This writ petition by T. Bal an Nair, Chairman of Sree Kottiyoor Devaswom, challenges the placement of unauthorized flex boards and advertising around the althara (the platform surrounding the banyan tree) within the Sree Kottiyoor temple precincts in Kannur District. The petitioner alleges that such boards, posted by the Kottiyoor Perumal Seva Sangham and others, mar the sanctity of the temple, encroach upon sacred space, and harm the environment and public interest. The third respondent claims the banyan tree and the althara are within his organisation’s possession, asserting that the tree was planted in 1977 with Devaswom approval and that the althara was constructed by the Sangham. The Malabar Devaswom Board counters with the government’s vesting of temple lands and the Board’s administrative authority. The High Court anchors its decision in environmental protection and public trust principles, referencing Article 48-A and Article 51-A of the Constitution and the public trust doctrine, as expounded in Fomento Resorts & Hotels Ltd. v. Minguel Martins, to emphasize that natural resources are held by the State for the people and future generations. The Court emphasizes the sacred status of banyan trees in Hindu faith and the need to harmonize worship with ecological safeguards. Accordingly, it directs the Malabar Devaswom Board to remove all unauthorized boards and materials from the banyan trees and althara within one month, and to issue temple-management guidelines. The writ petition is disposed with these directions, and cooperation among Devaswoms is urged, with penal consequences for noncompliance if necessary.
WP(C).No. 20404 of 2008(D) The petitioner, Dr. M.P. Ajith Kumar, is a Lecturer Senior Scale in the History Department of Sanathana Dharma College (affiliated to Kerala University). He was a Lecturer from July 1996 and was promoted to Lecturer Senior Scale in July 2001 under the UGC Scheme, 2001. The Kerala University approved his placement in the Selection Grade, but the Deputy Director of Collegiate Education (DCE) rejected the claim, asserting that the workload in the department did not justify selection-grade placement. Ext.P2 records a communication by the 2nd respondent rejecting the claim. The petitioner argues that once the University grants approval, Government authorities cannot sit in appeal over that decision, relying on Cherian v. Principal, S.B. College, Changanassery (1998) and Shalini Rachel v. Manager, Christian College (2007). The respondents contend that workload and related procedures (workload assessment, para. 6.26/6.27 of Govt. Order No.171/99/H.Edn., and Ext.R2(b) circular) justify denial. The High Court ultimately holds that Government or officers cannot sit in judgment over University approval; Ext.P2 is quashed, and the College is directed to forward the petitioner’s bills to the 2nd respondent for sanction and payment with arrears within two months. The decision cites Cherian and Shalini Rachel to reaffirm the non-appealability of University-approved actions in such academic appointments, and affirms the petitioner’s entitlement to the Selection Grade.
This is a criminal appeal filed by the complainant (Ammini Electronics) challenging an acquittal under Section 138 of the Negotiable Instruments Act. The accused allegedly issued a cheque for Rs. 14,490 drawn on State Bank of India in discharge of a liability; the cheque was dishonoured for insufficient funds. The complainant sent a registered lawyer’s notice; despite receipt, the accused did not repay. In the Addl. Chief Judicial Magistrate Court, the prosecution examined PW1 with Exts. P1–P6; the court acquitted under Section 255(1) Cr.P.C. The appellant contends that Ext. D1 was not properly proved and that the cheque-holder’s presumption under Section 139 NI Act ought to establish a debt, requiring a conviction under Section 138. They rely on Kochayippa v. Suprasidhan to argue that even a cheque for a lesser amount than the actual debt still supports a cause of action, and that the signature admission should trigger the presumption. The respondents oppose, arguing that the evidence fails to prove that the cheque was issued to discharge a legally enforceable debt and that the trial court’s acquittal was warranted. The High Court re-examines the evidence, applies the presumptions under the NI Act, and considers the compensatory approach from later authority; ultimately, the appeal is allowed, with conviction under Section 138 and sentencing.
