Tenetowl LogoTenetowl
Supreme Court of IndiaSupreme Court · 2024Division BenchCivil Appeal No. 6096 of 2017 allowed; Civil Ap...

Mahendra Kaur Arora v. HDFC Bank Ltd

Case / Petition Number:
Civil Appeals Nos. 6096-6097 of 2017
Neutral Citation:[2024] 6 S.C.R. 280

Case Synopsis & Summary

Mahendra Kaur Arora v. HDFC Bank Ltd is a Supreme Court decision in a rent dispute arising from a 9-year commercial lease between the parties. The appellant-landlady contends that although the Bank terminated the lease in August 2004 and handed over occupancy only in June 2006, the Bank did not hand over vacant possession nor pay use-and-occupation charges, and it applied the security deposit towards rent for three months. The Bank, in turn, filed a counter claim seeking refund of the security deposit. The Rent Tribunal decreed eviction and arrears in the landlady's favour and rejected the counter claim; the Appellate Rent Tribunal allowed the Bank's appeal, setting aside the decree. The High Court's Single Judge dismissed the landlady's petition under Article 227, and the Division Bench of the High Court held the intra-court appeal not maintainable. The Supreme Court held that clause 6 of the Deposit Agreement obligates refund of the security deposit contemporaneous with the landlord’s delivery of possession, a procedure not followed here, and that there is no valid basis to disturb the Rent Tribunal's decree. The Court, while sustaining the Division Bench's maintainability finding, allowed Civil Appeal No. 6096 of 2017 and dismissed Civil Appeal No. 6097 of 2017, thereby restoring the Rent Tribunal's decree and upholding the landlady's relief.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • Hima Kohli
  • Ahsanuddin Amanullah
Judgment Date
2024-05-08
Court Decision / Holding
Civil Appeal No. 6096 of 2017 allowed; Civil Appeal No. 6097 of 2017 dismissed. Rent Tribunal’s decree restored in favour of the landlady; Division Bench’s view on maintainability upheld.
Final Disposition
Civil Appeal No. 6096 of 2017 allowed; Civil Appeal No. 6097 of 2017 dismissed.

Parties to the Case

Appellants / Petitioners

  • Mahendra Kaur Arora

Respondents

  • HDFC Bank Ltd

Legal Representation & Advocates

Counsels for Petitioners

  • • Ms. Sobha Gupta, Senior Advocate
  • • Rishi Matoliya
  • • Nikhil Kumar Singh
  • • Raghuveer Pujari
  • • Ms. Sumati Sharma

Counsels for Respondents

  • • Sandeep P. Agarwal, Senior Advocate
  • • Varun Phogat
  • • Viresh B. Saharya
  • • Himanshu Dagar
  • • Nitin Sejwal
  • • Saujanya
  • • Ms. Tanya Chanda
  • • Akshat Agarwal

Provisions of Law Cited

Constitution of India, Article 227

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant-landlady submitted that the lease agreement and the Deposit Agreement obligate refund of the security deposit contemporaneous with the Bank removing itself from the leased premises and handing over vacant possession to the landlady. Since the Bank did not hand over possession and did not refund the deposit when it vacated on 18 June 2006, the Bank’s counter claim was not payable and the Rent Tribunal’s decree in the landlady’s favour should be sustained. They argued that the Appellate Rent Tribunal’s order setting aside the decree and allowing the counter claim was erroneous in light of the deposit clause, and that the Single Judge’s order under Article 227 should not have been distorted by an intra-court appeal. They maintained that not only did the Bank fail to comply with the deposit refund condition, but also that the High Court’s division bench decision on maintainability related to intra-court appeals under Article 227, which cannot be attacked through such appeals. The senior counsel emphasized that the remedy for wrong deposit handling lies in enforcing the terms of the Deposit Agreement and Rent Act provisions, and that the rent and arrears remain with the landlady until possession is properly delivered and the deposit refunded.

