WP(C) Nos. 2465/2022, 2520/2022, 3286/2022, 4110/2022 These writ petitions, heard together, challenge the land acquisition process, compensation, and rehabilitation aspects under the National Highways Act, 1956 and the Fair Compensation Act, 2013. Petitioners from multiple batches contend that they are entitled to benefits under Schedules II and III of the Fair Compensation Act and seek judicial oversight of the Compensation and Land Acquisition process (CALA) before awards are finalized. The government defendants contend the petitions are premature since awards have not yet been issued and that CALA must decide the claims in due course, while being guided by this Court’s declarations in Soumini and by the broader statutory framework. The Court observes that the issues are common across petitions and that CALA must consider all relevant facets, including rehabilitative measures, and cannot be dictated by the Government’s posture. It emphasizes expeditious processing of awards and adherence to statutory mandates, and reiterates that CALA should complete proceedings with due regard to Schedule II and III claims under the Fair Compensation Act, while being bound by the Court’s earlier pronouncements. The judgment ultimately directs CALA to hear the petitioners, assess all claims, and issue appropriate awards expeditiously, without restricting CALA’s independent decision-making within the statutory framework.
Premarajan, the revision petitioner, seeks to overturn eviction orders under Section 11(3) of the Kerala Buildings (Lease and Rent Control) Act, 1965. Landlord Abdulkhader moved the Rent Control Court (RCP No.12 of 2015) seeking eviction for his own occupation by his family; the court granted eviction on 13.09.2017. The Rent Control Appellate Authority dismissed the appeal on 13.02.2019. This revision petition under Section 20 of the Act contends that the eviction was not warranted and that the landlord’s claimed need is not bonafide, with the second proviso to Section 11(3) not satisfied. The landlord asserts his deaf son Favas Ahammad needs the shop to start a stationery business for livelihood, as he remains unemployed; he claims no other suitable shop is available and that the petition schedule shop on the ground floor is the only viable space. The petitioner contends the landlord and his son have been operating a photostat/internet business in two upstairs rooms of the same building, which undermines the claimed need and the absence of alternative premises. Courts below found the upstairs rooms unsuitable for a stationery business. The High Court reiterates bona fide need standards from Adil Jamshed Frenchman, Shiv Samp Gupta, Deena Nath, Ammu v. Nafeesa, and Gireeshbabu T. P. It concludes the need is sincere and that the second proviso is not established, while the first proviso is inapplicable. The revision petition is dismissed, with six months’ time to surrender possession on conditions: affidavit of unconditional surrender within two weeks, arrears payment within four weeks, and compliance with licensing requirements; failure cancels the time limit.
This writ petition challenges Ext.P3, an order of the Akathethara Grama Panchayat denying a building permit and insisting on a development permit under the Kerala Rules. The petitioner, an owner of a small plot (about 7 cents) purchased from a larger parcel, seeks the building permit for construction and seeks quashing Ext.P3. The petitioner argues Ext.P3 is unsustainable in light of the Court’s decision in Panjal Grama Panchayat, Thrissur v. Aneesh P. and anr. (2022 (2) KLT 653), which held that development permits are not mandatory for small plots purchased from larger lands. The Standing Counsel for respondents contends that development permits are required for development of land under Rules, 2019 (and Rule 2(ad)/2(ae), Rule 5, Rule 31) and that the District Town Planner should be consulted. The Court agrees that a reading of the Rules (2019) with the earlier decisions shows development of land involves an integrated activity. However, it notes that for small plots, the development permit is not required and quashes Ext.P3, directing the Panchayat to reconsider the building permit in light of Panjal. The judgment cites Nafeesa and earlier Single-Judge decisions in support. The matter is disposed with directions to reconsider within a tight timeframe, keeping the petitioner’s built-up rights in view.
This writ appeal (WA No. 1138 of 2014) challenges the judgment in W.P.(C) No. 23945 of 2011 and the Lok Adalat Exhibit P2 award dated 07.05.2011. The 1st respondent, Sreekumar, had purchased property by offering security for a loan obtained from the bank (the 4th respondent). A multistoried building was constructed on the security. The writ petition contended that the settlement agreement underpinning Exhibit P2 was illegal because it was signed only by the 4th respondent (on behalf of the writ petitioner) and not by all parties; no power of attorney authorizing such signing existed, and there was no privity of contract between the bank and the writ petitioner. Regulation 33.1 of the Kerala State Legal Services Authority Regulations, 1998 mandates that every Lok Adalat award must be signed by the parties to the dispute and the panel. The learned Single Judge held the award unsustainable for lack of signatures, relying on Leela v. The Manager, National Insurance Company (2008 (1) KHC 564). On appeal, the Division Bench affirmed that the signature of all parties is a mandatory requirement; there is no provision allowing a party to sign on behalf of another. Accordingly, the writ appeal was dismissed. The decision reinforces that Lok Adalat awards require full, explicit signing by all parties to be enforceable.
