The petitioner, a registered civil engineering contractor for the Southern Railway, seeks appointment of an arbitrator under Section 11 of the Arbitration and Conciliation Act, 1996, for disputes arising from a contract dated 28.03.2008. The contract contains an arbitration clause, but the opposite parties contend that certain disputes are “excepted matters” under Clause 63 and thus not arbitrable. Annexure-A7 sets out two claims totaling Rs. 43,66,203 that the petitioner wants referred to arbitration; the opposite parties refused, arguing these claims fall within excepted matters. The petition was heard on 14.02.2017 and final arguments were heard; the key issue is whether the two disputed claims are arbitrable or must be decided as excepted matters by the Court. The court analyzes Clauses 63 and 64(i) of the GCC, interpreting the list of excepted matters and the procedure for arbitration, as well as leading authorities on Section 11 proceedings (SBP & Co. v. Patel Engineering; National Insurance Co. Ltd. v. Boghara Polyfab; Booz Allen & Hamilton Inc. v. SBI Home Finance). The judge distinguishes contrary Kerala decisions (A.R.No.7 of 2012) and ultimately holds that arbitrability of Annexure-A7 disputes should be decided by the Arbitral Tribunal and directs reference to arbitration with interim award possible.
WP(C).No. 33743 of 2016 (P); WP(C).No. 33065 of 2016 (G); WP(C).No. 33886 of 2016 (I) This judgment consolidates three writ petitions—WP(C) Nos. 33743 of 2016 (P), 33065 of 2016 (G) and 33886 of 2016 (I)—challenging transfers of KSFE office attendants (last grade staff). The petitioner in WP(C) 33743 was transferred from Palari, Palakkad to Edappal, Malappuram, and later posted at Perinthalmanna during pendency. The respondents contend the transfer was under Ext.P2 (a general transfer order affecting many employees) and supported by the need to balance staff across districts; vacancies were reportedly available in Ottappalam and Kuzhalmannam. The petition contends transfers outside the home district cause hardship, disrupt families and education, and should be avoided for lower-grade staff, citing the policy to post as near as possible to home districts when vacancies exist. The court reiterates the limited jurisdiction to interfere with transfers but emphasizes special considerations for last grade employees, citing B. Varadha Rao v. State of Karnataka (1986) 4 SCC 131, which underscores reasonableness and fairness in transfer policies and notes the distinct treatment for Class III and IV employees. The judge directs reconsideration of postings near petitioners’ home districts, allows fresh representations within a week, and requires a decision within three weeks, while maintaining interim arrangements where appropriate. The petitions are disposed of with these directions, including specific guidance for the other two petitions on Thrissur and mutually agreed postings.
CRP(WAKF) No. 694 of 2013 The revision petition arises from a Waqf Tribunal decision in WOS No.5/2011 which decreed that the plaint schedule property is a waqf property and declined other reliefs. The petitioner, K.P. Aboobacker Haji, as Muthavalli, along with local Muslim residents, had sought under Section 26 read with Order VII Rule 1 CPC a declaration that the property is waqf and a decree for perpetual injunction restraining others from obstructing their right to perform prayers in the Masjid-Al-Thaquva. The tribunal’s interpretation of the reliefs led to denial of certain requests, including alteration or change in occupancy to permit mosque activities. The High Court first reiterates the Apex Court’s ruling in Rajasthan Waqf Board v. Devki Nandan Pathak that whether a property is waqf is a question to be decided by the waqf tribunal, not a civil court, and notes that the tribunal’s finding that the property is waqf has become final. It then examines the other reliefs, concluding that the Waqf Tribunal lacked jurisdiction to grant alterations or occupancy changes for religious use. Relying on Rule 34 of the Kerala Panchayat Buildings Rules, 2011 and the proviso to sub-rule (8) of Rule 7, along with the 2005 Manual, the Court directs that such reliefs, if pursued, must be considered by the Local Self Government authority with prior District Collector concurrence. The petition is disposed of with liberty to approach the appropriate authority for a change in occupancy, subject to compliance with statutory processes.
