Supreme Court of IndiaSupreme Court · 2002Division BenchAppeals allowed; award modified as described.

Karnataka Electricity Board v. State of Karnataka and Ors.

Case / Petition Number:
Civil Appeal Nos. 1327-1335 of 2002
Neutral Citation:/

Case Synopsis & Summary

This appeal concerns a land acquisition dispute arising from a February 1995 agreement between Karnataka Electricity Board (KEB) and landowners for compensation relating to land acquired for a 220 kV power station in Haveri. The agreement fixed Rs. 14,250 per gunta for 2/3 of the scheduled land and provided that solatium would be fixed by the Land Acquisition Officer (LAO). Notifications under Section 4, 5A and 6 were issued in 1995–1996, and the LAO subsequently awarded compensation at Rs. 14,250 per gunta for 1/2 of the land, plus solatium and interest at 9% for the first year and 15% thereafter. The Karnataka High Court dismissed petitions, upholding that the award was in accordance with the Land Acquisition Act, and that the appellant was not bound to sign Form-D. The Supreme Court, however, held that a written agreement existed and the LAO was bound to grant an award consistent with that agreement. It held that solatium under Section 23(2) should be 30% and that, since the agreement contemplated its fixation by the LAO, the Board could not contend otherwise; there was no specific agreement on interest, so the LAO’s interest award could be set aside. The Court modified the award: 2/3 of the land at Rs. 14,250 per gunta, 30% solatium with interest thereon, and struck down the LAO’s interest provision. Appeals allowed with no costs."

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • M. B. Shah
  • B. N. Agrawal
  • Arijit Pasayat
Judgment Date
2002-02-19
Court Decision / Holding
Appeals allowed. The LAO’s award is modified: compensation at Rs. 14,250 per gunta for 2/3 of the schedule property; claimants entitled to 30% solatium with interest thereon; the earlier provision awarding interest on the amount of compensation (9%/15%) is set aside; there shall be no order as to costs.
Final Disposition
Appeals allowed; award modified as described.

Parties to the Case

Appellants / Petitioners

  • Karnataka Electricity Board

Respondents

  • State of Karnataka and Ors.

Legal Representation & Advocates

Counsels for Petitioners

  • • Altaf Ahmed
  • • S.K. Kulkarni
  • • M. Gireesh Kumar
  • • Ankur Kulkarni

Counsels for Respondents

  • • Ashok Kumar Sharma
  • • Kamal Pundir
  • • Mohan V. Katarki
  • • N. Ganapathy (NP)

Provisions of Law Cited

Land Acquisition Act, 1894 – Section 2(1), Section 4(1), Section 5A, Section 6, Section 23(2)Rule 108 of the Rules framed by the State Government under the Land Acquisition Act – Form-DSection 23(1)(a) (reference to interest under the Act)Article 299 of the Constitution of India – signatory requirements under Form-D

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant contends that there was a written agreement producing before the LAO, who was bound to pass an award in accordance with the agreement. Solatium and additional amounts would depend upon the contract between the parties; Form-D signatures were not necessary beyond those of the parties and an officer authorised under Article 299; the LAO’s award of 2/3rd area and the claimed solatium cannot be faulted on the basis of the agreement; there is no specific agreement on interest, so the LAO’s interest award is unjustified.

Contentions of Respondents

The respondents contend that the award should reflect the statutory framework and the agreement, including measurement of compensation and the proper application of solatium as fixed by statute; they argued that formality requirements and interest provisions must comport with the act and related precedents.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (4)

Case NameCitationTreatmentExplanation
State of Gujarat and Ors. v. Daya Shamji Bhai and Ors.[1995] 5 SCC 746PositiveCited to support that gravity of solatium and related awards depends on contract between the parties.
Ishwarlal Premchand Shah and Ors. v. State of Gujarat and Ors.(1996) 4 SCC 174PositiveCited as authority on the treatment of solatium and related compensation under the Land Acquisition Act.
Abdul Aziz Abdul Razak and Anr. v. Municipal Corporation of Greater Bombay and Anr.(1996) 8 SCC 126PositiveCited for contract-based considerations in awards under LA Act.
Sunder v. Union of India(2001) 7 SCC 211PositiveConstitution Bench decision cited to inform the permissible basis for solatium/interest related to contract-based modification of awards.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,711 words•~13 min read

In The Court Record

Karnataka Electricity Board v. State of Karnataka and Ors.