Crl.MC Nos.112,113,525,526,527,531 & 532 of 2011 These petitions challenge the prosecution for non-payment of provident fund contributions under the Employees' Provident Fund and Miscellaneous Provisions Act, 1952, and a related IPC offence, against M/s Southern Electro Mago Pvt. Ltd. (Aroor) and its directors. The petitioner, a director, contends the company is a sick industrial unit; the matter was considered by BIFR, with the appellate authority remitting for fresh consideration, and hence, argues that criminal proceedings are not maintainable. Key issues revolve around whether a director can be a liable “employer” under Section 2(e)(ii) of the Act, and whether the Sick Companies Act bars such prosecutions. The petitioner relies on Dr. Vellayani Arjunan v. Employees Provident Fund Organization to argue that a person in charge cannot be prosecuted as the employer under Section 14(1A); respondents counter that the definition of “employer” includes the person who has ultimate control over the establishment, and that the Sick Companies Act does not automatically nullify criminal actions, citing Kusum Ingots & Alloys Ltd. v. Pennar Peterson Securities Ltd. to stress that late payments do not absolve liability. After hearing, the Kerala High Court declines to quash the proceedings, holds that the cases should be tried without any restrictive observations, and dismisses the petitions. The matter thus moves to trial.”
WP(C).No. 37337 of 2010(N) This Kerala High Court writ petition concerns K. P. Khamarunnisa, appointed as High School Assistant (Arabic) at P.T.M. Yatheemkhana Higher Secondary School, Edappalam, Palakkad, who seeks approval of her appointment after the government and authorities declined approval by quashing Exts. P2, P3, P4, P5, P7, P8, P11 and P16. The authorities contended that vacancies must first be filled by a protected teacher, citing G.O.178/2002/G.Edn. and Rule 6(viii) of Chapter V of the Kerala Educational Rules. The Manager had earlier earmarked a vacancy for a protected hand and, in a Maths leave vacancy, appointed a protected H.S.A. (Maths) who did not join, after Ext.P10. The government reiterated that approval could be granted only after a protected hand is appointed. The petitioner argues that postponing approval is unjustified and cites Ext.P6 (the petitioner’s appointment), Ext.P10 (the unjoined protected teacher), and Exts.P17-P18 showing others receiving approvals; she also relies on Nadeera v. State of Kerala (2011) 3 KLT 790, which held that postponement of approval cannot be justified. The court endorses the petitioner’s view that welfare of students dictates timely staffing and that the Manager has an obligation to secure a protected hand. It quashes the challenged orders and directs timely approval, with a protected hand to be appointed as required, ultimately allowing the petition.
WP(C).No. 22282 of 2011-I This writ petition under Article 226 challenges Ext.P4, an order of the District Judge Thiruvananthapuram. The Travanacore Devasom Board (a public institution) had contracted with Panchamy Pack (P) Ltd to modernise Aravana Prasadam production. After the contract expired and all payments were settled, the respondent filed an application before the Micro and Small Enterprises Facilitation Council under Sections 16-18 MSMED Act, 2006, resulting in Ext.P1 award dated 24.3.2011. The petitioner sought to set aside the award under Section 34 of the Arbitration and Conciliation Act, 1996 (Ext.P2) and, crucially, claimed exemption from the mandatory pre-deposit under Section 19 of the MSMED Act (which requires deposit of 75% of the amount before entertaining such an application). The District Judge dismissed Ext.P3 and Ext.P4, holding there is no power to exempt under Section 19 and directing the petitioner to deposit 75% of the award amount; the writ petition was dismissed. The High Court examined the language of Section 19 and cited Snehadeep Structures Pvt. Ltd. v. Maharashtra Small-Scale Industries Development Corp. Ltd. to interpret the deposit obligation, ultimately holding that the deposit is a pre-condition and there was no legitimised basis to exempt it. Nevertheless, the court extended the period for curing the defect by one month. The petition is dismissed, with time extended for compliance.
The Kerala High Court, in a division bench comprising Justices Pius C. KuriaKose and N.K. Balakrishnan, hears a Rent Control Revision from Sundaran, the tenant, challenging an eviction order under Section 11(3) of the Kerala Rent Control Act. The Rent Control Appellate Authority had reversed a Rent Control Court dismissal, ordering eviction on the ground of bonafide need of the landlady’s daughter to run a computer centre. The Rent Control Court had held the tenant protected by the second proviso to Section 11(3), concluding that the landlady’s title to the building was not established and that the tenant’s livelihood depended on the photo studio business with no available alternative premises in the locality. The appeal by the landlady and the revision by the tenant raised issues of title, bonafide need, and the applicability of the second proviso. The High Court, acknowledging that under the Rent Control Act the Appellate Authority is final on factual matters, found that the Appellate Authority’s bonafide finding was reasonable and that the Rent Control Court’s denial of title was erroneous, clarifying that title under the first proviso to Section 11(3) does not require proprietary ownership. The Court dismissed the revision but granted the tenant time to surrender by 15 January 2012, conditioned on filing an affidavit, clearing arrears, and paying occupancy charges until surrender.
