This writ petition (WP(C) No. 32479 of 2007) filed before the Kerala High Court by K.R. Dinesan, a government contractor, challenges the award of a NABARD RIDF XI funded project—Regulator-cum-Bridge at Attappilly Kadavu across the Kurumali River. Ext.P6 invited tenders with a four-month firm period, resulting in Chandragiri Constructions (lowest) withdrawing, followed by the second lowest bidder (Sree Narayana Constructions) declining to extend or reduce bid. The petitioner (third lowest, 17.01% above PAC) was asked to extend the firm period and consider negotiating at 15% above PAC. He declined to execute at the offered rate and sought release of his EMD; the EMD was refunded. Subsequently, after the exit of the other bidders, negotiations were held with the third respondent, who had submitted a firm offer that was adjusted in light of revised 2007 rates. The petitioner claimed entitlement to be awarded the contract under the PWD Manual provisions governing tender, contending he was the rightful claimant once the others withdrew. The respondents argued compliance with the PWD Manual and that continuing the project is in public interest, noting the project’s long history since 1982 and risk of funds lapsing. The court, citing Air India Ltd. v. Kochi International Airport Ltd, held that tender decisions are guided by commercial considerations and should not be interfered with unless public interest requires. It dismissed the petition, noting the petitioner’s EMD refund and lack of willingness to perform at the offered rates, with no costs awarded.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • Antony Dominic, J.
Judgment Date
2008-03-25
Court Decision / Holding
Writ petition dismissed; no order as to costs.
Final Disposition
Writ petition dismissed; no order as to costs.

Parties to the Case

Appellants / Petitioners

  • K.R. Dinesan

Respondents

  • State of Kerala
  • The Superintending Engineer, Irrigation Central Circle, Thrissur
  • Paul V. Thomas
  • Addl. R4. Varandarapilly Grama Panchayath
  • Addl. R5. Joseph S/O Kunju Varu

Legal Representation & Advocates

Counsels for Petitioners

  • • Sri Babu Joseph Kuruvathazha
  • • Sri K.I. Sageer

Counsels for Respondents

  • • Renjith Thampan
  • • Smt. P.A. Anitha
  • • Sri C.A. Majeed
  • • Sri P.N. Mohanan
  • • Sri M.R. Sabu

Provisions of Law Cited

P.W.D. Manual provisions governing awarding of work through tender (Ext.P7)Article 15.7.12 and 15.7.14 of the P.W.D. Manual (Ext.P2)

Legal Doctrines & Maxims

  • Tender decisions are guided by commercial considerations; courts should not interfere in administrative decisions except in cases of public interest (Air India Ltd. v. Kochi International Airport Ltd)
  • Public interest in timely execution of public works overrides private claims where the tender process has been lawfully conducted.

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioner contends that once Chandragiri Constructions withdrew and Sree Narayana Constructions declined to extend or reduce their bid, he, as the lowest viable bidder, should have been invited for negotiations and awarded the contract. He argues that Ext.P1 extended firm periods and that he should be allowed to negotiate or be re-tendered under the PWD Manual provisions; he asserts entitlement to the work at a rate he had quoted and laments the public interest of avoiding delay and loss of funds.

Contentions of Respondents

Respondents submit that the tender was processed strictly under the PWD Manual. With the exit of the other bidders and the petitioner’s refusal to extend, only the third respondent remained, and negotiations were properly conducted to secure a viable rate. Refunding the EMD after the petitioner’s withdrawal extinguished his claim to participate in negotiations. Re-tendering would cause delay and higher costs due to updated rates; funds may lapse if the project is halted; commercial considerations justify the decision.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (1)

Case NameCitationTreatmentExplanation
Air India Ltd. v. Kochi International Airport LtdAIR 2000 SC 801PositiveCited to support the proposition that tender decisions are governed by commercial considerations and courts should not interfere unless public interest dictates.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,146 words•~10 min read