A .. F # KARNATAKA ELECTRICITY BOARD _V._ # THE STATE OF KARNATAKA AND ORS. FEBRUARY 19, 2002 B [M.B. SHAH, B.N. AGRAWAL AND ARIJIT PASAYAT, JJ.] _land Acquisition Act, 1894: Sections 2(1 /), 4(/j, 5A, 6 and 23 (2)._ _land Acquisition-Agreement between Electricity Board and claimantlandowners-Provision for consideration of land and solatium-Award passed by land Acquisition officer not on the basis of Agreement between the parties Award passed by Land Acquisition Officer modified._ c Under an agreement, entered between the Appellant-Board and D[respondent-landowners, the Board agreed to pay consideration@ ][Rs. ][14, ][250 ] per gunta only for 2/3rd of the schedule property and the claimants agreed to hand over the entire schedule property to the Board. The Board also agreed to pay to the claimants solatium amount to be fixed by the Land Acquisition officer. By its award dated 27.7.1998, which was not on the basis of agreement produced before it, the Land Acquisition Officer granted compensation @ E[Rs. ][14,250 per gunta ][in ][respect ][of ][one half area ][of ][the schedule property. It ] also directed the appellants to pay solatium as well as interest on the said amount@ 9% per annum for the first year and@ 15% per annum for the subsequent years from the date of issue of Notification under Section 4(1 ). The Appellant-Board filed a writ petition before the Karnataka High Court which was dismissed by a Single Judge holding that (i) there was not much F difference between the amount awarded by the Land Acquisition Officer and the amount payable under the agreement; (ii) the award was strictly in accordance with the Land Acquisition Act. The appeals were also dismissed by the Division Bench of the High Court on the ground that as the appellant was not willing to sign and submit Form-D and had raised certain objections G[with regard to the payment ][of ][solatium, the Land Acquisition Officer was ] justified in passing the award in accordance with law. Hence these appeals. .. Allowing the appeals and modifying the award, the Court H HELD: I. There was a written agreement between the parties, which 1118 _0_ I tr- KARNA TAKA ELECTRICITY BOARD _v._ ST A TE 1119 was produced before the Land Acquisition Officer end he was bound to pess A award in accordance with the agreement. Grouting of interest, solatium and additional amount would depend upon contract between the parties. (1123-G-H) _State of Gujarat and Ors._ v. _Daya Shamji Bhai and Ors.,_ [1995) 5 SCC 746; _Ishwarlal Premchand Shah and Ors._ v. _State o/Gujarat and Ors.,_ (1996) 4 B SCC 174 and _Abdul Aziz Abdul Razak and Anr._ v. _Municipal Corpn. o/Greater Bombay and Anr.,_ (1996) 8 SCC 126, referred to. 2. Solatium amount is required to be fixed under Section 23(2) of the Land Acquisition Act@30%. After agreeing to pay the solatium, It was totally unreasonable on the part of the officers of the Appellant-Board to contend C that they were not bound to pay the solatium as there was no compulsory acquisition. Secondly, the Land Acquisition Officer also took an unjustified stand that appellant should sign the Form of agreement as prescribed under the rules even though the agreement signed by both the parties was produced before him imd at the request of parties, the land acquisition proceedings were initiated. Form-D prescribed under Rule 108 of the Rules framed by the State D Government under the Land Acquisition Act only contemplates the signatures of the land owners i.e. claimants and that of an officer authorised under Article 299 of the Constitution of India on behalf of and under the direction of the Governor of Karnataka. It also prescribes indemnity bond which is required to be executed by the claimants. It nowhere provides that the person for whose E benefit the property is acquired, should sign the said form. Thirdly, the claimants took unjustified stand that they were entitled to recover interest on the amount as provided under Section 23(1(a). [ 1123-C-FJ 3. The difference in the compensation awarded by the Land Acquisition Officer and the agreement is not much. However, as the appellant had agreed F to pay consideration amount for 2/3rd area of the schedule property, it was not open to the Land Acquisition Officer to award compensation for one half area of the schedule property. Further, as the appellant had agreed to pay to the claimants solatium amount to be fixed by the Land Acquisition Officer, therefore, award granting solatmm cannot be said to be, in any way, illegal or erroneous. However, as there is no specific agreement on payment of G interest in the facts of the present case, the award passed by the Land Acquisition Officer granting the same cannot be justified. [ 1124-8-C) 4. The award passed by the Land Acquisition Officer is modified accordingly. Thi! claim~nts shall be paid compensation at the agreed rate of Rs. 14,250 per gunta for 2/3rd urea of the schedule property. They would H 1120 SUPREME COURT REPORTS (2002] I S.C.R. A also be entitled to get 30% of solatium with i~terest thereon. However, the award directing that the appellant shall pay interest on the amount of compensation is set aside. (1124-D-E) _Sunder_ v. _Union of India,_ (2001) 7 SCC 211, referred to. B CIVIL APPELLATE JURISDICTION : Civil Appeal Nos. 13271335 of 