The National Insurance Company challenged a Workmen’s Compensation award of Rs. 4,07,700 granted to the dependants of Sreejith Babu, a bus driver who died in a road accident on 3 January 2003 while on a long journey. The bus, owned by the first opposite party and insured with the second opposite party, employed two drivers to cover the long trip; one drove while the other rested in the cabin awaiting his turn. The deceased’s dependants contended that even when not actively driving, the driver’s resting period was within the course of his employment, and thus the accident, which occurred around 12:10 am at Thalapara, arose out of and in the course of employment per Section 3 of the Workmen’s Compensation Act. The insurer admitted the policy but disputed the claim, arguing the death occurred while the deceased was resting and not driving, invoking a Supreme Court decision in AIR 2013 SC 1064 (Manager, National Insurance Co. Ltd v. Saju P. Paul). The Commissioner for Workmen’s Compensation found in favour of the applicants, and the High Court, in a Division Bench, upheld that view, distinguishing the cited decision as factually inapplicable. The High Court ultimately dismissed the appeal, thereby sustaining the award.
OP (CAT) No. 311 of 2016 (Z) This Original Petition challenges the Central Administrative Tribunal, Ernakulam Bench's October 25, 2016 order in OA No.516/2016, which directed the petitioners to depute the respondents to the Army Postal Service (APS) under the 25% direct recruitment quota, based on a limited departmental competitive examination held in 2015 and a circle‑level merit list issued in 2016. The petitioners (Union of India and Postal Department) contend that the recruitment and deputation to APS are governed by the Department of Posts MTS Recruitment Rules, 2010 (Annexure-A9) read with Annexure-A1/A10 notifications and the Constitution, especially the proviso to Article 309. They argue that Annexure-A9 contemplates division‑wise vacancies and that deputation would require a “technical promotion” to MTS when vacancies exist in the MTS cadre; circle‑level deputation across divisions is not permitted by the rules. The respondents (GDS) had challenged division‑wise vacancy restrictions and sought deputation to APS when vacancies exist elsewhere, relying on the 2016 circle‑level note to Annexure-A10. The Kerala High Court holds that the Tribunal’s directions to deputize contravene the explicit rules but allows the petitioners to consider invoking Rule 6 (Power to Relax) of Annexure-A9 to accommodate the applicants, keeping two APS vacancies unfilled pending this exercise.
This Motor Accident Claims Appeal arises from an award of the Motor Accidents Claims Tribunal, Irinjalakuda, in O.P. (MV) No.909/2004, concerning a fatal road accident that occurred on 15.9.2003 on the Mumbai-Goa National Highway in Maharashtra. The deceased was traveling in an autorickshaw, and the autorickshaw collided with a lorry. The wife, two minor children, and the father of the deceased were the claimants before the Tribunal; the 4th claimant died during the pendency. The Tribunal held the autorickshaw driver mainly responsible and consequently fastened liability on the insurer of the autorickshaw, the appellant-insurer United India Insurance Company Ltd. The appellant challenged the findings on negligence and the quantum of compensation, citing Ext.B2, an MACT award from Ratnagiri District in a similar matter that reportedly apportioned liability 75% to the autorickshaw insurer and 25% to the lorry insurer. The High Court examined the evidence on record (Exts.A1–A4, police materials) and held that the police case implicated the autorickshaw driver and that there was no contra evidence displacing that conclusion. It rejected the argument that a Ratnagiri award bindingly governs the present case under Section 163A of the M.V. Act. It also clarified that Bijoy Kumar Dugar does not generate a universal rule mandating equal negligence in every head-on collision. The appeal was dismissed, upholding the Tribunal’s findings and quantum as just and reasonable.
