Crl.MC.No. 4021 of 2009

Ajay Kumar Singh v Union Territory of Lakshadweep and The Sub Inspector of Police, Ameni

On 5 January 2010, the Kerala High Court heard Crl.M.C. No. 4021 of 2009 filed by Ajay Kumar Singh under Section 482 CrPC to quash the cognizance taken in S.T. 12/2008 of the Judicial First Class Magistrate, Ameni, for offences under Section 3(a) of the Lakshadweep Prohibition Regulation, 1979. The accused, a home guard constable, was alleged to possess five bottles of Indian Made Foreign Liquor on 26 December 2006 at Ameni. The final report was submitted on 20 February 2008 and cognizance was taken on 26 March 2008. The petitioner contended that cognizance was barred by the limitation period under Section 468(2)(b) CrPC, since the offence occurred on 26 December 2006 and the period of limitation had expired before cognizance. He argued that Section 473 CrPC allows cognizance after expiry of the period only with a proper explanation and in the interest of justice, and requires a speaking order. The Special Prosecutor argued the magistrate may be directed to reconsider if delay is not explained. The Court held there was no explanation for the delay and no speaking order under Section 473; relying on Tara Dutt (AIR 2000 SC 297) that delay must be properly explained and condonation must be in the interest of justice and must be a speaking order. Consequently, cognizance beyond the period of limitation cannot be sustained and the petition was allowed, quashing S.T.12/2008.

High Court of Kerala
Cus.Appeal No.28 of 2009

Commissioner of Customs, Custom House, Wellington Island, Kochi-9 v. Cochin Minerals & Rutiles Ltd.

This Kerala High Court Customs Appeal arises from an order of the Customs, Excise & Service Tax Appellate Tribunal (CESTAT) Bangalore allowing CochIn Minerals & Rutiles Ltd.’s ( respondent) appeal against a department-initiated duty demand under the Central Excise Act. The respondent–a manufacturer of Synthetic Rutile and Ferric Chloride–claimed exemption under Notification 4/97 CE for ores (Chapter 26) and initially the department accepted this exemption. Subsequently, show-cause notices were issued invoking Section 11A(1) of the Central Excise Act with a contention that the extended period of limitation (proviso to Section 11A(1)) could be invoked due to alleged fraud, collusion or wilful mis-statement. After adjudication, the final order (2004) demanded duty along with interest and penalties. The CESTAT Bangalore partly allowed the appeal, holding that the extended period could not be invoked and directing redetermination for pre-12.10.1998 demand while the remainder was set aside. The Revenue challenged the CESTAT order under Section 130 of the Customs Act, 1962. The High Court, relying on Supreme Court authorities like Continental Foundation Jt. Venture, Nestle India, Union of India Rajasthan Spinning & Weaving Mills, and earlier decisions, held there was no wilful or deliberate suppression of facts by CochIn Minerals. Consequently, the appeal is dismissed and the CESTAT order stands, with the exemption interpretation ultimately resting on the facts presented.

High Court of Kerala
OP No. 13211/2001 (W)

N. Purushothama Mallaya v. Cochin Corporation

Two brothers, Purushothama Mallaya and N. Prabhakara Mallaya, are entangled in a long-standing partition dispute over property in Mattanchery, Kochi. The 4th respondent, N. Prabhakara Mallaya, sought permission to reconstruct a dilapidated portion of the building in a share of the property adjudicated in earlier partition decrees. The High Court’s prior actions in O.S. 87/1978 culminated in remands and directions, with the Division Bench ultimately permitting reconstruction in accordance with a plan sanctioned by the Cochin Corporation (Ext.P7) and instructing the parties to pursue relief before authorities if objections arose. The petitioner challenged the corporation’s building permit to the 4th respondent, alleging lack of ownership, misrepresentation, and non-compliance with Rule 16 of the Kerala Municipality Building Rules, 1999, arguing that owner consent and proper ownership are prerequisites for a valid permit. The 4th respondent and the Corporation argued that ownership disputes are not a prerequisite for permit approval since the court already upheld the right to reconstruct and that the plan complies with building rules; objections should be raised before authorities. Ultimately, the court quashed a suspension order (Ext.P15), held that ownership disputes are not relevant to permit consideration, and disposed of the petitions, upholding the right to reconstruct per Ext.P7 and the approved plan.

