High Court of KeralaSingle JudgePartially allowed; enhanced land-value compensa...

K.N. Aji v Power Grid Corporation of India Ltd & Ors (CRP Nos.333/21 & 57/22)

Case / Petition Number:CRP Nos.333/21 & 57/22

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • V.G. Arun
Judgment Date
2024-02-26
Court Decision / Holding
Civil revision petitions are allowed in part. The Enhanced compensation awarded by the lower court shall be paid within three months, without any deduction. The amount already paid towards the value of trees shall not be deducted from the enhanced compensation. The petition filed by the Power Grid Corporation is dismissed to the extent of challenging the enhanced compensation; the claimant’s petition is allowed to the extent of the land-value diminution and central/outer corridor considerations as upheld by the court. If any portion of enhanced compensation is deposited, it shall be disbursed immediately on appropriate application.
Final Disposition
Partially allowed; enhanced land-value compensation to be paid without deduction; corporation's revision petition dismissed; order to disburse enhanced amounts within three months.

Parties to the Case

Appellants / Petitioners

  • K.N. Aji
  • Power Grid Corporation of India Ltd.

Respondents

  • Power Grid Corporation of India Ltd.
  • The Special Tahsildar (LA), Power Grid Corporation of India Ltd.
  • State of Kerala
  • Kerala State Electricity Board

Legal Representation & Advocates

Counsels for Petitioners

  • • P.T. Jose
  • • S. Ashitha
  • • R. Harishankar

Counsels for Respondents

  • • Millu Dandapani
  • • B. Premod
  • • V. Tekchand

Case Synopsis & Summary

The Kerala High Court, in a consolidated hearing of two civil revision petitions (CRP Nos. 333/21 and 57/22), scrutinizes the compensation awarded for damage caused by the drawing of 400 kV transmission lines across a landholding of 26.25 ares in Karukutty Village, Aluva Taluk. The claimant, K.N. Aji, contends that the original award inadequately compensated for the diminution in land value and the trees felled to facilitate the lines. The court below had fixed land value reductions and corridor-based percentages (40% for central corridor and 20% for outer corridors) and deducted 20% from the Ext.A7 land-value estimate, while awarding Rs. 16,63,097 as enhanced compensation. The claimant argues that the Advocate Commissioner’s findings should have informed a higher compensation for trees and land-value loss, and that deduction against the enhanced amount is improper. The Power Grid Corporation defends the lower quantum as reasonable, contending the line does not render the land unusable and emphasizing the need to avoid overcompensation. The judgment ultimately partially allows the claimant’s revision and orders payment of enhanced land-value compensation without any deduction; it dismisses the Corporation’s petition, and directs prompt disbursement.

Submissions & Arguments

Contentions of Appellants / Petitioners

The claimant contends the court below erred in rejecting enhanced compensation for the diminution in land value and for the value of trees cut, relying instead on the Advocate Commissioner’s report and Ext. A7/A1 valuation statements. He argues the cause of action arises with initial compensation and that the high-tension lines substantially diminish use and value of land; the 20% deduction from Ext. A7 and the 40% central/20% outer corridor scheme are not justifiable, and any deduction from enhanced compensation for amounts already paid should not be applied. He relies on Ext. C1/C1(a) and the Commissioner's findings to support higher losses. The contention is that law requires weighing factors such as land situs, distance from line, extent of line, and the owner’s reduced use, as per KSEB v. Livisha.

Contentions of Respondents

The Power Grid Corporation argues that the enhanced compensation sought is excessive and inconsistent with the actual damage; it contends that the line does not prohibit agricultural use or small structures and the court rightly applied reasonable percentages for central and outer corridors. It submits that Ext.A7 and the Commissioner's report should be viewed cautiously, as trees were felled after notification and the evidence is not robust to yield a higher quantum. It argues for a moderate deduction, citing the overall practicality of use and discouraging overcompensation, while emphasizing a limited diminution in land value under the circumstances.

Cited Precedents (1)

Case NameCitationTreatmentExplanation
KSEB v. Livisha(2007) 6 SCC 792PositiveThe court quotes KSEB v. Livisha to lay down the factors for assessing diminution in land value due to high-tension power lines—situs, distance from line, extent of line, and loss of use—which guided the calculation of land-value compensation.