Contentions of Respondents

The respondent-Bank contesting the landlady's claim argued that the Deposit Agreement terms require refund of the security deposit only upon termination of the lease and when the lessee vacates and hands over possession with the lessor, or after the lessor refuses to refund within 30 days; it asserted that the deposit refund obligation arises only on actual vacancy and delivery of possession and that the Bank's use of the premises beyond this period was not improper. It submitted that the Appellate Rent Tribunal's order correctly allowed the counter claim in light of the deposit clauses and that the Single Judge's Article 227 order could be attacked through an intra-court appeal, and that the High Court's maintainability decision was proper. It argued that the Bank's cease of possession on 18 June 2006 and the non-refundable deposit until then must be considered in the rent calculations and that the appeal should be dismissed.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,455 words•~12 min read

In The Court Record

Mahendra Kaur Arora v. HDFC Bank Ltd

[2024] 6 S.C.R. 280 : 2024 INSC 432 ## **Mahendra Kaur Arora** ## **v.** ## **HDFC Bank Ltd** (Civil Appeals No. 6096-6097 of 2017) 08 May 2024 ## **[Hima Kohli and Ahsanuddin Amanullah, JJ.]** ## **Issue for Consideration** In a petition u/Article 227 of the Constitution of India, Single Judge upheld the order passed by Appellate Rent Tribunal by which the decree passed in favour of the appellant-landlady by the Rent Tribunal was set aside and counter claim filed by the respondentBank seeking refund of the security amount was allowed. Appellant filed _intra_ court appeal which was dismissed by the Division Bench of the High Court as not maintainable. ## **Headnotes** **Lease Agreement – Respondent-Bank terminated the lease agreement by issuing three months’ notice in terms of clause 6 thereof – However, did not hand over the vacant possession of the premises to the appellant-landlady and continued occupying it – As per the appellant, the respondent also did not pay the use and occupation charges in respect of the subject premises, after adjusting the security deposit towards the rent payable for three months – Application filed by appellant seeking eviction and recovery of arrears of rent was decreed by Rent Tribunal, counter claim filed by the respondent was rejected – Appeal filed by respondent, allowed by Appellate Rent Tribunal – Appellant filed petition u/Article 227 of the Constitution of India before the High Court, dismissed by Single Judge – Appellant filed** _**intra**_ **court appeal, dismissed by Division Bench of the High Court as not maintainable:** **Held:** Language of Clause 6 of the Agreement made it abundantly clear that the respondent-Bank was liable to refund of the deposit amount contemporaneous to removing itself from the leased premises and handing over vacant possession thereof to the appellant and giving charge thereof to her, which procedure was not followed – Impugned order passed by Single Judge not [2024] 6 S.C.R.  281 ## **Mahendra Kaur Arora v. HDFC Bank Ltd** sustainable – However, order passed by the Division Bench of the High Court is maintained for the reason that no intra-court appeal could have been preferred by the appellant against an order passed by the Single Judge on a petition filed u/Article 227, Constitution of India – Judgment passed by Rent Tribunal restored and the decree passed in favour of the appellant upheld. [Paras 10, 11] ## **Constitution of India – Article 227 – Order passed in proceedings u/Article 227, maintainability of intra-court appeal:** **Held:** No intra-court appeal can be preferred against an order passed by Single Judge on a petition filed u/Article 227 of the Constitution of India. [Para 11] ## **List of Acts** Constitution of India. ## **List of Keywords** Lease Agreement; Rent Tribunal; Appellate Rent Tribunal; Nonpayment of rent; Eviction; Recovery of arrears of rent; Use and occupation charges; Termination of lease agreement; Vacant possession not handed over; Security deposit; Refund of deposit amount; Counter claim; _Intra_ court appeal. ## **Case Arising From** CIVIL APPELLATE JURISDICTION: Civil Appeal Nos. 6096-6097 of 2017 From the Judgment and Order dated 30.07.2015 in DBCSA No. 332 of 2012 and 09.01.2012 in SBCWP No. 8464 of 2009 of the High Court of Judicature for Rajasthan at Jaipur ## **Appearances for Parties** Ms. Sobha Gupta, Sr. Adv., Rishi Matoliya, Nikhil Kumar Singh, Raghuveer Pujari, Ms. Sumati Sharma, Advs. for the Appellant. Sandeep P. Agarwal, Sr. Adv., Varun Phogat, Viresh B. Saharya, Himanshu Dagar, Nitin Sejwal, Saujanya, Ms. Tanya Chanda, Akshat Agarwal, Advs. for the Respondent. [2024] 6 S.C.R. 282 ## **Digital Supreme Court Reports** ## **Judgment / Order of the Supreme Court** ## **Order** 1. The appellant-landlady is aggrieved by the judgment dated 30[th] July, 2015 passed by the Division Bench[1] as also the order dated 09[th] January, 2012 passed by the learned Single Judge in a writ petition[2] filed before the High Court of Judicature for Rajasthan at Jaipur Bench, preferred by her under Article 227 of the Constitution of India. 