Civil Appeal No.3548 of 2017 This group of Civil Appeals concerns the liability to pay tax on contracts under which multitudes of motor vehicles and equipment (cranes, trucks, trailers, tankers, etc.) were provided to ONGC and IOCL. The core issue is whether these arrangements amount to a transfer of the right to use goods, thereby constituting a “sale” under Clause 29A(d) of Article 366 of the Constitution, and thus attract VAT/Sales Tax. The Gauhati High Court held that the contracts involved a transfer of the right to use the goods, resulting in VAT/Sales Tax liability. The Supreme Court, in a consolidated judgment, revisits the framework established by Gannon Dunkerley, BSNL, and the subsequent cases, and interprets Clause 29A(d) in light of the 46th Amendment. Central to the analysis is the five-test framework (often termed the Panchratna tests) formulated by AR Lakshmanan, J. in BSNL, which requires (i) goods be available for delivery, (ii) identity of goods be definite, (iii) transferee have a legal right to use, (iv) the transfer of rights being exclusive during the period, and (v) the owner not re-transferring the rights. The Court finds that, in these contracts, the contractor retains control—provides crew, bears maintenance, bears liability, and retains possession—so there is no transfer of the right to use, and thus no deemed sale under VAT/Sales Tax. Accordingly, the contracts are not taxable sales; service tax may apply where applicable. The Court allows all appeals and disposes of related cross-appeals with liberty to recover service tax where law permits, while noting that there are no costs.
SLP(Crl.) No.12939 of 2024 This Supreme Court judgment concerns an appeal against an order of bail denial under the Maharashtra Control of Organised Crime Act, 1999 (MCOCA). The appellant, Siddhant alias Siddharth Balu Taktode, challenged the Bombay High Court’s order in Criminal Appeal No. 298 of 2024, which in turn upheld rejection of bail by the Special Judge (MCOC Act), Pune. The appellant contended that bail was maintainable given his age at arrest (21), the lack of direct involvement at the incident site, and the reliance on a single criminal antecedent; he argued that the case did not justify continued incarceration. The State and the complainant opposed bail, asserting the appellant is part of a gang that terrorizes the area and that the High Court’s reasoning was sound, and they objected to reliance on the cited precedents such as Javed Gulam Nabi Shaikh v. State of Maharashtra. The Court noted a protracted trial with no charges framed in several cases and emphasized the right to speedy trial as a constitutional facet. Relying on Manish Sisodia and Kalvakuntla Kavitha, the Court held prolonged pre-trial detention undermines the right to a speedy trial. The appeal is allowed; the orders below are quashed, and bail is granted on conditions: Rs.50,000 bond, residence restrictions, no entry into Akluj Tehsil, and regular court appearances, alongside a directive to reform trial production practices to avoid further delays.
Criminal Appeal Nos. 2489, 2490, 2491-2492 of 2025 These consolidated appeals arise from a common set of facts involving A. M. Paramasivam (a former Tamil Nadu MLA and Minister) and his wife P. Nallammal, who were charged under the Prevention of Corruption Act, 1988 read with the Indian Penal Code. Accused No.1 was charged with acquiring disproportionate assets during 1991–1996; Accused No.2 was charged with abetting that offence by allowing assets to be held in her name and in the name of minor children, under IPC Section 109 read with PC Act Sections 13(2) and 13(1)(e). The Trial Court convicted both; an attachment order under the 1944 Criminal Law Amendment Ordinance was issued, and the High Court upheld conviction and modified the attachment. The appeals were heard by a two-judge Bench in the Supreme Court. One judge (Amanullah, J.) allowed the appeal of the 2nd Accused, acquitting her of the IPC 109 read with 13(1)(e) charge and stating that the asset acquisitions in her name did not conclusively prove abetment or conspiracy; the attachment was not interfered with beyond what had been explained. The other judge (S. Dhulia, J.) disagreed on some conclusions but concurred in dismissal of the remaining appeals. The operative order partially allows the 2127/2024 appeal, while dismissing the others, and leaves administrative and attachment orders largely intact.
