Supreme Court of IndiaSupreme Court · 2003Division BenchAppeals disposed of; no costs.

M. Haroon Ansari v. District Collector, Rangareddy, Andhra Pradesh

Case / Petition Number:
Civil Appeal Nos. 1907B-1908 of 2000; CA Nos. 1909-1910, 1911-1912 and 1913-1914 of 2000
Neutral Citation:SUPREME COURT REPORTS [2003] SUPP. 6 S.C.R.

Case Synopsis & Summary

This Supreme Court decision arises from Public Interest Litigation filed in the Andhra Pradesh High Court challenging illegal blasting and crushing of granite near residential areas and a Ground Level Service Reservoir (GLSR) in Rangareddy district. The High Court had ordered a study by an Expert Committee which recommended a safe distance of 1 kilometer between quarry sites and residential localities/GLSR, but later extended it to 2 kilometers. On appeal, the Supreme Court appointed another Expert Committee, including specialists from the Indian School of Mines, Dhanbad, which concluded that a 1-km distance is adequate if proper safeguards are adopted. The Court examined reports from the Centre of Mining Environment, ISM, and the Pollution Control Board, noting that air, water, and noise pollution concerns could be mitigated with compliance to prescribed safeguards and monitoring. The Court held that a rigid 2-kilometer ban is unnecessary and directed that 1 kilometer should be treated as the safe distance between quarry leases and residential localities or GLSR and Osmansagar lake. It emphasized that the Pollution Control Board can enforce conditions and that other safeguards in the High Court’s order should remain. The appeals were disposed of with no costs, balancing public health concerns and environmental safeguards with practical enforcement.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • S. Rajendra Babu
  • G. P. Mathur
Judgment Date
2003-12-12
Court Decision / Holding
Appeals disposed of; 1-km safe distance between quarry sites and residential localities/GLSR/Osmansagar lake is to be treated as safe; 2-km restriction is not required. The Pollution Control Board must enforce conditions and the High Court’s safeguards remain in effect where applicable. No costs.
Final Disposition
Appeals disposed of; no costs.

Parties to the Case

Appellants / Petitioners

  • Mohammed Haroon Ansari
  • Anr.

Respondents

  • The District Collector, Rangareddy District, Andhra Pradesh

Legal Representation & Advocates

Counsels for Petitioners

  • • K.N. Rawal
  • • Solicitor General, (A.C.)
  • • R. Mohan
  • • P. Niroop
  • • R. D Chandrashekhar Reddy
  • • Pavan Kumar
  • • Hari Shankar K.
  • • A.T.M. Sampath
  • • V. Balaji
  • • G. Ramakrishna Prasad
  • • Md. Wasay Khan
  • • K.C. Sudarshan
  • • D. Mahesh Babu
  • • Nikhil Nayyar
  • • Mrs. Unnila Sirur
  • • T.V. Ratnam
  • • K. Subba Rao
  • • Anil Todale
  • • Guntur Prabhakar

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioners contended that illegal blasting and quarrying near the GLSR and residential localities causes fine dust and potential health hazards, including silicosis, and that the authorities must enforce a strict safe distance and robust safeguards; they urged adherence to environmental safeguards and prevention of pollution by keeping quarrying activities away from water reservoirs and populated areas.

Contentions of Respondents

The respondents argued that expert studies, including those by the Center of Mining Environment, ISM, and affidavits from the Pollution Control Board, show no significant adverse impact at a 1-km distance when safeguards are followed; they contended that a 2-km ban is unnecessary and that proper regulatory controls suffice to protect the GLSR and Osmansagar lake.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,234 words•~15 min read