Crl.MC.No. 7806 of 2016; underlying CC. No.1999/2015 This is a Criminal Miscellaneous Case under Section 482 CrPC filed in the High Court of Kerala at Ernakulam, challenging CC No.1999/2015 of the Judicial Magistrate of First Class, Kalamassery arising from Crime No.269/2015 at Eloor Police Station. The petitioners — Shemeer, Abdul Kareem and Shejeeb — are accused 1 to 3 indicted for trespass, assault and related offences under IPC sections 447, 323 and 294(b) read with 34. They seek quashing of the proceedings, asserting that the parties have settled their disputes amicably and that continuing the criminal case would undermine peace and disturb public order. Respondents, including the State and the alleged victims, consent to the settlement and do not wish to persist with the prosecution; the Public Prosecutor expresses reservations about invoking extra-ordinary powers under Section 482 in such cases. The Court cites Supreme Court precedents Gian Singh v. State of Punjab (2012) and Narinder Singh v. State of Punjab (2014) to underscore that quashing may be appropriate where settlement reflects ends of justice and avoids abuse of process. After evaluating these authorities and the factual matrix, the High Court decides that quashing the proceedings would serve ends of justice and promote peace, and so the petition is allowed. The final report and all proceedings in CC 1999/2015 are quashed.
This Regular Second Appeal arises from a partition dispute concerning ancestral property at Kozhikode. The appellant, Aliyot Vijayakumar (3rd respondent/3rd defendant), challenges judgments of the III Additional District Court, Kozhikode (dishonoring the partition suit) and the Additional Munsiff Court, Kozhikode, on the ground of maintainability. The lower courts dismissed the suit for partition; the plaintiff–respondents asserted that the appellant and other defendants had already suffered decrees and appeals, with the appeal now sought as a second appeal for a new contention. The appellant contends that his mother’s alleged right over the property was not adjudicated in the suit or in the first appeal, and that such an issue can be raised through a second appeal, relying on Hardevinder Singh v. Paramjit Singh and others. The respondents argue that the second appeal is not maintainable on such grounds, since the 3rd respondent did not challenge the original decrees at the proper stage and has not shown a legal basis to raise new contentions in a second appeal. The court examines the maintainability issue, distinguishes the cited precedent as inapplicable to the facts, and concludes that the appellant cannot raise fresh contentions via a second appeal. Ultimately, the RSA is dismissed with costs; all interlocutory applications are closed, and the parties bear their own costs.
MACA No. 2475 of 2015 (and connected MACA Nos. 2939, 3192 & 2974 of 2015) These MACA Nos. 2475, 2939, 3192 and 2974 of 2015 arise from four OP(MV) petitions under the Motor Accidents Claims Tribunal, Ernakulam, challenging awards for injuries sustained in a 14.10.2011 accident involving an auto rickshaw, a fork lift and a container lorry. The Tribunal awarded Rs.72,600, Rs.44,000, Rs.57,000 and Rs.60,500 with 8% interest and costs, directing the insurer to satisfy the awards and recover amounts from the fork lift driver and owner. The owner-appellant contends that the finding of negligence against the fork lift/other vehicles is unsustainable and that the auto rickshaw driver was not negligent; the insurer contends composite negligence among tort feasors and that the claimants could sue any or all responsible parties. The appellant relies on established precedents, including M.S. Grewal v. Deep Chand Sood, to define negligence, and APSRTC v. Hamalata and Pawan Kumar v. Harikishan Dass Mohan Lal to support joint liability in composite negligence. The High Court, after considering the record, dismisses the appeals, upholding the lower court’s awards and directing the insurer to satisfy the awards, with recovery to be effected from the insured where appropriate.
This Regular Second Appeal arises from a long-chained property dispute involving Poomangalam U.P. School, originally owned by Kunhikannan. After his death, rights devolved to his wife Lakshmi and his children, who released their interests to Lakshmi. Lakshmi later gifted the property to her daughter Indira (Ext.A3, 1999). Lakshmi then purportedly cancelled that gift (Ext.B11, 2002) and transferred rights via Ext.B1 (to Madhusoodanan) and Ext.B2 (to the defendant). Indira subsequently assigned her rights to the plaintiff through Ext.A4 (2005). O.S.157 of 2003 filed by Indira against Madhusoodanan ended with dismissal for default and a counter claim decreed in 2008, finalizing possession in favor of the counter claimant. The Director of Public Instructions and Government orders in 2006–2007 temporarily transferred management of the school but did not resolve title. The High Court set aside concurrent lower court findings, holding that res judicata, Order IX Rule 9 CPC, and Section 37(2) of the Specific Relief Act bar the present suit. It held the suit for declaration without a prayer for recovery of possession to be untenable (proviso to Section 34 of the Specific Relief Act) and that Article 58 Limitation Act bars the action. The appeal was allowed and the suit dismissed with costs, and pending interlocutory applications closed.