These Civil Appeals arise from a Delhi High Court judgment dismissing petitions seeking regularization of part‑time/ad‑hoc workers employed by the Central Water Commission (CWC). The appellants—three Safaiwalis and one Khallasi—had long, uninterrupted tenures (ranging from about a decade to nearly two decades) performing essential cleaning, gardening and maintenance duties at CWC offices. They claimed their duties were perennial and integral to the respondent’s functioning, though their appointments were labeled part‑time. The Tribunal dismissed their Original Application for regularization on grounds of lack of sanctioned posts and insufficient full‑time service (e.g., 240 days/year) and the High Court concurred, citing Uma Devi (Secretary, State of Karnataka v. Uma Devi) to deny regularization and highlighting lack of minimum educational qualifications and the outsourcing of services. The appellants argued that long service, absence of malafide, and the essential nature of their work warranted regularization, invoking Uma Devi principles in a tempered manner and relying on subsequent jurisprudence (notably Vinod Kumar) that procedural formalities cannot bar a substantive right when posts exist and duties are ongoing. The Supreme Court allowed the appeals: quashed termination, directed reinstatement and regularization of services with continuity to be counted for post‑retiral benefits, but with no back wages. It also cautioned against rigidly applying temporary labels and outsourcing that erodes workers’ rights, aligning with evolving public‑sector labor standards.
Civil Appeal No 6931 of 2021; Civil Appeal Nos 6932-6942 of 2021; Civil Appeal Nos 6948-6952 of 2021 This Civil Appeal arises from Telangana High Court interim orders directing Jawaharlal Nehru Technological University (JNTU) to proceed with counselling and admission in new engineering courses after AICTE approvals, despite JNTU’s contention that a State Government NOC was a precondition for affiliation. The High Court’s directions followed its view that the AICTE approval could not be treated as conclusive and relied on the decision in Jaya Gokul Education Trust, among others, to justify requiring NOC before counselling. JNTU and the institutions challenged these directions, arguing that once AICTE approves, the university should be able to grant affiliation without a fresh NOC, especially since AICTE’s process is now online and the central regulation governs approval. The Supreme Court examines Regulations 5.5, 5.6 and 6.1 of JNTU’s Regulations, which mandate prior State Government permission after AICTE approval for starting new programs or increasing intake, and also considers Section 20 of the Telangana Education Act 1982 and precedent such as JNTU Registrar v Sangam Laxmi Bai Vidyapeet and Abdul Kalam Technological University v Jai Bharath College. It emphasizes the continuing role of the State in ensuring educational needs, standards, and policy alignment, while acknowledging AICTE approvals. With the State having granted NOC on 1 November 2021, the Court directs JNTU to complete the affiliation process within ten days, keeps interim orders stayed, and allows the High Court to issue further directions based on the outcome.
Civil Appeal No. 10611 of 2024 Omkar Ramchandra Gond, a student from Latur with speech and language disability (46% certified permanent disability per disability certificate, 2017) sought admission to MBBS through the National Eligibility cum Entrance Test (NEET) 2024 under the Persons with Disabilities (PwD) quota and OBC category. He cleared NEET and applied for CAP Round-I, but his disability was deemed 40% or more under the NMC Appendix H-1 guidelines, rendering him ineligible for PwD quota or admission to MBBS. The Disability Certification Centre at Sir JJ Group of Hospitals certified a 44–45% impairment, and the NMC/GCI framework aligned with Appendix H-1, effectively denying PwD reservation by a blanket threshold. He approached the Bombay High Court, challenging the notification (13.05.2019) and the certificate, and sought interim admission. A Supreme Court interim order directed that a Medical Board assess whether his speech and language disability would impede his MBBS pursuit, and the Board later opined that it would not. The Court, in proceedings culminating on 15.10.2024, held that merely quantifying disability at 40% or above cannot automatically disqualify a candidate; a purposive, rights-based interpretation of RPwD Act and Article 41 is required, emphasizing inclusive education and reasonable accommodation. The Court directed NMC to revise its regulations, ensured admission, and disposed of the related writ petition, reinforcing the principle of inclusion for PwDs in higher education.