WP(C). No. 55 of 2011 (F) Indus Towers Ltd. and Shibu Mathew approached the Kerala High Court under Article 226 seeking police protection to undertake the construction, installation and operation of a mobile transmission tower in accordance with Ext. P6, a permit issued by the fourth respondent (Alappuzha Municipality). The petition asserts that Ext. P6 is valid and that respondents 6–14 have obstructed the project, prompting the plea for police protection. Respondents counter that the tower raises health concerns and cite a Local Self Government circular requiring site selection after public discussion. The court noted the applicants’ reliance on Essar Telecom decisions and examined the competing interests between development and public health, safety, and local governance processes. After considering the pleadings and authorities, the court held that police protection must be granted to permit construction per Ext. P6, while subject to the observations and conditions laid down in the Essar decisions. The judgment thus balances the legitimate objectives of telecom infrastructure with public health safeguards and administrative guidelines, ordering protection to enable the project while ensuring compliance with applicable norms.
This Kerala High Court ITA concerns whether depreciation under Section 32(1)(ii) of the Income Tax Act is allowable on the cost of an abkari licence (FL-3) attached to a bar hotel purchased in 2000 for about Rs. 80 lakhs. The assessee claims 25% depreciation on the licence component of the purchase cost, arguing that the FL-3 licence is a transferable business right that qualifies as an intangible asset. The assessing authorities and the ITAT had disallowed depreciation, treating the licence as a non-depreciable asset, and the Tribunal’s order was upheld. The assessee challenged that view, relying on Division Bench jurisprudence: Raveendran Pillai v. CIT (332 ITR 531) which held depreciation can be available even without evidence of erosion; and on Techno Shares & Stocks Ltd. v. CIT (327 ITR 323), where the Supreme Court held that BSE membership cards are depreciable as intangible assets under Section 32(1)(ii). The Revenue argued that the scope of Section 32(1)(ii) should be understood narrowly and emphasized conditions noted in the Techno judgment. The Kerala High Court held that the abkari licence squarely falls within Section 32(1)(ii) as an intangible asset and allowed depreciation on the written-down value, directing the AO to compute accordingly.
WP(C).No. 33675 of 2003(H) Johnson Solomon, a retired Head Constable of Thadiyittaparambu Police Station in Ernakulam Rural, challenges a disciplinary sequence culminating in a minor punishment confirmed by authorities (Exhibit P6). He had registered Crime No. 6/98 under IPC 376 and Section 3(1)(xi) of the SC/ST (POA) Act. An omission occurred in the express report: Section 3(1) was not included before forwarding to higher authorities; upon realization, the correction was made in the FIR before sending it to court and to the Circle Inspector. Exhibit P3 charged him with dereliction of duties for not including the noted offence and for not sending the case to the proper court. Exhibit P3(a) and the subsequent appellate and review orders affirmed this view, albeit with emphasis on delay as a factor. The petitioner argued, relying on Gangula Ashok v. State of A.P., that forwarding to the Magistrate Court was legally proper and that there was no intentional or wilful omission causing prejudice, since the correction occurred promptly at the initial stage. The High Court held that there was no serious lapse, reversed the impugned punishment, and quashed the orders. It directed that, being retired, the petitioner receive only notional benefits, with actual retirement benefits to be disbursed within three months. No costs were awarded.