2. The facts of the case reveal that the appellant-owner of a commercial premises at Vashistha Marg, Raja Park, Jaipur had leased out a part of the said premises[3] to the respondent-Bank for a period of nine years in terms of the lease agreement dated 13[th] October, 2000, executed between the parties. The relevant clauses of the said lease agreement are reproduced hereinbelow : ## _**“LESSEE’S COVENANTS:**_ _2 (j) On the expiry of the said period of the lease or any renewal thereof, the Lessee shall deliver the demised premises in such order and condition as in consistent with the terms, covenants and conditions on the part of the Lessee herein contained (save and except damage to the demised premises by the fire unless the fire has occurred due to negligence of the Lessee), riots, earthquake, storm, war, civil commotion, acts of God and other conditions over which the Lessee shall have no control) SUBJECT ALWAYS to what is stated hereinafter._ ## _**ASSIGNMENT/TERMINATION/RENEWAL**_ _6 (a) The Lessee shall be entitle to assign or sub-let or otherwise allow use and occupation of the demised premises or any part thereof to its business associates, affiliate companies but not beyond the tenure of this lease or renewal thereof (if any) , as mentioned hereunder._ _(b) Notwithstanding anything contained herein, the Lessee shall always be entitled, without assigning any reason, to_ > 1 D.B. Civil Spl. Appeal (Writ) No.332 of 2012 > 2 S.B. Civil Writ Petition No.8464 of 2009 > 3 Shop No.485 and basement [2024] 6 S.C.R.  283 ## **Mahendra Kaur Arora v. HDFC Bank Ltd** _terminate this lease at any time before the expiry of the tenure of this lease or any renewal period (if any) thereof, by giving to the Lessor three months’ prior notice in writing_ .” 3. In terms of the lease agreement, the agreed monthly rent of the premises was fixed at ₹28,625/- (Rupees Twenty eight thousand six hundred twenty five only). Vide letter dated 10[th] May, 2004, the respondent-Bank terminated the lease agreement by issuing a three months’ notice in terms of clause 6 thereof. The said notice period was made effective from 16[th] August, 2004. 4. It is the version of the appellant-landlady that the respondent-Bank did not hand over the vacant and peaceful possession of the leased premises to her and instead, continued occupying the subject premises upto 18[th] June, 2006, when the keys were finally handed over to her. It is also the stand of the appellant-landlady that the respondent-Bank did not pay her the use and occupation charges in respect of the subject premises from 16[th] August, 2004 till 20[th] February, 2006, after adjusting the security deposit of ₹85,875/(Rupees Eighty five thousand eight hundred seventy five only) towards the rent payable for three months. 5. Aggrieved by the non-payment of rent by the respondent-Bank, the appellant filed an application before the Rent Tribunal, Jaipur City, Jaipur on 20[th] February, 2006 seeking eviction and recovery of the arrears of rent. It was after institution of the aforesaid petition by the appellant-landlady that the respondent-Bank handed over the keys of the premises to her before the Presiding Officer of the Rent Control Tribunal on 18[th] June, 2006. The petition filed by the appellantlandlady was contested to the hilt by the respondent-Bank who also filed a counter claim seeking refund of the security amount along with interest @ 24% per annum compounded quarterly, w.e.f. 17[th] August, 2004, till realization. _Vide_ judgment dated 10[th] April, 2008, the rent application filed by the appellant-landlady was decreed in her favour and the counter claim filed by the respondent-Bank was rejected. 6. Aggrieved by the aforesaid decision, the respondent-Bank filed an appeal before the Appellate Rent Tribunal which was allowed vide order dated 05[th] March, 2009. As a consequence thereof, the decree passed in favour of the appellant-landlady was set aside and the counter claim filed by the respondent-Bank was allowed. The said order was challenged by the appellant-landlady by filing a petition [2024] 6 S.C.R. 284 ## **Digital Supreme Court Reports** under Article 227 of the Constitution of India before the High Court which was dismissed by the learned Single Judge _vide_ order dated 09[th ] January, 2012. Instead of approaching this Court for relief against the said order, the appellant filed a misconceived intra court appeal that has been dismissed by the Division Bench of the High Court as not maintainable _vide_ order dated 30[th] July, 2015. Both the orders are under appeal before us. 7. Ms. Shobha Gupta, learned Senior counsel appearing for the appellant-landlady submits that the learned Single Judge has erred in upholding the order passed by the Appellate Rent Tribunal whereby the decree passed in favour of the appellant-landlady was set aside inasmuch as the Court failed to appreciate the fact that the notice dated 10[th] May, 2004 issued by the respondent-Bank referred to its proposal to handover possession of the subject premises on 16[th] August, 2004. It is urged that the security deposit could have been refunded to the respondent-Bank contemporaneous to handing over vacant and peaceful possession of the premises to the appellantlandlord, which in the instant case was not done. It is therefore, submitted that the obligation cast on the appellant-landlady to refund the security amount in terms of the lease agreement did not arise till the respondent-Bank actually vacated the subject premises which admittedly remain in its possession till 18[th] June, 2006. 