Civil Appeal Nos. 1376-1377 of 2010 This case concerns a dispute over title and possession of a suit property originally belonging to Jessie Jayalakshmi. The appellant, V. Prabhakara, contends that a registered Will dated 04.09.1985 (Exhibit P4) executed by Jessie Jayalakshmi in his favor was valid and duly attested, whereas the respondents rely on an unregistered Will (Exhibit D1) and a mortgage recited therein to challenge P4. The deceased’s relationship with Kantha Lakshmi (Respondent No.1’s wife) and the latter’s divorce, which permitted occupancy in the property, form part of the background. The Trial Court held Exhibit P4 to be valid in accordance with Section 63 of the Indian Succession Act read with Section 68 of the Indian Evidence Act, and decreed the suit for declaration and possession. It rejected Exhibit D1 as forged. The High Court reversed, finding no adequate pleadings or credible basis to sustain P4 against D1, and dismissed the suit. The Supreme Court, however, set aside the High Court judgment and restored the Trial Court’s decree, holding that Exhibit P4 was properly proved and Exhibit D1 was not; there were no suspicious circumstances surrounding P4. The decision emphasizes adherence to pleadings, attestation norms, and the deference owed to trial court findings on questions of fact."
Arbitration Application No.32 of 2019 This Supreme Court arbitration matter concerns Arbitration Application No.32 of 2019 filed by Perkins Eastman Architects DPC and Edifice Consultants Private Limited against HSCC (India) Ltd. The consortium had won a PMSSY project for the All India Institute of Medical Sciences at Guntur, Andhra Pradesh, with Clause 24 of the contract providing a dispute-resolution mechanism culminating in arbitration after the Director (Engg.)/CMD HSCC steps. The applicants invoked Section 11(6) read with Section 11(12)(a) of the Arbitration and Conciliation Act, 1996, seeking the appointment of a sole arbitrator. The respondent-appointed arbitrator, Major General K.T. Gajria, by letter dated 30.07.2019, purportedly under Clause 24, is challenged as beyond the 30-day limit and potentially non-independent. The Court examined whether the dispute could constitute an International Commercial Arbitration (ICC) under Section 2(1)(f) due to the lead member of the consortium (Perkins Eastman, NY) and the Indian leadership of the consortium’s central management. It concluded that the arbitration in question could qualify as ICC, but found the 30-day appointment by HSCC’s CMD via the CGM to be improper. Relying on precedent (Walter Bau AG, TRF Ltd, Larsen & Toubro v SCOMI, and others) the Court entertained the application and appointed Dr. Justice A.K. Sikri as the sole arbitrator, while annulling the prior appointment, subject to independence declarations under amended Section 12 and time constraints under Section 29A. The matter was disposed with the arbitrator’s fees to be shared equally, and the order to be communicated to the appointed arbitrator.