WP(C).No. 32129 of 2014 (M) The petitioner, P.K. Vinayan, retired as Executive Engineer of the Kerala Water Authority, challenges Ext.P6, which rejected his plea to reckon his pre-Kerala Water Authority government service (02.01.1984 to 23.12.1986) for pensionary benefits. He had earlier served as Draftsman Grade-I in the District Soil Conservation Office (1984–1985), in the Public Works Department (1985–1985/86), and in the Block Development Office, South Vazhakulam (1985–1986) before joining the Kerala Water Authority on 23.12.1986. Relying on Exts.P2 and P3 (orders dated 27.10.1999), he contends that government service should be counted for pension, as has been done in similar cases. He cites Mohammed Basheer A. v. State of Kerala (ILR 2015 (1) Ker 10) and Writ Appeal No.2556 of 2015, arguing that the benefit of Government orders under Rule 11 of Part III Kerala Service Rules should not be overridden by the Note under Rule 20. The respondents submit that prior government service cannot be counted for autonomous/public sector pensions, citing Government letter 1826/B3/12/WRD (2012). The court examines Rule 11 and Rule 20 of Part III KSR, relevant GO orders, and the judgments, ultimately allowing the petition by reconciling prior service with KWA service. It notes that pro-rata pension is not required per the 2009 note, and directs re-fixation of pension within three months.
WP(C).No. 41148 of 2016 (P) This writ petition challenges Ext.P1, an order of the Maintenance Tribunal under the Maintenance of Parents and Senior Citizens Act, 2007, and Ext.P2, the Appellate Tribunal’s dismissal of the appeal. The petitioner– Lakshmikutty Amma—had sought to set aside two settlement deeds (Nos.1291/2011 and 1201/2011) executed in favour of the first and second respondents, contending that the documents should be examined under Section 23 to prevent transfers that deny basic amenities or misappropriate property of a dependent senior citizen. The Tribunal held that the settlement deeds did not include a stipulation obligating the transferee to provide basic amenities, and the appellate authority declined relief on that basis. The Kerala High Court, relying on Radhamani and Shabeen Martin, held that Section 23’s protective mechanism is rooted in the transferee’s conduct rather than an express condition in the deed itself. The court noted that the condition to provide basic amenities may be inferred from conduct prior and after execution of the deed, and that the absence of explicit recital does not defeat the petition. Ext.P2 was set aside, and the matter remanded to the Appellate Tribunal to reconsider Ext.P1 consistent with the law, within three months. The court reserved the merits and clarified that no decision on the merits was made, and disposed of the petition without costs.
WP(C).No.10230 of 2009 (W) The petition challenges the denial of monetary benefits on a retrospective promotion to the post of Head Master at a school in Tirur, Malappuram. The petitioner, E.A. Poulose, an Upper Primary School Assistant, claimed that he was the sole qualified candidate for promotion, but the Manager of the school elevated another, allegedly less qualified, individual. After earlier court intervention directing consideration of rival claims, the AEO and then the DEO issued orders denying full back wages or extended pecuniary benefits from the date of appointment, restricting benefits only from the date of actually taking charge. The petitioner relied on prior judgments including State of Kerala v. Bhaskaran Pillai and later Supreme Court dicta in E.K. Bhaskaran Pillai to contend that where an illegality or breach of court directions denied him his rightful promotion, he should not be deprived of monetary benefits for the period of denial. The Government pleader argued for the conventional no-work-no-pay principle and for limiting back benefits. The High Court, after analyzing contrasting authorities and the exceptional circumstances of the case, held that the petitioner is entitled to pecuniary benefits from an early retrospective date rather than from when he assumed duty, and directed payment with back wages and consequential benefits, subject to a formal order within a month.
The appellant, a partnership firm operating a three‑star hotel at Wadakkancherry, sought renewal of its Foreign Liquor licence for 2017‑18 after having held FL‑3 and then FL‑11 licences. The State declined renewal in light of the Supreme Court’s directions in State of Tamil Nadu v. K. Balu and Another (2017) and the extension of those directions to curb liquor shops within a prescribed distance from highways. The single Judge upheld the decision and measured the distance using Note-2 to Rule 13(1) of the Foreign Liquor Rules, 1953 (gate‑to‑gate, shortest public pathway). The hotel challenged this, contending that Note‑2 is applicable only to the 200‑metre prohibition from institutions, temples, churches, mosques, etc., and not to the 500‑metre outer‑edge highway distance mandated by the Supreme Court’s directions. The respondents argued that the 500‑metre distance must be determined by Note‑2 in the absence of a different yardstick. The Division Bench distinguished the purposes of the two distances and held that importing Note‑2 to the 500‑metre criterion would yield absurd results, as it would allow licit outlets within long stretches of property adjacent to highways. It set aside the lower order to the extent that Note‑2 was applied for the 500‑metre distance and disposed of the appeal accordingly, reaffirming the need to align distance measurement with the Supreme Court’s safety‑oriented policy under Article 142 and the Abkari Act regime.
