Maichel Kurian v. Secretary, Uzhavoor Grama Panchayath & Ors.

Case / Petition Number:W.P.(C) No.3963/2011

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • C. T. Ravikumar
Judgment Date
2011-02-28
Court Decision / Holding
Writ petition allowed. It was held that respondents 1 and 2 are bound to number the building constructed under Ext.P1 in the property (2.12 cents of Survey No. 194/15, Monippally Village) and to pass appropriate orders, without insisting on an NOC from the PWD. This relief was granted with a directive to act expeditiously, within one month from receipt of a copy of the judgment, while preserving the possibility of any lawful acquisition proceedings under law.
Final Disposition
Writ petition allowed; relief granted directing numbering of the building without requiring an NOC, with directions to act within one month; Ext.R1(e) (stop memo) set aside to the extent it conflicts with this order.

Parties to the Case

Appellants / Petitioners

  • Maichel Kurian

Respondents

  • Secretary, Uzhavoor Grama Panchayath, Uzhavoor Po, Kottayam District
  • Uzhavoor Grama Panchayath, Uzhavoor Po, Kottayam District (Rep. by its Secretary)
  • Deputy Director of Panchayath, Kottayam
  • District Town Planner, District Planning Office, Nagampadam, Kottayam
  • Highway Authority and Executive Engineer (Roads Division), Kerala Public Works Department, Kottayam Division
  • Assistant Executive Engineer, Roads Sub Division, Kerala Public Works Department, Vaikom
  • Executive Engineer (PWD), Kerala State Transport Project (KSTP) Division, Muvattupuzha
  • Chief Engineer (Roads and Bridges), Kerala Public Works Department, Thiruvananthapuram

Legal Representation & Advocates

Counsels for Petitioners

  • • Sri K.M. Firoz
  • • Smt. M. Shajna
  • • Sri Jacob E. Simon

Counsels for Respondents

  • • Sri P. Santhal­ingam
  • • Sri S. Sharan
  • • Smt. K.R. Deepa

Case Synopsis & Summary

Maichel Kurian, the owner of 2.12 cents of land in Survey No. 194/15 at Monippally Village in Meenachil Taluk, constructed a three-storey building with Ext.P1 building permit dated 14.12.2009. After completion, he sought a building number; however, the 1st respondent issued a stop memo based on Ext.R1(e) dated 25.2.2010 from the Executive Engineer, KSTP Division, directing the Panchayath to stop construction. The petitioner approached the Adalath and sought relief to number the portion built under Ext.P1 and to declare that an NOC from the Public Works Department was not required. He relied on Peer Mohammed v. Chirakandam Grama Panchayath (2008 (3) KLT 300). The central issue concerns Section 18 of the Kerala Highway Protection Act, 1999, which prescribes building lines and control lines and requires the competent authority to publish such determinations in the Gazette and two newspapers under Section 18(2). The Government Pleader argued that even if publication is not effected, Sections 9 and 10 of the Act impose duties on highway authorities for plan maintenance and demarcation. The court examined the statutory scheme and precedents, holding that failure to publish Section 18(2) undermines the effect of building lines and that the 2008 KLT decision supports the petitioner. Consequently, Ext.R1(e) cannot be sustained; the court directs numbering of the building under Ext.P1 without an NOC, within one month, while noting potential acquisitions under law.

Provisions of Law Cited

Section 18 of the Kerala Highway Protection Act, 1999 (Building lines and control lines)Section 9 of the Kerala Highway Protection Act, 1999 (Maintenance of highway plans)Section 10 of the Kerala Highway Protection Act, 1999 (Demarcation of highway boundaries)

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioner argued that Ext.P1 granted building permission, and the subsequent stop memo (Ext.R1(e)) issued by KSTP relied on Section 18 of the Kerala Highway Protection Act. He contended that no notification or publication under Section 18(2) had been made, rendering the building lines non-enforceable. He relied on Peer Mohammed v. Chirakandam Grama Panchayath (2008 (3) KLT 300) to claim a right to have the building numbered and to demolish any requirement for an NOC from PWD if the lines were not properly published.

