Civil Appeal No. 7257 of 2011 This Supreme Court judgment consolidates Civil Appeal No. 7257 of 2011 and connected appeals by cellular mobile service providers (the assessees) against the Department’s demand for tax deduction at source under Section 194-H on payments to franchisees/distributors under prepaid telecommunication business models. The Court first reproduces Section 194-H and explains its contours: deduction at 5% on payments/credits by a person responsible for paying to a resident in respect of commission or brokerage, with thresholds and conditions. It clarifies that the obligation attaches only when a legal principal–agent relationship exists between the payer and the payee, and when payment/credit arises from that obligation; the expression “indirect” payment must not be used to widen the scope to genuine business arrangements where no such relationship exists. The judgment then scrutinizes the franchise/distributor arrangements of Bharti Airtel, concluding that franchisees/distributors act as independent contractors rather than agents, earning income through discounts/margins rather than remuneration paid by the payer. The court distinguishes prior rulings (including Singapore Airlines) on the basis of factual differences and emphasizes a pragmatic approach to tax provisions, urging prospective clarity if required. Consequently, 194-H does not apply to these facts, and the assessees’ appeals are allowed while the revenue’s appeals are dismissed. The decision clarifies the permissible scope of TDS in complex franchising structures and promotes a practical interpretation of obligations under tax law.
Criminal Appeal Nos. 96-97 of 2011; 995-996 of 2011; 622 of 2011; 1362-1363 of 2011 This is a consolidated Supreme Court judgment dealing with multiple criminal appeals arising from a prolonged family dispute and property contention in Nallappanahalli, Karnataka. On 15 March 1995, a survey-related dispute escalated into a violent confrontation in which two men (Kenchappa and Krishnappa) died and several others were injured, including a bomb-explosion incident allegedly caused by accused No.2. The trial court acquitted all accused; the State, challenging the acquittals, and the injured complainant, challenging the conviction, carried the matter to higher courts. The Karnataka High Court, in 2010, reversed the acquittals and convicted many accused under Section 304 Part I read with 149 IPC and under Section 324 read with 149 IPC, while acquitting some accused (10 and 12) and upholding others. The Supreme Court, by a two-judge bench, scrutinized the evidence and the legal standards governing appeals against acquittal, including the structure of common object under Section 149 IPC, the preference for consistent eyewitness testimony, and the treatment of unexplained injuries. It ultimately affirmed convictions for multiple accused under 304 Part I read with 149 and upheld the 324/149 convictions, enhanced the sentence to ten years for those convicted, acquitted some accused, and dismissed certain connected appeals, directing surrender for serving sentences.
This Supreme Court judgment revisits the interpretation and implementation of the Modified Assured Career Progression Scheme, 2008 (MACPS) with effect from 01.09.2008 and its interplay with earlier upgradations under the Assured Career Progression Scheme (ACPS) and the Sixth Pay Commission’s Revised Pay Rules. It recalls the three-judge precedent in Union of India v. M.V. Mohanan Nair and related matters, clarifying that MACPS provides for three financial upgradations at 10, 20, and 30 years, but that such upgradations are tied to the immediate next Grade Pay in the revised pay band hierarchy, not to the next promotional post. The Court discusses several subsequent authorities (R.K. Sharma, Director, Enforcement v. Sudheesh Kumar, Ex.HC/GD Virender Singh) and explains how they are to be read in light of MACPS, including the holding that earlier ACP upgradations may still count in determining MACPS benefits, and that some earlier decisions (notably Balbir Singh Turn) were effectively overruled. The judgment emphasizes that MACPS benefits are personal, not seniority-based, and must be reconciled with past upgradations and pay revisions under CCS RP Rules. It also addresses recoveries and refunds in light of State of Punjab v. Masih, directing that retirees should not bear arrears and that pension/pay scales will be redetermined prospectively from 01.01.2025. The appeals are allowed, with disposal of connected petitions.