2002. From the Judgment and Order dated I 0.1.2001 of the Karnataka High Court in W.A. Nos. 66027-35 of 2000 (LA) C Altaf Ahmed, Additional Solicitor General, S.K. Kulkarni, M. Gireesh Kumar and Ankur Kulkarni for Vijay Kumar for the Appellant. Ashok Kumar Sharma, Kamal Pundir, Mohan V. Katarki and N. Ganapathy (NP) for the Respondents. D The Judgment of the Court was delivered by SHAH, J. Leave granted. .. Question involved in these appeals is-whether award passed by the Land Acquisition Officer (hereinafter referred to as "LAO") is in conformity E with the agreement between the parties. As such, there is not much difference between the two but for one or the other reason parties including the LAO have taken unjustified stand. Hence this litigation. Appellant Karnataka Electricity Board challenged the order dated F 26.7.2000 passed by the learned Single Judge rejecting its Writ Petition No. 4804 of 1999, before the Division Bench of the High Court of Karnataka at Bangalore by filing Writ Appeal Nos .. 6027-35 of 2000 (LA). Those appeals were dismissed by the impugned judgment and order dated I 0.1.200 I. Hence these appeals. G In Writ Petition No. 4804 of 1999, appellant challenged the award dated 27. 7.1998 passed by the LAO granting compensation@ Rs. 14.250 per gunta as agreed between the parties and also directing the appellant to pay solatium as well as interest on the said amount @ 9% per annum for the first year and @ 15% per annum for the subsequent years from the date of issue of notification under Section 4(1 ). The LAO also directed that compensation H amount should be 50% of the total value as directed by the Member Secretary. KARNA T AKA ELECTRICITY BOARD _v._ ST A TE [SHAH, J.] 1121 Urban Development Authority, Cauvery as the land was undeveloped area, A despite the agreement that compensation was to be paid for 2/3rd land and I/3rd was to be deducted on the ground that it was undeveloped. The writ petition was disposed of by the learned Single Judge by holding that there was not much difference between the amount awarded by the LAO and the amount payable under the Agreement. The Court also held that award was B strictly in accordance with the Land Acquisition Act. The appeals were also dismissed by the Division Bench of the High Court on the ground that as the appellant was not willing to sign and submit form-D and had raised certain objections with regard to the payment of solatium, the LAO was justified in passing the award in accordance with law. The court observed that appellant even though a statutory body resiled from the agreement and committed its C breach. For dealing with the contentions raised in these appeals, we would narrate the facts in brief. Admittedly, an agreement dated 2nd February, 1995 was entered into between the appellant and respondent Nos. 2 to 6 (claimants) for acquisition of 21 acres 14 guntas of land belonging to the claimants, situated in R.S. No. 222 and 226. Haveri Town for the purpose of establishing a 220 K. V. capacity electricity power station. The said agreement _inter alia_ provides that- - ( a) appellant was looking for land in Haveri town for the use of Karnataka Electricity Board (hereinafter referred to as 'KEB') and to install power station for public purpose; - (b) appellant and claimants negotiated for the purpose of acquisition of land and consideration was fixed by mutual discussion at Rs. 14,250 (rupees fourteen thousand two hundred and fifty only) per gun ta; F - ( c) it was expressly made clear that the claimants have agreed to receive consideration @ Rs. 14,250 per gunta only for the 2/3rd area of the scheduled property and hand over the entire scheduled property to K.E.B. - ( d) claimants have agreed voluntary to accept the considerations as it was a profitable consideration per gunta ·and it was fair market value of the property; - (e) appellant and claimants have agreed to apply to the Land Acquisition Officer. Haveri to acquire the land and to pay the compensation to the claimants and also to hand over the land to H 1122 SUPREME COURT REPORTS [2002) I S.C.R. ## A K.E.B. in the manner prescribed under the Land Acquisition Act, 1894. In pursuance to the aforesaid agreement, parties _inter alia_ covenanted as under : (As per the agreement, !st Party is claimants and 2nd Party is K.E.B.) :- B 1. that the first party agreed that the market value of the property of the schedule property is Rs. 14,250 per gunta and it shall not exceed at any cost more than Rs. 14,250 per gunas; c 2. that the first party has agreed to receive consideration at a rate of Rs. 14,250 per gunta only for the 2/3rd area of the schedule property and to hand over the entire schedule property to the second party; 3. 