This Motor Accident Claims Appeal arising from OP (MV) 599/2006 before the Motor Accidents Claims Tribunal, Perumbavoor, concerns injuries sustained by the appellant, Sivasankaran Nair, in a Feb 23, 2006 accident when his motor cycle KL-7/AJ 4081 was struck by car KL-6/B 4285 driven negligently by the first respondent. The Tribunal granted compensation in part, allowing Rs. 42,616 with interest, and dismissed other heads of claim. The appellant contends that the Tribunal erred by not applying the higher notional income standards and the multiplier prescribed by leading decisions, and by misapprehending the disability assessment and the medical evidence. The insurer contests liability and the quantum, arguing lack of proof of income and challenging the higher sums claimed. The High Court re-evaluates key inputs: notional monthly income is fixed at Rs. 4,500 (citing Ramachandrappa) for a 2006 accident; the appropriate multiplier is 11 (per Sarla Verma); disability is finally assessed at 10% functional disability after scrutinizing Exts A4–A12 and the medical board evidence, and the need for a Medical Board is discussed (citing Raj Kumar). The court enhances compensation across several heads, recalculates losses including loss of earning capacity (Rs. 59,400), loss of earnings (Rs. 18,000), treatment expenses (Rs. 50,000), bystander expenses (Rs. 3,300), pain and sufferings (Rs. 25,000), and loss of amenities (Rs. 20,000), resulting in a total enhanced amount of Rs. 1,77,200. The appeal is thus allowed in part, with an order to deposit the enhanced amount within 60 days and to disburse to the appellant with 6% interest on the enhanced sum from the date of petition to realisation, along with Rs. 5,000 costs.
Mathai, the petitioner in M.A.C.A. No.1648 of 2013, challenges a 2013 MACT award (O.P.(MV) No.242/2010) arising from a 16.01.2009 motor accident on the Mannackanadu–Kurichithanam road. The Motor Accidents Claims Tribunal held the first two respondents (driver and owner) liable and awarded Rs.1,34,144 as compensation, while exonerating the insurer (3rd respondent) on the ground that the petitioner was a gratuitous passenger in a goods auto-rickshaw. The petitioner argued that the goods auto-rickshaw involved was insured with the 3rd respondent at the material time, and that the insurer must indemnify the insured since the accident occurred while the petitioner was on the public road; Exts. A1–A15 and Exts. B1–B3 were relied upon to prove the case. The 1st and 2nd respondents did not contest the petition; the 3rd respondent contended the policy does not cover passengers in a goods vehicle and pointed to alleged inconsistencies in the private complaint and the wound certificate. The Kerala High Court partly allowed the appeal, holding the insurer liable to indemnify the insured and enhancing several heads of compensation. It recalculated compensation using the multiplier doctrine (Kajal) for bystander expenses and the Pranay Sethi framework for future prospects, arriving at an additional Rs.10,28,100 with 7.5% interest from the date of filing until realization, to be paid within two months, with disbursement per Circular No.03/2019.
This writ petition challenges the denial of appointment to the post of Accountant-cum-Data Entry Operator notified by Annamanada Grama Panchayat under MNREGS. After ranking No.1 in Ext. P2, the petitioner faced opposition in the Panchayat committee meeting held on 11.09.2020, where nine members, including the Vice President, opposed appointment on the ground that she did not reside within Annamanada Grama Panchayat. The petitioner contends a mala fide motive behind the dissent, allegedly to favour Anumol Babu, the sole applicant resident in the Panchayat who had the least marks. Pending the petition, the Panchayat decided not to fill the post due to non-availability of pending works, and later issued Ext. P6 (17.02.2022) not to fill the post. The petitioner seeks quashing Ext. P3 (dissent) as arbitrary and unconstitutional and to enforce appointment in line with her rank. The respondent Panchayat claims there is no legal right to appointment; Ext. P6 reflects a temporary hiatus rather than a denial on merits, and there is no resident-preference provision in MNREGS. The Court holds that discrimination based on residence in public employment contravenes Article 16, citing Kailash Chand Sharma, and sets aside Ext. P3. It directs a merits-based consideration of Ext. P6’s validity under MNREGS and related orders after affording hearing, with a two-month deadline for a decision.
