Tenetowl LogoTenetowl
High Court of KeralaKerala High Court · 2009Division BenchWrit petition disposed; police protection direc...

Kavalapara Aaryam Kavu Bhagavathy Seva Samithi v. Sub Inspector of Police, Shornur; Circle Inspector of Police, Ottappalam; Superintendent of Police, Palakkad; CITU, Chumattu Thozhilali Union; Kerala Headload Workers Welfare Board

Case / Petition Number:
WP(C).No. 20193 of 2009(T)
Neutral Citation:/

Case Synopsis & Summary

Kavalapara Aaryam Kavu Bhagavathy Seva Samithi, a charitable trust, sought police protection to facilitate unloading of marble slabs for the construction of a community hall near a temple in Palakkad district. In March 2008, a consignment of 769 square meters of marble slabs was brought to the site; members of the fourth respondent union claimed exclusive unloading rights and obstructed unloading, compelling the petitioner to divert the slabs to Palakkad and raise additional costs. With the project’s completion imminent, further consignments were expected, heightening the risk of renewed obstruction. The petitioner approached the police but alleged inaction, prompting the writ petition seeking a direction to furnish police protection for unloading and asserting that the Kerala Headload Workers Act could regulate the matter in a scheme-covered area. The fourth respondent union argued that unloading falls within their rights and that they possess the requisite skill and contractual arrangement to unload, maintaining the site is within the Act’s ambit. The court examined whether the site qualifies as an establishment and whether unloading is a principal or incidental activity. Relying on precedents, it held the community hall site is not conclusively an establishment and that unloading is incidental to the main skilled work of laying the floor, thus limiting the Act’s applicability. The petition was disposed with directions for police protection and permission to engage the union on mutually agreed terms.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • P. R. Raman
  • P. Bhavadasan
Judgment Date
2009-08-11
Court Decision / Holding
The writ petition is disposed of as follows: (i) There will be a direction to respondents 1 to 3 to afford police protection to the petitioner and employees of Sakthi Tiles (India) Pvt. Ltd., for unloading the marble slabs, in case the petitioner makes a request in that regard and if any obstruction is caused by the members of the fourth respondent. (ii) Petitioner will be at liberty to engage the members of the fourth respondent on mutually agreed terms, if the petitioner is willing to do so.
Final Disposition
Writ petition disposed; police protection directed for unloading; petitioner may engage the fourth respondent union on mutually agreed terms for the unloading work; the main construction status and act applicability not strictly determined in favor of exclusivity of the union.

Parties to the Case

Appellants / Petitioners

  • Kavalapara Aaryam Kavu Bhagavathy Seva Samithi, represented by its Managing Trustee, R.Valsala Amma, W/o Late Venugopala Menon, 'Kavalappara House', (Ambal Nivas), West Fort Road, Palakkad

Respondents

  • Sub Inspector of Police, Shornur, Shornur Police Station, Palakkad District
  • Circle Inspector of Police, Ottappalam, Office of the Circle Inspector of Police, Ottappalam, Palakkad District
  • Superintendent of Police, Palakkad, Office of the District Superintendent of Police, Palakkad
  • CITU, Chumattu Thozhilali Union, represented by its Secretary, Vadakkekkara Unit, Kavalappura P.O. Shornur Municipality, Palakkad District
  • Kerala Headload Workers Welfare Board, Palakkad Local Committee, represented by its Chair Person

Legal Representation & Advocates

Counsels for Petitioners

  • • T. Krishnan Unni, Senior Advocate
  • • R. Rajesh R. Kormath

Counsels for Respondents

  • • Govt. Pleader Sri. P.A. Salim
  • • Sri. N. Reghuraj for R4
  • • Smt. Amminikutty for R4
  • • Sri. Koshy George, SC, KHLWWB for R5

Provisions of Law Cited

Kerala Headload Workers Act, 1998, Section 2(m)

Legal Doctrines & Maxims

  • To be a headload worker, a person must be employed directly or through a contractor for loading or unloading work in an establishment (as defined by the Headload Workers Act).
  • If the worker predominantly performs duties other than headload work, occasional loading/unloading does not bring him under the headload worker definition.
  • Unloading of goods can be incidental to the main work; the status of the activity is to be determined by its centrality to the establishment's principal task.
  • Temple or temple-adjacent areas may not automatically be establishments under the Act; the question depends on factual context and statutory definitions.