In The Court Record

K.R. Dinesan v. State of Kerala & Others

## **IN THE HIGH COURT OF KERALA AT ERNAKULAM** **PRESENT :** **THE HONOURABLE MR. JUSTICE ANTONY DOMINIC** ## **TUESDAY, THE 25TH MARCH 2008 / 5TH CHAITHRA 1930** ## **WP(C).No. 32479 of 2007(N)** **--------------------------** **PETITIONER:** ## **--------------** **K.R.DINESAN, GOVT.CONTRACTOR, KUNDANI HOUSE, MATTATHURKUNNU P.O., KODAKARA - VIA, TRICHUR DISTRICT.** **BY ADV. SRI.BABU JOSEPH KURUVATHAZHA SRI.K.I.SAGEER** ## **RESPONDENTS:** **-----------------** **1. STATE OF KERALA, REP. BY ITS SECRETARY TO GOVERNMENT, DEPT. OF WATER RESOURCES, GOVT.SECRETARIAT, THIRUVANANTHAPURAM.** **2. THE SUPERINTENDING ENGINEER, IRRIGATION CENTRAL CIRCLE, TRICHUR.** **3. PAUL V.THOMAS, GOVT.CONTRACTOR, POOTHRIKKA P.O., KOLENCHERY, ERNAKULAM DISTRICT.** **ADDL.R4. VARANDARAPILLY GRAMA PANCHAYAT, REPRESENTED BY ITS SECRETARY, VARANDARAPILLY, THRISSUR DT.** ## **(ADDL.R4 IMPLEADED AS PER ORDER DATED 15.2.2008 IN IA 2106/08)** **ADDL.R5. JOSEPH, S/O KUNJU VARU, NANDIPULAM, THRISSUR DT. REPRSENTED BY SECRETARY.** **(ADDL.R5 IMPLEADED AS PER ORDER DATED 15/2/2008 IN IA 1959/08)** **BY ADV. SRI.C.A.MAJEED FOR R3 SRI.P.N.MOHANAN** **SRI.RENJITH THAMPAN SMT.P.A.ANITHA GOVT.PLEADER SRI.M.R.SABU** **THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON 12/03/2008,THE COURT ON 25/03/2008 DELIVERED THE FOLLOWING:** **WPC NO.32479/07** ## **APPENDIX** ## **PETITIONER'S EXHIBITS** **EXT.P1: TRUE COPY OF the PROCEEDING BEARING NO.D6-4373/95 DT.10.7.07 ISSUED BY THE 2ND RESPONDENT.** **EXT.P2: TRUE COPY OF ARTICLE 15.7.12 AND 15.7.14 OF THE P.W.D.MANUAL.** **EXT.P3: TRUE COPY OF THE REPRESENTATION DATED 3.10.07 SUBMITTED BY THE PETITIONER BEFORE THE 2ND RESPONDENT.** **EXT.P4: TRUE COPY OF THE REPRESENTATION DT.15.10.07 SUBMITTED BY THE PETITIONER BEFORE THE 1ST RESPONDENT.** **EXT.P4(a): TRUE COPY OF THE EXPLANATION DT.16.7.07 SUBMITTED BY THE PETITIONER.** **EXT.P5: TRUE COPY OF THE REPRESENTATION DT.16.11.2007 SUBMITTED BY THE PETITIONER BEFORE THE 1ST AND 2ND RESPONDENTS WITH ITS COPY TO THE CHIEF ENGINEER.** **EXT.P5(a): TRUE COPY OF THE RECEIPTS EVIDENCING THE SENDING OF EXT.P5.** **EXT.P6: TRUE COPY OF THE TENDER NOTIFICATION ISSUED BY THE 2ND RESPONDENT, INVITING TENDERS FOR NABARD RIDF XI-CONSTRUCTING A REGULATOR-CUM-BRIDGE AT ATTAPPILLY KADAVU ACROSS KURUMALI RIVER NEAR PUDUKKAD IN TRICHUR DISTRICT.** **EXT.P7: TRUE COPY OF THE P.W.D. MANUAL DETAILING THE PROVISIONS OF LAW GOVERNING THE AWARDING OF WORK THROUGH TENDER.** ## **EXTS. OF R2** **ANNEXURE R2(a): TRUE COPY OF THE REQUEST MADE BY THE PETITIONER FOR RELEASE OF EMD DT.25.8.2007.** **EXT.R2(b): TRUE COPY OF THE TABULATION STATEMENT.** **EXT.R2(c): TRUE COPY OF THE LETTER OF THE PETITIONER TO THE 3RD RESPONDENT.** **EXT.R2(d): TRUE COPY OF THE LETTER DATED 16.11.2007.** ## **EXTS.OF R3** **EXT.R3(a): A PHOTOCOPY OF THE LETTER DT.17.7.2007 ISSUED BY 2ND RESPONDENT.** **WPC NO.32479/97** **-2-** ## **EXTS OF R4** **EXT.R4(a): TRUE COPY OF THE LETTER DATED 18.3.82 OF THE SPECIAL SECRETARY TO GOVERNMENT, DEPARTMENT OF IRRIGATION.** **EXT.R4(b): TRUE COPY OF THE RESOLUTION OF THE MATTATHUR GRAMA PANCHAYAT DT.12.7.99.** **EXT.R4(b)(i): TRUE COPY OF THE RESOLUTION OF KODAKARA BLOCK PANCHAYAT DT.15.7.99.** **EXT.R4(b)(ii): TRUE COPY OF THE RESOLUTION OF THRISSUR DISTRICT PANCHAYAT DT.16.7.98.** ## **EXT.R4(c): TRUE COPY OF THE ESTIMATE OF THE CHIEF ENGINEER.** ## **//TRUE COPY//** ## **P.A. TO JUDGE** ## **ANTONY DOMINIC, J. =============== W.P.(C) NO. 32479 OF 2007 N ====================** ## **Dated this the 25[th] day of March, 2008** ## **J U D G M E N T** The prayers in this writ petition are mainly to direct respondents 1 and 2 to award to the petitioner the work of constructing a Regulator-cumBridge at Attappilly Kadavu across Kurumali River, in response to Ext.P6 tender notification, and not to award the said work to the 3[rd] respondent. 