Contentions of Respondents

The respondents argued that Section 18(2) mandates Gazette notification and newspaper publication of building lines and control lines, and that non-compliance would affect the enforcement of such lines. They asserted that Sections 9 and 10 require the highway authority to maintain plans and demarcate boundaries, and that Ext.R1(e) was a valid Stop Memo in light of the ongoing expansion plans and the statutory duties of the PWD and Panchayath.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
Peer Mohammed v. Chirakandam Grama Panchayath2008 (3) KLT 300PositiveThe court relied on this decision to hold that Gazette notification and newspaper publication are essential for the determination and implementation of building lines; failure in publication is significant and can entitle the petitioner to relief.
ITC Bhadrachalam Paperboards & another v. Mandal Revenue Officer, A.P. & others1996 (6) SCC 634PositiveCited to support that Gazette notification and newspaper publication constitute an essential process in determining building lines and their implementation.

Diagnostic Tool

Beta

Does this judgment govern your specific facts?

Don't risk relying on a distinguishable precedent. Enter your facts or proposition below. We will test it against Maichel Kurian v. Secretary, Uzhavoor Grama Panchayath & Ors. and instantly map out authorities that support, challenge, or govern your position.

Extracted Judgment Text

Exact text extracted from official judgment records.

## **IN THE HIGH COURT OF KERALA AT ERNAKULAM** **PRESENT :** **THE HONOURABLE MR. JUSTICE C.T.RAVIKUMAR** **MONDAY, THE 28TH FEBRUARY 2011 / 9TH PHALGUNA 1932** **WP(C).No. 3963 of 2011(U)** **-----------------------------------** **PETITIONER(S):** **------------------------** **MAICHEL KURIAN,S/O.KURIAN,AGED 40 YEARS, NOORAMMAKKIYIL HOUSE, MONIPPALLY PO,REPRESENTED BY HIS WIFE AND POWER OF ATTPRNEY HOLDER PREETHI MAICHEL,W/O.MAICHEL KURIAN,AGED 37 NOORAMMAKKIYIL HOUSE, MONIPPALLY PO.** **BY ADVS. SRI.K.M.FIROZ SMT.M.SHAJNA SRI.JACOB E SIMON** ## **RESPONDENT(S):** - **--------------------------** **1. THE SECRETARY,UZHAVOOR GRAMA PANCHAYATH, UZHAVOOR PO,KOTTAYAM DISTRICT 686 634.** **2. UZHAVOOR GRAMA PANCHAYATH,UZHAVOOR PO, KOTTAYAM DISTRICT,REP.BY ITS SECRETARY 686 634.** **3. THE DEPUTY DIRECTOR OF PANCHAYATH, OFFICE OF THE DEPUTY DIRECTOR OF PANCHAYATH, KOTTAYAM- 686 601.** **4. THE DISTRICT TOWN PLANNER, DISTRICT PLANNING OFFICE,ST.ANTONY'S COMPLEX II, NEAR MUNICIPAL BUS STAND, NAGAMPADAM,KOTTAYAM 686601.** **5. THE HIGHWAY AUTHORITY AND EXECUTIVE ENGINEER(ROADS DIVISION),KERALA PUBLIC WORKS DEPARTMENT, KOTTAYAM DIVISION,KOTTAYAM 686601.** **6. THE ASSISTANT EXECUTIVE ENGINEER, ROADS SUB DIVISION, KERALA PUBLIC WORKS DEPARTMENT , VAIKOM 686605.** **tss** ## **W.P.(C) NO.3963/2011** **7. THE EXECUTIVE ENGINEER(PWD), KERALA STATE TRANSPORT PROJECT(KSTP) DIVISION, MUVATTUPUZHA,MUVATTUPUZHA PO, ERNAKULAM DISTRICT. 687 504.** **8. THE CHIEF ENGINEER(ROADS AND BRIDGES), KERALA PUBLIC WORKS DEPARTMENT, THIRUVANANTHAPURAM.695 001.** **R1 & 2 BY SRI.P.SANTHALINGAM, SENIOR ADVOCATE R1 & R2 BY ADV. SRI.S.SHARAN** **R3 TO R8 BY GOVERNMENT PLEADER SMT.K.R.DEEPA** **THIS WRIT PETITION (CIVIL) HAVING COME UP FOR ADMISSION ON 28/02/2011, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING:** **tss** ## **C.T.RAVIKUMAR, J.** ## **----------------------------------------** ## **W.P.(C)No.3963 OF 2011** ## **-------------------------------------------------Dated this the 28[th] day of February, 2011** ## **J U D G M E N T** The contention of the petitioner, who is the owner and possession of 2.12 cents of land in Survey No.194/15 of Monippally Village in Meenachil Taluk, is that he had constructed a small building attached to the existing building thereon. In fact, it is a three storied building. The said construction was carried out on the strength of Ext.P1 building permit dated 14.12.2009. Subsequently, the petitioner has approached the 2[nd] respondent for getting building number. In fact, after completion of the construction, the petitioner was served with a stop memo by the 1[st] respondent based on letter No.KSTP/M/83K/2009 dated 25.2.2010 from the Executive Engineer, Kerala State Transport Project (KSTP) Division, Muvattupuzha, the 7[th] respondent. It is produced in the writ petition by the 1[st] respondent as Ext.R1(e). Obviously, such an objection was raised thereunder in terms of the provisions under **W.P.