This High Court of Kerala appeal concerns whether the benefit of Section 163A of the Motor Vehicles Act, 1988 is available to claimants where the deceased’s annual income exceeds Rs. 40,000. The dependents (claimants) of a deceased passenger sought compensation under Sections 166 and 163A. The Motor Accidents Claims Tribunal (Trivandrum) computed the award under Section 163A by treating the deceased as earning Rs. 40,000 per year. The insurer contends that the court below could not have invoked Section 163A merely because the claimants agreed to limit the claim to that annual income; Section 163A is a social security provision with a Second Schedule, and the formula under it is not triggered for higher incomes. The respondents/claimants rely on statutory language and prior authorities (including Sarla Verma and National Insurance Co. v. Muneer) to advocate calculations under the structured formula, even for higher incomes. The Kerala High Court, consistent with Deepal Girishbhai Soni v. United India Insurance Co. Ltd., holds that Section 163A benefits are restricted to those with annual income up to Rs.40,000. Consequently, this appeal is allowed; the impugned order is set aside; the Tribunal must determine the claim afresh under Section 166, expeditiously (within 45 days from 01.09.2011). 50% of the award deposited by the appellant is to be retained in fixed deposit pending disposal.
This High Court of Kerala appeal concerns whether the right to compensation under Section 124A of the Railways Act is a personal, non-heritable right confined to the dependent named in Section 123(b), or whether the legal heirs of a deceased dependent can step into the shoes of the claimant and seek execution of an award already obtained by the dependent. The appellant, Krishnakumar G., who is not a dependent of the victim but is the sole legal heir of the father who was a dependent, sought to execute an award under Section 124A after the death of the dependent claimant. The Railway Claims Tribunal initially held that a legal heir could not pursue execution on behalf of a deceased dependent, treating Chapter XIII as a self-contained code exempting other laws. The Kerala High Court undertook a comprehensive statutory survey of Sections 123, 124, 124A, 125 and related provisions, and held that Section 125(1)(d) includes the legal representatives where the dependant had a claim; the term “dependent” must include the legal representative of the estate of a deceased dependent. The Court also relied on precedents recognizing transferability of decrees, inheritance principles, and substitution of legal representatives under Rule 26 of the Railway Claims Tribunal Rules, to hold that rights crystallized in a decree are transferable to the legal heirs. The appeal was allowed, the impugned order set aside, and directions issued for expeditious disposal of execution with a cost award.
This is a second appeal arising from a suit for injunction brought by the plaintiff, E. Raghavan Nair, against trespass by the defendants who claim rights in a portion of Lakshmi Amma’s 28-cent partition property. Ext.A1 (the 1968 partition) allotted 28 cents, with Ext.A2 (1986) transferring 10 cents to the plaintiff. Ext.B1 (1988) conveyed 9 cents to Kunhi Krishnan Nair, and Ext.B2 (1988) conveyed the remaining 9 cents to the first defendant, with life interest reserved to Lakshmi Amma. Ext.B3 (1994) records Lakshmi Amma and Gopalan Nair’s assignment of the B2 plot to Choorikadan Krishnan Nair. The plaintiff contends that he has possessed the A2 plot as a distinct, walled portion, separate from the defendants’ properties. The defendants assert there was a three-cent parcel left between the plaintiff’s land and the first defendant, later purportedly conveyed by Ext.B5 and B6, and challenge the accuracy of boundaries in various deeds. The trial court found that no such remaining land existed and decreed in favour of the plaintiff; the appellate court concurred. The High Court held that, on examined evidence and plan Ext.C3, there was no three-cent residue; attestation of Ext.B3 does not prove knowledge of its recitals; and the essential possession and boundaries establish that the plaintiff’s rights are confined to Ext.A2/B2 identified plots. Ultimately, no substantial question of law arose and the second appeal was dismissed.
Jayan, an injured claimant, challenged the Motor Accidents Claims Tribunal’s award of Rs 15,500 for injuries sustained in a road accident on 04/05/2000. The tribunal awarded modest amounts across heads including loss of earning (Rs 5,000), hospital expenses (Rs 500), pain and suffering (Rs 7,000) and loss of amenities (Rs 3,000). On appeal, the appellant challenged only the quantum, arguing that his income should be Rs 3,000 per month (not Rs 2,500) and that the clavicle fracture caused temporary unemployment and substantial medical and miscellaneous expenses, including transport and assistance costs. He relied on authorities including Lata Wadhwa v. State of Bihar and Laxmi Devi Tabbar to support a higher income figure. The tribunal’s finding that disability of 7% did not necessarily reduce earning capacity was also contested. The High Court agreed that Rs 2,500 monthly was too low and accepted the appellant’s position that Rs 3,000 should be used for computation, noting that unemployment was likely short (not more than two months) and that medical/miscellaneous expenses warranted higher compensation given the injury and Ext. A9. The Court recalculated the heads, granting a further Rs 13,000 in addition to the tribunal’s award: Rs 1,000 for loss of earnings, Rs 2,500 for medical/miscellaneous, Rs 5,000 for pain and suffering, and Rs 4,500 for loss of amenities. The appeal is allowed in part and the Tribunal's directions otherwise upheld; interest on the total amount is ordered with a 334-day delay rider.