This writ appeal challenges a Kerala High Court order that granted police protection to the petitioners (R1–R7) in WP(C) 10351/2022 against threats from the appellant, Prakashan, and others. The petitioners claim title under Ext. P4, a final decree in O.S. No.168 of 1989, and assert that Ext. P7 delivery report and Ext. P8 delivery receipt put them in possession of the subject property. The appellant and respondent No.11 contend that possession was delivered after, and during, execution proceedings stayed by Ext. R4(a) dated 17.08.2011, rendering the delivery illegal; they also allege lack of notice of Exts. P7–P8 to them. The Single Judge held that Ext. R4(a) stay merged with the final judgment, so the delivery in 2012 could not be resisted on the stay basis, and the second appeal against Ext. P5 was not live due to delay. The Division Bench, citing a Supreme Court proposition (Prem Chopra) that interim orders merge with final judgments, affirmed that the stay had no independent legs. It noted that the law protects the diligent, not the indolent, and that the appellants did not timely challenge the delivery. Consequently, the writ appeal was dismissed for lack of merit.
This Regular Second Appeal challenges the judgment and decree in A.S. No.56/2012 on the file of the I Addl. District Judge, Ernakulam, arising from O.S. No.74/2008 before the Sub Court, Kochi. The suit sought possession of plaint A schedule property (7 cents in Sy.No. 209/2, Fort Kochi) along with damages for use and occupation and a permanent injunction. The original plaintiff died during proceedings and his legal heirs were impleaded as plaintiffs 2 and 3. The plaintiff claimed exclusive possession since 1956 under Gift Deed No. 447/1956; the defendants contended the right was only to a thatched shed (B schedule) and not to the appurtenant land. The suit history includes O.S. 386/1990 (eviction), O.S. 218/2002 (injunction) and O.S. 47/2006 (representative suit), with decrees granting possession to plaintiffs for the house and related structures. The appellants challenged on grounds of bar under Order II Rule 2 CPC for not including appurtenant land and other relief in earlier suits, and on whether Exts. A15/A16 (O.S.47/2006) bind them in a representative suit under Order I Rule 8. The High Court held that Order II Rule 2 bars the present suit and that the constructive res judicata principle under Explanation IV to Section 11 CPC applies. It also held Exts. A15/A16 cannot bind the appellants, there is no sameness of interest for Order I Rule 8, and the suit for possessory title cannot bind the appellants. The second appeal was allowed; lower judgments were set aside with costs to the appellants.
This Kerala High Court criminal appeal arises from a trial in S.C.No.243/2005 in Thrissur, challenging the conviction of the first accused (Suresh Babu) under sections 304-B and 498-A IPC. The prosecution alleged that Rakhi, wife of the first accused, was subjected to mental and physical cruelty and dowry harassment following disputes over dowry ornaments and property; she died on 16.09.2000 due to septicaemia after sustaining 40% burns, allegedly from self-immolation prompted by the cruelty. The Sessions Court convicted A1 and acquitted others, sentencing 7 years’ RI for 304-B and 3 years plus fine for 498-A with a direction to pay the fine to Rakhi’s child. The High Court scrutinized the central evidentiary pillar: Ext.P14 dying declaration and the accompanying medical and testimonial evidence, including Ext.P7, Ext.P8, Ext.P13 and Ext.P19, while noting delays in recording the dying declaration and the FIR (nine days), inconsistencies in witness testimony, and lack of corroboration for the dowry-cruelty chain. The judgment surveys key authorities on dying declarations (Lakhan; Uttam; Nallapati; Rajkumar; Assoo) and cautions against relying on dying declarations in isolation where circumstances cast doubt. The Court ultimately held that conviction cannot be sustained on Ext.P14 alone, given the record. The appeal is allowed; conviction and sentence are set aside and the accused is acquitted.