Civil Appeal No. 2376 of 2020 This appeal arises from a long-running Rajasthan land-acquisition dispute linked to an arbitration award that quantified the compensation for 145 bighas of land out of a larger 249.60-bigha holding. The 1973 notification under the Rajasthan Land Acquisition Act led to years of litigation, culminating in an arbitration under an agreement of 1980, superseding an earlier 1979 agreement. The sole arbitrator fixed the price as of 27.11.1978, determining a total compensation of Rs. 12,18,700 for 145 bighas. The 1980 agreement contemplated sale to Hindustan Engineering & Industries Ltd. only if the price fixed by the arbitrator was accepted, with the sale deed to be executed on certain conditions. The respondent sought execution of the sale deed pursuant to the award, while the appellant argued that the award fixed price, not title, and that the agreement—subject to sale on acceptance of price—was the operative instrument. The Rajasthan High Court affirmed a 1995 executing-order directing sale-deed execution, but the Supreme Court held that the arbitration award was limited to price fixation and did not convey title or confer a right to execute a sale deed. The Court quashed the execution order, emphasized that non-registration of the award/agreement impacts enforceability, and ordered cost payments to be made to the respondent, effectively ending the dispute with a deposit-based settlement and further payment by the appellant.
Writ Petition (Civil) No.341/2022 This petition, filed under Article 32 of the Constitution, challenges the February 4, 2022 notification of the National Board of Examinations scheduling the NEET-PG 2022 on 21 May 2022, arguing it would clash with counselling for NEET-PG 2021 and violate the petitioners’ fundamental rights under Articles 14 and 21. The Court notes that NEET-PG 2022 was fixed for May 21, 2022, with registration closed on March 25, 2022, and that the petitioners had participated in NEET-PG 2021 counselling. The matter references the Court’s own observation in Shivam Satyarthee and Others v. Union of India and Others, which stated the clash had been resolved due to postponement, and cites that the new date for NEET-PG 2022 had been fixed. The petition argues for postponement by about eight weeks and for allowing those who participated in NEET-PG 2021 counselling to register for NEET-PG 2022 by extending the last date; it also asserts that doctors who served during the COVID period require fair opportunity and consideration. The respondents contend that postponement would adversely affect patient care and create cascading disruptions. Ultimately, the Court holds that the academic session has already been delayed, the policy/administrative decisions must stand, and the petition is dismissed in view of the balance of interests and public health considerations, preserving the sanctity of medical education.
Civil Appeal No. (APGENCO) 2025; arising out of SLP (C) Nos. 8998 of 2023 and 13200 of 2023 These two Civil Appeals arise from an order of the High Court of Telangana at Hyderabad under Section 11(6) of the Arbitration and Conciliation Act, 1996, directing the constitution of an Arbitral Tribunal (AT) to resolve disputes under GCC Clause 22.2. The tender process for APGENCO's Rayalseema Thermal Power Plant involved a Consortium (Tecpro Systems Ltd., VA Tech Wabag Ltd., Gammon India Ltd.) that was formed for exclusive participation in the bid. A Letter of Intent was issued in 2010, followed by three Purchase Orders; leadership of the Consortium changed after VA Tech took over and the first respondent Tecpro faced financial distress and CIRP, with payments continuing to be made to each member in agreed proportions. The first respondent invoked arbitration unilaterally, while APGENCO contended that arbitration rights attach to the Consortium as an entity, not to an individual member; the GCC is a pre-bid document, and the Purchase Orders do not expressly grant arbitration to APGENCO and the Consortium. The High Court allowed Section 11 proceedings, and referred disputes to arbitration. The Supreme Court held that Section 11(6) scrutiny is limited to prima facie existence of an arbitration agreement; the AT must decide on capacity, authority, and other objections under Section 16 after referral. It relied on Cox & Kings and other precedents to emphasize minimal judicial intervention at this stage and confirmed that the AT may examine the preliminary issues. The Court dismissed the appeals, keeping the AT’s referral intact and directing that the AT consider all questions including maintainability in due course, with no costs.
Civil Appeal No. 2908 of 2022 This Supreme Court Civil Appeal arises from a dispute over Change in Law (CiL) compensation for Inter Plant Transfer (IPT) of coal linked to Mundra TPP, involving Uttar Haryana Bijli Vitran Nigam Limited (and Dakshin Haryana Bijli Vidyut Nigam Limited) as appellants and Adani Power (Mundra) Limited as respondent. The core issue concerned whether a Coal India Limited communication dated 19 June 2013 permitting IPT could be treated as a Change in Law event under the Power Purchase Agreement framework, and how the associated compensation should be computed. The Central Electricity Regulatory Commission (CERC) had held IPT to be not Change in Law, while APTEL upheld that finding for certain aspects and postponed the decision on the IPT issue. The Supreme Court, after hearing the parties, held that IPT qualifies as Change in Law, overruling the APTEL view, and directed CERC to recalculate the benefits, considering inter alia the cost savings in railway transportation and the consequent burden on DISCOMs and consumers. The judgment also relies on Energy Watchdog and other authorities to interpret the scope of ‘Law,’ including instruments of government instrumentalities and executive instructions. The matter is remitted to CERC with a six-month timeline to determine the precise benefit payable, and no costs are awarded.