Criminal Appeal No. (2025) / Special Leave Petition (Criminal) No. 16212 of 2024 This appeal arises from a challenge by the State of Karnataka to a Karnataka High Court order that quashed an FIR under Section 13(1)(b) read with Section 13(2) of the Prevention of Corruption Act, 1988 (PC Act) against Sri Channakeshava H.D., an Executive Engineer of BESCOM. The FIR (No.54/2023) was registered on 04.12.2023 after a Lokayukta investigation found assets disproportionate to known income during 11.11.1998 to 30.09.2023, amounting to Rs. 6.64 crore, with allegations of benami purchases and hidden assets. The High Court held that the second proviso to Section 17 of the PC Act requires a preliminary inquiry and that the Superintendent of Police (SP) had not demonstrated a mind-to-mind inquiry before registering the FIR, thus deeming the proceedings void. The State contends that a preliminary inquiry is desirable but not mandatory and that the SP’s order, passed on a detailed source report dated 05.10.2023, suffices to register a cognizable offence. It relies on Lalita Kumari and subsequent rulings, including Sudhakar Reddy, to argue discretion, not a mandatory requirement. The Supreme Court, per a Division Bench, holds that in corruption matters the necessity of a preliminary inquiry is case-specific; a detailed source report can justify bypassing such inquiry. Consequently, the appeal is allowed, the High Court’s quashing is set aside, and the FIR must proceed. Interim orders are vacated. The decision reinforces that pre-FIR scrutiny is not universally mandatory; the availability of robust source information can permit registration without a formal preliminary inquiry.
Civil Appeal Nos. 9488-9489 of 2019 This Supreme Court Civil Appeals concern a challenge by the University of Delhi to a Delhi Development Authority decision and a DMRC policy enabling a high‑rise private housing project within Zone‑C of the University campus. The University contends that land within its enclave, originally owned by the Defence Ministry and acquired for a public purpose connected to the Metro project, was improperly converted to residential use for a private builder, contrary to MPD‑2021, the DMRC charter, and the campus’s heritage and privacy considerations for hostels housing hundreds of students. It points to privacy implications for women students, preservation of historical structures, and the need to uphold the Master Plan’s restrictions on tall buildings in the campus vicinity. The writ petition was dismissed by a learned Single Judge in 2015; the University later sought condonation of a 916‑day delay in filing an appeal, arguing that internal deliberations, Executive Council approvals, and evolving considerations on disability access and safety delayed action, not malfeasance. The Delhi High Court, and now the Supreme Court, emphasize the liberal principle of condonation of delay but ultimately dismiss the appeals on the ground of delay and laches, with no adjudication of merits. The judgment underscores balancing substantial justice against undue delays, especially in matters involving public policy and large‑scale public projects.
Civil Appeal Nos. 2935-2938 of 2022 The appeals arise from a common High Court judgment that terminated the mandate of a sole Arbitrator under section 14(1)(a) of the Arbitration and Conciliation Act, 1996, and substituted a fresh arbitrator, while also dismissing CPC Order VII Rule 11 applications. The parties had a family dispute concerning partition of properties and agreed to refer it to a sole arbitrator on 04.08.2008. The arbitrator adjourned proceedings; delays led the parties to revoke the mandate by letters dated 11.07.2009. Applications under section 14(1)(a) of the Act were filed before the District Court. The Trial Court dismissed the CPC application in 2010. The High Court, in writs and arbitration petitions, held that there was undue and unreasonable delay by the arbitrator, and terminated the mandate under section 14(1)(a), appointing a fresh arbitrator. The appellant contends that once the arbitrator was appointed, and without a written arbitration contract, the application under section 11(6) of the Act was not maintainable and that there was no undue delay justifying termination. The respondents rely on established authorities that delay can terminate the arbitrator’s mandate. The Supreme Court reconsiders these issues, clarifies the distinction between sections 11(5)/(6) and the proper court for termination, and ultimately quashes the High Court decision, allowing the appeals in part. The matter is remitted to the appropriate court for adjudication under section 14(2) with directions for timely completion and potential substitution of the arbitrator following due procedure.