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioner contended that unloading of marble slabs is incidental to the main contract of laying the floor and not a stand-alone headload activity. They argued the site falls within a scheme-covered area, potentially bringing it under the Kerala Headload Workers Act, but that the establishment criterion could fail here since the complex is not an establishment per se. They relied on authorities suggesting that unloading as a peripheral activity does not automatically categorize workers as headload workers and urged the court to protect the project by directing police protection for unloading and by permitting engagement of the fourth respondent union only on mutually agreed terms.

Contentions of Respondents

The respondents argued that the Headload Workers Act applies in the scheme area and that the union has a right to unload under the contract/scheme rules. They cited Exts. R4(a)-(c) showing agreements and communications supporting the union’s role in unloading and claimed the construction site, though part of a broader project, is within the jurisdiction of headload workers’ welfare arrangements. They argued that the obstruction of unloading is a legitimate assertion of union rights and emphasized the necessity to safeguard workmen’s interests and the project’s progress.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (4)

Case NameCitationTreatmentExplanation
T.M.B.S. v. Administrative Officer1999 (3) KLT 900PositiveUsed to illustrate that a temple scenario may not render an area an establishment under the Act, supporting the court’s conclusion that the community hall site need not be treated as an establishment.
Jayaprkash v. Superintendent of Police2006(2) KLT 41Mentioned OnlyReferenced to discuss relevance; court notes it may not have much relevance to the present case.
Venkatraman v. Sub Inspector of Police2005(4) KLT 365PositiveCited as a supportive authority that unloading can be incidental to main work, aiding the petitioner’s argument.
Raghavan's case (Full Bench)1998(2) KLT 732PositiveFull bench decision on headload worker definition; used to frame the central inquiry under S.2(m) of the Headload Workers Act.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,435 words•~16 min read

In The Court Record

Kavalapara Aaryam Kavu Bhagavathy Seva Samithi v. Sub Inspector of Police, Shornur; Circle Inspector of Police, Ottappalam; Superintendent of Police, Palakkad; CITU, Chumattu Thozhilali Union; Kerala Headload Workers Welfare Board