High Court of Kerala
WP(C).No. 14007 of 2009(U)

P. Mujeeb Rahman v. The Tribunal for Local Self Government Institutions, Thiruvananthapuram; Ramanattukara Grama Panchayath; Ramanattukara Grama Panchayath Secretary; M. Abdul Nadeer

The petitioner, P. Mujeeb Rahman, challenges Ext.P7, a revision order passed by the Tribunal for Local Self Government Institutions in Revision Petition No.129/08. The sequence of events began when the 2nd respondent applied on 27/11/2006 for a license to run a chicken stall; due to inaction by the 3rd respondent Panchayat, the 2nd respondent started the stall under a deemed license under Section 236(3) of the Kerala Panchayat Raj Act. The Panchayat later issued Ext.P3, requiring closure, and despite Ext.P4 reply, the stall was closed. Earlier writ petitions led to orders directing the Secretary to consider the license application, and in 2008 the application was rejected via Ext.R2(d) on the basis of a Panchayat resolution not to allow chicken stalls outside the designated market. The 2nd respondent appealed under Section 276(1) and the Tribunal allowed the revision, holding that the Panchayat’s inaction and reliance on a policy decision violated statutory safeguards (Sections 232, 236(3), and related Rules). The petitioner contends that the Tribunal cannot strike down a Panchayat resolution or substitute policy for individual merits. The court ultimately upholds the Tribunal’s reasoning, noting that the Panchayat cannot bar private stalls outside the market and that the Tribunal was empowered to examine the validity of Panchayat resolutions. The writ petition is dismissed; Ext.P7 is sustained.

High Court of Kerala
Crl.Rev.Pet.No. 2335 of 2010

Antoney Joseph v. C.H.Krishnan & State of Kerala

This is a criminal revision petition filed by Antoney Joseph, an advocate practicing in Hosdurg, challenging the conviction under Section 138 of the Negotiable Instruments Act (NI Act) arising from a cheque for Rs. 60,000 dated 26-03-2007 that was dishonoured for insufficient funds. The complainant alleged that the accused undertook to discharge a liability of his brother (who had a settled dispute with the complainant) and issued the cheque to satisfy that liability; the cheque bounced and notices were issued. The trial court convicted the accused for the offence under NI Act and sentenced him to simple imprisonment for one month with a direction to pay Rs.60,000 as compensation under Cr.P.C. Section 357(3). On appeal, the Sessions Court confirmed the conviction but reduced the imprisonment to one day till the rising of the court, while maintaining the compensation order. The revision petition contends that the accused was not liable since the debt was that of his brother, not himself, and that the evidence failed to establish a legally enforceable debt. The High Court, relying on Damodar S. Prabhu v. Sayed Babalal H, emphasizes prioritizing the compensatory remedy over punitive measures in cheque dishonour cases. It upholds the conviction but modifies the sentence, substituting imprisonment with a substantial fine. The court directs payment of the fine within three months, with default imprisonment, and realisation of Rs.72,500 as compensation to the complainant.

High Court of Kerala
RCR 176/2010

T.K. Bhaskar Nambi v. Puthiyottil Suresh Babu

RCR 176/2010 raises the issue whether a landlord may project a joint bona fide need for eviction under Section 11(3) of the Kerala Buildings (Lease & Rent Control) Act, 1965, by including the occupation needs of a dependent spouse. The landlord sought eviction to start a ready-made garments business for children, claiming his wife (dependent on him) would assist and manage the venture if required. The Rent Control Court held that the need was not bona fide and that the landlord did not establish the two provisos to Section 11(3). The Rent Control Appellate Authority reversed, holding the claim bona fide, while affirming the Court’s view on the protection under the first and second provisos. The tenant challenged before the High Court, arguing that Section 11(3) contemplates only bona fide need for the landlord’s own occupation or for occupation by a dependent family member and that “joint need” with the spouse is not contemplated; pleading must be unambiguous, and a future contingency cannot support eviction. The High Court, by a Division Bench, held that the conjunctive use of “or” in Section 11(3) does not bar a landlord from projecting a bona fide need that includes a dependent spouse’s involvement, and that the landlord’s pleading and evidence were sufficient to establish bona fide need. The court clarified that pedantic pleading should not defeat a bona fide claim. It disposed of the revision petition by granting the tenant time to vacate, with conditions including deposit of arrears and continued rent, on or before 15 September 2011.