In The Court Record

M. Haroon Ansari v. District Collector, Rangareddy, Andhra Pradesh

A # MOHAMMED HAROON ANSARI AND ANR. _v._ THE DISTRICT COLLECTOR, RANGA REDDY DISTRICT, A.P. DECEMBER 12, 2003 ## [S. R.AJENDRA BABU AND G.P. MATHUR, JJ.] B ## _Environment :_ _Pollution-Mining activities-In residential locality-Impact on Ground Level Service Reservoir (GLSR):-Safe distance-Maintaining of-'-_ C _Expert Committee appointed by High Court recommended a safe distance of 1 KM-However, High Court extended it to 2 KM-On appeal, Supreme Court appointed an Expert Committee-Accepting the Committee's report, Held : 1 KM is a safe distance between the site of the quarry leases and residential locality or GLSR._ D A Petition in the nature of a public interest litigation was filed in the High Court praying for a direction to the respondents to take action against the illegal blasting an" crushing of granite stones as it was causing dust pollution in the residential are~s. The expert committee appointed by the High Court recommended that mining activities E could take place beyond a safe distance of 1 KM. However, the High Court directed that no quarry lease should be granted within a distance of 2 KM from the residential locality or Ground Level Service Reservoir. On appeal, this Court appointed an expert committee, which also F recommended a safe distance of 1 KM. ## Disposing of the appeal, the Court HELD : 1.1. It is unnecessary to impose a condition that the distance of 1 KM for carrying out· the quarry activities should be G converted to 2 KM. The affidavit of Pollution Control Board indicates that if proper safeguards are adorted as indicated in the said affidavit, it will not cause any air, water or noise pollution, much less, dust particles affect the water supply system in Ground Level _Service_ Reservoir (GLSR). [722-F-G] H 715 716 SUPREME COURT REPORTS [2003] SUPP. 6 S.C.R. A 2. It is, therefore, directed that the order made by the High Court be modified by directing that the distanc~ of 1 KM is a safe distance between the site of the quarry leases and the residential localities or GLSR. (722-G-HJ CIVIL APPELLATE JURISDICTION .Civil Appeal Nos. 1907B 1908 of 2000. From the Judgment and Order dated 17.10.97 ofthe Andhra Pradesh High Court in W.P. No. 7326/97 and Order dated 2.12.97 in W.P.M.P. No. 33976 of 1997. c ## WITH C.A. Nos. 1909-1910, 1911-1912 and 1913-1914 of 2000. K.N. Rawal, Solicitor General, (A.C.), R. Mohan, P. Niroop, R. D Chandrashekhar Reddy, Pavan ~umar, Hari Shankar K., A.T.M. Sampath, V. Balaji, G. Ramakrishna Prasad, Md. Wasay Khan, K.C. Sudarshan, D. Mahesh Babl, Nikhil Nayyar, Mrs. Unnila Sirur, T.V. Ratnam, K. Subba Rao, Anil T j°dale and Guntur Prabhakar for the appearing Parties. E The Judgment of the Court was delivered by RAJENDRA BABU, J. : On the basis of a letter sent to the Chief Justice of the High Court of Andhra Pradesh, a petition in the nature of public interest litigation was entertained to direct the respondents to take action against the illegal blasting and cr~shing of granite for concrete metal F in the areas of the Goldodi, Nanakramguda, hills ofKhanapur and Kokapet in Rangareddy District as a result of which a lot of fine granite silica dust is entering into the atmosphere which causes a disease called 'Silicosis' to the residents nearby. Two writ petitions were filed by the appellants in Civil Appeal Nos. 1907-1908/2000 calling for records of proceedings G before the Assistant Director of Mines and Geology, Hyderabad in respect of grant of lease over an extent of 5 acres in survey No. 239 of Kokapet village, ·Rangareddy District, for quashing the same and for granting appropriate consequential reliefs. Similarly, certain other -persons also filed writ petitions challenging the action of the Government in stopping H the mining operations in different areas of Kokapet village. ## M.H. ANSARI _v._ DISIT. COLLECTOR, RANGA REDDY [RAJENDRA BABU, J.] 717 The High Court called for a report from the Assistant Director of A Mines and Geology. The said Report revealed that there are four quarry leases and three stone crushers in Kokapet village, Rajendranagar Mandal; that the quarries and crushers are at a distance of 2 kms to the South of Kokapet viii.age and 20 kms from Hyderabad; that the ground level water reservoir of Hyderabad Metropolitan Water Works and Sewerage ~oard B is located at a distance of 1 km from the stone quarry, which supplies water to the city of Hyderabad; that the Osmansagar lake is also located at about 3 kms South West of these quarries and crushers. After receipt of the Report of the Assistant Director of Mines and Geology, the High Court impleaded 17 stone industries and also directed issue of notice to the