Diagnostic Tool

Beta

Does this judgment govern your specific facts?

Don't risk relying on a distinguishable precedent. Enter your facts or proposition below. We will test it against K.N. Aji v Power Grid Corporation of India Ltd & Ors (CRP Nos.333/21 & 57/22) and instantly map out authorities that support, challenge, or govern your position.

Extracted Judgment Text

Exact text extracted from official judgment records.

## **IN THE HIGH COURT OF KERALA AT ERNAKULAM** ## **PRESENT** ## **THE HONOURABLE MR.JUSTICE V.G.ARUN** **MONDAY, THE 26[TH] DAY OF FEBRUARY 2024 / 7TH PHALGUNA, 1945** ## **CRP NO. 333 OF 2021** **AGAINST THE ORDER/JUDGMENT OPELE 1259/2012 OF VI ADDITIONAL** ## **DISTRICT COURT, ERNAKULAM** ## **REVISION PETITIONER/S:** **K.N.AJI, AGED 47 YEARS S/O. NARAYANAN, KARUKAMPILLY HOUSE, PADUVAPURAM P.O., PALISSERY, ANGAMALY-683576. BY ADVS. P.T.JOSE S.ASHITHA** ## **RESPONDENT/S:** - **1 POWER GRID CORPORATION OF INDIA LTD., CONSTRUCTION AREA OFFICE, KAKKANAD, NOW IN PAO/400, 220KV SUBSTATION, KUMARAPURAM P.O., PALLIKARA, KOCHI-682303, REPRESENTED BY DEPUTY MANAGER.** - **2 THE SEPCIAL TAHSILDAR (LA), POWERGRID CORPORATION OF INDIA LIMITED, CHEVARAMBALAM, KOZHIKODE, NOW IN KAKKANAD P.O., PIN682030.** - **3 STATE OF KERALA, REPRESENTED BY DISTRICT COLLECTOR, ERNAKULAM, KOCHI682031.** - **4 KERALA STATE ELECTRICITY BOARD, REPRESENTED BY CHAIRMAN AND MANAGING DIRECTOR, KSEB LIMITED, THIRUVANANTHAPURAM-695001. BY ADV MILLU DANDAPANI** **OTHER PRESENT:** ## **SR.GP.V.TEKCHAND;SC FOR KSEB B.PREMOD** **THIS CIVIL REVISION PETITION HAVING BEEN FINALLY HEARD ON** **12.01.2024, ALONG WITH CRP.57/2022, THE COURT ON 26.02.2024 DELIVERED THE FOLLOWING:** CRP Nos.333/21 & 57/22 -2- ## **IN THE HIGH COURT OF KERALA AT ERNAKULAM** ## **PRESENT** **THE HONOURABLE MR.JUSTICE V.G.ARUN** **MONDAY, THE 26[TH] DAY OF FEBRUARY 2024 / 7TH PHALGUNA, 1945** **CRP NO. 57 OF 2022** **AGAINST THE ORDER/JUDGMENT OPELE 1259/2012 OF VI ADDITIONAL** ## **DISTRICT COURT, ERNAKULAM** ## **REVISION PETITIONER/S:** **POWER GRID CORPORATION OF INDIA CONSTRUCTION AREA OFFICE, MAVELIPURAM COLONY, KAKKANAD, COCHIN - 682 030, PRESENTLY AT CONSTRUCTION AREA OFFICE, 400/220, KV SUB STATION, KUMARAPURAM P.O., PALLIKKARA, ERNAKULAM - 683 565, REPRESENTED BY ITS SENIOR GENERAL MANAGER.** **BY ADV MILLU DANDAPANI** ## **RESPONDENT/S:** - **1 AJI K.N. S/O.NARAYANAN, KARUKAMPILLY HOUSE, PADUVAPURAM (PO), PALISSERY, ANGAMALY, ERNAKULAM DISTRICT - 683 576.** - **2 HE SPECIAL TAHSILDAR (LA) POWER GRID CORPORATION OF INDIA LTD., CHEVARAMBALAM, KOZHIKODE DISTRICT - 673 017.** - **3 STATE OF KERALA REPRESENTED BY DISTRICT COLLECTOR, CIVIL STATION, KAKKANAD, ERNAKULAM, KOCHI - 682 030.** - **4 KERALA STATE ELECTRICITY BOARD REPRESENTED BY ITS CHAIRMAN AND MANAGING DIRECTOR, KSEB LTD., KSEB VAIDHUTHI BHAVAN, PATTAM (PO), THIRUVANANTHAPURAM - 695 004. BY ADVS. P.T.JOSE R.HARISHANKAR** **THIS CIVIL REVISION PETITION HAVING BEEN FINALLY HEARD ON** **12.01.2024, ALONG WITH CRP.333/2021, THE COURT ON 26.02.2024 DELIVERED THE FOLLOWING:** CRP Nos.333/21 & 57/22 -3- ## **ORDER** Dated this the 26[th] day of February, 2024 These revision petitions are filed challenging the order passed by the Additional District Judge-VI, Ernakulam in O.P.(Electricity) No.1259 of 2012. The original petition was filed by the revision petitioner in CRP No.333 of 2021 (hereinafter called 'the claimant'), being dissatisfied with the compensation awarded towards the damage and loss sustained due to the drawing of 400 KV lines across his property by the Power Grid Corporation of India Ltd (hereinafter called 'the Corporation'). The essential facts are as under; The claimant is in ownership and possession of landed property having an extent of 26.25 Ares comprised in Sy.No.243/1 of Karukutty Village in Aluva Taluk. The land was cultivated with various yielding and non-yielding trees. According to the CRP Nos.333/21 & 57/22 -4- claimant, to facilitate drawing of the lines and smooth transmission of power, large number of trees were cut from his property. The drawing of high tension lines rendered the land underneath and adjacent to the lines useless, resulting in diminution of the value of the property. In spite of the huge loss suffered by the claimant, only an amount of Rs.89,378/- was paid as compensation towards the value of yielding and non-yielding trees cut. Surprisingly, no compensation was granted for diminution in land value. Hence, the original petition was filed, seeking enhanced compensation towards the value of trees cut and diminution in land value. 