High Court of Kerala
LA.App. No. 52 of 2010 (L.A.A. Nos. 52, 53, 54 & 831 of 2010)

T. Nirmala v. Special Tahsildar (LA), Thrissur Municipality; The Executive Engineer, Kerala Water Authority; District Collector, Thrissur

These Land Acquisition Appeals arise from a common judgment relating to the acquisition of lands in Cheruthuruthy village for construction of a water tank by the Kerala Water Authority under the Land Acquisition Act. The Land Acquisition Officer awarded compensation at Rs. 6,172 per Are (based on Ext. A1). The claimant produced Exts. A1–A3; Ext. A1 is the basis document, while Exts. A2–A3 reflect market values of Rs. 30,000 per cent in transactions with BSNL two years after the notification. The Advocate Commissioner reported that Ext. A1 is not comparable to the acquired land and Exts. A2–A3, though post‑notification, showed higher values due to road frontage proximity but could not be accepted in full. The Subordinate Judge fixed Rs. 12,500 per Are. The appellants argued for higher compensation, arguing that Exts. A2–A3 should guide value, with deductions for time and road frontage; Respondents argued that Exts. A2–A3 are post‑notification, not comparable, and should be heavily discounted. The Supreme Court’s ratio in GM Oil & Natural Gas Corp. v. Rameshbhai Patel was invoked to caution reliance on post‑notification documents. The Court re‑appraised the evidence, allowing part of the appeals and fixing enhanced market values: Rs. 21,000 per Are (Rs. 8,500 per cent) for L.A.A. No. 52/2010, and about Rs. 19,900 per Are for L.A.A. Nos. 53/54/831/2010, with statutory benefits under the Act.

High Court of Kerala
WP(C).No. 18734 of 2008

Jayakumar v. K.K. Bahuleyan

This is a Kerala High Court writ petition under Article 227 challenging orders allowing the counter claim in OS No. 833 of 1992, remitted on appeal for fresh disposal. The plaintiff filed a perpetual injunction suit which the trial court had decreed in his favour; on appeal, the decree was set aside and the case remitted. After remand, the defendant moved for a counter claim for declaration of title and possession, and alternatively for recovery of possession and injunction. The trial court permitted the counter claim and received it, following applications to reject and amend the counter claim by the plaintiff. The petitioner contends the counter claim is barred by limitation and barred as a matter of procedure since it was filed after the written statement, relying on Order VIII Rule 6(A) and Article 58 of the Limitation Act, and that the remand order confined the matter to a fresh commission for identification of property. The respondent contends the factual basis for the counter claim was already stated in the original pleading, and that limitation issues should be decided during trial, not at entertainability, citing Sabhari Syndicate v. Catholic Syrian Bank Ltd. The High Court, after examining the remand scope and the court’s authority, found that the remand direction restricted the trial to property identification and not to future counter claims, and accordingly set aside the orders allowing the counter claim and dismissed related applications, directing expeditious disposal of the suit.

High Court of Kerala
WP(C).No. 17874 of 2009(D)

V.O. Devassy v. State of Kerala and Others

V.O. Devassy, owner of 7.116 cents of land in Paravur, sought a building permit from North Paravur Municipality in 2007 for a three-storey commercial building. The Municipality issued Ext.P1 (building permit) and Ext.P2 (approved plan). After demolishing the old structure, disputes with a neighboring owner, Sudheesh, led to a civil suit and a stop memo Ext.P3 on 01/02/2008. The matter triggered a cascade of orders: the Tribunal’s adjudications (Ext.P8, Ext.P14, Ext.P19) and successive notices (Ext.P9, Ext.P10, Ext.P15, Ext.P20) produced by the Municipality, culminating in Ext.P22 canceling the permit for alleged Building Rules violations. The petitioner argued that once permit and plan were approved, the Municipality could not retract, and that Ext.P20 (notices) were issued without proper basis; he relied on Heera Construction (P) Ltd. v. Corporation of Trivandrum to support equity in his favor. The respondents contended that, despite permit and plan, non-compliance with Building Rules justifies cancellation under Rule 16 of the Kerala Municipality Building Rules, with Sections 406(1) and 408 of the Kerala Municipality Act guiding such action. The High Court held that the permit and plan were issued in violation of Building Rules, and Rule 16 empowered suspension/cancellation; however, equity does not favor the petitioner given his continued construction post-notice. The writ petition is disposed of: Ext.P22 is upheld, but the petitioner may limit to two floors and apply for regularization, with the Municipality to consider accordingly.