The appellant, Shri A. Vijayan, served as Farm Superintendent at the Central Plantation Crops Research Institute (CPCRI) Kasaragod. He was charged in C.C.8/2002 (SPE/CBI) Ernakulam under Section 7 and 13(2) read with 13(1)(d) of the Prevention of Corruption Act. The Special Judge (SPE/CBI) convicted him after trial, awarding six months’ rigorous imprisonment and a Rs. 2,000 fine under Section 7, and one year’s rigorous imprisonment with a Rs. 3,000 fine under Section 13(2) r/w 13(1)(d). The prosecution alleged that as CPCRI’s Farm Superintendent he abused his public office to extort a bribe from PW1 (owner of Cannanore Industrial Security Unit) to extend the security-contract term beyond 31 March 2002. On 18 January 2002, the appellant allegedly demanded Rs. 2,000; a trap was laid on 19 January 2002, with MO6 cash and phenolphthalein testing indicating receipt of the bribe, and Exts. P2 and P3 formalizing the recovered items. The defence claimed the money represented a loan repayment to PW2, and that the appellant had no authority to extend the contract; DWs suggested a private dispute rather than a crime. The High Court upheld the conviction, rejecting the loan- repayment defense and holding that the evidence established a demand and acceptance of illegal gratification and that MO6 was not legal remuneration. The appeal was dismissed.
OP(C).No. 3206 of 2011(O) This is an OP(C) petition (OP(C).No. 3206 of 2011) filed in the Kerala High Court, Ernakulam, by Nabeesa Beevi, guardian of the third judgment debtor, challenging Exts.P13 and P14 orders in EP No.164/2010 in OS No.101/89 of the Munsiff’s Vaikom. Ex parte preliminary and final decrees had been passed against the third judgment debtor. During execution, the guardian filed I.A. Nos.1129/2011 and 1131/2011 seeking to condone delay and to set aside the decrees, but the Munsiff denied condonation and dismissed I.A.1131/2011. Respondents asserted that the petitioner’s proper remedy is to file an appeal under Order XLIII Rule 1(d) CPC to challenge Ext.P14 and, in that appeal, Ext.P13 as well. The petitioner contended that the challenge is to the correctness of the orders rather than merits, and invoked the court’s inherent jurisdiction under Article 227. The judge relied on decisions in Lakhsmikutty Panickathi v. Bharghavi Panickathi (1987 [2] KLT 562), 2004 [3] KLT 712 and C.K. Thomas & Co. v. Muthoot Leasing and Finance Ltd. (2007 [2] KLT 32) to hold that a statutory appeal is the proper remedy. Consequently, the petition was closed, directing the petitioner to pursue the appellate remedy and not exercise jurisdiction under Article 227. The court emphasized Ext.P12 delivery order is not the subject of challenge here.
This Civil Revision Petition challenges an order of the Joint Registrar of Cooperative Societies directed at realising Rs.3,40,681.29 with 18% interest from the petitioner under the Kerala Co-operative Societies Act. The order, dated 18.12.1999, was sought to be executed as if it were a decree, and EA.192/2007 challenged the maintainability of execution on the ground that there was no certified decree. The Sub Court/Nayyattinkara relying on Krishnamoorthy v. Khaleel Rahman held the execution petition maintainable. The petitioner contends that Section 76 of the Act requires a certificate from the Registrar before an order, decision or award can be executed through a civil court, and without such certificate the award does not acquire the decree character. The respondent counters that this is a collateral attack, not permissible, and that the remedy lies within the Act’s framework rather than in civil execution. The High Court analyzes Section 76, noting the distinction between subsections (a), (b), and (c), and the role of Rule 72 of the Co-operative Societies Rules regarding the issue and substitution of certificates. It emphasizes that the certificate imparts the life and character of a decree to the order, and that without it the execution petition is not maintainable. Consequently, the revision is allowed, the impugned order set aside, EA 192/2007 allowed, and EP dismissed, with leave to pursue lawful remedies. This reinforces strict adherence to statutory execution procedures under the Act.