CRIMINAL APPEAL NO. 1525 OF 2009 On 11 July 1992, a night-time assault in the village of Nana Ankadia left three deceased and five injured. The matter, tried in the Sessions Court for offences under the Indian Penal Code (IPC) and other statutes, involved 17 accused (including two absconding) with some acquitted and others convicted. The High Court’s consolidated judgment in 2004–2005 resolved several appeals by the convicts and the State/complainant, but the Supreme Court found the proceedings deeply flawed: defective framing of charges, omnibus and inconsistent applications of Sections 143, 147, 148, 149 IPC, and unclear designation of guilt under Section 302 IPC in relation to the three deaths. The Court traced the jurisprudence governing unlawful assemblies, vicarious liability under Section 149 IPC, and the need for precise charges with individual accountability for each death. It rejected the possibility of a fresh retrial given the 26-year lapse and the loss of witnesses, and instead ordered redress by public law damages to the victims’ families and survivors. The Court also deprecated systemic failures in investigation, prosecution, and cross-examination, urging reforms. Ultimately, the appeals were disposed of with a landmark compensation order: Rs 25 lakh to each deceased’s family and Rs 10 lakh to each surviving injured person, to be deposited within eight weeks.
Civil Appeal No. 2886 of 2012 This Supreme Court Civil Appeal arises from a 2005 suit for partition of ancestral property, where respondents sought to amend the plaint by adding a prayer declaring a prior compromise decree (dated 14 October 2004) null and void, along with a court fee. The trial had neared its end when the amendment was sought; the Trial Court dismissed it, but the High Court, on challenge, allowed the amendment subject to costs. Basavaraj (the appellant) challenged this order, contending that allowing such an amendment would change the character of the suit from partition to declaration, essentially inviting a collateral attack on a consent/decree, which is impermissible and, in any event, time-barred. The appellant argued that Order VI Rule 17 CPC proviso restricts late amendments, that challenge to a compromise decree is governed by the Special provisions in Order XXIII Rule 3 CPC, and that, since the decree was passed at Lok Adalat, it would prejudice the non-parties to the compromise and could prejudice the appellant’s rights accrued over time. The respondents argued the amendment arose from an inadvertent oversight, could be argued by reframing issues, would avoid multiplicity of litigation, and should be permitted under settled authority (Revajeetu, Pushpa Devi Bhagat, and others). The Court ultimately allowed the appeal, set aside the High Court’s order, and dismissed the amendment, with substantial costs awarded to the appellant, clarifying the limits of late amendments in the context of compromise decrees and consent orders.
Criminal Appeal No. 2493 of 2024 This Supreme Court judgment concerns the legality of Arvind Kejriwal’s arrest under the Prevention of Money Laundering Act, 2002 (PMLA) and the scope of judicial scrutiny of Section 19(1) arrests before the filing of a prosecution complaint. The DoE arrested Kejriwal on 21 March 2024 pursuant to ECIR HIU-II/14/2022 and sought custodial remand; the Delhi High Court had rejected Kejriwal’s petition under Articles 226/227 CrPC challenging the arrest and remand. The core issue is whether the arrest complied with Section 19(1), which requires the arresting officer to possess material in his possession and to form a written “reasons to believe” that the arrestee is guilty of a PMLA offence, plus informing the arrestee of the grounds and forwarding the order and material to an adjudicating authority. The Court reiterates that the safeguards in Section 19(1) are stringent and designed to protect life and liberty, and that failure to meet them vitiates the arrest. It holds that the magistrate must scrutinize the “reasons to believe” and the material before granting remand, and that authority to arrest cannot be immune from judicial review. While endorsing the need to curb abuse, the Court also directs interim bail for Kejriwal and refers a larger Bench to decide broader questions on “need and necessity to arrest.”