High Court of Kerala
CRL.A. No.1620 of 2007; D.S.R. No.4 of 2007

Navas @ Mulanavas v. State of Kerala

Navas @ Mulanavas, aged about 28, was convicted of offences under Sections 449, 302 and 309 IPC for breaking into a house and murdering four members of Latha’s family and injuring the mother‑in‑law in a Kerala residence. The night of 3/11/2005 saw a hole drilled into the eastern wall enabling entry into the locked house; the four deceased were Latha (39), Ramachandran (45), their 11‑year‑old daughter Chithra, and Latha’s elderly mother‑in‑law Karthiyani Amma (80). The prosecution alleged the accused attacked Latha first, then Ramachandran and Chithra, causing multiple injuries with MO objects, before self‑inflicting wrist injuries and attempting suicide. The trial court imposed death for the 302 IPC offence and terms of imprisonment for the other counts. The High Court, in a common judgment along with a death sentence reference, reviewed the evidence and the accused’s 313 statement, accepting that the accused gained access by creating the hole and that the injuries and writings in the southern room were attributable to him. However, applying Bachan Singh and Swamy Shraddananda principles, the Bench held that the case did not fall within the rarest of rare category requiring death. The sentence under 302 IPC was reduced to life imprisonment with a rider not to be released for 30 years, while keeping other sentences intact. The reference’s result was that the death sentence was not warranted.

High Court of Kerala
CRL.R.P. No. 2804 of 2010

DR. JAYANTHAN v. KERALA AYURVEDA PHARMACY LTD.

DR. JAYANTHAN, the revision petitioner, challenges a conviction under section 138 of the Negotiable Instruments Act for issuing a cheque of Rs 75,000 dated 3 March 2003 in favour of Kerala Ayurveda Pharmacy Ltd. The complainant alleged that the cheque was issued to discharge a legally enforceable debt arising from purchase of medicines; the cheque was dishonoured for want of funds, and despite a notice, the accused did not repay. Cognizance was taken by the Judicial First Class Magistrate-I, Aluva, and C.C. 1306/2003 was instituted. The trial court, after evaluating the evidence, found the cheque issued towards discharge of a legally enforceable debt and convicted the revision petitioner under section 138 NI Act, sentencing six months’ simple imprisonment and directing payment of Rs 75,000 as compensation under section 357(3) Cr.P.C., with a default sentence of 60 days. The lower appellate court (Addl. District & Sessions Judge, Adhoc-III) North Paravur) dismissed the appeal, affirming conviction and sentence. The High Court, while not disturbing the concurrent findings, relied on the Supreme Court principle that the compensatory remedy should be prioritized over punitive action in cheque-dishonour cases and, in light of that position, substituted imprisonment with a fine. The order directs the accused to pay Rs 1,05,000 within three months (Rs 1,00,000 to the complainant under Cr.P.C. 357(1)(b); the balance to the State Exchequer), with default imprisonment for six months if not paid by 23.12.2010; coercive steps to enforce payment are deferred until that date. The revision petition is disposed of accordingly.