This High Court of Kerala motor accident claims appeal arises from a MACT award in OPMV 440/2011, challenging both the quantum of compensation and the Tribunal’s finding of contributory negligence. The appellant, Ginend Kumaran, a 20-year-old engineering student, sustained multiple injuries when a lorry collided with his motorcycle on 3 September 2010. The Tribunal awarded Rs 4,25,723 but held the claimant 75% responsible for the accident, reducing the award accordingly. The appellant argued that there was no evidence of contributory negligence and that the insurer’s liability should be based on full compensation. On appeal, the Kerala High Court held that there was no contributory negligence on the part of the appellant and set aside the 25% deduction, allowing the entire amount. It also re-evaluated damages, noting the notional income of Rs 3,500 per month was too low for a young engineering student in 2010; the court increased it to Rs 5,500 per month, which produced a net enhancement of Rs 47,400 under permanent disability and, after set-off of the Tribunal’s earlier award, an overall uplift of Rs 26,400. The court disallowed loss of earnings of Rs 21,000, allowed total compensation to be enhanced, and directed the insurer to deposit the enhanced sum within two months, with interest on the total amount from petition filing date.
WP(C).No. 38501 of 2017 (K) Ali Neetukattill and other petitioners challenge entries in the Data Bank under the Kerala Conservation of Paddy Land and Wetland Act, 2008, contending that their lands were converted from paddy to garden lands before the Act and therefore should not be subjected to restrictions. They allege that the Data Bank entries prevent construction, building permits, and numbering of buildings, and have filed applications before Local Level Monitoring Committees (LLMCs) seeking corrections to Data Bank entries and revenue records. Some petitions also seek building permits or building numbers based on previously issued permits. The petitioners rely on the Supreme Court’s principle that if properties were converted prior to the Act, the Act’s provisions would not apply (Revenue Divisional Officer v. Jalaja Dileep). They urge correction of records and permission to use lands for other purposes, potentially under Clause 6 of the Kerala Land Utilization Order (KLUO). The court notes LLMCs’ power to correct Data Bank mistakes and requires reports from the Kerala State Remote Sensing and Environment Centre (KSRSEC) for the position of properties at the Act’s commencement. The judgment directs LLMCs to decide corrections after obtaining KSRSEC reports, with fees as directed, within three months. If relief is granted, building permits or numbers must be issued in accordance with KLUO, and a fresh revenue assessment may follow. The decision integrates prior cases such as Puthan Purakkal Joseph and Kizhakkambalam Mariumma for procedural guidance.
OP (DRT) No. 120 of 2016 (O) This Original Petition challenges Ext.P15, the final order of the Debt Recovery Tribunal-II in S.A.66/2006 (T.S.A No.10/2016). The petitioners, proprietors of a textile firm, had availed cash credit from Union Bank of India secured by mortgage on several parcels of land. After SARFAESI proceedings the Bank took symbolic possession and issued a sale notice; the petitioners challenged the action through SA No.66/2006 before the DRT. They also pursued a One Time Settlement (OTS) scheme and approached this Court via W.P.24839/2006 with directions that payment as directed would enable OTS, while non-compliance would leave remedies before the DRT. The writ petitions were disposed with directions, and later, the Division Bench permitted the Bank to hand over possession to the auction purchaser, with sale certificates to issue subject to the writ appeal. The petitioners contended that Ext.P15 proceeded on a misreading of the Division Bench’s directions and that the DRT did not decide the issues raised in SA on merits, resulting in a jurisdictional error. The respondents argued that interference at Article 227 should be avoided and that an appellate remedy exists. The Kerala High Court found a jurisdictional defect, set aside Ext.P15, and remitted the matter to the DRT for fresh merits, directing final orders by 31 December 2017. The petition is disposed with these directions.
