4.3 The OEM/vendor/Tier­I sub­vendor will be free to select the Indian offset partner for implementing the offset obligation provided the IOP has not been barred from doing business by the Ministry of Defence.” 26 31. Despite the aforesaid illustration, the petitioners kept on emphasising that the French Government has no say in the matter, as per media reports. It is also stated that there was no reason for Dassault to have engaged the services of Reliance Aerostructure Ltd., through a joint venture, when the company itself had come into being only on 24[th] April, 2015. The allegation, thus, is that the Indian Government gave a benefit to Reliance Aerostructure Ltd., by compelling Dassault to enter into a contract with them, and that too at the cost of the public enterprise, HAL. 32. It is no doubt true that the company, Reliance Aerostructure Ltd., has come into being in the recent past, but the press release suggests that there was possibly an arrangement between the parent Reliance company and Dassault starting from the year 2012. As to what transpired between the two corporates would be a matter best left to them, being matters of their commercial interests, as perceived by them. There has been a categorical denial, from every side, of the interview given by the former French President seeking to suggest that it is the Indian Government which had given no option to the French 27 Government in the matter. On the basis of materials available before us, this appears contrary to the clause in DPP 2013 dealing with IOPs which has been extracted above. Thus, the commercial arrangement, in our view, itself does not assign any role to the Indian Government, at this stage, with respect to the engagement of the IOP. Such matter is seemingly left to the commercial decision of Dassault. That is the reason why it has been stated that the role of the Indian Government would start only when the vendor/OEM submits a formal proposal, in the prescribed manner, indicating details of IOPs and products for offset discharge. As far as the role of HAL, insofar as the procurement of 36 aircrafts is concerned, there is no specific role envisaged. In fact, the suggestion of the Government seems to be that there were some contractual problems and Dassault was circumspect about HAL carrying out the contractual obligation, which is also stated to be responsible for the non­conclusion of the earlier contract. 33. Once again, it is neither appropriate nor within the experience of this Court to step into this arena of what is technically feasible or not. The point remains that DPP 2013 28 envisages that the vendor/OEM will choose its own IOPs. In this process, the role of the Government is not envisaged and, thus, mere press interviews or suggestions cannot form the basis for judicial review by this Court, especially when there is categorical denial of the statements made in the Press, by both the sides. We do not find any substantial material on record to show that this is a case of commercial favouritism to any party by the Indian Government, as the option to choose the IOP does not rest with the Indian Government. ## **Conclusion:** 34. In view of our findings on all the three aspects, and having heard the matter in detail, we find no reason for any intervention by this Court on the sensitive issue of purchase of 36 defence aircrafts by the Indian Government. Perception of individuals cannot be the basis of a fishing and roving enquiry by this Court, especially in such matters. We, thus, dismiss all the writ petitions, leaving it to the parties to bear their own costs. We, however, make it clear that our views as above are primarily from the standpoint of the exercise of the jurisdiction under 29 Article 32 of the Constitution of India which has been invoked in the present group of cases. ………….....................,,CJI [RANJAN GOGOI] ………….....................,,J. [SANJAY KISHAN KAUL] ………….....................,,J. [K.M. JOSEPH] NEW DELHI DECEMBER 14, 2018
End of Judgment Record
Browse All Landmark Cases Judgments
2019-01-22

State of Himachal Pradesh & Anr. v. Pinju Ram & Others; State of Himachal Pradesh & Ors. v. Ganesh Dutt & Anr.

This batch of appeals concerns regularisation and monetary benefits of part‑time employees in Himachal Pradesh who were converted to daily‑wage status. The State had issued a policy on 27 February 2004: part‑time Class‑IV employees who had completed ten years of continuous service as on 31 December 2003 would be made daily wagers with prospective effect, and posts vacated by such employees would stand abolished; Education and Ayurveda were excluded from the policy. Revenue Chowkidars, engaged by Panchayats, were not covered by that policy and received separate treatment. Following writ petitions and an order of the Himachal Pradesh High Court and in light of later developments, the State drew‑up directions in 2011 (22 September) to give seniority to Revenue Chowkidars on the basis of ten years of service, but with wages from the date of actual appointment and without back‑dated monetary benefits; 7 July 2012 further instructions reiterated this stance for remaining part‑time employees, with monetary benefits not guaranteed in the interregnum. The respondents pressed for back wages dating from 1 January 2007 and broader coverage. The Supreme Court held that the 2007 back‑pay direction was unsustainable, clarified that seniority would count from ten years without past benefits, and that the 2011 policy and Moti Singh principle should guide the approach. The appeals are allowed; no costs. The related writ petitions are to be disposed of consistent with these directions.