Crl.Rev.Pet.No. 2520 of 2003 This is a Criminal Revision Petition under Sections 397 and 401 Cr.P.C., challenging the concurrent conviction of the revision petitioner, Baiju P.T., for an offence under Section 138 of the Negotiable Instruments Act, arising from a cheque for Rs 50,000 dishonoured on presentation. The trial court, in CC No.1337/1998 (Mobile, Kottayam-Changanassery), convicted the accused on 18-07-2002 and sentenced him to three months’ simple imprisonment. On appeal, the Additional Sessions Judge, Kottayam, by judgment dated 24-06-2003, confirmed the conviction but reduced the sentence to one month and directed payment of Rs 35,000 as compensation under Section 357(3) Cr.P.C., with a default sentence of one month. The revision petition, lodged on 30-09-2003, contends the conviction and seeks relief from the severity of the sentence. The court notes that during pendency the accused paid Rs 15,000, and there was contested claim of settlement; the trial and appellate courts concurrently found theCheque-issuance and dishonour established. The High Court cites Supreme Court principles from Damodar S. Prabhu v. Sayed Babalal H and Kaushalya Devi Massand v. Rookishore, interpreting the NI Act as a civil wrong with criminal overtones and endorsing compensation to meet ends of justice rather than harsh imprisonment. Ultimately, the court sustains the conviction, enhances compensation to Rs 70,000, converts the sentence to imprisonment till rising of the court, grants four months to pay, and defers coercive steps until 17-02-2018, with release of any deposits to the complainant.
WP(C).No. 18740 of 2015 (N) This writ petition challenges Exhibits P1 and P2—the award of the Co-operative Arbitration Court (ARC 125/2008) and the order of the Co-operative Tribunal in appeal. The petitioners, Thevara Co-operative Society Ltd. and Thevara Urban Co-operative Society Ltd., contend that the Arbitration Court’s finding that the domestic enquiry was vitiated and the resulting direction for reinstatement were illegal, having ignored binding High Court and Supreme Court judgments. The Arbitration Court had held the punishment of the first respondent irregular and set aside the dismissal, directing reinstatement with full service benefits and back wages with continuity. The Tribunal, while upholding the vitiation of the enquiry and the lack of mind/quoarum issues, remanded for compensation rather than reinstatement, following a ruling that the Arbitration Court lacked jurisdiction to direct reinstatement. The petitioners argued that once an enquiry is vitiated, a fresh enquiry should be directed, and that the charges—ranging from fake accounts to misappropriation—were grave. The respondents maintained the petition was a dilatory tactic and highlighted the prolonged proceedings. The High Court ultimately held that the Arbitration Court’s remand for compensation was proper, and that the petition failed; Exhibits P1 and P2 were sustained as modified, and no further relief was granted.
WA.No.2340/2017 & WA.No.2363/2017 These writ appeals challenge a common judgment of the Kerala High Court dismissing WP(C) No. 35558/2017 and related matters, concerning the tender for supply of PSC poles in the North Malabar region for two years. The Kerala State Electricity Board invited tenders with pre-qualification requiring Earnest Money Deposit and tender fee. Respondents 3 and 4 submitted bids; their bids were rejected for non-payment of the prescribed fee, though contemporaneous e-procurement records and bank communications indicated payments were in process. The SBI system reportedly failed to update the payment status, leading to a delay in processing the bids, with corrigenda and several emails exchanged among SBI, the Kerala State IT Mission, and KSEB. The petitioners argued that the non-payment was caused by a bank system fault, not by the bidders, and urged that penalizing them would breach tender conditions and fairness; they relied on Bakshi Security v. Devkishan Computed and emphasized public interest in fair play. The learned Single Judge dismissed the petitions, holding that the fault lay in SBI’s system and that revocation of the tenders was permissible. The Division Bench, considering rival submissions, cited tender terms and the bank failure, but favored public interest, and upheld the dismissal of the appeals, indicating no malice or illegality in the process.