Civil Appeal No. 4648 of 2022 Abhimanyu Partap Singh, a minor aged around five and a half years at the time of the 1996 road accident, filed a petition under Section 166 of the Motor Vehicles Act seeking compensation for permanent disability. The Motor Accident Claims Tribunal, Chandigarh, held joint and several liability and awarded Rs. 9,00,000 with 9% interest. The claimant’s appeal to the Punjab and Haryana High Court partly allowed enhancement: Rs. 1,00,000 for a motorized wheelchair; future loss of earning enhanced to Rs. 6,00,000 for ten years; attendant charges raised to Rs. 7,08,000; medicines, physiotherapy, and diapers increased; loss of amenities, marital bliss, and life expectancy augmented to Rs. 3,00,000 with other heads adjusted to total Rs. 23,20,000. The appellant’s case rests on the premise of 100% permanent disability and lifelong needs, arguing that lifetime loss of earnings, ongoing attendant care, and future medical expenses must be incorporated, guided by Kajal (supra) for the multiplier and by Indian and English authorities on damages. The respondents contended that concurrent findings and existing precedents justify the awards, relying on Jagadish and Pranay Sethi. The Supreme Court re-evaluated compensation, applying Kajal’s multiplier (18), life-long future earnings, enhanced attendant and medical costs, and non-pecuniary damages. Resultantly, the appeal is allowed in part; enhanced compensation totals Rs. 51,62,000, with interest at 6.5% p.a. from petition filing until payment.
Civil Appeal Nos.6377-6378 of 2019 The matter concerns a challenge to the 1 March 2013 assessment order and the property tax demanded from the respondent developers. The Delhi High Court had dismissed the civil suit as not maintainable (a view upheld by a Division Bench), and directed the Single Judge to reconsider jurisdiction. The Division Bench, however, remanded for fresh consideration on the maintainability issue. The Supreme Court, exercising its jurisdiction under leave granted in the Civil Appeals, analyzed whether the Delhi Municipal Corporation Act, 1957 ousts civil court jurisdiction in tax disputes or whether the remedy provided under Sections 169-171 (appeals to the Municipal Taxation Tribunal) is adequate and exclusive. Relying on the classic ouster framework (Dhulabhai) and the principle that exclusion of civil jurisdiction must be express or clearly implied, the Court noted that the Act creates a liability to pay tax and provides a complete appellate mechanism. It held that, in light of the statutory scheme, civil court jurisdiction is impliedly barred, as the Tribunal’s orders have finality and the statutory remedy is adequate. The Court cited several precedents to articulate the test for ouster, including Wolverhampton, Mask, Kamla Mills, and Srikant Jituri, and ultimately set aside the High Court’s judgment, allowing the appeals.
Civil Appeal No. 2402 of 2019 (Arising out of Special Leave Petition No. 22211/2018) Vidya Drolia & Ors. filed Civil Appeal No. 2402 of 2019 challenging a Calcutta High Court order appointing an arbitrator in a landlord–tenant dispute under the Transfer of Property Act. The tenancy, entered in 2006 for 10 years with a renewal option and rent of Rs. 12,985 per month, included a clause that disputes would be referred to an Arbitral Tribunal of three arbitrators under the Arbitration & Conciliation Act, 1996. After the tenancy expired, the landlord sought possession; arbitration was invoked in 2016. The Calcutta High Court appointed an arbitrator in 2016, and 18 sittings occurred. In 2017, this Court decided Himangni Enterprises v. Kamaljeet Singh Ahluwalia on arbitrability in landlord–tenant disputes, prompting review by the appellants. The Supreme Court then considered Section 11(6A) of the Arbitration Act (amended 2015) amid related provisions (Section 16(1), and references to existence versus validity of arbitration agreements), and traced doctrinal authorities on arbitrability (SBP & Co., Booz Allen, Natraj Studios, Olympus, etc.). It held that the amendment envisions a two‑step inquiry into the existence of an arbitration agreement and that certain disputes may require reconsideration by a larger bench. Ultimately, the Court lifted the stay on arbitral proceedings, allowed them to continue toward an award, and disposed of the appeal, though enforcement requires Court leave. The matter was to be referred to a three-judge Bench for ruling on broader issues."