8. _Per contra_ , Mr. Sandeep P. Agarwal, learned Senior counsel appearing for the respondent-Bank seeks to rely on the terms and conditions of the lease agreement and, in particular clauses of the Deposit Agreement dated 13[th] October, 2000. Clauses 6 and 8 of the Deposit Agreement read as follows : - _“6. It is agreed by and between the parties hereto that on the said Lease Agreement of any renewal thereof expiring by efflux of time or coming to an end for any reason whatsoever as provided in the said Lease Agreement the Lessor shall refund (without any deduction on any account and without interest) the said deposit to the Lessee simultaneously with the Lessee removing itself/ its officers / employees using the leased premises from and vacating the leased premises and giving charge thereof to the Lessor (reasonable wear and tear, damages/ Loss to / destruction of the leased premises by fire not caused_ [2024] 6 S.C.R.  285 ## **Mahendra Kaur Arora v. HDFC Bank Ltd** _by the willful neglect on the part of the Lessee, its officers /employees using the leased premises, Civil commotion, riots, air attack, act of God and anything else beyond the control of the Lessee excepted).”_ 8. In the event the Lessor does not refund the said deposit to the Lessee in full, at the time of the said Lease Agreement or any renewal thereof comes to an end, as aforesaid, then the consequences mentioned in para nos. i) to iii) hereunder shall follow: - i) The Lessee shall (without prejudice to its rights and remedies in law) , not be obliged or bound to vacate and give charge of the leased premises to the Lessor and the Lessee shall be entitled to use or permit, the leased premises to be used by any person of its choice without being liable to pay any rent, outgoings or damages to the Lessor until such time as the Lessor does not refund to the Lessee the said deposit in full ; and - ii) In addition, the Lessor shall be liable to pay to the Lessee interest @ 24% p. a. compounded quarterly, on the said deposit from the date of termination or expiry of the said Lessee Agreement or any renewal thereof till the date of refund of the said deposit by the Lessor to the Lessee; and - iii) _In the event the Lessor is unable to return the deposit as aforesaid for a period of 30 days from the date it becomes due, the Lessee shall be liberty to further sub- let the leased premises for period of not less than 12 months at a time on such terms and conditions as the Lessee may in its absolute discretion may deem fit”_ 9. It is the stand of the respondent-Bank that in terms of the aforesaid clauses of the Deposit Agreement, the appellant-landlady was under an obligation to refund the security deposit to the respondent-Bank at the time of handing over vacant and peaceful possession of the leased premises, which she failed to do and therefore, the aforesaid clauses entitle the respondent-Bank to continue using the leased [2024] 6 S.C.R. 286 ## **Digital Supreme Court Reports** premises itself or by any other person of its choice without any liability to pay any rent/outgoings/damages. 10. We are afraid, the aforesaid argument advanced by learned counsel for the respondent-Bank is not persuasive. The language of Clause 6 of the Deposit Agreement makes it abundantly clear that the respondentBank was liable to refund the deposit amount contemporaneous to the Bank removing itself from the leased premises and handing over vacant possession thereof to the appellant-landlady and giving charge thereof to her, which procedure in the instant case, had not been followed. There is nothing on record to demonstrate that any steps were taken by the respondent-Bank calling upon the appellantlandlady to remain present at the subject premises for purposes of handing over/taking over possession of the leased premises on a particular date and time and giving charge thereof to her for her to refund the security deposit simultaneously to the respondent-Bank. 11. For the aforesaid reasons, we are unable to sustain the impugned order dated 09[th] January, 2012 passed by the learned Single Judge that has upheld the order dated 05[th] March, 2009, passed by the Appellate Rent Tribunal, Jaipur. However, the order dated 30[th] July, 2015 passed by the Division Bench of the High Court is maintained for the reason that no intra-court appeal could have been preferred by the appellant-Landlady against an order passed by the learned Single Judge on a petition filed under Article 227 of the Constitution of India. As a result, Civil Appeal No. 6096 of 2017 is allowed, the judgment dated 10[th] April, 2008 passed by the Rent Tribunal is restored and the decree passed in favour of the appellant-landlady is upheld. Civil Appeal No. 6097 of 2017 is however dismissed as there is no error in the finding returned by the Division Bench of the High Court regarding maintainability of an appeal against the order dated 09[th] January, 2012, passed in proceedings under Article 227 of the Constitution of India. Parties are left to bear their own expenses. _Result of the case:_ Civil Appeal No. 6096 of 2017 allowed; Civil Appeal No. 6097 of 2017 dismissed. _Headnotes prepared by:_ Divya Pandey
End of Judgment Record
Browse All Supreme Court of India (2024) Decisions
2024-04-09