2018-08-14

Union Bank of India and Others v. C.G. Ajay Babu and Anr.

This is a Supreme Court of India appeal concerning the forfeiture of gratuity under the Payment of Gratuity Act, 1972. The respondent was a branch manager of the appellant bank and was dismissed on 3 June 2004 after disciplinary proceedings. A show-cause notice sought to forfeit gratuity due to misconduct involving moral turpitude, which was ordered on 20 April 2004. The High Court upheld the dismissal but held that gratuity could be paid since there was no financial loss to the bank, and that a bipartite settlement between the bank and employees permitted forfeiture only where misconduct caused financial loss. The Division Bench, however, held that forfeiture under Section 4(6) must be read together with Section 4(5) and that no loss was proven, thus entitling the employee to gratuity in accordance with the bipartite settlement. The Supreme Court agreed with the High Court that forfeiture is not automatic; it is controlled by Sections 4(5) and 4(6) of the Act and by the bipartite settlement, which requires loss to justify forfeiture. The Court emphasized that an act must constitute an offence involving moral turpitude and that conviction is generally required for forfeiture under 4(6)(b)(ii). The appeal is dismissed with no costs.

2018-09-25

Reema Salkan v. Sumer Singh Salkan

This is a Supreme Court of India criminal appeal under the Criminal Appellate Jurisdiction arising from a maintenance dispute under Section 125 Cr.P.C. The parties, married in 2002, had a protracted litigation history. The Family Court granted maintenance to the wife from 17 July 2003 to 8 December 2010, and held no maintenance thereafter. The High Court, in revision, partly allowed the application, directing Rs.9,000 per month from 9 December 2010 onward, while upholding the earlier period’s Rs.10,000 per month. This Court had earlier granted interim maintenance of Rs.20,000 per month in 2014 (Criminal Appeal Nos. 2347-2349 of 2014). The appellant contends there has been no change in circumstances since the interim order and that the respondent’s substantial assets, education, and overseas earnings establish the capacity to pay higher maintenance. The respondent defends the High Court’s reasoning, arguing that the Family Court’s assessment, demeanor observations, and the principle that maintenance should not be perpetual require careful scrutiny, and that the notional minimum wage approach used by the High Court is flawed. The overarching issue is the quantum of monthly maintenance payable to the appellant and whether the interim amount should be augmented beyond the period up to 2010.”

2019-12-03

M/s Embassy Property Developments Pvt. Ltd. v State of Karnataka & Ors.

This judgment concerns three Civil Appeals filed by a Resolution Applicant, the Corporate Debtor (through its Resolution Professional) and the Committee of Creditors, challenging an Interim Order of the Karnataka High Court staying an NCLT order in proceedings under the Insolvency and Bankruptcy Code, 2016. The NCLT Chennai had admitted an application under Section 7 of the IBC against M/s Tiffins Barytes Asbestos & Paints Ltd. and directed a moratorium under Section 14. The Interim Resolution Professional then sought a deemed extension of a mining lease under MMDR Act, 1957 and the Government of Karnataka rejected it. The NCLT, by an order dated 11.12.2018, set aside the Government’s order and directed execution of Supplement Lease Deeds for the period up to 31.03.2020. The Government of Karnataka challenged this in a High Court writ petition, which stayed the impugned NCLT order. The core issues were: (i) whether the High Court may interfere under Article 226/227 with an NCLT order in IBC when an appeal lies to the NCLAT, and (ii) whether fraud can be inquired into by NCLT/NCLAT in CIRP. The Court reiterates that IBC is a complete, umbrella code with a three‑tier mechanism (NCLT, NCLAT, Supreme Court) and that public‑law disputes arising from MMDR Act obligations lie outside IBC. It ultimately holds that while NCLT/NCLAT may inquire into fraud, they cannot adjudicate MMDR‑related public legal disputes; and the High Court’s writ jurisdiction in public‑law contexts remains permissible. The appeals are dismissed.