Go_vernment of Andhra Pradesh to appoint a Committee of Experts to C examine whether quarrying, crushing and blasting activities close to Osmansagar lake and the ground level water reservoir of Hyderabad Metropolitan Water Works and Sewerage Board are _endangered by such_ operations and submit a report of the said Committee to the High Court. D A Committee, consisting of Shri T. Chattarjee, Member Secretary, A.P. Pollution Control Board, Shri K.P. Chandrasekhar Rao, Director (Technical), Hyderabad Metropolitan Water Works and Sewerage Board, Shri K.V. Rao, Shri T.V. Chowdary, Director of Mines and Geology, Hyderabad and Shri P. Babu Rao, Director, Ground Water Department, E submitted its report on 4.8.1997. Conclusions and recommendations of the Committee are as under :- "(1) As a result of blasting in the quarries, within a radius of 1 k.m. the shock waves which are generated, pass through the joints especially the horizontal joints and create vibrations in the nearby _p_ areas. The reservoir which is close by is also within the range of its impact. Higher than present intensities of blasting will definitely cause damage to the reservoir structure. Thus, blasting and quarrying within a range of 1 k.m., already prohibited, must not be permitted. G (2) To prevent unathorisied quarrying, it is suggested that the approach road must be closed after the gateway of the GLSR and all activities of unauthorised quarrying must be stopped forthwith. Security staff can be contracted for the purpose by the GLSR authorities. H · 718 SUPREME COURT REPORTS [2003) SUPP. 6 S.C.R. A - (3) The authorised quarry and crusher company will lose approach and can be permitted to build another approach to their facilities from the Eastern side. ' B c - (4) The quarries on the northern flanks of the hill range at a distance of l km from the reservoir will not have any impact on the reservoir as the joint patterns/systems in the areas. The GLSR is on one side of the dispersion point, the authorised quarries are on the other side of it. However, as a precautionary measure, the intensity of blasting must be kept at the minimum by fixing the limit of number holes, depth of hole. and quantity of explosive per blasting. - (5) There is no impact on Osmansagar lake due to blasting beyond I km radius." D However, the High Court, after noticing various aspects attributed to in the Report, held as follows :- E F "The distance of 1 kilometre, according to expert committee is a safe distance between the site under quarry lease and the residential locality or GLSR. In fact, the distance between them is not only to he safe, but it should be safer. As the residents of the village situated nearby are experiencing tremors as well as dust pollution, it is always better that no quarry lease should be granted within a distance of2 kilometers in future. Therefore, respondents 7 to 23 cannot operate quarry ieases and stone crushers. It is, ~owever, open to them to apply for areas for quarry lease beyond 2 kilometers from residential areas and GLSR." On the basis of this conclusion, the High Court set aside the leases granted in favour of 17 respondents, including the appellants in these G appeals before us. The order of the High Court is in challenge in these appeals. When the matter came up before this Court, by an order made on 17.2.1998, this Court stayed the order of the High Court in so far as the appellants before this Court is cor.cerned and restrained.the appellants from H carrying on any mining and stone crushing operations within a distance of M.H. ANSARI _v._ DISIT. COLLECTOR, RANGA REDDY [RAJENDRA BABU, J.] 719 > I kilometer from the lake or service reservoir and 500 meters from human A habitation. Subsequently, this Court granted leave in all these matters and, by an order made on 4.3.2003, asked the parties to get a report from a > competent institution or organisation which has experience in the field to make a proper assessment as to the impact on the GLSR in relation to the activities carried on by the stone crushers and quarries and file a report. B The said Report has been made by Center of Mining Environment, Indian School of Mines, Dhanbad making an assessment of the impacts of stone quarries and stone crushers on the ground level service reservoir on the banks of Osmansagar lake on the outskirts of Hyderabad city. The said Committee consisted of Prof. N.C. Saxena, Professor and Dean who was c a mining engineer and mining environment expert having over 35 years experience, Prof. Gurdeep Singh, Head, Center of Mining Enviroriment > who was an expert on environmental pollution having over 20 years experience, Dr. (Mrs.) Rekha Ghosh, Asst. Prof. who was environmental geologist and hydrogeologist having over 