4. that the first party agreed that he will receive the agreed D consideration amount through land acquisition officer in the manner prescribed by law and also agree to hand over the possession of the property immediately on execution of this agreement. Second party may enter into the schedule property to install the power station according to their requirements or utilise the said property in any manner as it deems fit: E Similarly, K.E.B. agreed as under- I. 2. that the second party shall pay consideration amount at Rs. 14,250 F per gunta of only 2/3rd area of the schedule property and to take possession of the entire schedule property; 3. that the second party shall bear all the incidental expenditure required to acquire the schedule land; 4. that the second party agreed to pay to the first party solatium G amount to be fixed by the land acquisition officer. The agreement was signed by both the parties on 2nd February, 1995. On the basis of the said agreement and on the joint request of the parties, the State Government issued the Notification under Section 4 of the Land Acquisition Act on 08.9.1995. Enquiry under Section 5A of the Act was held H and Section 6 Notification was issued on 26.9.1996. Before that appellant • KARNATAKAELECTRICITY _BOARDv._ STATE [SHAH, J.) 1123 was directed to deposit a sum of Rs. 57,62,402 by letter dated 3.5.1996 on the basis of agreed amount and hence on 4.7.1996 appellant deposited the same by demand draft dated 29.6.1996. In the present case, the dispute arises mainly because of unjustified stand taken by the parties including the LAO in not passing an award on the basis of the written agreement which was produced before him. Firstly, it was B unjustified stand taken by the officers of the appellant that claimants were not entitled to solatium. As quoted above, it was specifically mentioned in the covenant that the appellant had agreed to pay to the claimants solatium amount to be fixed by the LAO. Solatium amount is required to be fixed under Section 23(2) of the Land Acquisition Act @ 30%. After agreeing to pay the C solatium, it was totally unreasonable on the part of the officers of the appellant to contend that they were not bound to pay the solatium as there was no compulsory acquisition. Secondly, the LAO also took an unjustified stand that appellant should sign the Form of agreement as prescribed under the rules (as provided under D sub-section (2) of Section 11 of the Land Acquisition Act), even though the agreement signed by both the parties was produced before him and at the request of parties, the land acquisition proceedings were initiated. The learned Additional Solicitor General has produced before us the Form-D prescribed under Rule 108 of the Rules framed by the State Government under the Land E Acquisition Act. The said form only contemplates the signatures of the land owners i.e. claimants and that of an officer authorised under Article 299 of the Constitution of India on behalfof and under the direction of the Governor. of Karnataka. The Form also prescribed indemnity bond which is required to be executed by the claimants. This prescribed Form nowhere provides that the person for whose benefit the property is acquired, should sign the said F form. Thirdly, it is also to be stated that the claimants took unjustified stand that they were entitled to recover interest on the amount as provided under Section 23(J)(a). In our view, the learned Additional Solicitor General rightly contended G that undisputedly there was a written agreement between the parties, which was produced before the LAO and the LAO was bound to pass award in accordance with the agreement. Law on this subject is settled. Granting of interest, solatium and additional amount would depend upon contract between the parties. _[Re: State of Gujarat and Ors._ v. _Daya Shamji Bhai and Ors.,_ [1995] 5 SCC 746; _lshwarlal Premchand Shah and Ors._ v. _State of Gujarat_ H 1124 SUPREME COURT REPORTS [2002] I S.C.R. A _and Ors.,_ (1996] 4 SCC 174 and _Abdul Azis Abdul Razak and Anr._ v. _Municipal Corporation of Greater Bomaby and Anr.,_ (1996] 8 SCC 126. We also agree with the learned Single Judge that the difference in the compensation awarded by the LAO and the agreement is not much. Further, as the appellant had agreed to pay to the claimants solatium amount to be B fixed by the LAO, therefore, award granting solatium cannot be said to be, in any way, illegal or erroneous. However, as there is no specific agreement on payment of interest in the facts of the present case the award passed by the LAO granting the same cannot be justified. Further, as the appellant had agreed to pay consideration amount at the rate of Rs. 14,250 per gunta for C 2/3rd area of the schedule property, it was not open to the LAO to award compensation for one half area of the schedule property. In this view of the matter, award passed by the LAO requires to be modified accordingly. It is ordered that the claimants shall be paid compensation at the agreed rate of Rs. 14,250 per gunta for 2/3rd area of the D schedule property and not 50% thereof. As directed by the LAO, claimant also would be entitled to get 30% oi solatium and on the said amount of solatium they would be entitled to have interest in view of the decision rendered by the Constitution Bench of this Court in _Sunder_ v. _Union of India,_ (200 l] 7 SCC 211. However, the award directing that the appellant shall pay interest @ 9% per annum for the first year and @ 15% per annum for the E subsequent years from the date of issue of notice under Section 4(1) of the Land Acquisition Act on the amount of compensation is set aside. The appeals stand allowed accordingly. There shall be no order as to costs all-throughout. F T.N.A. Appeals allowed.
End of Judgment Record
Browse All Supreme Court of India (2002) Decisions
2002-12-17