Crl.Rev.Pet.No.1093 of 2017 (CC 427/2016) This Criminal Revision Petition challenges an order of the Judicial First Class Magistrate-I, Thodupuzha, rejecting the accused’s request under Section 243 Cr.P.C. to send a dishonoured cheque under Section 138 of the Negotiable Instruments Act for forensic age-analysis of handwriting and signature. The cheque, worth Rs.5 lakh, is alleged to have been issued in 2013, but the defense contends that the cheque leaf and its signature are more than 18 years old; if age-dating could establish that the cheque was not executed in 2013, the complainant’s case would crumble. The trial court dismissed Annexure-A3, seeking forensic examination by the Central Forensic Science Laboratory (CFSL). The High Court surveys a line of authorities including Rajan v. T.K. Madusoodanakurup and Another, T. Nagappa v. Y.R. Muralidhar, and R. Jagadeesan v. N. Ayyasamy, noting doubts about the availability of reliable forensic facilities to determine the age of handwriting or ink. An affidavit from CFSL Hyderabad confirms there is no facility for age-dating handwriting or signatures. While fair-trial concerns were raised in Nagappa, the court distinguishes that decision on distribution of facilities. Ultimately, given the absence of a reliable method, the petition is dismissed, sustaining the trial court’s refusal and the NI Act prosecution.
Mat.Appeal No. 322 of 2016 This is a matrimonial appeal arising from a Family Court Kozhikode order in OP 480/2014, concerning whether Madhavan Nair’s family pension should go to his wife or to Janaki Amma. The original petition, filed by Balamani C.T., sought a declaration that she was Madhavan Nair’s legally wedded wife and thus entitled to family pension. The Family Court found that Madhavan Nair had contracted a valid customary marriage with Balamani on 20.03.1965, and that although a 1957 marriage contract (Exhibit B7) was produced, it did not establish a legally valid marriage. The court relied on the testimony of PW1 and PW2, who described customary Malabar Nair marriage rituals (lighted lamp, Nira Para, Pudava, thali, garland exchange), concluding that their evidence established a valid customary marriage. The appellant, Janaki Amma, contended that the 1965 marriage did not occur and attacked Balamani’s allegations by arguing the 1957 contract and other documents were not lawfully capable of producing a valid marriage; she asserted that Madhavan Nair had never married Balamani and that service records showed her as Madhavan Nair’s wife. The High Court, applying the preponderance of probabilities standard in civil/matrimonial matters and considering the cited authorities (Sreekumar v. Prema; Mohandas Panicker v. Dakshayani; Surjit Kaur v. Garja Singh), upheld the Family Court’s finding. It held Exhibit B7 cannot render a valid marriage and dismissed the appeal, with no costs.
WP(C).No. 254 of 2017 (F) Gramodhaya Vanitha Kendram, a registered society engaged in the manufacture of washing soaps in Palakkad, seeks police protection against a demand by the Head Load Workers’ Union that loading and unloading be performed only by registered workers or by workers drawn from the Head Load Workers Welfare Fund Board. The petitioner’s unit is largely manufacturing-based, with a minority of workers involved in loading and unloading of stock. The respondents argue that the area is a scheme-covered zone and that the petitioner must employ either registered workers for loading/unloading or draw from the pool maintained by the Board; they allege that the petitioner uses unregistered labour for loading/unloading. The petitioner relies on Theresa Jose v. Sub Inspector of Police (2015) (3) KHC 487), a Larger Bench decision, which states that unless the workforce is exclusively engaged in loading/unloading, the Board’s pool applicability does not arise. The respondent contends Theresa Jose does not apply here. After hearing, the court agrees that the petitioner’s contention has force and, guided by Theresa Jose, holds that the second respondent cannot insist on Board pool recruitment unless the loading/unloading work is predominant. The court directs the first respondent to register a crime on any violation and to provide police protection to prevent breach of peace; the writ petition is disposed of in the petitioner’s favor with protective directions.