Kerala High Court heard a writ petition by Kulanda Grama Panchayath challenging Exhibit P2, an order of the Justice (Retd) Siri Jagan Committee that fixed compensation for the second respondent following injuries from a stray dog incident and directed payment by the Panchayat: Rs 1,83,714 with interest at 9% from the date of claim. The petition argued the committee, created by the Supreme Court’s Exhibit P4 order, could only entertain dog-bite complaints and lacked jurisdiction because the injuries occurred when the scooter rider braked to avoid a dog, not a bite; it also claimed violation of natural justice due to lack of opportunity and that there was insufficient material to quantify compensation. The respondent contended that Exhibit P4 created a broader remit to address stray dog menace and ensure victims receive just compensation, citing the Supreme Court orders and Anupam Tripathi (2016). The court observed that the P4 order and subsequent orders indicate the committee’s mandate extends beyond dog bites to curb stray dog menace and to ensure relief for victims. It held that the committee is a fact-finding authority, with very limited scope for interference; it found sufficient opportunity was given to the Panchayat, and, after considering the relevant aspects, dismissed the petition, thereby upholding the P2 order.
R.C.R.No.185 of 2014 and connected cases (consolidated with Nos. 186, 190, 191, 198, 199, 200, 201, 202, 210, 211, 216, 224, 225, 226, 230, 231, 232, 233 of 2014) These Rent Control Revision petitions arise from landlord Korothmkandy Khalid seeking eviction under Sections 11(3) and 11(4)(iv) of the Kerala Building (Lease and Rent Control) Act, 1965, in respect of multiple rooms in the Jayasree Complex, Thalassery. The High Court examines a batch of revisions challenging orders of dismissal and confirmations by RCC and RCAA, with the core issue being whether the landlord’s reconstruction plan and his own occupation constitute bona fide needs justifying eviction. The court reiterates the wide scope of Section 20 revisional jurisdiction, allowing the High Court to review the legality, regularity or propriety of subordinate orders and, if necessary, reappraise evidence for that limited purpose. It rejects the contention that Khalid’s wealth or possession of other premises negatives bona fides, emphasizing that a landlord may own multiple properties and still have a genuine need. The court also clarifies that the definition of “building” under the Act can extend to space occupied by the building itself for the landlord’s bonafide use, aligning with precedents like Sarada, Daniel and Narayanankutty, while engaging with points from D.A.V. College and other authorities to refine interpretation. Ultimately, the petitions are allowed: eviction under Sections 11(3) and 11(4)(iv) is granted, with three months to surrender possession and conditions to pay arrears and rent up to vacatur.
This writ appeal arises from a decision in WP(C) No.18035 of 2022, where Sabna M.S. sought a building permit for a residential construction on a small land parcel in Nedumangad. The Nedumangad Municipality rejected the application (Exhibit P3) for reasons including absence of plot subdivision details. The High Court of Kerala, in a decision dated 10.06.2022 in Nafeesa v. Chavakkad Municipality and related judgments, held that a development permit is required only if there is a subdivision of plots; where a project does not involve land development, a building permit can be granted without insisting on a development permit. Following that line of reasoning, the learned Single Judge disposed of Sabna’s writ petition by directing the Municipality to consider the building permit without requiring subdivision or a development permit, provided the applicant is otherwise eligible, within three weeks. The present writ appeal challenges this. The Division Bench reviews the precedents, notably Nafeesa and Panjal Grama Panchayat v. Aneesh P, and agrees with the principle that a small landowner seeking construction need not obtain a development permit for the entire property, so long as statutory requirements are otherwise satisfied. The appeal is dismissed; time for consideration of the application is extended by three weeks.
This is an original petition (OP(C) 968 of 2022) filed in the High Court of Kerala at Ernakulam by the defendant, Najeeb, challenging an order dated 26 May 2022 in I.A. No.5 of 2022 in O.S. No.130 of 2019 before the 2nd Additional Sub Court, Ernakulam. The suit, instituted by the respondents for partition, led the defendant to tender ten documents in evidence. Due to the counsel’s COVID-19 illness, the documents could not be produced at the initial stage. After the counsel recovered, the defendant moved I.A. No.3/2022 to remove the case from the Special List and I.A. No.5/2022 to accept the documents on record (Exts. P1–P2), which the trial court dismissed (Ext. P4). The respondents argued belatedness and non-compliance with Order VIII Rule 1(a) CPC. The petitioner contended that, in pandemic times and per a Supreme Court decision in Levaku Pedda Reddamma & Others v. Gottumukkala Venkata Subbamma & Another (2022), procedural rules should not bar the right to lead evidence, especially with costs. The High Court invoked Article 227 and supervisory powers to set aside Ext. P4, allow Ext. P1, accept Ext. P2, and direct the trial court to permit tendering of documents on record, while expediting disposal of the suit. The judgment emphasizes a lenient, justice-focused approach to late evidence in exceptional circumstances.