WP(C).No. 22147 of 2017 (P) This writ petition arises under the Kerala Value Added Tax Act (KVAT) where M/s Alwaye Sugar Agency seeks permission to revise its VAT returns for the assessment year 2011-12 after audit revealed omissions in purchases and sales. The petitioner had filed original returns and paid tax; upon audit, omissions were noted, and the petitioner sought leave to revise to reflect correct figures. The respondents refused, arguing that the time limits for revising returns under Sections 22 and 31 of the KVAT Act and Rule 22 of the KVAT Rules had expired, and a belated revision would alter turnover and tax liability. The Government Pleader relied on Venus Marketing v State of Kerala and Jayam & Co. v AC to plead strict construction of concessions under taxing statutes, particularly where suppression is found. The judge, however, observed that while taxation statutes merit strict interpretation, they cannot be applied mechanically to punish a dealer who voluntarily comes forward to rectify omissions and pay the differential tax, if any, before any Departmental proceedings arise. Emphasizing the object of the statute to ensure tax compliance, the court held that honest dealers should be permitted to revise returns, with the possibility of availing input tax credit where preconditions are satisfied. The KVAT Act’s scheme and rules should be interpreted liberally in favor of honest taxpayers, to prevent cascading taxation, and to promote compliance. The court granted relief and directed the revision within three weeks.
This is a Motor Accident Claims Appeal under Section 166 of the Motor Vehicles Act challenging an award by the Principal M.A.C.T., Kozhikode in OPMV 597/2010. The appellant Nishad, a 21-year-old rider, sustained injuries in a collision between a motorcycle and an autorickshaw (KL-11/Y-240) and was hospitalized for 22 days. The Tribunal awarded Rs.71,395 with 7% interest. The appellant sought enhancement on heads including pain and suffering, loss of earning power, disability, and extra nourishment. The respondents contended that the schedule already fairly compensated the appellant. The High Court elected to interfere to a limited extent, re-evaluating the quantum under several heads. The court found the appellant’s claimed earnings of Rs.8,000 per month unsupported by cogent evidence; hence, it fixed monthly income notionally at Rs.3,000 but ultimately re-fixed it at Rs.6,000 for calculation purposes, recognizing the 21-year-old’s potential. It reaffirmed the multiplier based on age and accepted the disability percentage (2%) while noting that compensation for loss of earning power cannot exceed disability, citing Oriental Insurance Co. Ltd. v. Hariprasad. The court re-assessed loss under disability, and allowed additional sums: Rs.12,960 for loss of earning power (via higher income), Rs.700 for bystander expenses during hospitalization, Rs.5,000 for pain and suffering, and Rs.5,000 for loss of amenities, totaling Rs.32,660. Delay was condoned; the insurer must deposit the enhanced amount with interest within a month. The appeal was disposed of accordingly.
RCRev.No. 337 of 2015 (C) This is a Rent Control Revision challenging the eviction order under Section 11(3) of the Kerala Buildings (Lease and Rent Control) Act, 1965. The revision petitioner, Ernakulam Wholesale District Co-operative Store Ltd., seeks to evict the respondent tenant, R. Subramanyam, arguing bona fide need for the petition schedule premises due to the deterioration of the business location and a family arrangement that now places ownership or occupation with the petitioner. The case follows earlier litigation culminating in Ext.B1 order under which a prior petition was disposed of; the petitioner contends that a fundamental change in circumstances after Ext.B1 justifies a fresh eviction petition, especially since the petition schedule shop is reportedly owned by the petitioner and required for the petitioner’s elderly, ill-health faced business needs. The respondent disputes the landlord-tenant relationship and contends the petition is barred by Section 15, as it is based on the same cause of action and Ext.B1 bars further action. The courts below found that the petition was not barred and that a change in circumstance had occurred, including testimony and a report (Ext.X3) indicating that the building had fallen down. The respondent’s challenge was not supported by contrary evidence; Ext.X3 was unchallenged. The High Court upheld these findings, concluding no bar existed and the revision was rightly dismissed.