Kizhakke Vattakandiyil Madhavan (Dead) Thr. Lrs. v. Thiyyurkunnath Meethal Janaki and Ors

This appeal concerns partition of a family property in Eravattur, Kozhikode, governed by pre-1956 Mitakshara succession. Madhavan died before 1910; his widow Chiruthey remarried Neelakandan, triggering Section 2 of the Hindu Widow’s Remarriage Act, 1856, which extinguishes a widow’s rights in her deceased husband’s property on remarriage. Chiruthey’s second marriage, and a sequence of instruments dated 1910–1925—back-to-back deeds creating a lease in favour of Cheriyamma and her son (Exhibits A-20 and A-1) and an assignment (Exhibit A-2)—formed the basis for Chandu (the plaintiff) and Sankaran’s successors-in-interest to seek partition in OS 157/1985. The Trial Court granted partition to the plaintiff; the First Appellate Court dismissed; the Kerala High Court restored the Trial Court’s decree. The Supreme Court, however, allowed the appeal. It held that on remarriage the widow’s title over Madhavan’s property stood lapsed under Section 2; yet the back-to-back deeds involved Nangeli (Madhavan’s mother) and Sankaran, who retained an interest. Exhibit A-20 was treated as a valid conveyance, but Chiruthey’s own title did not survive; the lease purportedly created by A-1 could not extend beyond its 12-year term. Consequently, the plaintiff’s claim for partition could not be sustained, and the appeal was allowed with the trial/decree of the lower courts set aside.

