High Court of KeralaKerala High Court · 2010Single JudgeRevision dismissed.

Kerala State Electricity Board v. Sri M.N. Sivaraman

Case / Petition Number:
CRP No. 65 of 2007

Case Synopsis & Summary

This is a Civil Revision Petition filed by the Kerala State Electricity Board (revision petitioner) challenging an order of the District Judge, Thodupuzha, in O.P.(Ele.) No.182 of 2004 that granted enhanced compensation for trees cut and removed and for damages to the claimant’s property caused by overhead power lines laid by the Board. The claimant had sought Rs. 4,25,000 as enhanced compensation, while the Board contended that adequate compensation had already been paid. In the evidence stage, Exts. A1–A7 were produced by the claimant; Ext. B1 represented the Board’s valuation. The trial court, after hearing both sides, awarded Rs. 13,455 with interest at 7.5% from 5.7.2002 (date of cutting) to realisation. The sum of Rs. 8,188 paid earlier by the Board was ordered to carry 9% interest from 5.7.2002 to 12.4.2004. The Board’s counsel argued that there was no evidence to support enhanced compensation and that the court arbitrarily reassessed maintenance costs—reducing the Board’s 50% maintenance deduction to 30% for jack trees and pepper vines—without data. The court relied on Kumba Amma v. K.S.E.B. (2000 (1) KLT 542 (FB)) to justify 5% annuity, though it later noted such guidelines are generally inapplicable. It also held the land-value diminution claim was unfounded. On revision, the High Court concluded there was no merit in the challenge and dismissed the revision, upholding the lower award as proper.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • S.S. Satheesachandran
Judgment Date
2010-02-08
Court Decision / Holding
Revision dismissed.
Final Disposition
Revision dismissed.

Parties to the Case

Appellants / Petitioners

  • Kerala State Electricity Board

Respondents

  • Sri M.N. Sivaraman

Legal Representation & Advocates

Counsels for Petitioners

  • • C.K. Karunakaran, SC for KSEB

Counsels for Respondents

  • • S.K. Muraleedhara Kaimal for R1

Submissions & Arguments

Contentions of Appellants / Petitioners

The revision petitioner (Board) submitted that the claimant did not adduce evidence to justify enhanced compensation beyond what had already been paid, and the court’s reassessment of maintenance costs (reducing 50% to 30% for pepper vines and jack trees) was without data and improper. They contended that reliance on earlier guidelines (Kumba Amma) was misplaced or inapplicable to this case, and that the meagre Rs.13,455 awarded could not be considered proper enhancement.

Contentions of Respondents

The respondent claimed enhanced compensation supported by Exts A1–A7 and disputed the Board’s valuation (Ext. B1). The respondent argued the court’s approach—reassessing maintenance costs and applying an annuity framework—was warranted given the injury to 18 pepper vines, one jack tree, and related damages, and that the rejection of the land-value diminution claim was justified by the record.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
Kumba Amma v. K.S.E.B.2000 (1) KLT 542 (FB)OverruledCourt states that the guidelines in Kumba Amma are inapplicable in all types of cases, effectively overruling their broad applicability.
K.S.E.B. v. Livisha(2007) 6 SCC 792Partly Overruled / LimitedThe court notes that principles regarding situs of land and extent of injury from overhead lines are not relevant in this case, indicating limited applicability of Livisha's teachings.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•989 words•~5 min read