IN THE HIGH COURT OF KERALA AT ERNAKULAM PRESENT : THE HONOURABLE MR. JUSTICE P.R.RAMAN & THE HONOURABLE MR. JUSTICE P.BHAVADASAN TUESDAY, THE 11TH AUGUST 2009 / 20TH SRAVANA 1931 WP(C).No. 20193 of 2009(T) -------------------------- PETITIONER(S): ---------------------- KAVALAPPARA AARYAM KAVU BHAGAVATHY SEVA SAMITHI, REPRESENTED BY ITS MANAGING TRUSTEE, R.VALSALA AMMA, W/O.LATE VENUGOPALA MENON, 'KAVALAPPARA HOUSE', (AMBAL NIVAS), WEST FORT ROAD, PALAKKAD. BY ADV. SRI.T.KRISHNAN UNNI, SENIOR ADVOCATE ADV. SRI.RAJESH R. KORMATH RESPONDENT(S): ------------------------ 1. THE SUB INSPECTOR OF POLICE, SHORNUR, SHORNUR POLICE STATION, PALAKKAD DISTRICT. 2. THE CIRCLE INSPECTOR OF POLICE, OTTAPPALAM, OFFICE OF THE CIRCLE INSPECTOR OF POLICE, OTTAPPALAM, PALAKKAD DISTRICT. 3. THE SUPERINTENDENT OF POLICE, PALAKKAD, OFFICE OF THE DISTRICT SUPERINTENDENT OF POLICE, PALAKKAD. 4. C.I.T.U., CHUMATTU THOZHILALI UNION, REPRESENTED BY ITS SECRETARY, VADAKKEKKARA UNIT, KAVALAPPARA P.O. SHORNUR MUNICIPALITY, PALAKKAD DISTRICT. ADDL. R5 IMPLEADED. 5. THE KERALA HEADLOAD WORKERS WELFARE BOARD, PALAKKAD LOCAL COMMITTEE, REPRESENTED BY ITS CHAIR PERSON. ADDL. R5 IMPLEADED AS PER ORDER DTGED 31.7.2009 IN I.A. 9072/09. BY GOVT.PLEADER SRI. P.A. SALIM. BY ADV. SRI. N. REGHURAJ FOR R4 ADV. SMT. AMMINIKUTTY FOR R4 ADV. SRI.KOSHY GEORGE, SC, KHLWWB FOR R5 THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON 05/08/2009, THE COURT ON 11/08/2009 DELIVERED THE FOLLOWING: WPC. 20193/2009. ## APPENDIX PETITIONER'S EXTS: EXT. P1 : TRUE COPY OF THE REGISTERED TRUST DEED DATED 13.2.2009 OF SUB REGISTRAR'S OFFICE, PALAKKD. EXT. P2 : TRUE COPY OF THE ASSIGNMENT DEED DATED 21.2.2005 OF SUB REGISTRAR'S OFFICE, SHORNUR. EXT. P3 : TRUE COPY OF THE APPROVED PLAN DATED NIL OF THE PROPOSED COMMUNITY HALL. EXT. P4 : TRUE COPY OF THE COMPLAINT DATD 24.6.2009 PREFERRED BEFORE FIRST RESPONDENT. EXT. P5 : TRUE COPY OF THE COMPLAINT DATED 24.6.2009 PREFERRED BEFORE SECOND RESPONDENT. EXT. P6 : TRUE COPY OF THE COMPLAINT DATED 24.6.2009 PREFERRED BEFORE THIRD RESPONDENT. EXT. P7 : TRUE COPY OF RECEIPT DATED 25.6.2009 ISSUED BY FIRST RESPONDENT. EXT. P8 : TRUE COPY OF RECEIPT DATED 25.6.2009 ISSUED BY SECOND RESPONDENT. EXT. P9 : TRUE COPY OF RECEIPT DATED 25.6.2009 ISSUED BY THIRD RESPONDENT. EXT. P10 : TRUE COPY OF THE AGREEMENT DATED 15.5.2006 ENTERED INTO BETWEEN M/S. PARAMOUNT CONSTRUCTIONS, OTTAPPALAM AND THE MANAGING TRUSTEE OF THE PETITIONER. EXT. P11 : TRUE COPY OF THE LETTER DATED 2.2.2008, ADDRESSED TO THE PETITIONER BY SHAKTHI TILES (INDIA) PRIVATE LIMITED. ## RESPONDENTS' EXTS: EXT. R4(a) : TRUE PHOTOCOPY OF THE AGREEMENT ENTERED INTO BETWEEN M/S. PARAMOUNT CONSTRUCTION COMPANY AND THE 4TH RESPONDENT UNION. EXT. R4(b) : TRUE PHOTOCOPY OF THE COMPLAINT DATED 29.2.2008 SUBMITTED BY THE LEADER OF POOL NO.8 OF SHORNUR SUB COMMITTEE. EXT. R4(c) : TRUE PHOTOCOPY OF THE LETTER DATED 29.2.2008 ISSUED BY THE CHAIRMAN OF HEADLOAD WORKERS WELFARE FUND BOARD. ## **P.R. RAMAN & P. BHAVADASAN, JJ.** - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - W.P.(C) No. 20193 of 2009 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Dated this the 11th day of August, 2009. ## **JUDGMENT** ## **Bhavadasan, J,** Kavalapara Arayam Kavu Bhagavathy Seva Samithi, a charitable trust decided to construct the community hall intended to be used for religious and social functions. The flooring is to be laid with marble. It is stated that in the month of March, 2008, when a consignment of 769 square meters of marble slabs purchased by the petitioner were brought in two containers to the construction site, about ten to twenty persons claiming to be members of the fourth respondent union claimed that they alone are entitled to unload the slabs and they will not permit anybody else to do the same. It is pointed out that in fact flooring was to be done by Sakthi Tiles (India) Private Limited, who had their own employees for marbling the floor. Since the members of the fourth respondent union obstructed WPC. 20193/2009. 2 the unloading of the marble, petitioner sought the help of respondents 1 to 3, but they were unable to do anything in the matter. Therefore the Managing Trustee was constrained to divert the consignment to his house at Palakkad. Since there was a dispute, the labourers, who came from Rajasthan for flooring returned to their native place. It is pointed out by the petitioner that the work is nearing completion and flooring is to be done immediately. For that purpose, more marble slabs will have to be brought and the marble slabs kept at Palakkad, too will have to be brought to the site. The petitioner apprehends threat and obstruction from members of the fourth respondent union. Trust had preferred Exts.P4 to P6 complaints dated 24.6.2009. Petitioner has mentioned in detail the necessity for him to seek protection. It is alleged that the site where the community hall is put up cannot be called as an establishment and does not fall within the ambit of Kerala Headload Workers Act and also that unloading of marble WPC. 20193/2009. 