In the Kerala High Court, a criminal leave petition under Sec. 378(4) Cr.P.C. challenged an acquittal under Sec. 138 of the Negotiable Instruments Act. The complainant, a chit fund company, alleged that the accused issued Ext. P-1 cheque for Rs. 2,27,325 towards a debt arising from a chit transaction; the cheque was dishonoured (Exts. P-2, P-3) and a statutory demand notice was issued. The trial court (Chief Judicial Magistrate, Palakkad) in S.T.C. No. 788/2015 acquitted the accused after holding that the statutory presumption under Sec. 139 NI Act had been effectively rebutted by the defense, and noting multiple deficiencies in the prosecution case. It highlighted omissions in the complaint and notice regarding the transaction’s particulars, non-production of the promissory note, and the belated and unreliable Ext. P-8 ledger, including inconsistencies about daily versus monthly collections and the rate of interest. The court found that the basic debt was not proven with credible documentation, and that the signature and handwriting on Ext. P-1 had inconsistencies. Relying on precedents such as Rangappa v. Sri Mohan and T. Vasanthakumar v. Vijayakumari, it upheld the view that presumption could be rebutted. On appeal, the Kerala High Court dismissed the leave petition, deeming the trial court’s acquittal well-founded, and held there was no compelling basis to reverse it.
This is a Kerala High Court Criminal Leave Petition (Crl.L.P. No.393 of 2017) filed by K. Vijayan (complainant) seeking leave to file an appeal under Section 378(4) Cr.P.C. against an acquittal on charges under Section 138 of the Negotiable Instruments Act rendered on 25.10.2012 by the Judicial First Class Magistrate, Karnappally. The accused, Sajeev Kumar and Mohanavally, allegedly borrowed Rs.1,00,000 on 12.7.2006 and issued a cheque (Exhibit P1) drawn on a joint account; the cheque bounced for insufficient funds, leading to a statutory demand (Exhibit P4) and a criminal complaint. The defence contended that there was no direct or vicarious liability, that accused No.2 was not a signatory to the cheque, and that there was a lack of credible evidence showing a loan or actual financial capacity on the complainant’s part. The trial court evaluated the evidence with an emphasis on circumstantial suspicions, questioned the complainant’s sources of funds, and doubted the genuineness of the transaction, ultimately acquitting both accused. The High Court, after hearing argument, held that the trial court’s acquittal was not perverse and that the appellant failed to establish a compelling case for interference. Relying on apex court precedents clarifying the heavy burden on the complainant to prove borrowal, and the limits on relying on presumptions in Sections 118(a)/139 NI Act, the court dismissed the petition for leave. The acquittal stands and no appeal is permitted.
WP(C).Nos. 17494 of 2017 (J) and 23944 of 2017 Two writ petitions, WP(C) Nos. 17494/2017 and 23944/2017, challenge the refusal of permissions for a hazardous-occupancy project (LPG godown) on grounds of inadequate access. The petitioner asserts a 12-metre easementary pathway along the eastern and northern boundaries to satisfy Rule 59(4) of the Kerala Municipality Building Rules, 1999, and Rule 61(4) of the Kerala Panchayat Building Rules, 2011, and contends that the property abuts a municipal road of 5 metres width yet has alternative access that would permit Group-I(2) occupancy. Reliance is placed on Vidya Devi v. State of Kerala and Biji Francis v. State of Kerala. The respondents contend that the controlling factor is the width of the main street from which access begins; a 5-metre municipal road cannot yield the required 7-metre width, and the 12-metre pathway does not constitute actual access. The court notes Division Bench guidance in W.A. No. 367 of 2017 supporting the 7-metre access requirement for hazardous occupancy. After analysis, the petitions are dismissed, as the 12-metre path does not provide lawful access, and the main street width cannot be expanded. The judgment emphasizes public safety and the need for clear access for fire/rescue operations, while leaving open the possibility of a fresh lease/deed and compliance with law. While rights remain, statutory access requirements prevail.
WP(C).No. 11326 of 2017 (M) Petitioner M/S Kunathukalathil Jewellers, a KVAT assessee with a head office at Changanassery and branches in Kottayam and Thiruvalla, paid tax on a compounded basis under Section 8(f) up to 2009-10. After closing the Thiruvalla branch in 2010, it continued in 2010-11 to compute compounded tax including the tax paid by the closed branch, relying on the then-existing Section 8(f) and its accompanying explanations. For 2011-12 and 2012-13, the 1st respondent issued notice under Section 25(1) proposing to reckon the turnover of the closed branch for compounding, and, despite the petitioner’s replies and hearings, Exts.P4 and P4(a) assessment orders dated 12.10.2015 were passed, effectively rectifying earlier orders to tax the closed branch’s past liability. The petitioner urged that Exts.P4,P4(a) were issued under a rectification power that must be exercised within four years and that the 2014 amendment introducing Explanation 3 to Section 8(f) clarifies only the regulation of proportionate reductions when a branch closes mid-year, with retrospective effect. The court held that Exts.P4 and P4(a) were issued under Section 25(1) within time but accepted the petitioner’s broader argument on retroactivity: Explanation 3 clarifies the scope of 8(f) and should apply retrospectively to exclude the Thiruvalla branch’s tax from subsequent years, quashing the contrary portions of Exts.P4 and P4(a) and allowing the petition with consequential relief.