High Court of Kerala
WA.No.12 of 2010

Pulkuzhiyil Mohammedkutty v. Pookkottil Sadanandan and Kerala State Election Commission

The appellant, Pulkuzhiyil Mohammedkutty, challenged the bye-election held for Ward II of Koduvally Grama Panchayat in 2007, alleging irregularities such as double voting and impersonation, and sought to set aside the election of the first respondent, Pookkottil Sadanandan, with a declaration of the appellant as the elected member. Parallel to this, a voter filed an EC petition under Section 35(q) of the Kerala Panchayat Raj Act asserting that the first respondent had not declared assets within the prescribed time; the Election Commission subsequently disqualified him with effect from 27.3.2008. The appellant also sought to restrain the State Election Commission from conducting any by-election in Ward II pending disposal of the Election Petition O.P. 18 of 2007 before the Munsiff Court II, Kozhikode. The learned Single Judge held that an order under Sections 100 and 101 takes effect upon pronouncement and that Section 107(2) saves ongoing proceedings, thereby declining the prayer to stay the by-election. On appeal, the High Court held that under Sections 84 and 149 (and Section 149(3)) of the Act, a casual vacancy must be filled by a bye-election within six months, and that Section 151A of the Representation of the People Act (inserted later) does not permit staying the by-election to avoid potential absurd consequences. Consequently, the appeal was dismissed: the bye-election must proceed within the statutory window, and the petition’s maintainability was not disturbed.

High Court of Kerala
O.P. No. 3256/2003-K

M/S. K.M.WOOD WORKS v State of Kerala and Others

The petitioner, M/S K.M. Wood Works, Palakkad, challenges Ext.P16, an order of the Divisional Forest Officer cancelling the No Objection Certificate (NOC) dated 24 July 2001 for the petitioner’s wood-based furniture unit. The unit began operations after registering with the District Industries Centre (Ext.P4) and possessed a Panchayat licence (Ext.P5). The cancellation arose after complaints by a neighbouring wood industry; Ext.P16 relied on the unit functioning within 5 km of forest boundaries. The petitioner argued that there is no outright ban on such factories within 5 km, and that annual licence renewal and NOC requirements under G.O.(P).No.93/99/Forest (Ext.P8) should govern, not arbitrary cancellation. The State cited apex court directions in Godavarman Thirumulpad v. Union of India (AIR 1997 SC 1228) and central empowered committee guidelines, insisting that the SL Empowered Committee must determine NOC for wood-based industries. The petitioner also relied on a Division Bench decision in W.A.No.1593/1999 supporting similar petitions. The High Court held that the SL Empowered Committee is the proper authority to issue NOC and directed reconsideration by that Committee, with interim stay continuing. The court directed the petitioner to apply to the SL EC within three weeks, with the judgment, and to complete due enquiries including inspections within three months. The writ petition was disposed of with no costs, preserving the interim stay until action by the SL EC.

High Court of Kerala
RSA.No.1190 of 2010

A.M. Makkar and others v. A.E. Alikutty and others

This is a Regular Second Appeal heard by a Single Judge of the Kerala High Court arising from O.S. No. 502 of 2004. The appellants/plaintiffs claim that a sale deed dated 1988 (Ext. A1) executed by Late Amina Pillai in favour of the 1st defendant is void for fraud and misrepresentation and seeks a declaration of nullity with consequential reliefs. They contend that they are legal heirs of Late Amina Pillai through her brother and hence have standing to impugn Ext. A1. The trial court dismissed the suit, holding that the plaintiffs failed to establish their status as legal heirs and that Ext. A1 was supported by consideration. On appeal, the lower appellate court dismissed the delay petition in filing the first appeal, resulting in an inoperative appeal. The present Regular Second Appeal examines (i) whether a second appeal lies against the dismissal of a first appeal on delay, and (ii) whether the plaintiffs have established a prima facie case to challenge Ext. A1. The court notes conflicting Supreme Court authorities (Chandi Prasad v. Jagdish Prasad; Shyam Sundar Sarma v. Pannalal Jaiswal) on entertainability and proceeds to consider the matter. It ultimately finds the delay not satisfactorily explained and declines to condone it. Consequently, the appeal is dismissed, affirming the trial and first appellate court’s conclusions on merits and emphasizing the need for clear delay explanations in second appeals.