3 slabs is only incidental. The members of the fourth respondent Union have no right to claim that they alone shall be engaged for the purpose of unloading the marble slabs. Therefore, the petitioner seeks a writ of mandamus directing respondents 1 to 3 to provide necessary police protection for the purpose of loading and unloading the articles at the work site. 2. The fourth respondent union has filed a counter affidavit pointing out that the allegations are without any basis whatsoever. They pointed out that the petitioner is not entitled to any relief. The fourth respondent was represented by the Secretary of the union. According to this respondent there is no cause of action for the petitioner since the only unpleasant incident even according to the petitioner had occurred in March, 2008. No other incident is referred to by the petitioner to show that the members of the fourth respondent union had done anything to arrest the progress of the construction. They say that the construction of the WPC. 20193/2009. 4 community hall is entrusted to M/s. Paramount Construction Company, Ottapalam. Ever since the work was entrusted to them, the members of the fourth respondent union had been engaged for loading and unloading the materials required for the construction of the hall. They had entered into an agreement with them, which is produced as Ext.R4(a). An year ago the marble slabs were brought for unloading. The members of the fourth respondent union belonging to pool No.8 under the Shornur Sub Office of the Headload Workers Welfare Fund Board requested that they be permitted to unload the consignment. They would say that no particular skill is required to unload the marble slabs. The members of the fourth respondent union are competent and well equipped to unload marble slabs. They would also point out that the community hall is being put up in a scheme covered area and therefore the headload workers had a right to claim the work. The relevant communication is produced as Ext.R4(c). The claim of WPC. 20193/2009. 5 the petitioner that the community hall does not fall within the ambit of the definition of 'establishment' cannot be accepted. Pointing out that this is a deliberate attempt to deny work to the members of the fourth respondent union in some pretext or other, they pray for dismissal of the writ petition. 3. The Chair Person of the Local Committee of the Kerala Headload Workers Welfare Board sought himself to be impleaded by filing I.A. 9072 of 2009 and that was allowed. According to them, the community hall is being put up in a scheme covered area and the provisions of the Act are applicable. The area falls under Pool No.8 and there are nine registered workers. The claim made by the petitioner is unsustainable both on facts and in law and has been made with the intention to deny employment to the members of the fourth respondent union. They too point out that the petitioner is not entitled to any relief. WPC. 20193/2009. 6 4. The question that arises consideration is whether the claim of the petitioner that he is not bound to engage the headload workers attached to fourth respondent union is sustainable. 5. Most of the facts are not in dispute. It is accepted by all that the community hall is being put up in a scheme covered area. It is to be noticed that the petitioner has produced Exts.P10 and P11, which would show that the work of putting up a community hall has been split up into two parts. In Ext.P10 it can be seen that some of the works have been entrusted to M/s. Paramount Construction Company. Ext.P11 would indicate that the flooring of the community hall has been entrusted to Sakthi tiles (India) Pvt. Ltd.. The work includes the following: i) Marble Slabs unloading. ii) Marble Cutting and Laying iii) Three Times Polishing iv) One Time Waxing Polish WPC. 20193/2009. 7 In the light of Exts.P10 and P11, it is idle for the fourth respondent to contend that the entire construction work was entrusted to M/s. Paramount Construction Company. May be that the fourth respondent union has been able to enter into an agreement with M/s. Paramount Construction Company. That can be in relation to the work entrusted to them and that cannot extend to the work undertaken by Sakthi Tiles (India) Pvt. Ltd. 6. There is also no dispute regarding the fact that the place where the community hall is being put up is covered by the scheme. If the provisions of the Act are applicable, members of the fourth respondent union will have to be engaged for the work. 7. Learned counsel appearing for the petitioner pointed out that the community hall is close to a temple and if that be so, the Act has no application as the temple cannot be treated as an establishment. In support of the said proposition, learned counsel placed reliance on the decision reported in **T.M.B.S. v.** WPC. 20193/2009. 