35 years experience and Dr. A.K. > Pal, Asst. Prof. who was an expert in environmental pollution having 20 D years experience. The Committee, after studying the area, nature of mining activities, change in land use, topography, ground vibrations due to blasting, air quality assessment, water quality assessment, noise quality assessment, concluded as follows :- ## _"Impacts on Ground Level Service Reservoir (GLSR)_ E • As seen in Fig. 1 a the GLSR lies on the opposite flank _cf_ the hill with respect of the sites of the quarries of Mis Saleem Metal Industries,, M/s Sulfi Metal Industries, and Mis Al-Hira Metal Industries at an aerial distance of about 1.2 km. F • The blast vibration studies at the site of GLSR indicated that the level of the vibrations for the nature of blasting done at the quarries was such that it was below the lowest detectable limit of the instrument (0.51 mm/sec) and hence below the permissible G limit (10 mm/sec for dominant frequency >25 Hz) for the objects of historic importance and sensitive structures. Therefore, the GLSR is not likely to be affected by blasting at the quarries of Mis Saleem Metal Industries, Mis Sulfi Metal Industries, and M/s Al-Hira Metal . Industries. 4 H 720 ## SUPREME COURT REPORTS [2003] SUPP. 6 S.C.R. A B c D • It is observed from the wind-rose diagram in Fig. 8 that the predominant wind direction in the area was from the side of the ·GLSR towards the quarries and crusher sites ofM/s Saleem Metal Industries, _Mis_ Sulfi Metal Industries, and _Mis_ Al-Hira Metal Industries. The concentrations of SPM, RPM, Ox and S02 in the air were well withi.!1. the permissible limits of 200 ug/m3, 100 ug/m3, 80 ug/m3 and·80 ~g/m3 respectively for residential areas. The concentration of PBS ·in the ambient air was below the detectable limit of <0.6 mg/m3. Hence, the activities at the quarries and the stone crushers were not causing any air pollution · at the site of GLSR. • The drainage/watershed (Fig. 2) study indicates that the GLSR and the quarries and stone crushers of M/s Saleem Metal Industries; Mis Sulfi Metal Industries, and Mis Al-Hira Metal Industries lie in two different watersheds. Hence,. the run-off from the quarries and stone crushers cannot reach the site of the GLSR. Thus, there is no question of water at GLSR getting polluted due to the activities at these quarries and cru_shers. ## _Impacts on Osmansa'gar Lake_ E F G H • As seen in Fig. la Osmansagar lake lies on the opposite side of the hill from the sites of the quarries and stone crushers of M/s Saleem Metal Industries, _Mis_ Sulfi Metal Industries, and M/s Al-Hira Metal Industries at a distance of about 1.5 km. The dam of the lake is at a distance of about 4 km from the quarries. Als.o the lake lies in a different area/watershed as is evi.dent from the drainage map of the area shown in Fig: 2. Hence, the runoff from the quarries and stone crushers. can not reach the lake and pollute the water in the lake. • The water quality studies for the lake water (samples W7 & W8) indicate that the quality of the water available in the lake was conforming to the potable water standards (IS· 10.500) • The ground vibrations due to blasting at the quarries of _Mis_ Saleem Metal Industries, Mis Sulfi Metal Industries, and _Mis_ AlHira Metal Industries would not reach the darn site of the lake as ## M.H. ANSARI _v._ DISTI. COLLECTOR, RANGA REDDY [RAJENDRA BABU, J.] 721 its distance was about 4 km from the mines and the vibration A observations at GLSR at a distance of about l .tkm indicates that the level of the vibrations was below the measuring limit of the instrument. • In view of the above discussions Osmansagar lake is not likely B to be affected in any manner due to mining and stone crushing activities of _Mis_ Saleem Metal Industries, _Mis_ Sulfi Metal Industries, and _Mis_ Al-Hira Metal Industries. ## _Impacts on Kokapet Village_ Kokapet village lies at a distance of about 2 km from the site of the quarries and stone crushers of _Mis_ Saleem Metal Industries, _Mis_ Sulfi Metal Industries, and _Mis_ Al-Hira Metal Industries. The mining and stone crushing operations of these industries would not affect the village in any manner because of the D following reasons : • The village being at a distance of about 2 km would not receive the blast vibrations to affect any building or structure because the level of the vibrations at a distance of 1.2 km at the site of the GLSR was below the detectable limit of the ihstrument. E • The ambient air quality at the village was good as the concentrations of the SPM, RPM, Nox, So2 and Pb in the ambiettt air were well below the permissible limits for the residential areas (24 hour average). Hence, the quarrying and stone crushing activities F