OP(KAT).No. 469 of 2017 (Z) This Kerala High Court petition challenges the Kerala Administrative Tribunal’s (KAT) order in OA No.2250 of 2016 (dated 23 May 2017) which held that regularisation of service for SC Promoters is not permissible under the law declared in Secretary, State of Karnataka and others v. Umadevi and others (2006) 4 SCC 1. The petitioners—ten SC Promoters employed in various Gram Panchayats—argue for regularisation or, at least, a scheme to regularise through a limited, rule-based process. The Court examines Ext.P3 (the Court’s decision on 31 Aug 2017), which refused general regularisation but permitted a limited relief: modifying Annexure A17 so that 10% of district vacancies for SC Promoters could be filled from “Social Workers” up to age 50, with preference for those aged 40–50 if qualified. The judgment notes that the Supreme Court’s Umadevi principle bars regularisation except as specifically allowed; however, considering the record and chronology, the Court extends the concluding paragraph of Ext.P3 to petitioner’s benefit to the limited extent described. The court reiterates that no sweeping regularisation is ordered, rejects the broader relief sought, and disposes of the petitions accordingly, while ensuring alignment with constitutional and statutory constraints including Article 142 invoked to grant limited relief.
The revision petition by the tenant (KuriAn Philip) challenges eviction orders under sections 11(2)(b) and 11(3) of the Kerala Buildings (Lease and Rent Control) Act, 1965. The petition schedule building sits on land jointly owned by the petitioners, with plans to demolish and reconstruct a multi-storied commercial building to house an Academy of Fashion Technology as a joint venture with adjoining landowners. The petition alleges rent arrears since May 2006 at Rs. 700 per month and claims subletting to a stranger; it further asserts that the third petitioner is not a co-owner and that there is no valid landlord-tenant relationship or bona fide need. The Rent Control Court and the Appellate Authority held eviction lawful under 11(2)(b) and 11(3). In revision, the petitioner contends misjoinder, lack of landlord-tenant relationship evidence (no rent deed), and that the third petitioner’s stake is not established by Ext.B6 (preliminary decree) or Ext.A1 (partition deed). The High Court, after considering evidence, confirms landlord-tenant relationship, arrears, and bona fides of the need, supported by Ext.A1 partition deed, Ext.A6 joint venture, and Exts.A7/A8 permits with Commission reports confirming old age and dilapidation. The court rejects assertions opposing the genuineness of the need, relying on earlier judgments (Kurian K. Kuriakose, Sait Nagee Purushotham) and upholds the concurrent findings. The revision is dismissed, with one month to surrender possession and all interlocutory applications closed.
OP(C) No. 3106 of 2017 (O) Poabs Estates (P) Ltd. approached the High Court under Article 227 challenging Ext. P3, the trial court’s order accepting a belated written statement in OS 142/2015 before the Principal Sub Judge, Palakkad. The petitioner asserts that the statement was filed after a 90‑day period fixed by Order VIII, Rule 1, CPC, and that the order reveals no application of mind by the court to the reasons for the delay. It is argued that there was negligence in preparing Ext. P1, with the deponent district officers failing to give a contemporaneous, detailed affidavit, reflecting administrative laxity. The respondent State counters with the cited Supreme Court decision Sambhaji and others v. Gangabai and others, contending that Order VIII, Rule 1 CPC is essentially procedural and not mandatory, and that procedural rules aid justice rather than hinder it. It further maintains that laches should be avoided, but the court must allow practical management of suits. The High Court, while not upsetting the Sub Court's order, emphasizes the need to avoid recurrent delays and to implement corrective measures for the government machinery. It directs the Sub Judge to prioritize OS 142/2015 with a target disposal within six to eight months from production of a certified copy of this judgment, and disposes of the petition accordingly.