CIVIL APPEAL NO.7235 OF 2009 Prem Cottex, Panipat-based manufacturer of cotton yarn, challenged an order of the National Consumer Disputes Redressal Commission dismissing their consumer complaint for deficiency in service against the electricity distribution licensee. The matter arose after a 2009 short assessment notice claimed under-billing due to misapplication of the multiplied factor (MF) from 404.517 kW to 850 kVA, resulting in a demand of Rs. 1,35,06,585/-. The appellant argued that the licensee’s mistake and gross negligence led to inflated bills and that, under Section 56 of the Electricity Act, 2003, no sum due can be recovered after two years from the date it became first due, and that such recovery cannot be effected by disconnection. The National Commission had treated the case as an escaped assessment, not deficiency in service, and dismissed the complaint. The Supreme Court examined Section 56 and the jurisprudence around first due, two-year limitation, and permissible remedies for a billing error. It held that electricity charges become due only when the bill is issued, and that the two-year bar under Section 56(2) applies to both recovery and disconnection as an exception to the general law of limitation. While Rahamatullah Khan’s reasoning was discussed, it was distinguished on facts. The Court affirmed dismissal of the complaint, noting that no deficiency in service was established, and granted eight weeks to settle the remaining amount with no costs awarded. The matter also clarifies the scope of remedies after billing mistakes and emphasizes the distinction between escaped assessment and deficiency in service.
Civil Appeal Nos. 941-945 of 2004 & Ors. This batch of Civil Appeals before the Supreme Court concerns purchase tax under Kerala General Sales Tax Act, 1963, notably Section 5A, and its pari materia for Tamil Nadu General Sales Tax Act, 1959, namely Section 7A. The Court frames three core issues: (I) whether purchases by appellants from dealers exempt from tax, or from dealers whose sale is tax-exempt, are purchases of goods the sale or purchase of which is liable to tax within the meaning of Section 5A/7A; (II) whether the purchaser is liable to pay purchase tax where the seller’s sale is exempt or no tax is payable; and (III) whether the purchase tax under these provisions is a tax on manufacture or on consignment, or an inter-State levy, which would affect its constitutionality. The judgment notes that this is a legacy dispute in the wake of VAT/GST reforms, but the constitutional validity of the provisions remains in question for the time being. The Court outlines the statutory framework, including definitions of ‘dealer’, ‘goods’, and ‘sale’, and treats Section 5A/7A as independent charging provisions designed to plug revenue leakage by taxing purchase turnover when normal tax liability would be foregone due to exemptions. It holds that Section 5A/7A operate even where the seller is exempt from sales tax, and that such exemptions do not negate the purchaser’s liability; the levy is within the State’s legislative competence. Accordingly, the appeals are dismissed and the High Court judgments upholding the Acts are preserved, with no costs, and the stay orders vacated.
The Supreme Court hears an appeal by Digambar Suryawanshi and Kashibai Suryawanshi (parents‑in‑law) challenging an order under Section 482 CrPC of the High Court of Bombay at Aurangabad, which had dismissed a quashing petition against FIR No. 339 of 2018 (Shivaji Nagar Police Station, Latur) under Sections 498A, 312, 313 and 34 IPC. The FIR relates to cruelty and alleged pregnancy/miscarriage related events occurring between 2015–2016, including demand for a male child, coercive acts, a miscarriage, and alleged poisoning. The complainant-wife had separated and later sought divorce by mutual consent, which was granted by the Family Court in May 2019. The High Court refused to exercise inherent jurisdiction to quash the FIR. The appellants contend they had no active role and were dragged into the case merely as parents‑in‑law; the allegations are vague, the divorce notice predates the FIR, and the charges are unspecific. The State contends that the FIR discloses prima facie offences and must be examined at trial. The Supreme Court, applying Bhajan Lal’s categories and Dara Lakshmi Narayana’s critique of 498A misuse, holds the allegations insufficient to sustain an offence against the appellants and that continued proceedings would constitute abuse of process. The appeal is allowed and the FIR and all proceedings are quashed.
Janhit Abhiyan filed a batch of petitions challenging the Constitution (One Hundred and Third Amendment) Act, 2019, which inserted clause (6) into Articles 15 and 16, enabling the State to provide up to ten percent reservation for economically weaker sections (EWS) of citizens in education admissions (including private unaided institutions) and in initial public employment, but excluding the socially and educationally backward classes (SCs, STs and non-creamy-layer OBCs) from the EWS. The petition argued that the Amendment rests on a single economic criterion, which, under longstanding jurisprudence, cannot be the sole basis for affirmative action under Articles 15 and 16, and that exclusion of SEBCs from the new provision violates the Equality Code and the basic structure of the Constitution. The matter was referred to a Constitution Bench to decide three core questions: whether the amendment breaches the basic structure by permitting economic criteria; whether excluding SEBCs from EWS violates equality; and whether introducing EWS up to ten percent in addition to existing reservations breaches the fifty percent ceiling. The majority held that economic criteria as a basis for affirmative action can be constitutionally permissible in the framework of a living, evolving Constitution and that the amendment does not destroy the basic structure; the petitions were disposed of accordingly. A dissenting view by Justice S. Ravindra Bhat criticized the exclusionary aspect, and Justice Pardiwala rendered a separate opinion with its own conclusions.