2. Before referring to the facts, a look at the background that led to Ext.P6 tender notification, as disclosed in the affidavit filed by the 4[th] respondent, the Varandarappilly Grama Panchayat is necessary. It is stated that by Ext.R4(a) dated 18.3.1982, the aforesaid project was sanctioned, but its implementation got delayed and hence, the beneficiary Panachayaths viz., Varandarappilly, Kodakara, Mattathur and Thrissur District Panchayath had passed resolutions requesting for an early completion of the project. Exts.R4(b) series are the resolutions. On account of their efforts, finally the Government had sanctioned construction and Ext.R4(c) estimate was prepared, out of which, Rs.4 crores is being obtained as loan from NABARD. It is their specific case that if the project is implemented, the distance between Chalakkudy to Thrissur would be reduced by 30 Kms and that it will be of benefit to 1490 **WPC 32479/07** **:2 :** hectares of agricultural land and lakhs of people, including adivasis. In essence, what the 4[th] respondent wants is the immediate implementation of the project and according to them, if the project is delayed, the funds sanctioned would lapse. 3. Ext.P6 dated 9.2.2007 is the notice inviting tender for the work in question. In terms of Ext.P6, the firm period of the offer made was to be 4 months from the date of opening the tender. The tenders received were opened on 9.2.2007 and hence, the offers were to remain firm till 8.6.07. As is disclosed through the statements filed by respondents 1 and 2, the lowest tenderer M/s Chandragiri Constructions had withdrawn their tender. The 2[nd] lowest, M/s Sree Narayana Constructions, which had quoted 15% above PAC, refused to extend the firm period or reduce the quoted rate and as a result, their offer also became invalid. The petitioner, who had quoted 17.01% above PAC was the 3[rd] lowest, who was issued Ext.P1 letter dated 10.7.2007, requesting to extend the firm period for 4 months and also enquiring whether he was willing to execute the work at 15% above the PAC. 4. It is stated that on 10.7.2007 itself, a letter was issued to the 3[rd] respondent also requesting to extend the firm period of his offer. **WPC 32479/07** **:3 :** Though the petitioner has a case that this letter was issued on 10/6/07, it is clarified in the additional statement dated 25.1.2008 that the letter was issued only on 10.7.2007. To the letter dated 10.07.2007 received by him, the petitioner replied by Ext.P4(a) dated 16.7.07, declining to execute the work at the rate offered in Ext.P1 and requesting to release his EMD. In Ext.P4(a), the petitioner has also not stated that he was willing to execute the work even at the rate quoted by him. The statement filed by the respondents also disclose that while the 3[rd] respondent agreed to extend the firm period, the petitioner submitted Ext.R2 dated 25.8.07, seeking refund of his EMD and that the EMD was accordingly refunded to him on 5.09.2007. With the disappearance of the petitioner from the fray, the only valid offer available was that of the 3[rd] respondent, who had quoted 57% above the PAC. It is stated that in the negotiation that followed with the 3[rd] respondent, rate for civil work was agreed to be reduced to 55% and that the rate quoted by him for mechanical work was less than the estimated rate. Thereafter a proposal was submitted to the Chief Engineer recommending to accept the offer made by the 3[rd] respondent. 5. An additional statement is also filed, in which it is stated that the work was tendered based on 2004 schedule of rates and that **WPC 32479/07** **:4 :** subsequently, 2007 rates have been introduced, with an escalation of 35% and going by that standard, the rate now offered by the 3[rd] respondent is a viable one, especially in view of the increase in the cost of materials. It is further contended that once the petitioner has got his EMD refunded, he has no further claim to be awarded the work and that his motive is only to get the work re-tendered although he was unwilling to execute the work. According to the respondents, if the work is to be retendered, that can be only at 2007 schedule of rates and will result in additional financial burden to the State. 6. Petitioner submits that coming to know of the efforts to award the work to the 3[rd] respondent, he had submitted Exts. P3 and P4 to respondents 2 and 1, respectively, the receipt of which is denied by the respondents in the statement filed on 13/11/2007. According to him, despite the representations thus made by him, since efforts were on to award the work to the 3[rd] respondent, this writ petition was filed, with the prayers mentioned earlier. 