at Mis Saleem Metal Industries, Mis Sulfi Metal Industries, and _Mis_ Al-Hira Metal Industries were not causing any air pollution problem at the village. • The village would also not receive any run-off from the site of the quarries and the stone crushers because even if being in the G same drainage system the run-off will be arrested in the water impoundment before the village." We called upon the Pollution Control Board to respond to the Report submitted by the Center of Mining Environment, Dhanbad, but the H 722 SUPREME COURT REPORTS (2003] SUPP. 6 S.C.R. A Pollution Control Board has v not contradicted what has been stated in the said Report. On the other hand, it was averred by them that (a) the RSPM, SPM NOX and S02 are within the Ambient Air Quality Standards prescribed for residential zones, (b) Noise levels are also within the permissible limits at some crushers, (c) the run off from the stone crushers B reaches in the downstream of Osmailsagar lake, that is, Musi river as seen from the drainage map. Pollution Control Board further stated in their affidavit that :- ## c ## D "The impact studies done by the Indian School of Mines, Dhanbad concluded that there will not be any adverse impacts on GLSR or Osmansagar lake due to the mining and stone crushing activities of the three crushers which are located about 1.2 km away from GLSR. From this observation, it can also be concluded that there will not be any impact on GLSR or lake from any other existing crushers as they are further away from these three crushers on which studies are made by the ISM." We may, at once, notice that the High Court was persuaded by public interest involved in the matter in initiating proceedings on the basis of a letter sent to it. The anxiety of the High Court was further exhibited by E its concern in the matter in constituting an expert committee and although that Expert Committee stated that a distance of 1 km is a safe distance between the site under quarry lease and the residential locality or GLSR, but in order to be safer than what the Expert Committee observed, the High Court increased the distance by another 1 km. Particularly when the assessment made by the Center of Mining Environment, Indian School of F Mines, Dhanbad, concluded that there is no impact by the quarry operations carried on by the appellants before us on the GLSR or Osmansagar lake or nearby residential locality, it is unnecessary to impose condition that the distance of I km for carrying out the quarry activities should be converted to 2 km. The affidavit of Pollution Control Board indicates that G if proper safeguards are adopted as indicated in the said affidavit, it will not cause any air, water or noise pollution, much less dust articles affect the water supply system in GLSR or Osmansagar lake. We, therefore, direct that the order made by the High Court is modified by directing that the distance of 1 km is a safe distance between the site of the quarry leases H and the residential localities or GLSR or Osmansagar lake. The guidelines MJI. ANSARI _v._ DISTI. COLLECTOR, RANGA REDDY [RAJENDRA BABU, J.] 723 - issued by the Andhra Pradesh Pollution Control Board specified I km to A be safe distance between crusher and human habitation from 17.01.1997. Prior to that it was only 500 meters away from national Highway and 100 meters away from the State Highway, Major District roads and other roads. That is why this Court granted an interim order earlier and directed that no mining and stone crushing operations shall be carried on within a B distance of 1 km from lake or reservoir and 500 meters from human habitations. This order will hold good in respect of all such mining leases which have been granted pnor to 17 .12.1996. It is not necessary to advert to any other details or arguments raised in the petitions filed before the High Court or in appeals before this Court. Suffice it to observe that the C impugned order of the High Court shall stand modified only to the extent indicated by us and all other terms set out by the High Court in regard to the safeguards to be adopted in maintenance of environment shall remain intact. Further, it is certainly necessary that the appellants before carrying on any of the mining and stone crushing activities obtain necessary clearance from the Pollution Control Board and must comply by such D conditions as may be imposed by the Pollution Control Board. It is open to the Pollution Control Board to take such action as may be necessary to enforce the conditions imposed by them under the relevant statutes. > The appeals shall stand disposed of accordingly. No costs. E v.s.s. Appeals disposed of.
End of Judgment Record
Browse All Supreme Court of India (2003) Decisions
2003-09-22