Criminal Appeal No. 1443 of 2018 (arising out of SLP Crim. No. 6532 of 2018) This is a Supreme Court of India decision in Criminal Appeal No. 1443 of 2018 (arising out of SLP (Criminal) No. 6532 of 2018) by Justice S. Abdul Nazeer and Justice A.K. Sikri. The appellant, Dr. Dhruvaram Murlidhar Sonar, a medical officer at a Primary Health Centre, is accused in FIR No. 59 of 2000 of Mhasawad Police Station, Nandurbar District, for offences under Sections 376(2)(b), 420 read with Section 34 IPC and Section 3(1)(x) of the SC/ST Act. The High Court of Judicature at Bombay (Aurangabad Bench) dismissed the appellant’s petition under Section 482 Cr.P.C. seeking quashment of the FIR and chargesheet. The appellant contends that the proceedings are mala fide and an abuse of process, alleging a personal grudge and extraneous motive; he asserts that there was no ongoing relationship with the complainant and that the allegations, if true, do not constitute a crime. The Supreme Court reiterates that Section 482 Cr.P.C. is an extraordinary power to prevent abuse of process or secure ends of justice, citing Bhajan Lal and subsequent decisions, and emphasizes restraint in exercising it. The Court distinguishes rape from consensual sex within relationships, noting that consent, circumstances, and intent are determinative. After examining the materials, the Court holds that the complainant’s allegations do not prima facie establish rape or the other offences; thus quashing the FIR and the chargesheet. The appeal is allowed, and the impugned Bombay High Court order is set aside, with the FIR and chargesheet quashed.
CIVIL APPEAL NO.1689 OF 2022 Frost International Limited filed a civil appeal in the Supreme Court challenging an order of the Orissa High Court that set aside a revisional court’s rejection of the plaint under Order VII Rule 11 CPC and remanded for fresh consideration. The 2009 suit in the Bhubaneswar District Court concerned a licence plot RS-4 at Paradeep Port linked to a 17 January 2009 MoU under which Frost would supply 3786 MT (typo: 3876 MT) of iron ore fines and Milan would endeavour to protect Frost’s licence; a Rs. 56 lakh cheque was handed to Milan’s advocate as security, with Milan allegedly pressuring Frost to supply ore or encash the cheque. Frost claims the cheque was handed over as security and that Milan and Milan’s associate (defendant no.2) colluded to pressure performance, leading to a cheque dishonour and a NI Act notice under Section 138. Milan sought rejection of the plaint on grounds that the suit was barred under the Specific Relief Act (and frivolous/subterfuge). The trial court dismissed the Order VII Rule 11 application; the revisional court allowed the revision and rejected the plaint. The High Court’s writ remand was reversed by the Supreme Court, which held that the Orissa amendment to Section 115 CPC empowers revisional courts to dispose of the matter without remanding, restored the revisional order, and rejected the plaint, with costs to be borne by the parties. The plaintiff may pursue other remedies under law.
This Supreme Court decision concerns pay-scale parity for employees of the Directorate General of Ordnance Factories Headquarters (OFB-HQ) who sought upgradation of their pay scales to match similarly placed employees in CSS/CSSS and AFHQ Civil Service cadres. The Central Administrative Tribunal (CAT) had declined relief, and the Delhi High Court then set aside the CAT order, directing that OFB-HQ Assistants and Personal Assistants be placed in the CSS-equivalent pay scales with effect from the dates when parity had historically existed. The Union of India challenged these orders, arguing that pay-scale fixation is a prerogative of the employer and that judicial review is limited, even as para 3.1.9 and 3.1.14 of the Sixth Central Pay Commission (6th CPC) recommendations were invoked. The respondents contended that OFB-HQ employees had historically been treated as equal to CSS/CSSS staff and that parity should be extended. The Court analyzed the 6th CPC paragraphs 3.1.9 and 3.1.14, and examined prior decisions including Manoj Kumar (2021) and All India Naval Clerks Association, distinguishing some authorities while aligning with the principle of parity where there has been historical parity or irrational discrimination. The Court ultimately held that the appeal is devoid of merit, upholding the High Court’s approach, and dismissed the appeal with no order as to costs. The High Court’s order partially rectified pay anomalies by aligning OFB-HQ with CSS/CSSS parity in the relevant cadre.