8 **Administrative Officer** (1999 (3) K.L.T. 900). Relying on the decision reported in **Jayaprkash v. Superintendent of Police** (2006(2) K.L.T. 41), learned counsel pointed out that the construction site does not fall within the ambit of an establishment. 8. Considerable reliance was also placed on the decision reported in **Venkatraman v. Sub Inspector of Police** (2005(4) KLT 365) and it was contended that the work of unloading the marble slabs is only incidental to the other work to be done by the employees of Sakthi Tiles (India) Pvt. Ltd., who were entrusted with the work of laying the floor of the community hall. The said concern has its own employees and under such circumstances the work of unloading being only an incidental one, the members of the fourth respondent union cannot lay any claim to do the unloading. 9. Learned counsel appearing for the respondents then pointed out that no particular skill is required to unload the marble WPC. 20193/2009. 9 slabs and there is no reason as to why work should be denied to the members of the fourth respondent union. In this regard, the fourth respondent received considerable support from the additional fifth respondent also. 10. In the decision reported in **T.M.B.S. v. Administrative Officer** (1999 (3) K.L.T. 900) the facts indicate that the matter related to putting up of a panthal near a temple. It was held that the contractors and traders engaged for such activities have their own arrangements to unload the articles and put up the panthal. It is also pointed out that the temple is not an establishment falling within the ambit of the Act and therefore the Act was not applicable. 11. Of course, if it is to be held that the community hall is a part of the temple, then ofcourse the principle enunciated by the decision applies. But even the learned Senior Counsel appearing for the petitioner was unable to show that the WPC. 20193/2009. 10 community hall was being put up as a part of the temple. If that be so, no help can be derived from the decision mentioned above. 12. The decision in **v.** reported **Jayaprkash Superintendent of Police** (2006(2) K.L.T. 41) may not have much relevance in the context of the present case. That related to agricultural operation. It was held that the Act does not extend to agricultural operations. That decision has not much relevance in the present case. 13. However, the decision reported in **Venkatraman v. Sub Inspector of Police** (2005(4) KLT 365) may be of considerable help to the petitioner. Following the principle of the said decision, learned Senior Counsel contended that the work of unloading of marble slabs was only an incidental activity, the main activity being the laying of the floor. According to the learned Senior Counsel, there can be no dispute that for laying marble slabs specialised skill is needed and it cannot be done by members WPC. 20193/2009. 11 of the fourth respondent union. It is as part of that work that unloading was done by the workers of Sakthi Tiles (India) Pvt. Ltd. The activity of unloading cannot be treated as an independent one. It is also pointed out that there is no regular unloading of marble slabs and at best there may be one or two more consignments. In the said decision it was held as follows: “The Full Bench in Raghavan's case (1998(2) KLT 732) had considered the issue and had observed as following: “Yet another point raised before us was the case of workers employed in the establishments, who are doing the work of loading and unloading along with other duties. Learned counsel for the petitioners would contend that in such circumstances, the workers cannot be treated as headload workers coming under the definition of that term under the Act. We do not think that this is an issue where an answer in general can be given. It will depend on the facts of each case. If the worker is dong loading and unloading work regularly in WPC. 20193/2009. 12 the establishment, he cannot be taken out of the purview of the Act only for the reason that he is discharging some other duties also. One the other hand, if he is principally employed to carry on the work other than loading and unloading and if occasionally he does the work of loading and unloading, it may not be possible to treat him as a headload worker coming within the definition. But, as mentioned earlier, it will depend on the facts of each case.” We feel that in the above context, the prime enquiry has to be conducted with reference to the definition of headload worker as found in S.2(m) of Headload Workers Act, 1998. A person has to be employed directly or through contractor engaged in or for an establishment, for loading or unloading work, for him to be identified as a headload worker. Therefore, if principally and predominantly a person is not engaged for headload work, he is not a 'headlord worker' as coming under the Act. Other provision of the enactment lends support to such conclusion.” WPC. 20193/2009. 