7. Respondents 1 and 2 have filed 2 statements about which reference has already been made earlier. The 3[rd] respondent has filed a counter affidavit in which, he would contend that the steps taken by **WPC 32479/07** **:5 :** respondents 1 and 2 are strictly in compliance with the provisions contained in the PWD Manual, the relevant portions of which are Exts. P2 and P7. He would also submit that once his EMD has been refunded on a request made by the petitioner, he has no further claim to be awarded the work. 8. The point that was urged by the learned counsel for the petitioner is that in view of the provisions contained in the PWD Manual, the petitioner was the rightful claimant to be awarded the work. It is argued that once M/s. Chandragiri Constructions had withdrawn and M/s. Sree Narayana Constructions had declined to extend the firm period or reduce their bid amount, petitioner was the lowest bidder, who alone was eligible to be invited for negotiations. According to him, since the firm period of his offer had expired on 8/6/2007, his refusal to extend the firm period in response to Ext.P1 letter dated 10.7.2007, will not make him ineligible in any manner. Therefore, according to him, the options that were available to the respondents were that he should have been invited for negotiations or they should have re-tendered the work. 9. Having considered the submissions made, I am unable to accept the contentions urged by the counsel for the petitioner. As held by **WPC 32479/07** **:6 :** the Apex Court in **Air India Ltd. v. Kochi International Airport Ltd (AIR 2000 SC 801)** in tender, decisions are guided by commercial considerations and a Court is expected to interfere with the decision of the administrative authorities, not on the making of a legal point, but only when public interest demands such interference. The project in question was approved in 1982 and after more than a quarter of a century, it has reached this far and if it is not allowed to go on, even the funds will lapse. Therefore, unless there are compelling reasons of public interest, this court will not be justified in upsetting the decision of the authorities. 10. The pleadings in the writ petition show that the petitioner has not disclosed anything about the EMD that has been got refunded by him. It is true that with the exit of Chandragiri Constructions and Sree Narayana Constructions, petitioner was the next lowest bidder. But then, when Ext.P1 letter was issued asking him to extend the firm period, his reply by Ext.P4(a) was one of unwillingness to do the work and he demanded that the EMD should be refunded to him. He did not even offer to do the work at the rate quoted by him. His request for refund of EMD was reiterated by him in Ext.R2 dt.25.8.2007 also. Subsequently, the EMD was refunded on 5.9.07. Once EMD has been refunded to him, the petitioner can have no **WPC 32479/07** **:7 :** further claim to be awarded the work or called for negotiations. The provisions of the PWD Manual will not improve his case for the reason that once the petitioner has ceased to be a tenderer by accepting the EMD refunded, he cannot expect to be invited for negotiations thereafter. It is obviously because of this, he is now insisting that the respondents should now go in for re-tender. 11. As already noticed, in none of the communications, has the petitioner expressed his willingness to execute the work at the rate quoted by him. In Ext.R3(b), his offer was to do the work at 31.5% above PAC. Even during the course of hearing, to a pointed querry whether he was willing to do the work at the quoted rate, quick was his response, in the negative. Therefore, the idea is not to execute the work but only to force the authorities to re-tender the work. The delay will certainly be prejudicial to public interest, since the 2004 schedule of rates, based on which Ext.P6 tender notice was issued, has been revised in 2007, and any re-tender can only be based on revised schedule of rates, causing additional financial liability to the State. Further, the funds sanctioned will also lapse. 12. I also do not see anything irregular in negotiating with the 3[rd] respondent. Once the petitioner also got his EMD refunded and exited **WPC 32479/07** **:8 :** from the fray, the only remaining bidder was the 3[rd] respondent, who had also kept his offer firm, responding to letter dated 10.7.2007. If that be so, he is entitled to be called for the negotiations. I do not find merit in any of the contentions raised and in my view, the writ petition is only to be dismissed and I do so. There shall be no order as to costs. **ANTONY DOMINIC,JUDGE.** Rp
End of Judgment Record
Browse All High Court of Kerala (2008) Decisions
2008-12-17