In The Court Record

Kerala State Electricity Board v. Sri M.N. Sivaraman

# **IN THE HIGH COURT OF KERALA AT ERNAKULAM** **PRESENT :** **THE HONOURABLE MR. JUSTICE S.S.SATHEESACHANDRAN** **MONDAY, THE 8TH FEBRUARY 2010 / 19TH MAGHA 1931** **CRP.No. 65 of 2007()** **-------------------OPELE.182/2004 of ADL.D.C. & MACT,THODUPUZHA** **....................** ## **REVN. PETITIONER(S)/RESPONDENT:** **-------------------------------** **KERALA STATE ELECTRICITY BOARD, REP. BY ITS SECRETARY, VYDYUTHI BHAVAN, PATTOM, THODUPUZHA.** **BY ADV. SRI.C.K.KARUNAKARAN, SC FOR KSEB** ## **RESPONDENT(S)/PETITIONER:** **-------------------------** **SRI.M.N.SIVARAMAN, RES.AT MELOTTU HOUSE, ERATTAYAR KARA, KALKOONTHAL VILLAGE, UDUMBANCHOLA TALUK.** **ADV. SRI.S.K.MURALEEDHARA KAIMAL FOR R1** **THIS CIVIL REVISION PETITION HAVING BEEN FINALLY HEARD ON 08/02/2010, THE COURT ON THE SAME DAY PASSED THE FOLLOWING:** ## **ORDER IN I.A.NO.182/2007 IN C.R.P.NO.65/2007** ## **DISMISSED.** **8.2.2010** **SD/- S.S.SATHEESACHANDRAN, JUDGE** **/TRUE COPY/** **P.A. TO JUDGE** ## **S.S.SATHEESACHANDRAN, J.** ## **------------------------------C.R.P.NO.65 OF 2007 () ----------------------------------Dated this the 8[th] day of February, 2010** ## **O R D E R** The revision is directed against the order dated 28.6.2006 in O.P.(Ele.)No.182 of 2004 passed by the District Judge, Thodupuzha. The above O.P. was filed by the respondent, hereinafter referred to as the 'claimant' seeking enhanced compensation for the trees cut and removed and also damages caused to his property by the drawing of overhead lines by the Kerala State Electricity Board, hereinafter referred as the 'Board'. The claimant had raised a claim for a sum of Rs.4,25,000/- as enhanced compensation. The Board resisted that application contending that adequate and reasonable compensation had been paid to the claimant. In the enquiry over the claim, Exts.A1 to A7 were exhibited by the claimant. For the respondent Board Ext.B1 valuation statement was marked. On the materials placed and after hearing the counsel on both sides, the court below awarded a CRP.65/07 2 sum of Rs.13,455/- with interest at the rate of 7.5% per annum from 5.7.2002, the date of cutting and removing of the trees till the date of realisation. So far as the sum of Rs.8,188/which had been paid earlier by the Board, interest was directed to be paid at the rate of 9% per annum from the date of cutting 5.7.2002 till the date of such payment 12.4.2004. Enhanced compensation as above with direction to pay interest as indicated above, is challenged in the revision. 3. I heard the counsel on both sides. The grievance canvassed by the learned counsel for the Board is that though no evidence was let in by the claimant to substantiate any of the claims canvassed for enhanced compensation over and above the sum fixed by the Board, the court has arbitrarily reassessed the compensation, that too, reducing the percentage of the maintenance cost which had been assessed by the Board in assessing the compensation. In the case of assessment of compensation due for the cutting and removal of jack tree, the Board had taken into account 50% of the maintenance cost with respect to the yield from that tree for CRP.65/07 3 fixing the compensation payable. A sum of Rs.1,012/- was fixed towards compensation for the tree with reference to the yield assessed by the Board. Reducing the maintenance cost fixed by the Board, the court has fixed a sum of Rs.1,500/- as the compensation payable. Maintenance cost assessed by the Board at 50% was deducted by the court at 30% without any data is the ground urged by the counsel to contend that the interference with the assessment made by the court is not proper. I do not find any merit in the submission. So far as a jack tree is concerned, normally, no expenditure towards maintaining that tree is required. At the most, some deductions can be made with reference to the dropping and nothing else. Further more, the deduction made with respect to the maintenance cost, where it was prima facie satisfied that the deduction made at 50% by the Board was not correct, cannot at all be found fault with. Similarly in the case of pepper vines also, the maintenance cost assessed by the Board was modified by the court. There is no data as to the extent of the land nor any case for the Board that the claimant had to engage some other person to maintain his pepper vines, which CRP.65/07 4 had been cut and removed for drawing the overhead lines. It is also noticed that 18 pepper vines had been cut and removed for drawing such lines. The deduction made by the court with respect to the maintenance cost fixed by the Board in the case of pepper vines was not proper. The Board had assessed annuity return at 5% to fix the compensation payable. The court, following the guidelines and principles in **Kumba Amma v. K.S.E.B. (2000 (1) KLT 542 (FB))** has reassessed the compensation at 5% annuity return. True, the guidelines enunciated by this Court in the above decision have been found to be inapplicable in all types of cases. But in respect of a small tract of land, and that too in assessing compensation with respect to 18 pepper vines and one jack tree, the principles laid down in **K.S.E.B. v. Livisha ((2007) 6 SCC 792)** by the apex court regarding the factors like situs of the land, how far and what extent the injury had been caused by the drawing of the overhead lines to such land etc. are not relevant. Further more, in the present case, it is also noticed that the claim for the diminution of land value on account of the drawing of the overhead lines canvassed by the claimant CRP.65/07 5 was found against and there is no challenge against the rejection of that claim. Taking that also into account, with reference to the meagre sum awarded as compensation, that too, a sum of Rs.13,455/-, I find that the challenges canvassed in the revision contending that it is excessive and unreasonable cannot be appreciated. I do not find any impropriety in the assessment and awarding of the enhanced compensation ordered by the court below. Revision lacks merit and it is dismissed. ## **S.S.SATHEESACHANDRAN JUDGE** prp
End of Judgment Record
Browse All High Court of Kerala (2010) Decisions
2010-09-09

T.K. Biju and Gangaprasad S. v. State of Kerala and The Director, Institute of Human Resources Development (IHRD)