2. The court below rejected the claim for enhanced compensation for the value of trees cut since no evidence in support of the claim was produced. As far as the claim for enhanced compensation towards diminution in land value is concerned, the court below relied on Ext.A7 CRP Nos.333/21 & 57/22 -5- document as well as Exts.C1 and C1(a) commission report and plan. As per Ext.C1 report, the Commissioner has reported that the claimant's property is situated on the western side of the Munnorpilly Road, which is about 150 metres to the north of Pallissery Junction. The court below also noticed that while Ext.A7 property is having public roads on two sides, as per Ext.C1(a) plan, the claimant's property is having no road access. Based on these factors, the court below fixed the land value of the claimant's property by deducting 20% of the value shown in Ext.A7 property. Relying on Ext.C1(a) plan, the extent of central corridor was held to be 15.443 cents and that of the outer corridors, 15.295 cents (3.385+11.910). For the central corridor, 40% of the land value was granted as compensation and for the outer corridors, 20% of the land value. Accordingly, the claimant was found entitled to compensation of Rs.16,63,097/-. Dissatisfied with CRP Nos.333/21 & 57/22 -6- the quantum of enhancement, the claimant has filed CRP No.333 of 2021, whereas the Corporation has filed CRP No.57 of 2022 contending that the enhancement ordered is far in excess of the actual damage sustained. 3. Heard Adv.P.T.Jose for the claimant and Adv.Millu Dandapani for the Corporation. 4. Learned Counsel for the claimant contended that the court below committed gross illegality in refusing to grant enhanced compensation for the loss sustained due to the cutting of valuable trees, in spite of the Advocate Commissioner assessing and reporting the loss. The findings in the Commissioner's report were not relied on by the court below for the reason that the property was inspected much after the trees were cut. The said reasoning is flawed since the trees were cut much after issuance of notification by the Corporation and the cause of action for filing the original petition arose CRP Nos.333/21 & 57/22 -7- only on payment of the initial compensation, even later. It is further contended that 20% deduction made from the value of property involved in Ext.A7 document is unreasonable. 5. It is submitted that the court below grossly erred in granting only 40% of the land value fixed for the central corridor and 20% for the outer corridors. It is further submitted that the court below failed to consider the diminution in land value of the remaining property, which was rendered useless due to the drawing of electric lines and the direction to set off the amount already paid towards the value of yielding and non-yielding trees cut from the enhanced compensation awarded is illegal. It is hence contended that, considering the extent of damage sustained and the diminution in land value consequent to the drawing of lines, the court below ought to have granted compensation as claimed. CRP Nos.333/21 & 57/22 -8- 6. Learned Counsel for the Corporation contended that, compensation towards diminution in land value granted is exorbitant and there is no rationale in granting 9% interest on that amount. The court below also erred in relying on Ext.A7 for fixing the land value of the claimant's property. As the drawing of electric lines does not prohibit the landowner from conducting agricultural activities and putting up small structures, 40% of the land value granted for the central corridor and 20% for the outer corridors are exorbitant. 