State of Punjab v. Pohla Singh and Anr.

This is a Supreme Court of India decision (September 22, 2003) arising from Criminal Appeal No. 901 of 1996, where the State of Punjab challenges acquittal by the Punjab and Haryana High Court of two respondents for offences under Section 302 read with Section 34 IPC. The trial court had convicted Pohla Singh and Balkaur Singh for homicidal death of Mandip Singh around 5.30 a.m. on 11 June 1991; the other two accused were given the benefit of doubt. The High Court acquitted the two respondents on the ground of delay in lodging the FIR and questioned the time of occurrence, treating these as improbable factors that undermined the prosecution case. The State contends that there is no embargo on appellate review of acquittals and that the High Court’s reasoning rests on surmises and conjectures, ignoring the eye-witnesses’ detailed testimony and the trial court’s careful evaluation. The Supreme Court agrees to re-appreciate admissible evidence to prevent miscarriage of justice, noting that unexplained delay, standing alone, is the relevant factor, and that the prosecution need not answer every hypothetical question. It faulted the High Court’s approach, upheld the credibility of witnesses, reversed the acquittal, and restored the trial court’s verdict, directing the respondents to serve their sentences.

2003-05-01

Parwati Bai v. Radhika

This Supreme Court decision concerns eviction of a sub-tenant from municipal non-residential premises in Khargaon, Madhya Pradesh. The appellant (Parwati Bai) had leased the premises from the Municipal Council and sub-let to the respondent (Radhika). The ownership of the premises vested in the municipality, and the landlord sought eviction on the ground of non-payment of rent and need for self-occupation under the Transfer of Property Act, while contending that the Madhya Pradesh Accommodation Control Act, 1961 should not apply since the property is owned by a local authority used for non-residential purposes. The Trial Court and the First Appellate Court, and the High Court, held that the accommodation-control Act applied and dismissed the eviction suit for lack of proven grounds under Section 12. The Supreme Court held that the premises, being owned by a local authority, are immune from the Act itself, and between the landlord (appellant) and sub-tenant (respondent), the landlord-tenant relationship arises with the municipality as the landlord. The key issue is whether tenancy was terminated validly under Section 106 of the Transfer of Property Act; there is no infirmity in the notice. Consequently, the appeal is allowed: the suit for eviction is decreed, the respondent to vacate within six months (with undertaking), rent arrears to be determined by the Executing Court, and no order as to costs. The decision aligns with existing rulings on premiss-based immunity and the applicability of transfer-only remedies.

2003-03-31

T. Lakshmipathi v. P. Nithyananda Reddy

This Supreme Court judgment deals with an eviction challenge under the Andhra Pradesh Buildings (Lease, Rent and Eviction) Control Act, 1960, over a property in Chittoor whose ownership status arose from a partition among co-owners. Respondent No. 1, P. Nithyananda Reddy, remained a co-owner and landlord after partition, while several co-owners sold their interests. Tenants of the property temporarily yielded possession to transferees (appellants Nos. 3–5) and later to appellants Nos. 1–2 through sale deeds; eviction petitions were filed on grounds of bona fide need and rent arrears. The Rent Controller decreed eviction, confirmed by the Appellate Authority and High Court. The central issue was whether eviction could proceed when tenancy rights persisted despite transfers, and whether the doctrine of merger could terminate the tenancy. The Court held that merger requires complete coalescence of the lessee’s and lessor’s interests in the whole property at the same time in one person; because the appellants acquired only a portion of the co-owners’ interests, there was no merger, and tenancy rights remained. Demolition of the superstructure by tenants did not destroy the tenancy since the land continued. The judgment relies on several precedents concerning co-ownership, merger, and estoppel, reinforcing that partial acquisitions do not extinguish tenancy. Consequently, the appeal was dismissed and the eviction decree upheld with costs.

2003-11-17

Nair Service Society v. District Officer, Kerala Public Service Commission and Ors.

Nair Service Society (NSS) challenged a Kerala High Court order directing the Kerala Public Service Commission (KPSC) to advise candidates from the Muslim supplementary list against not-joining-duty vacancies (NJD) in the recruitment for Sub-Engineers for the Kerala State Electricity Board (KSEB). The case turns on the Kerala State and Subordinate Service Rules, 1958, particularly Rules 14–17, which provide a rotating chain of appointments between open competition (merit) and reserved categories (SC/ST/OBC) with a 50% aggregate ceiling for reservation in any recruitment year. KPSC had prepared a main rank list of 177 and a supplementary list of 62 to satisfy reservation requirements. After the main list exhausted, KPSC advised Muslims from the supplementary list for NJD vacancies, prompting NSS to file petitions. The High Court and Division Bench had held that the supplementary list could continue to operate, even after the main list expired, to fill NJD vacancies, thereby potentially breaching the 50% ceiling. The Supreme Court held that the supplementary list has no survival once the main list is exhausted and that advising from it would violate the 50:50 rule, as envisaged by Article 16(4) and related provisions. Nevertheless, appointments already made pursuant to the impugned judgment were not to be disturbed. The appeals were disposed of with no costs.