Holy Family Hospital, Bishop Vayalil Medical Centre and Morning Star Medical Centre v. Intelligence Officer (IB), Department of Commercial Taxes, Idukki

This Original Petition (O.P. No. 31064/2000) challenges Exts. P5 and P9 against petitioners 1 and 2 and Ext. P10 against the third petitioner, all issued under the Kerala General Sales Tax Act by the Department of Commercial Taxes. The petitioners are three hospitals—Holy Family Hospital, Muthalakkodam (Thodupuzha), Bishop Vayalil Medical Centre, Moolamattom, and Morning Star Medical Centre, Adimali—established and managed by charitable trusts of religious congregations. They contend that, despite purchasing medicines, there is no sale of medicines within the hospital and thus they cannot be classified as dealers under KGST; the hospitals function on a charitable basis without profit motive, and medicines are used for treatment of their patients by doctors. The Government Pleader counters that the issue is settled against them by this Court’s decision in P.R.S Hospital v. State of Kerala (2003) (1 KLT 133), which held that hospitals can be treated as dealers under the Act. The petitioners seek an opportunity to rebut the factual/legal position, request stay or setting aside of the orders, and, if necessary, registration as dealers with fresh consideration. The court disposed of the petition, setting aside Exts. P5, P9, and P10, directing the respondent to consider objections afresh and pass final orders within two months, with the petitioners required to prove non-collection of tax; no costs.