13 14. It is evident from the records produced in the case that Sakthi Tiles (India) Pvt. Ltd., has been engaged to do the flooring of the community hall. Ext.P11 agreement also indicate things to be done by the said concern. The activity of unloading the tiles is one among the above activities for doing the work by the concern. It could not be said that the main work of Sakthi Tiles (India) Pvt. Ltd., in the case on hand is loading and unloading. It forms only a very minor part of the work. So also it is extremely doubtful if the community hall could be called as an establishment falling within the ambit of the Act. 15. Learned counsel appearing for the fourth respondent and additional fifth respondent were unable to show that loading and unloading was the main work that was being carried on in the site and the claim of the petitioner to the contrary is incorrect. WPC. 20193/2009. 14 16. The contention taken by the fourth respondent that there was no cause of action does not appear to be very convincing. The petitioner has already referred to an incident, which occurred in March, 2008, which compelled the petitioner to divert the marble slabs to his house incurring huge additional expenditure. The incident as such is not disputed by the fourth respondent. May be that the petitioner at that point of time did not seek actual police aid. However, there is no reason to disbelieve that the Sakthi Tiles (India) Pvt. Ltd and the petitioner apprehend more trouble from the members of the fourth respondent union as and when future consignment of marble slabs arrive. One has also to note that the marble slabs kept in the house of the petitioner in Palakkad will also have to be brought to the site. In the light of the incident that occurred in March, 2008 and also the attitude of respondents 4 and 5, the apprehension expressed by the petitioner could not be faulted. Petitioner is certainly entitled to take WPC. 20193/2009. 15 precautions. It is for the said reason that the petitioner has approached respondents 1 to 3. Seeing the attitude of respondents 1 to 3, if the petitioner felt that no help will be received from them, certainly the petitioner is justified in approaching this court for necessary reliefs. 17. Learned counsel appearing for the fourth respondent then pointed out that that there are only nine workers attached to the particular pool and there is no reason as to why they should not be given work of unloading the marble slabs. It is pointed out that the members of the union are willing to do the work at a reasonable wage. Learned counsel appearing for additional fifth respondent assured that if the members of the fourth respondent union are engaged and if they create trouble, either in the matter of unloading or in the matter of wages, they will interfere and settle the dispute amicably. Fifth respondent too pleaded that the members of the fourth respondent union be WPC. 20193/2009. 16 engaged for unloading the tiles. 18. Well, if as a matter of fact, the petitioner is inclined to employ the members of the fourth respondent on terms, there can be no objection. But the learned Senior Counsel appearing for the petitioner pointed out that the petitioner was not amenable to such a concession. In the light of the fact that the community hall cannot be treated as an establishment and also the fact that the work of unloading of marble slabs can only forms a very minor part of the main work entrusted to Sakthi Tiles (India) Pvt. Ltd., it cannot be said that the activity concerned fall within the ambit of the act. If that be so, the members of the fourth respondent union has no justification to claim that as a matter of right they should be engaged for unloading marble slabs. It must be remembered that the act of unloading marble slabs will occur only very rarely. The work entrusted to Sakthi Tiles (India) Pvt. Ltd., is for the purpose WPC. 20193/2009. 17 of laying the floor with marbles. There cannot be any doubt regarding the fact that the work of laying marble slabs is a skilled work and needs specialised workers. The main work relates to laying of the floor of the community hall, and unloading the marble slabs is only incidental to the main work. It also needs to be noticed that the consignment consists of marble slabs of specified dimensions. The members of the fourth respondent union have no statutory or any other right to physically obstruct the unloading of marble slabs. In the above facts and circumstances, the petitioner is entitled to reliefs in this petition. The writ petition is disposed of as follows: i) There will be a direction to respondents 1 to 3 to afford police protection to the petitioner and employees of Sakthi Tiles (India) Pvt. Ltd., for unloading the marble slabs, in case the petitioner makes a request in that regard and if any obstruction is caused by the members of the fourth respondent. WPC. 20193/2009. 18 ii) Petitioner will be at liberty to engage the members of the fourth respondent on mutually agreed terms, if the petitioner is willing to do so. P.R. Raman, Judge P. Bhavadasan, Judge sb.
End of Judgment Record
Browse All High Court of Kerala (2009) Decisions
2009-06-26