High Court of Kerala
Crl.R.P.No.2599 of 2010

Raju George v. N.K. Varghese and State of Kerala

The Kerala High Court hears a criminal revision under Section 397 Cr.P.C. (Crl.R.P.No.2599 of 2010) filed by Raju George against his conviction under Section 138 of the Negotiable Instruments Act for issuing a cheque for Rs 80,000 dated 6 March 2004 that bounced for lack of funds. The complainant alleged that the accused borrowed Rs 80,000 and issued the cheque in discharge of the debt. The Judicial First Class Magistrate Wadakkanchery took cognizance and tried the case; the trial court found the cheque was issued for discharge of the debt and convicted the accused under Sec. 138 NI Act, sentencing three months' simple imprisonment and directing payment of Rs 80,000 as compensation under Cr.P.C. The Addl. District & Sessions Judge, Fast Track Court No.I, Thrissur, on appeal, dismissed the appeal, upholding the conviction. The High Court, after hearing, did not disturb the concurrent findings, but invoked a Supreme Court decision in Damodar S. Prabhu v. Sayed Babalal H., emphasizing that the remedial, compensatory aspect should receive priority over punitive measures in cheque bounce cases. Accordingly, the court modified the sentence to one day’s simple imprisonment and increased the compensation to Rs 1,00,000, payable within three months, with directions to appear on 7 December 2010 to receive the sentence and to make payment. Coercive steps were deferred until 2 December 2010.

High Court of Kerala
WP(C).No. 25989 of 2010(W)

M/S.SHREE GANAPATHI KUTIR UDYOG v. COMMISSIONER OF CUSTOMS, WILLINGTON ISLAND, COCHIN-9 & ASSISTANT COMMISSIONER OF CUSTOMS (REFUND), WILLINGTON ISLAND, COCHIN-9

Shree Ganapathi Kutir Udyog imported used photocopier machines via Cochin Port in 2006. Customs proceedings culminated in Ext.P1, an order of confiscation with liberty to release the goods on payment of redemption fine Rs. 3,70,000 and penalty Rs. 1,90,000. On appeal, Ext.P2 upheld the confiscation but reduced the fine to 10% and the penalty to 5% of the assessable value, making the petitioner eligible for a refund of Rs 38,740. The petitioner then filed Ext.P3 Form 102 refund claim on 08-03-2008. The authorities demanded originals (Ext.P4 deficiency memo); the petitioner submitted an indemnity bond (Ext.P6) and attended a personal hearing; address change intimations were filed (Ext.P9(2)). On 21-04-2009 Ext.P10 notice demanded refund, relying on Ext.P11 judgment; Ext.P12 rejection order was issued on 24-11-2008 and served on the petitioner's agent. The petitioner contended that refund of fine and penalty is not governed by Section 27 of the Customs Act and that the Customs Refund Regulations 1995 do not apply; Ext.P11 (this Court's 2009 decision) held refunds could not be rejected on technical grounds; Circular Ext.P14 suggested no formal refund application is necessary. The respondents contended that Form No.102 and originals are required and that the remedy under Section 128 of the Customs Act (within 60 days) was not pursued. The learned Judge declined relief, applying the District Executive Officer v. Abel principle that subsidiarity of statutory remedy bars extraneous jurisdiction. The appeal is dismissed.

High Court of Kerala
WP(C).No. 24883 of 2007(K)

Dr. Indira Bai Amma v Nimmy (minor) and Others

This writ petition under Article 227 of the Constitution of India (WP(C) No.24883 of 2007) challenges Ext.P9, a common order in I.A. Nos.1234/03 and 1236/03 in O.S.51/1997, which set aside a prior dismissal of the suit against the second defendant for default in taking fresh steps after the summons had been returned unserved. The suit, originally filed as O.S.51/1997 after leave to sue as indigent persons, claims compensation for alleged medical negligence arising from anesthesia during a cesarean section, resulting in the first plaintiff’s blindness and immobilization, with the child born described as a vegetable. After grant of indigent status and delayed permission to sue, the plaintiffs continued to litigate; the suit against the second defendant was dismissed on 14.1.2000 for failure to issue fresh summons. The plaintiffs sought restoration under Order IX Rule 9 of the CPC and Section 5 of the Limitation Act. The Sub Judge partially allowed Ext.P5, and Ext.P9 thereafter set aside the dismissal, prompting the writ petition. The petitioner contends that a dismissal under Order IX Rule 5 cannot be restored under Rule 9 and argues maintainability and procedural defects. The respondents support restoration for ends of justice, and the court, exercising inherent jurisdiction under Section 151 and Order I Rule 10(2) of the CPC, upholds Ext.P9 while urging expeditious disposal of the suit, within six months, to prevent miscarriage of justice.