2008-03-17

K.V. Ramakrishnan v. P.P. Krishnan and The Public Prosecutor, High Court of Kerala

This Criminal Appeal, filed with leave by the complainant, challenges the acquittal of the first respondent under Section 138 of the Negotiable Instruments Act. The appellant alleges that he lent Rs.2,00,000 to the first respondent on 20 June 2005 and that Ext.P1 is a cheque for Rs.2,00,000 dated 20 December 2005 drawn on the drawee bank. The cheque was returned dishonoured on 23 December 2005 for funds insufficiency and signature difference (Ext.P2). Notices were issued (Ext.P3, Ext.P4) and the reply (Ext.P6) contained allegations that Ext.P1 was forged because the cheque leaf was lost; the respondent did not produce any documentary evidence to show the loan or delivery of Ext.P1. The magistrate acquitted, finding the complainant failed to prove issuance of Ext.P1 and the debt, thus negating the Section 139 NI Act presumption in the complainant’s favor. The appellant contends that, given Ext.P1 is a cheque drawn on the respondent’s account, there is a presumption that it was issued in discharge of debt. He argues the evidence satisfies statutory requirements. The High Court, however, endorses the trial court’s view, emphasizing that the burden lies on the complainant to prove delivery and debt. Citing Krishna Janardhan Bhat, the court clarifies that the presumption relates to discharge, not existence, of debt, and since credible evidence is lacking, the appeal fails. Consequently, the appeal is dismissed.

2008-07-07

V. Damodaran Pillai v. N. Basheer and State of Kerala

The Kerala High Court heard a criminal miscellaneous petition under Section 482 CrPC challenging an inadequate sentence in a cheque bounce case under Section 138 NI Act. The complainant, V. Damodaran Pillai, alleged that the accused N. Basheer issued a cheque for Rs. 42,000 drawn on Indian Bank, which was dishonoured for insufficient funds upon presentation. Despite statutory notice, the amount remained unpaid. A private complaint was tried before the Judicial First Class Magistrate, Punalur, resulting in the accused being found guilty under Section 138 NI Act. The trial court held that the maximum fine under the statute is Rs. 5,000 and did not order imprisonment, nor compensation under Section 357(3) CrPC. The Sessions Court declined to intervene. The petitioner challenged these sentences in revision under Section 482 CrPC, arguing that the court should have awarded compensation to the complainant under 357(3) CrPC and not mechanically imposed only a fine. The High Court examined the statutory framework and precedents, particularly Bhaskaran v. Balan, and Hari Krishan v. State of Haryana, which endorse liberal use of Section 357(3) to compensate complainants when imprisonment or heavier fines are not provided or feasible. The court held that the trial court's approach failed to consider the full remedial options and directed remand for re-sentencing and determining a reasonable compensation, if any, under 357(3), while maintaining the conviction. The matter was to be expedited, with civil settlement possible to be taken into account.

2008-08-27

P.K. Puthupppan v. Kothamangalam Housing Co-Operative Bank Ltd. & Others

The petitioner, P.K. Puthupppan, President of Kothamangalam Housing Co-Operative Bank Ltd., challenged a report by the Kerala Women’s Commission (Ext. P6) which found that after initial appointment the first respondent was promoted as an Accountant but that the post of Secretary had been denied, with allegations of harassment against the petitioner. The Commission also recommended expeditiously constituting an independent Grievances Redressal Cell in line with Supreme Court guidelines. The matter traces Ext. P6 to the Registrar to examine whether the complainant was denied a fair opportunity for promotion; the court notes that promotions depend on feeder-category rules under the Kerala Co-Operative Societies Act, 1969 and the Rules, and that an unqualified person cannot claim promotion. Nevertheless, on account of the peculiar facts and because Ext. P6 has already been forwarded, the court directs the Registrar to consider the grievance under the relevant statutes, notwithstanding Section 69 of the Act. The court then invokes Vishaka v. State of Rajasthan (AIR 1997 SC 3011), holding that the guidelines against sexual harassment in the workplace apply to all workplaces, including cooperatives, and must be observed until legislation fills the vacuum. The judgment directs implementation of Vishaka guidelines, formation of a Compliant Committee and Mechanism within one month and issuance of circulars to implement these norms.