2024-10-04

Banshidhar Construction Pvt. Ltd. v. Bharat Coking Coal Limited & Others

Banshidhar Construction Private Limited (the appellant) challenged Bharat Coking Coal Limited’s tender for a mega project to salvage, develop, and operate a coal mine under a revenue-sharing arrangement for 25 years. The tender NIT dated 16.08.2023 imposed stringent eligibility criteria, including Clause 10 requiring financial capacity documentation and a Power of Attorney for signing bids. The appellant contended that its Power of Attorney (dated 07.11.2023 and notarised 14.11.2023) was valid, and its bid documents were uploaded before the last submission date (01.12.2023). Technical bids opened on 04.12.2023, yet the appellant was declared technically disqualified on 06.05.2024 on grounds that it did not meet Clause 10. Meanwhile, Respondent No.8 was declared technically qualified and later found to be the successful bidder after financial bids were opened on 07.05.2024, despite non-compliance with the “mandatory” Clause 10 documents, including delayed Audited Balance Sheets. The High Court dismissed the writ petition. The Supreme Court, while acknowledging limited review in mega-project tenders, held that public authorities must act with fairness, transparency, and without arbitrariness or malafides. It held that the Power of Attorney requirement was satisfied and that accepting the non-compliant Respondent No.8 while rejecting the appellant was arbitrary. The Court set aside the impugned decision and permitted a fresh tender process in accordance with law, reaffirming that Article 14 requires equal treatment and non-arbitrariness in public procurement.

2024-03-21

Union of India v. M/s Indian Oil Corporation Ltd.

This Supreme Court judgment concerns an appeal by the Union of India challenging a batch of Allahabad High Court orders that directed refunds to IOCL for a difference of approx. 110 km in freight charges on the Baad–Hisar route. IOCL had been charged on the basis of a distance of 444 km under the old Local Distance Table; following Railway Ministry circulars in 2004 and 2005 rationalizing the rounding-off of chargeable distance, the distance was reduced to 333.18–334 km in practice. IOCL issued notices under Section 106 of the Railways Act, 1989 (formerly Section 78-B of the Railways Act, 1890) seeking refunds of the alleged overcharge, and 122 consignments were paid at the old distance before the authorities corrected the distance. The Railway Claims Tribunal dismissed most claims as time-barred, while the Allahabad High Court allowed IOCL’s appeals, holding that the original 444 km charge was an “illegal charge” rather than an overcharge, and thus protected by equity. The Union of India challenged this, arguing that Section 106(3) only covers refunds of overcharges and not illegal charges; that the change in distance stemmed from policy rationalization and circulars, not an erroneous charge. The Court distinguishes Hindustan Petroleum, clarifies the overcharge/illegal charge distinction, and ultimately holds that the 444 km distance was illegal. As a result, the Union’s appeals are dismissed, and IOCL’s refunds for the difference would be payable to IOCL. The matter underscores the nuanced interplay between statutory time limits, chargeable distance, and the nature of the charge in refund claims.

2024-07-23

Gene Campaign & Anr. v. Union of India & Ors.

This is a batch of writ petitions initiated in 2004–2005 addressing the environmental and regulatory treatment of GM crops, specifically the environmental release of transgenic mustard DMH-11 (Dhara Mustard Hybrid-11). The Supreme Court examined whether GEAC’s 18.10.2022 conditional approval and the 25.10.2022 decision were legally sound, whether they violated Article 21 (right to a safe environment) and whether the precautionary principle was properly applied. The court undertook a comprehensive review of the regulatory framework under the Environment Protection Act, 1986 and the 1989 Rules, as well as the Technical Expert Committee (TEC) reports and Parliamentary Standing Committee recommendations. A key feature is the dual opinions: Justice Nagarathna (with Justice Karol concurring but delivering a separate opinion) upheld a robust judicial review of executive policy in GM regulation and found serious irregularities in the decision-making process, quashing the impugned approvals and directing a national policy on GM crops, greater public transparency, and safe-guarded field testing. Justice Karol, in a separate opinion, while endorsing the need for precaution, cautioned against an outright ban on HT crops and emphasized policy matters be left to the legislature. The judgment thus emphasizes environmental rule of law, public trust, intergenerational equity, and a precautionary approach, while mandating further regulatory reform and public participation.