This batch of writ petitions challenges the Institute of Human Resources Development’s (IHRD) recruitment process for the Last Grade Service under notification RECT/03/09/HRD (dated 21.1.2009). The core questions concern the validity of the 23.8.2009 written test, the 23.10.2009 short list (main and supplementary) drawn therefrom, and the 19.3.2010 rank list published after interviews. Petitioners—mostly former daily wage/ad hoc employees—also pursue regularisation, arguing that the selection framework and weightage for past service were either discriminatory or inadequately applied. Ext.P4 had disposed of earlier petitions by directing IHRD to finalise recruitment under a resolution dated 9.7.2007, and Ext.P5 laid down the recruitment rules: an objective written test (70 marks) and an interview (30 marks) with category-wise cut-offs (Rule 5.3) and a rank list valid for three years (Rule 5.4). The court holds that deviations such as clause 8 in the hall ticket do not render the process void in the absence of prejudice, and upholds the short-list’s legality to a large extent. However, drawing on Umadevi (3) and Satya Prakash, the court ultimately directs a limited revisiting of the rank list to grant weightage under Rule 5.2 to those petitioners who would have been included, while denying general regularisation. All petitions are disposed with these directions.

2010-01-21

State of Kerala and District Collector, Kollam v. K. Raghavan

This is a review petition filed by the State of Kerala and the District Collector, Kollam, challenging the High Court’s 23 March 2009 judgment in W.P.(C).29695 of 2005, which directed the Government to consider a freedom fighter’s pension claim and to grant pension from the date of application. The petition traces a long history: the applicant, aged about 75 at the time of filing on 29.12.1995, faced earlier adverse orders in 1987 and 1989; after litigation, the 2005 judgment directed reconsideration and culminated in a 2009 order granting pension in December 2009 but from the date of sanction rather than from the date of application. The review petition contends that the Supreme Court’s decision in State of M.P. and Another v. Devkinandan Maheshwari (2003) and a Division Bench decision followed in W.A. Nos.1419/2006 & 1818/2006 require pension from the date of sanction, not the application date, and thus the judgment should be recalled. It also relies on Dokka Samuel v. Dr. Jacob Lazarus Chelly (1997) to assert that omitting authorities is not a ground for review. The Court, however, finds that omission to cite authorities cannot ground a review and that the government’s delay in compliance violates the Court’s directions, warranting dismissal of the review petition with costs.

2010-02-23

Anitha Rajan v. Revenue Divisional Officer, Thrissur; Thasildar, Chavakkad; Village Officer, Nattika; Sub Registrar, Thriprayar

Anitha Rajan, the petitioner, purchased 50 cents of land in Re-Survey No.166/1, Nattika village, Thrissur district, from the legal heirs of late Gangadharan via Ext.P3 sale deed registered at Triprayar. The conveyance, through power of attorney documents Ext.P1 (executed by Ajayan in Dubai in favor of his mother Rathnabhai) and Ext.P2 (executed by Usha in India), prompted mutation proceedings before the Revenue Divisional Officer (RDO). The RDO refused to effect mutation unless the original Ext.P1 POA was produced for adjudication of stamp duty under the Kerala Stamp Act, 1959, claiming non-compliance with stamping and the need to determine stamp duty under sections 31 and 32. The petitioner contends that it is not mandatory to submit every PoA executed outside India for adjudication; only instruments chargeable with duty which cannot be stamped by private persons must be taken to the Collector under section 18(2). Ext.P1, though executed abroad, is on Indian stamp paper and was presented at registration, having been stamped Rs.150 under Article 44(f). The court analyzed sections 18(1), 18(2), 31 and 32 and held that section 18 applies to instruments executed outside India; since Ext.P1 is duly stamped, Section 18 has no application and Sections 31-32 cannot be invoked to compel production. Relying on Madras High Court decisions Manoharan v. Velu and R.B.K. Rajeswari Nachiar, the court held the Village Officer erred in requiring Ext.P1 before the RDO, quashed Exts.P4 and P6, and directed mutation actions to be completed within two months of certified judgment copy.

2010-03-23

V. Mohanan Nair v. Babu Pillai and others

This writ petition arises from a complex land dispute in Nedumangad where the petitioner, V. Mohanan Nair, challenged a trial court order that set aside a commissioner's report and remitted for a fresh report. In O.S. 380/2005 the plaintiff sought a permanent injunction; in O.S. 542/2005 the second respondent sought declaration of title and possession based on deeds executed in 2005. To resolve the location of the plaint schedule property, a commission was appointed, and Ext. P2 report and plan were filed. Subsequently, I.A. 4808/2009 was filed by the second respondent seeking to set aside the commission report and plan and remit for a fresh report. The trial court remitted the matter; Ext.P8 records the order, which the petitioner challenged in this Writ Petition. The respondents relied on a decision in Sarojini v. Karthiyani Amma to contend that Article 227 petitions against commission reports are not maintainable, while the petitioner argued lack of justification for remitting and the undue delay in filing the petition. The Kerala High Court, while recognizing the normal reluctance to exercise visitorial jurisdiction, held that exceptional circumstances permit interference under Article 227 and remanded the matter for fresh consideration, directing that the trial court assess sufficiency of Exts. C1, C1(a), C1(b) and allow further inspection if needed. The result is a remand to ensure a fair adjudication on the commission report."