This is a writ appeal filed by the State of Kerala challenging the order dated 07.12.2016 of a learned Single Judge in WP(C) No.31919 of 2014. The Single Judge had held that the respondent, Omana S.N., a retired Associate Professor of a private aided college, falls within the definition of 'employee' under Section 2(e) of the Payment of Gratuity Act, 1972, and is entitled to gratuity calculated under the Kerala Service Rules (KSR) up to the Act’s ceiling of Rs. 10 lakhs. The State contends that gratuity provisions do not apply to teachers, arguing that Section 2(e) excludes those who hold posts under the State Government and that, as the respondent was paid through government salary for a private aided college, the KSR and university statutes govern her pensionary benefits. The State further submits that amendments to extend gratuity coverage to teachers were not intended to override pre-existing statutes governing pension benefits for education service, and that the 2009 amendment was not retroactive as regards educational institutions. The respondent contends that the 2009 amendment brings teachers within the Act, and that Section 14 of the Act provides an overriding effect over any inconsistent enactments. The High Court ultimately upholds the respondent’s position, holding that teachers are covered by the Act and that the gratuity payable, within the Rs. 10 lakh ceiling, must be calculated on total service, overruling contrary statutes. The appeal is dismissed.
This High Court of Kerala, in a motor vehicle accident appeal, revisits the Motor Accidents Claims Tribunal’s award under Section 166 of the Motor Vehicles Act, 1988. The claimant, then 33, sustained severe injuries on 18 June 2006 when the Maruti Omni van (KL-3/G-5052), driven by the first respondent and insured with the third respondent, knocked him down while he walked along a public road. The Tribunal held the driver rash and negligent and the insurer liable to indemnify the owner, awarding ₹4,50,035 in total under various heads after scaling the disability from 27% to 22% based on government guidelines. The tribunal fixed the claimant’s monthly income at ₹3,000 due to lack of reliable material. On appeal, the High Court accepts the insurer’s liability and, applying the Ramachandrappa decision, re-fixes the income at ₹5,500 per month. It applies the Sarla Verma multiplier of 16 and computes enhanced compensation across heads: increased loss of earnings to ₹66,000, additional bystander and nourishment costs, medical expenses, pain and suffering, loss of amenities, and a revised disability amount, culminating in a total extra award of ₹1,45,880 along with 8% interest from the petition date. The insurer is directed to deposit the enhanced amount within two months; the appeal is disposed of with no costs.
This is a Motor Accident Claims Appeal arising from a failure to adequately compensate the family of Mohammed Haneefa, who died in a road traffic accident on 19-03-2007 when a lorry KL 11B 455 collided with his motorcycle. The MACT had awarded Rs. 7,03,000 but held the deceased 50% negligent, thereby reducing the compensation. The appellants—wife, minor children, and parents—contended that the deceased was employed abroad (as evidenced by Ext. A7 passport), earning about 1500 Saudi Riyal per month, and thus the Tribunal should have fixed a higher notional income than Rs. 5,000. The Tribunal’s approach relied on scant evidence, including Ext. B1 (scene mahazar) to assess negligence and income, and it did not lead to a full factual appraisal of gratuities and losses. The High Court re-evaluated the damages, fixing the deceased’s monthly income at Rs. 7,000 (based on Ext. A7) and applying a 15-year multiplier with three dependents, resulting in a larger dependency sum of Rs. 9,45,000. Additional heads—loss of love and affection, loss of consortium, loss of estate, funeral expenses, transport charges, pain and suffering, and clothing—were adjusted in favor of the appellants (with various added amounts). The Court, however, set aside the Tribunal’s 50% negligence finding as unsupported by substantial material and directed further evidence on contributory negligence. The appeal was allowed in part and remitted to the Tribunal to determine whether the deceased contributed to the accident, with a four-month disposal timeline and further directions for deposit of amounts by the insurer’s party.
Mat.Appeal Nos. 193/2009, 204/2009 & Crl.M.C. No.1909 of 2012 Jamsheena v. Naushad arises from a Muslim matrimonial dispute in which the Wife (Jamsheena) challenged a Family Court order in OP Nos. 595/2006 and 596/2006, heard together with related proceedings, and a revision under the Muslim Women (Protection of Rights on Divorce) Act, 1986. The Family Court Kozhikode, by a common order dated 9 December 2008, dismissed the Wife’s claim for recovery of gold ornaments and money and for past maintenance, while directing maintenance for the child at Rs. 500 per month and directing the return of a motor cycle or its value (Rs. 43,000). It found insufficient material to prove the Wife’s ownership of gold ornaments or the money, and concluded that the Wife was not entitled to past maintenance beyond talaq. The Wife challenged via Mat.Appeal Nos. 193/2009 and 204/2009, with a criminal miscellaneous petition (Crl.M.C. No. 1909/2012) challenging the revision order, which reduced a maintenance amount to Rs. 2,14,920/-. The High Court, after hearing on 9 August 2017 and 7 November 2017, evaluated the evidence (including Ext. A1 and Exts. B1–B11) and held that the material on record did not establish the alleged ornaments or cash, and that the Family Court did not err in its rejection. It also noted the talaq pronounced on 17 July 2006 and observed that maintenance beyond iddat under the Act would require appropriate relief. Accordingly, Mat.Appeals and Crl.M.C. were dismissed, upholding the Family Court’s orders.