Civil Appeal No. 1077 of 2013 This appeal concerns a prawn-farming enterprise (Isnar Aqua Farms) insured under a brackish-water policy with United India Insurance Co. Ltd. for 1994 covering 22,67,000 prawns across 37 ponds. After a White Spot Disease outbreak caused mass prawn mortality, the insured filed a claim which was repudiated by the insurer on the grounds of alleged record-keeping deficiencies. The National Consumer Disputes Redressal Commission (NCDRC) initially found the repudiation unjustified, noting that the insurer had conducted pre-issuance inspections and was aware of the insured’s operation, and that the assessment of losses should be guided by the policy’s stipulated method. On review by this Court (2009 remand), the NCDRC re-quantified compensation using various surveys and a death certificate. It adopted the death certificate (01.05.1995) and two survey reports to determine the loss, ultimately calculating ₹30,69,486.80, with simple interest at 9% p.a. The insurer’s defense—insufficient or unsubstantiated records—was reconciled by recognizing the death certificate and policy clauses, including the requirement to obtain evidence from independent bodies. The core issue became computation of admissible loss via three methods under the policy: input cost, unit cost, and fortnights valuation, with the lowest value deemed payable. The Supreme Court ultimately held that the liability should be the lowest of these three methods (₹75,87,750), added interest, and directed payment of the remaining balance ₹45,18,263.20 at 10% simple interest, six weeks from the date of judgment. The appeal is disposed with costs to be borne by the parties.
Civil Appeal Nos. 3155-3159 of 2023 This batch of Civil Appeals challenges the counting of work-charged service for pension after regularization under the Work Charged Establishment Revised Service Conditions (Repealing) Rules, 2013. The petitioners, originally engaged as work-charged employees and later regularized under the 2013 Rules, contend that the entire period spent in work-charged posts should be counted towards pensionable service, especially given long service (approximately 30–35 years) and prior benefits received. They rely on the premise that work-charged service has never been truly distinct from regular service, and the tokens of protection (e.g., MACP-like benefits) reflect the state’s obligation to count their service toward retirement benefits. The State counters that there is a clear regulatory distinction between regular and work-charged employees; Rule 5(v) provides that for pension qualification, one year of regular service is credited for every five years of work-charged service and, if the minimum pensionable period is not met, the shortfall may be supplemented. The Larger Bench of the Patna High Court held that for pension, only the portion of work-charged tenure that enables reaching the qualifying service should be added, though the entire period may be counted for promotion purposes. The Supreme Court upholds the validity of the 2013 Rules and Rule 5(v), holds counting is limited to qualifying service for pension, and dismisses the appeals, affirming that pension quantum cannot be based on the entire work-charged period. The decision balances equity for long-serving workers with the structural distinction between regular and work-charged employment.
Civil Appeal No. 946 of 2023 This Supreme Court Civil Appeal arises from a Delhi High Court writ petition (C.P. 1178/2015) challenging a land acquisition under the Land Acquisition Act, 1894, later governed by the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013. The dispute concerns lands in Village Molarband where Notification under Section 4 was issued in 1964, an Award issued in 1981, and possession taken in 1997. The Government contends that possession was relinquished to the beneficiary department (DDA) and that compensation was deposited (not paid) long ago; therefore no lapse should be deemed under Section 24(2) of the 2013 Act. The High Court had held that the acquisition lapses under 24(2) due to inaction and non-payment of compensation, relying on Pune Municipal Corporation v. Harakchand Misirimal Solanki. The Constitution Bench reverses this view, overruling Pune and related decisions, and clarifies the interpretation of Section 24(2), including the meaning of ‘paid’ (not including mere court deposit), the effect of possession, and the five-year inaction window before 1-1-2014. The Court applies Indore Development Authority as a guiding doctrine and holds that there is no deemed lapse in the present case. The appeal is allowed, with no costs, and pending applications disposed of.