Nalini, wife of Unnikrishnan, the accused in an Abkari Act case, appeals against her conviction under Section 8(2) of the Abkari Act by the Additional Sessions Court (Fast Track II), Palakkad, for possessing 5 litres of illicit arrack on 04.09.2007 at Perumudiyar Desom, Muthuthala Village, Ottapalam Taluk. The trial court framed the charge, examined witnesses, and relied on Exts. P1–P9 and MO1 to convict, sentencing her to one year’s rigorous imprisonment and a fine of Rs. 1 lakh. On appeal, the Kerala High Court, in a judgment delivered on 24 August 2022 by Justice K. Babu, allowed the appeal and acquitted. The court found that the prosecution failed to establish the identity of the person carrying the contraband at the scene, noting that PW1 and PW2 had only a fleeting view and that Ext. P1/mahazar contained additions (including signatures) not consistently reflected in MO1. There were no independent witnesses corroborating the prosecution, and the accused’s signature on MO1 could not be relied upon to prove identity. Further, there was no verifiable chain of custody for the sample, no tamper-proof dispatch proof, and an unexplained delay in chemical analysis (sample admitted late and analyzed after a long gap). Relying on well‑established authorities on eyewitness identification and forensic chain of custody (including Krishnadas v. State of Kerala), the court held the link to the contraband was not proved and acquitted the appellant. The appeal is allowed as above.
CRL.M.C. Nos.4170 & 4222/2021 Two Criminal Miscellaneous Cases (Crl.M.C. Nos. 4170/2021 and 4222/2021) were heard together under Section 482 CrPC before the Kerala High Court, challenging proceedings in two connected cases before the Judicial Magistrate of First Class—Kollam. Crime No. 105/2021 (Eravipuram PS) involves the petitioner in Crl.M.C. No. 4222/2021 and relates to penetrative sexual assault and related acts alleged against the accused in a clinical setting, carrying offences under IPC sections 342, 354B, 354 and 376(2)(b). Crime No. 96/2021 (Eravipuram PS) involves the petitioners in Crl.M.C. No. 4170/2021 and encompasses offences under IPC sections 294(b), 323, 324 and 448 read with 34. The defacto complainant in Crime No. 105/2021 is the wife of one petitioner in 4170/2021, while the accused in 96/2021 includes the husband of the defacto complainant in 105/2021, linking the two prosecutions. The petitions argue for quashing on the basis of a mutual settlement between the parties, supported by affidavits, contending the matter should be put to rest. The Public Prosecutor opposes it, emphasizing the gravity of the alleged rape and that not all offences are compoundable. Citing Gian Singh v. State of Punjab (2012) 10 SCC 303, the Court notes that settlements may justify quashing in certain civil-flavour offences, but it holds that rape is grievous and cannot be quashed merely on settlement. Ultimately, the Court declines to quash and dismisses both petitions as the offences are serious and the settlements do not justify termination of proceedings.
W.P.(C). No. 18727 of 2021 This writ petition (WP(C) 18727 of 2021) by K.A. Abraham challenges alleged misplacement of construction following a building permit issued for re-survey No. 285/7 of Manarcadu village in Kottayam District. The petitioner asserts that after obtaining the permit, construction has proceeded in an area categorized as Nilam in the data bank and in revenue records, contrary to the permit. He relies on Exts P15 and P16, communications from the Agricultural Officer, and seeks a mandamus directing the 1st respondent to invoke Section 13 of Act 28 of 2008 in respect of the property and to ensure compliance by the 2nd and 4th respondents with Ext P9; he also seeks to prevent any construction by the 9th respondent or anyone under him, to consider Ext P10 after hearing, and to take steps for demolition of the building constructed in the disputed resurvey. The petition has been argued by the petitioner’s counsel along with the Government Pleader and the Panchayat; and the 9th respondent’s counsel appeared. The court, after hearing, found that this is a matter to be reviewed by the 1st respondent. It directed the petitioner to file a representation within three weeks, and ordered that the 1st respondent consider it, after giving opportunity of hearing to all affected parties, within one month and to take into account Exts P15–P16. The order emphasizes due process over immediate relief.