(C).No. 3963 OF 2011** 2 Section 18 of Kerala Highway Protection Act 1999 (for short 'the Act'). According to the petitioner, he had completed the construction much before the issuance of the said stop memo. In the said circumstances, the petitioner was constrained to approach the Adalath organised by the Government through Ext.P2. As per Ext.P3, the petitioner was informed that the request of the petitioner could not be considered as KSTP has taken steps for expansion of the road and that KSTP has directed the Secretary of the Panchayath to stop construction activities. It is in the said circumstance, that the writ petition has been filed, mainly with the prayer to direct respondents 1 and 2 to number the portion of building constructed on the strength of Ext.P1 and also to set aside Ext.P3. The further prayer is for issuance of a declaration that the respondents are bound to take steps to number the building constructed as per Ext.P1, without insisting No Objection Certificate from the authorities under the Public Works Department. 2. I have heard the learned counsel for the petitioner, learned Standing Counsel for the respondents 1 and 2 and also the learned Government Pleader. **W.P.(C).No. 3963 OF 2011** 3 3. The learned Counsel for the petitioner submitted that the matter in issue is squarely covered in favour of the petitioner by the judgment of this Court in **Peer Mohammed v. Chirakandam Grama Panchayath** reported in **2008 (3) KLT 300** . As already noticed herein, the respondents are refusing to number the building constructed by the petitioner on the strength of Ext.P1 permission on the ground of non-compliance of the conditions under Section 18 of the Act. In the said context, it is relevant to refer to Section 18 of the Act and the same reads thus:- **“S.18: Building lines and Control lines:---(1) The competent authority shall determine building lines and control lines in respect of any category of highway in such a way that the distance between the middle of a highway and the building line or that between the building line and the control line shall be fixed with due regard to the requirements of safety and convenience of traffic and of future development of the highway.** **Explanation:--- For the purpose of this subsection middle of a highway means, in relation to any highway for the improvement of which plans have been prepared by the highway authority, the middle of the highway as proposed to be improved in accordance with the plans, and where no such plans have been prepared, the point halfway between the boundaries of the highway.** **W.P.(C).No. 3963 OF 2011** 4 ## **(2) The building lines and control lines as determined for any category of highway or part thereof shall be published in the Gazette and in two daily news papers by the competent authority.”** 4. A perusal of sub sections (1) and (2) of Section 18 of the Act would reveal that it is incumbent on the competent authority to notify and publish the determination regarding the building lines and control lines for any category of highway in the gazette and in two daily newspapers. Admittedly, hither to, no such notification or publication has been effected showing determination of the building lines and control lines, in terms of the provisions under Section 18(2) of the Act. The questions to be considered are 'what is the effect and impact of failure to comply with the mandatory requirements under Section 18(2) of the Act and whether, in such circumstances, the petitioner would be entitled to get the relief sought for in this writ petition'. The learned Government Pleader submitted that, even the failure on the part of the competent authority in issuing the notification as required under Section 18(2) of the Act, would not be fetch any benefit of the petitioner in view of the provisions under Section 9 **W.P.(C).No. 3963 OF 2011** 5 and 10 of the Act. Sections 9 and 10 of the Act reads thus:- ## **“ S.9: Maintenance of highway plans:-** **(1) The highway authority shall, after having made a survey of each highway and its boundaries, prepare and maintain a plan as approved by the competent authority in respect of such highway.** **(2) A plan maintained under sub-section (1) shall show clearly the boundaries of the highway, the detailed measurements of road widths, the distance between boundary marks and sufficient measurements from fixed points to enable the refixation in position of boundary marks in case they have been displaced or tampered with.** ## **S.10: Demarcation of highway boundaries:-** **(1) The highway authority shall have the boundaries of the highways in its charge demarcated with reference to the plans maintained by it under sub-section (1) of section 9, by planting stones or other suitable marks of a durable nature at intervals all along with highway in such a manner that the imaginary line joining such stones or marks shall show the road boundary correctly.