High Court of Kerala
WP(C).No. 20649/2009-A

K.M. Mariam v. Mahatma Gandhi University

This writ petition concerns K.M. Mariam, a retired government nurse who joined and later absorbed into the Mahatma Gandhi University’s self-financing School of Medical Education as Principal. The petitioner’s career path began in government service (Nursing Tutor, Lecturer, Associate Professor) and culminated in her appointment as Professor in 1997, followed by absorption as Principal in 2004 with the age of retirement fixed at 60 years. The University promised pensionary benefits “without waiting for receipt of pension contribution from Government of Kerala” as a special case and sought to transfer her previous government service; she was assured that retirement benefits would be paid by the University. However, after a ragging incident, she faced suspension (from 2005) and, despite acquittal on related charges, remained suspended pending criminal proceedings. She was reinstated in March 2009 by a writ petition (Ext.P7). Subsequently, the University issued Exts. P9 and P12 in 2009 asserting that pensionary benefits would be denied due to lack of government sanction and because the School is a self-financing institution not covered by University Statutes. The High Court held Exts. P9 and P12 arbitrary, noting mutual service commitments and the binding nature of the absorption terms, and quashed these orders. It directed the University to compute and disburse retirement benefits (including DCRG, provident fund, gratuity, staff welfare, and last month’s salary) and to obtain government sanction to transfer pension contributions, with timelines for payment and pension initiation.

High Court of Kerala
WP(C) 4486/2010 & 21130/2010

SleeBa v. Manual (W.P(C) Nos. 4486/2010 & 21130/2010), High Court of Kerala

These writ petitions challenge the operation of a metal crusher unit on a 1.33‑acre property owned by the respondent. The licensee under an August 18, 2005 agreement was permitted to run the unit for ten years, with monthly licence fees and the respondent bearing the asset’s security. A cancellation agreement dated November 23, 2009 purportedly terminated the licence, with compensation and a security deposit provided by the respondent. The petitioner contends that the cancellation’s validity and genuineness require expert opinion under Sec. 73 of the Indian Evidence Act, and that termination must conform to the contract terms or by expiry in 2015. The respondent contends the cancellation is valid and that the petitioner has no right to possession post‑cancellation, with the trial court to decide ultimate rights later. The court notes the dispute over disputed versus admitted signatures and cites Sec. 73; it also relies on Trivandrum Golf Club v. State of Kerala to frame the principle that premature termination generally permits damages rather than permanent injunction. Nevertheless, recognizing the machine cannot be left idle, the court fashions a provisional arrangement: to keep the unit running under supervision by the party most suited to operate it, subject to specified conditions and secure deposit. The other writ petition is disposed of accordingly.

High Court of Kerala
WP(C).No. 37530 of 2008(P)

Vijayan Menon v. M/S Ansal Builders Limited

The writ petition challenges a P5 order passed by the II Addl. Sub Judge, Ernakulam, referring a tenancy issue under Section 125(3) of the Kerala Land Reforms Act to the Land Tribunal in a suit for recovery of possession (O.S. No. 654 of 2007). The plaintiff, Vijayan Menon, claims title to 56 cents in survey No. 476/8 at Kureekkad, traced to a registered partition deed (No. 1265 of 1971). The defendant, Ansal Builders Limited, a land development company, contends the plaintiff’s title is subject to land reform and asserts tenancy rights since 1932, with those rights vesting in two persons who allegedly conveyed possession to the defendant for development. The defendant filed I.A.4872/2008 under Section 151 CPC to stay the suit and refer the tenancy issue to the Land Tribunal. While the application was pending, an Advocate Commissioner was appointed for measurement. The court directed disposal of the P3 petition and ordered that the Commissioner proceed only if tenancy did not arise. P5 subsequently referred the tenancy question to the Land Tribunal. The High Court held that reference under Section 125(3) is warranted only if the suit raises a question regarding tenancy rights; here the defendant’s case rests on an agreement to develop, not on tenancy rights. The court set aside P5, deleted the tenancy issue, and directed expeditious trial within six months from receipt of a copy of the judgment.