Civil Appeal No. 2320 of 2021 This Supreme Court appeal concerns back wages and posting orders of a Medical Officer who faced reallocation after the reorganization of Uttar Pradesh. Manoj Kumar Sharma, the writ petitioner, was posted in Uttarakhand and subsequently transferred to Uttar Pradesh; he submitted joining reports at various locations and did not report to the place of posting in Badaun. Uttarakhand relieved him in phases, and he was relieved on 12.09.2003, but did not join, instead seeking postings near his home district. A writ petition filed in 2006 sought mandamus to post him in a hospital suitable to his qualifications. The Single Judge found fault with the State’s non-communication of the posting/transfer orders and granted relief, including back wages. The High Court’s Division Bench upheld 50% back wages for 05.07.2003 to 28.12.2016 and other benefits, while leaving the question of back wages open for further decision. The Supreme Court, however, reversed: noting that Sharma was relieved by Uttarakhand in 2003 and did not join, allegedly delaying for 13 years while practicing privately, and that the 26.09.2016 order had attained finality. Citing State of Punjab v. Khemi Ram on the necessity of communication of orders, and Divisional Manager, Aravali Golf Club on limits to judicial interference, the Court set aside the High Court orders, allowed the appeal, and awarded no costs. The decision emphasizes that communication of an order is essential and condemns repeated summons of officers to court for administrative matters.
This Supreme Court judgment arises from a batch of disqualification petitions filed under the Tenth Schedule of the Constitution (defection) by three Telangana MLAs belonging to the Bharat Rashtra Samithi (BRS) who allegedly joined the Indian National Congress (INC) after elections: Danam Nagender, Kadiyam Srihari, and Venkata Rao Tellam. The petitions were filed in March–April 2024 challenging the validity of these defections, with a BJP MLA Alleti Maheshwar Reddy joining later to seek disqualification of Nagender. The High Court of Telangana, at the single-judge level, directed the Speaker to place the petitions before him and to fix a hearing schedule within four weeks; on 22 November 2024, the Division Bench reversed that order, holding that no time-bound directions should be issued to the Speaker. The present Civil Appeals arise from SLPs challenging the High Court’s order. In a detailed discussion of the constitutional framework governing disqualification under the Tenth Schedule, the Constitution Bench/Division of this Court reiterates that the Speaker acts as a Tribunal and that judicial review is limited to jurisdictional errors, mala fides, violations of natural justice, and perversity, and cannot normally compel a Speaker to decide within a fixed timeframe. However, considering the need to curb defection and ensure constitutional objectives, the Court directs expeditious action by the Speaker. The matter culminates in a relief that the Speaker should conclude the proceedings within three months and prevent protraction by the involved MLAs, with no costs awarded.
Criminal Appeal No. 3301 of 2025 (Special Leave Petition (Criminal) No. 4354 of 2025) This Supreme Court matter concerns the State of Andhra Pradesh’s challenge to an anticipatory bail order granted to N. Sanjay, an IPS officer, in connection with allegations of serious irregularities surrounding tenders, funds disbursement, and agreements under BNSS for awareness camps and related procurement. The High Court of Andhra Pradesh had granted anticipatory bail to the respondent following a petition under Section 482 CrPC, while the State contends that the investigation requires custodial interrogation to uncover the full extent of the alleged improprieties, including alleged signing of contracts and approval of payments without adequate verification. The State submits that the respondent, being the apex authority for approvals, played a pivotal role in the alleged scheme, with payments allegedly released despite questions on work completion and evidence. The respondent contends that custodial interrogation is unwarranted, there is no record of complaints, and he must be presumed innocent; he also asserts political bias. The Court’s reasoning emphasizes the discretionary nature of anticipatory bail, the need for non-partisan investigation, and the principle that custodial interrogation should be a last resort, not a default presumption. The Court interferes to ensure a fair investigation, holding that the appeal should be allowed, the impugned order set aside, and the anticipatory bail quashed, while granting time for surrender and preserving rights for subsequent bail proceedings. The decision underscores equal treatment before law and cautions against over-elaborate evidentiary discussion at the bail stage.