Richu Hannah Joy and Ron Sam Joy, the petitioners, are the legal heirs of Late Leelamma K who served the Kerala State Co-operative Bank for over two decades and retired in 2017. They challenge the insistence on a maximum gratuity capped at Rs. 10 lakhs under Rule 59(iii) of the Kerala Co-operative Societies Rules and seek higher gratuity in terms of Section 4(5) of the Payment of Gratuity Act, 1972 (POG Act). They rely on Chandrasekharan Nair v. Kerala State Co-operative Agricultural and Rural Development Bank (Full Bench, 2017) which held that an employee of a cooperative society, covered by both the POG Act and Kerala Co-operative Regulations, is entitled to a higher gratuity under Section 4(5), even if the default amount under Section 4(2) is lesser. The petition cites earlier Kerala High Court rulings (W.P.(C) No.27507/2013; W.P.(C) No.1023/2019) and a Supreme Court order in SLP Nos. 9446–9451/2018, affirmed as Exhibit P7, to support the claim. The respondent Bank contends that the statutory regime, including the 2010 amendment and the provisos to Rule 59, caps gratuity where the Act does not apply, and that relief under Section 69 of the Co-operative Societies Act is the proper remedy. The Court ultimately holds in favour of the petitioners, directing disbursement of the higher gratuity with 9% interest from retirement, within three months, and to consider any retrospective salary revision affecting the amount.
A High Court of Kerala, Ernakulam, hears MACA No. 2664 of 2009, an appeal by Rajesh P. S/o Velukutty challenging an award by the Motor Accident Claims Tribunal, Manjeri, under Section 166 of the Motor Vehicles Act, 1988. The accident occurred on 1 July 2004 when a car allegedly driven negligently by the first respondent struck the appellant while he waited at Chattiarmad. He sustained fractures of the femur shaft, both bones of the left leg, and the left humerus, and was treated at Koyas Hospital, Feroke, and Medical College Hospital, Calicut for 12 days. The appellant, a carpenter, claimed Rs. 3,00,000 (limited to Rs. 2,00,000) as compensation; the first respondent was ex parte; the second respondent was the owner and the third respondent insurer of the car. Exts A1–A4 and X1 were produced. The Tribunal awarded compensation in part: Rs. 59,303 plus interest and costs payable by the insurer. On appeal, the court re‑examines the evidence, fixes the notional monthly income at Rs. 6,000 (citing Chameli Devi and Shivakumar for income in similar occupations), confirms disability at 3%, and applies a multiplier of 17 (Sarla Verma). It recalculates heads of loss—raising loss of earnings to Rs. 60,000, adjusting bystander expenses, extra nourishment, pain and sufferings, and loss of amenities—and aggregates to Rs. 1,41,723. The court holds the appellant entitled to enhanced compensation, directs deposit of the enhanced amount with interest (7% p.a.) and costs, to be disbursed to the appellant. The appeal is allowed in part, with enhanced relief granted.
R.P. No.71 of 2021 is a review petition by K.S. Joshy challenging the High Court of Kerala's judgment in W.P.(C) No.13005 of 2018, dated 1 February 2019, concerning the use and reclamation of a paddy field measuring 139.56 acres (Ares) under the Kerala Land Utilisation Order, 1967 and related statutory schemes. The writ petition questioned orders passed by the primary and appellate authorities under clause 6(2) of the Kerala Land Utilisation Order, 1967, regarding utilisation of the land for non-agricultural purposes. At final hearing, counsel for the petitioner submitted that it would suffice to permit an application under section 27A of the Kerala Conservation of Paddy Land and Wetland Act, 2008 (as amended by Act 2018) and to consider it dehors the Exhibit P11 order; the court directed that the petitioner may file such an application before the Revenue Divisional Officer (RDO) within three weeks, to be decided in accordance with law and within three months. The RDO later passed an order on 25 March 2020 allowing the application subject to specified conditions, including watershed development and conversion charges. The review petition filed on 8 December 2020 contends that the RDO order violates statutory provisions and precedents, and that the 29.6.2019 application should be treated as a continuation of Exhibit P3 under the KLUO, 1967. The Court ultimately held that no application was pending before the RDO under clause 6 of the KLUO, 1967, and, noting that the judgment had been acted upon, dismissed the review petition for lack of a valid ground for review.