7. A careful scrutiny of the impugned order reveals that the claim for enhancement of compensation towards the value of trees cut was rightly rejected since no supporting material, other than the findings in the Advocate Commissioner's report, was made available. Even, according to the Commissioner, a clear and definite number could not be arrived at as the CRP Nos.333/21 & 57/22 -9- trees were already cut and removed. The court also noticed that the commission report is an exact copy of the details contained in Ext.A1 detailed valuation statement. As found by the court below, apart from the interested testimony of the claimant and that of a person who claimed to have purchased agricultural products from the claimant, no other witnesses were examined. Therefore, the court below rightly held that the evidence let in by the claimant was not sufficient to discard the contemporaneous valuation statement prepared by the Corporation. 8. As far as the diminution in land value is concerned, the factors to be taken into consideration, as laid down in _**KSEB v. Livisha**_ _**[(2007) 6 SCC 792]**_ are as under; “ _10. The situs of the land, the distance between the high voltage electricity line laid thereover, the extent of the line thereon as also the fact as to whether the high voltage line passes over a small tract of land or_ CRP Nos.333/21 & 57/22 -10- _through the middle of the land and other similar relevant factors in our opinion would be determinative. The value of the land would also be a relevant factor. The owner of the land furthermore, in a given situation may lose his substantive right to use the property for the purpose for which the same was meant to be used.”_ On careful scrutiny of the impugned order, it is seen that the compensation was enhanced after taking all the above factors into consideration. The nature of the land, the cultivation therein, the commercial importance of the area and the manner in which the land was affected by drawing of the lines are all seen considered for fixing the land value as well as the percentage of diminution. The court below has deducted only 20% of the land value in Ext.A7 document, which according to me, is a reasonable deduction. Similarly, in granting 40% of the land value as compensation for the central corridor and 20% for the outer corridors also, the discretion was CRP Nos.333/21 & 57/22 -11- exercised in a proper manner. Being so, I find no reason to interfere with the question of enhancement. Having held so, I find the impugned order to the extent it directs deduction of the amount already paid from the enhanced compensation to be illegal. In this regard, it is pertinent to note that the Corporation had paid only an amount of Rs.89,378/- towards the value of trees cut and had refused to pay any amount towards diminution in land value. The court below, on the other hand, rejected the claim for enhancement of compensation towards value of trees cut and awarded compensation towards diminution in land value. As no compensation was paid towards diminution in land value earlier, the court below was not justified in directing to deduct the compensation granted towards value of trees cut from the compensation awarded for diminution in land value. The impugned order, to that extent, warrants CRP Nos.333/21 & 57/22 -12- interference. For the aforementioned reasons, the civil revision petition filed by the claimant is allowed in part. The direction in the impugned order to deduct the compensation already granted from the enhanced compensation is set aside. Consequently, the enhanced compensation awarded by the court below shall be paid within three months, without any deduction. If any portion of the enhanced compensation is already deposited, that shall forthwith be disbursed to the claimant on appropriate application being filed. The civil revision petition filed by the Corporation is hence dismissed. Sd/- **V.G.ARUN JUDGE** Scl/