Civil Appeal Nos. 3511/2018 and 3512/2018 This Supreme Court Civil Appeal concerns two Industrial Disputes referred to the Industrial Tribunal by ONGC’s contract workers at Sibsagar and Lakwa regarding regularization of contract labour. The Industrial Tribunal had directed regularization; the learned Single Judge upheld the award, while the Division Bench of the High Court remitted the matters for fresh consideration in light of the Steel Authority of India Ltd. v. National Union Waterfront Workers (2001) 7 SCC 1 to examine whether there was a genuine contract. Aggrieved, the workers’ association approached the Supreme Court. The Court observed that the Single Judge had meticulously considered all relevant aspects and left little scope for the Tribunal to adjudicate further. The Division Bench’s remand was deemed inappropriate for merits review. Consequently, the Court set aside the Division Bench’s judgments and remitted the matters to the High Court to decide the writ appeals on merits, expeditiously, preferably within six months, with pending applications disposed of and no costs. The judgment also engages with the application of Rule 25(2)(v)(a) of the Contract Labour (Regulation and Abolition) Central Rules, 1971, in assessing whether contract labour perform permanent/perennial work entitled to regular employment. Overall, the decision clarifies the proper appellate path for examining contract labour regularization while ensuring expeditious disposal on merits.
Civil Appeal No 6805 of 2022; Civil Appeal No 6806 of 2022 This Supreme Court decision concerns the abolition of the Odisha Administrative Tribunal (OAT) and the legality of the Central Government’s notification abolishing it. The Odisha High Court had struck down a 2019 notification abolishing the OAT, but the Supreme Court held that Article 323A of the Constitution is a permissive, enabling provision and does not compel the establishment of SATs nor bar their abolition once created. The Union Government invoked Section 21 of the General Clauses Act read with Section 4(2) of the Administrative Tribunals Act to rescind the 1986 notification establishing the OAT. The Court held that abolishing an SAT is a valid administrative decision and not barred by Article 323A. It found no violation of Article 14, nor of the fundamental right to access to justice, since pending OAT cases will be revived and heard by the Orissa High Court; litigants retain a remedy in the High Court. While Section 21 is applicable to administrative orders, the Court emphasized that the exercise of such power must be in harmony with the statute’s scheme. The Court also directed the Ministry of Law and Justice to conduct a judicial impact assessment as directed in Rojer Mathew but ruled that such assessment was not a prerequisite for abolition. The appeals were dismissed, upholding the abolition and transferring pending matters to the Orissa High Court.
Writ Petition (C) No. 439 of 2020; Writ Petition (C) No. 449 of 2020 Two writ petitions challenge the Madhya Pradesh Governor’s order directing an immediate floor test in a running assembly after twenty-two Indian National Congress MLAs tendered resignations and were accused of being held captive to coerce the outcome. The matter traces chronology from early March 2020, when resignations were submitted and later accepted for six ministers, to mid-March when the Governor issued directions under Articles 174 and 175(2) pressuring a floor test in the Budget Session of 16 March 2020. The petitions—one by Shivraj Singh Chouhan and ten BJP MLAs, the other by MP Congress Legislature Party through its Chief Whip—contend that such intervention encroaches on the Speaker’s exclusive domain over resignations and disqualification under Article 190(3)(b) and the Tenth Schedule, and that a floor test should ordinarily be resolved on the floor of the House after civil, voluntary resignations are examined. The Court surveys constitutional provisions (aid-and-advice, Governor’s discretionary powers, floor-test jurisprudence) and precedents such as SR Bommai and Nabam Rebia, distinguishing extraordinary circumstances from routine politics. It ultimately directs reconvening the Assembly on 20 March 2020, orders a show-of-hands vote, and video-graphing, concluding the floor test by 5:00 pm, while dismissing some reliefs sought by MP Congress. The petitions are disposed of accordingly, emphasizing democratic accountability and cautious gubernatorial action.”