This is a criminal miscellaneous petition (Crl.MC.No. 3420 of 2011) heard by a Single Judge of the High Court of Kerala at Ernakulam challenging the interim maintenance order passed by the Family Court, Thrissur. The Family Court had directed the petitioner to pay monthly maintenance of Rs. 1500 from 1 May 2011 to his wife, the first respondent Latha, under Section 125 Cr.P.C. The petitioner contends that the status of the parties is unresolved and that the first respondent is not his legally wedded wife; if the first marriage subsists, the second marriage would be void and the maintenance obligation would not arise at this stage. He also argues that he was not afforded an opportunity to challenge the quantum and that the petition mischaracterizes his residence and financial capacity. The first respondent counters that Annexure E of the objection statement in the main petition admits the marriage on 1.4.2007 and that the couple lived together, which suggests a valid marriage entitling her to maintenance. The court below noted the admission and treated the interim maintenance as a valid liability, while also observing that issues of subsistence of a prior marriage and the subsisting validity are matters for the main petition. Ultimately, the High Court upheld the status quo, dismissing the Crl.M.C. and leaving the Family Court order intact, noting the maintenance quantum as minimal and appropriate.
The Kerala High Court hears a second appeal arising from a medical negligence suit against Dr. Ajayan, an assistant surgeon at General Hospital, Ernakulam. The plaintiff, Moni, and the State of Kerala contend that negligent treatment for jejuno- or intussusception caused prolonged illness and expenses, culminating in surgery at another hospital. The trial court and the Sub Court (First Appellate Court) accepted the plaintiff’s claim of negligence and awarded damages; ultimately, the appellate court (Second Appellate Court) upheld the findings, only to have the matter litigated in this second appeal. The judgment surveys the evidence, including hospital records (Exts X1–X2), the testimonies of PWs 4–7 and DW1, and the medical opinions regarding conservative treatment versus surgery. Central to the court’s analysis is the Bolam standard, which requires that a doctor must act according to the standard of an ordinary skilled professional and is not negligent if acting in an accepted mode of treatment. It also notes that intussusception can be managed conservatively in some cases and that immediate surgery is not always necessary if the patient responds to non-operative measures. The court ultimately holds that the evidence supports the conservative course and, applying Bolam, concludes no negligence by the defendant. The Second Appeal is allowed; the judgments and decrees of the lower courts are set aside and the suit is dismissed.
Mat.Appeal.No. 809 of 2010 (D) This Kerala High Court (Division Bench) case centers on whether the civil court (and the Family Court) jurisdiction is ousted by the Muslim Women (Protection of Rights on Divorce) Act, 1986 (MW Act). The divorced wife (appellant) sought return of gold ornaments and cash allegedly retained by her ex-husband, along with maintenance claims under Section 125 Cr.P.C. The Family Court, in a common order with the maintenance petition, held it had no jurisdiction to entertain the ornaments/cash claim and dismissed the O.P. The appellant contends that civil courts retain jurisdiction under Section 9 CPC to try civil matters and that MW Act Section 3 does not oust the civil forum for recovery of ornaments and cash, which rights predated the Act. The respondent argues the MW Act is a self-contained code for Muslim women’s rights at divorce and the appropriate forum is the Magistrate under Section 3. The Court analyzes MW Act Section 3, its non obstante clause, and the Family Courts Act Section 7, explaining that Section 7 transfers jurisdiction from ordinary civil courts to Family Courts for specified matrimonial disputes, but does not expressly or impliedly bar civil remedies for preexisting rights such as return of ornaments and cash. It places reliance on Kunhimohammed Ayishakutty and Rajaram/N.D.M.C. lines to hold that civil courts retain jurisdiction unless an express/implied bar exists, distinguishes Avaran Koya, and ultimately allows the appeal in part. The Court directs the Family Court to re-decide O.P.815/2007 in light of these conclusions, with appearances on 15/12/2011 and a six-month deadline for final disposal.