Nishana Mol.N v Alappuzha Municipality & Secretary, Alappuzha Municipality

This writ petition concerns the registration of a marriage under the Kerala Registration of Marriages (Common) Rules, 2008 (Common Rules). The petitioner Nishana Mol.N, whose marriage was solemnized on 8 March 2009, sought registration of her marriage by the Local Registrar. Her husband was abroad, and she submitted Form No. 1 along with documents; however, the Local Registrar demanded the presence of both spouses for registration, a point contested by the petitioner. The court recalls the apex court’s directions in Seema v. Ashwani Kumar (2006) to frame rules ensuring compulsory registration to protect women and provide evidence of marriage, while noting that registration under the Rules does not itself create a marriage but evidences one solemnized otherwise. The Rules specify that registration is mandatory for marriages solemnized within the state, with various procedural requirements (Rules 5, 6, 9, 10, 11, 13, 16, 17) and mechanisms for correction, appeal, and re-registration. The court clarifies that the presence of both parties is not ordinarily required; the registrar may require appearance only in cases where there is reasonable doubt about identity, and even then as an exception rather than a rule. Ultimately, the court directs that registration and certificate issuance be completed within one month from copy of the judgment, without insisting on joint appearance, provided the memorandum is in order.

2009-07-27

Abdul Majeed Kalathil v. District Collector, Malappuram & Others

This batch of writ petitions concerns the constitutional validity of Section 17 of the Kerala Anti-Social Activities (Prevention) Act, 2007, and the power of District Magistrates to confiscate vehicles used in anti-social activities. The petitions challenge the absence of a substantive prohibition against using vehicles for anti-social activities and the lack of a defined procedure for confiscation or an appellate remedy. In W.P.C. No. 9925 of 2009 (the lead case), Abdul Majeed Kalathil contends that his goods carriage KL 11-B/6651 was seized by the Sub Inspector of Pandikkad Police and reported to the District Collector, Exts.P1–P2. The court scrutinizes Section 17's scope, defining anti-social activity (Section 2(a)) and whether the District Collector’s power to confiscate is constitutionally tenable. It finds Section 17 to be vague and violative of Articles 14, 19(1)(g) and 21, as it rests on subjective police satisfaction with no clear standards or process. It also notes environmental objectives but concludes that fundamental rights must prevail. The court does not sustain confiscation under Section 17; instead, it directs that such vehicles be dealt with under the Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001 and Rules, with interim release under specified conditions. It further directs initiation of Sand Act proceedings within a month and finalization within another month. The writ petitions are disposed of accordingly, preserving the rule of law and environmental protection.

2009-06-11

WA No. 671 of 2006 (Fertilizers and Chemicals Travancore Ltd v Union of India)

This writ appeal concerns the pay revision and pensionary benefits of employees of the Fertilizers and Chemicals Travancore Ltd (FACT). The long-term settlement covering terms of employment expired on 31 December 1996. A fresh settlement was concluded (notified 28 August 2001) and made retroactive to 1 January 1997, with revisions in wages and benefits. Clause 29 of Ext. P1 provides that arrears relating to wage revision and dearness allowance for the period 1 January 1997 to 30 June 2001 will be reviewed and decided by management/government only when the company earns profits for at least three consecutive years; Clause 33.1 provides that employees who retired on or after 1 January 1997 will be eligible for arrears calculated from 1 January 1997 to the date of retirement, subject to adjustments for interim relief already paid, with any unclaimed amount transferred to a Welfare Fund. The appellants—the retirees who fall in the 1 January 1997 to 1 July 2001 window—argue that they were denied arrears and were paid pensionary benefits at pre-revised rates, creating discrimination. Respondents contend Ext. P1 binds the parties and arrears depend on profits, and that pay revision administered to others does not compel retroactive change. The court held that Ext. P1 terms survive as terms of employment and directed the management to consider terminal benefits at revised rates within two months and to release arrears when paid to current workers, with connected matters following."

2009-05-29

M/S. Palm Fibers & Yars Trading Co. v. State of Kerala & Others

The petitioner, a Small Scale Industrial unit, ran two LT power connections (No.13070 and No.13427) with commercial production starting in July 1994 and July 1995. On 06/02/1992, the Government issued Ext.P1 guaranteeing concessional tariffs (pre-1992 tariff) for five years from the date of commencement or substantial capacity expansion, certified by the District Industries Centre. Ext.P2 certified eligibility for this concession. Subsequently, the petitioner increased power demand to 300 KVA and was reclassified/advised to HT status from 15/05/1998, converting LT supply to HT. The petitioner argued that Ext.P1 benefits should extend for the full five-year period, covering the LT quantities certified in Ext.P2, and that the HT conversion was a mere reclassification directed by the Board, not a cessation of eligibility. The Board argued Ext.P1 targets only those who commenced production during 1992–1996 and that HT conversion from 15/05/1998 falls outside the Ext.P1 window, rendering the petitioner eligible only up to 15/05/1998. Earlier orders (Ext.P3) had set aside a cut-off date for merits, and Ext.P6/Ext.P4 handled appeals. Ultimately, the Court held that the HT conversion was outside Ext.P1’s period, but directed that the LT benefits for the two LT connections be extended only until 23/05/1998 (LT dismantling date) and without reimbursement from the Industries Department, as held in OP No.7622/1998. The petition was disposed of as above.