** **(2) Where there are bends or links in the road boundary, the stone or marks shall be so located as to give the correct configuration of the boundary when they are jointed by straight lines.** **(3) The boundary stones or marks, which may be given consecutive numbers, shall be maintained on the ground as if they constitute part of the highway.”** **W.P.(C).No. 3963 OF 2011** 6 5. In terms of Section 9 of the Act, the highway authority after conducting a survey of each highway and its boundaries shall prepare and maintain a plan as approved by the competent authority in respect of such highway. As per Section 10, the demarcation of highway boundaries are to be effected with reference to the plans maintained by it under sub-section (1) of Section 9. In short, in terms of Section 9 and 10 of the Act, the competent authorities under the highway authority are under an obligation to discharge the duties as specifically contemplated under Section 9 and 10 of the Act. That apart, in terms of Section 18 of the Act, even after preparation of such a plan and demarcation of the boundaries, the competent authority has a further statutorily bounden duty to notify and publish the determination regarding the building lines and control lines in respect of any category of highway. The very intention behind casting such a duty on the competent authority to notify and publish determination of the building lines and control lines viz; letting it known to the public would be defeated if the contention of the learned Government Pleader is accepted. When the statute **W.P.(C).No. 3963 OF 2011** 7 makes it mandatory to publish the determination of the building lines and control lines in respect of any category of highway or part thereof, in the gazette and in two daily newspapers by the competent authority the competent authority cannot be heard to contend that failure to do so would be having no significance or consequence. In fact, what exactly is, its effect and impact considered by this Court in the decision reported in **2008 (3) KLT 300** rendered relying on the decision of the Hon'ble Apex Court in **I.T.C.Bhadrachalam Paperboards & another v. Mandal Revenue Officer, A.P & others** reported in **1996 (6) SCC 634** . It was held that Gazette notification and news paper publication are essential part of the process of determination of building lines and control lines and for its implementation. It was also held that Section 18(2) provides the manner in which the publication is to be effected and therefore the mode prescribed by the statute must be followed and such a requirement is imperative and cannot be dispensed with. In short, going by the said decision the determination of the building line and control line would take effect only from the date of such publication prescribed under Section 18(2) of the **W.P.(C).No. 3963 OF 2011** 8 Act. In the light of the said factual and legal positions, I am of the view that Ext.R1(e) letter of the 7[th] respondent requiring the respondents 1 and 2 to stop the construction cannot be sustained at all. That apart, indisputably, prior to the issuance of Ext.R1(e) letter and also the stop memo, the petitioner had already completed the construction on the strength of Ext.P1 building permit. Add to it, there is no case for the respondents that the building line and control line have been determined. Even if, they are determined, admittedly, they were not notified and published as contemplated under Section 18(2) of the Act. In the said circumstances, in the light of the decision of this Court in **2008 (3) KLT 300,** the petitioner is entitled to get relief as sought for in this writ petition. 6. Accordingly, it is declared that respondents 1 and 2 are bound to number the building constructed by the petitioner on the strength of Ext.P1 in the property in 2.12 cents of property comprised in Survey No.194/15 of Monippally Village in Meenachil Taluk. Consequently, there will be a direction to respondents 1 and 2 to number the building constructed by the petitioner on the strength of Ext.P1 in the aforesaid property 9 ## **W.P.(C).No. 3963 OF 2011** without insisting 'No Objection Certificate' from the authorities under the Public Works Department and pass appropriate orders thereon. This shall be done as expeditiously as possible, at any rate, within a period of one month from the date of receipt of a copy of this judgment. Needless to say that this judgment will not stand in the way of initiation or continuation of any acquisition proceedings in accordance with law. **C.T.RAVIKUMAR JUDGE** dmb