WP(C).No. 18274 of 2016 (H) This writ petition challenges Ext.P12, an order of the Registrar of Co-operative Societies, which held that the dismissal of the first respondent (an employee of the petitioner) was illegal. The petitioner, a Central Society registered under the Kerala Co-operative Societies Act, had dismissed the employee by Ext.P10; the employee challenged the order and the Board of Directors confirmed the dismissal by Ext.P11. The Government referred the matter to the Registrar, who, after hearing the parties, issued Ext.P12. The petitioner contends that the Registrar had no jurisdiction to adjudicate service disputes between a cooperative society and its employees, citing established precedents that such disputes are to be resolved under Section 69 of the Kerala Co-operative Societies Act, and that Rule 198(2A) requires a disciplinary committee to pass orders like Ext.P10. The respondent argues that Ext.P10 was a valid executive action and that Rule 198(2A) was not properly observed. The High Court reviewed these contentions, endorsing the view that Registrar lacks jurisdiction to entertain service disputes under Rule 176 and reaffirming that such matters must be resolved under Section 69, a position supported by earlier decisions. The Court ultimately holds Ext.P12 to be without jurisdiction and disposes of the petition with a clarificatory direction that Ext.P12 will not preclude the petitioner from pursuing disciplinary action, if any, in accordance with law.
WP(C).No. 26652 of 2009 (B) Mujeeb Rehman, the registered owner of a KL 55 C 4039 pickup van, challenged an Ext.P2 order of the District Collector confiscating the vehicle for alleged illegal transportation of river sand under the Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001. The vehicle was seized by the Tahsildar, Tirur, and entrusted to the Kalpakanchery Police Station. Based on the Tahsildar’s report dated 28.03.2009 and the seizure mahazar, the District Collector initiated proceedings and issued a notice for personal hearing on 11.05.2009. The petitioner did not appear, and Ext.P2 concluded that the vehicle was used for illegal transportation of river sand and was liable to confiscation. The order required the owner to remit 40,000 to the River Management Fund in lieu of confiscation under Rule 27(3) of the Rules, within seven days. The petitioner sought a writ of certiorari to quash Ext.P2 and for related relief. The court underscored the object of natural justice — to prevent arbitrariness and ensure fair decision-making — and emphasized that some reasons must be disclosed in quasi-judicial orders. Citing B.A. Linga Reddy, the court held that a speaking order is essential. Ultimately, it found no interference with Ext.P2; the petitioner had paid the amount and the vehicle was released thereafter. The writ petition was dismissed.
The appellant, T.G. Polymer and Company, challenged a conviction in CC 123/2009 by a Judicial First Class Magistrate for an offense under Section 138 of the Negotiable Instruments Act, alleging that a cheque for ₹1,34,391 issued by the accused in discharge of a goods transaction bounced for insufficient funds. The trial court acquitted the accused under Section 255(1) Cr.P.C. on grounds that the prosecution failed to prove the execution of the cheque and the existence of a liability. The Kerala High Court, on 30 June 2017, dismisses the criminal appeal and upholds the acquittal. The court acknowledged that the cheque bounced and that statutory notice was issued, but held that the prosecution failed to prove due and conscious execution of Ext. P1, and that Exts. P8–P18, covering transactions up to July 2008, did not establish a December 2008 liability or a direct link to the accused as the signatory in the transaction. The defence claim that Ext. P1 is a signed blank cheque allegedly handed over years earlier and later misused was not credibly disproved. In the absence of proved execution, there is no basis for invoking the presumptions under Sections 118 and 139 NI Act. Consequently, the court confirmed the acquittal and dismissed the appeal, maintaining the trial court’s verdict.