Devender Pal Singh v. State N.C.T. of Delhi

This judgment deals with three review petitions under Article 137 of the Constitution challenging the death sentence in cases involving murder. The petitions focus on whether death should be imposed when one of the three Judges on the bench records acquittal or advocates a life sentence. The Court clarifies that while the scope of review in criminal proceedings has broadened, a review is not a re-hearing of the original appeal and must be grounded in a miscarriage of justice. Review petitions are normally disposed of by circulation, not as full-blown re-arguments, and are permissible only where there is a grave error, manifest on the face of the order, or a miscarriage of justice. The opinion cites P.N. Eswara Iyer and Suthendraraja to stress that review is not routine and cannot be equated with the original hearing; the finality of judgments is preserved unless compelling reasons exist. The majority holds that a death sentence should not be reconsidered merely because two Judges share a different view than one Judge, nor should acquittal by a lower court automatically negate the Possibility of a death sentence if the circumstances still warrant it. The judgment also discusses the “rarest of rare” standard from Bachan Singh and the scope of reference to a larger Bench. A dissent by Shah, J. proposes that altering the death sentence to life imprisonment would meet justice in some cases, but the majority dismisses the petitions.

2002-04-24

Narpat Singh v Jaipur Development Authority

This Supreme Court decision concerns the long-running dispute over land acquired under the Lal Kothi Scheme in Jaipur. Land belonging to four appellants was acquired for a public purpose and an award awarded monetary compensation along with directions to allot residential plots of 1000 or 2000 square yards. On reference, courts enhanced the monetary compensation while upholding the plot allotments. A tripartite settlement among the claimants, the State Government and the Urban Improvement Trust ( UIT, later Ja ipur Development Authority, JDA) reduced the compensation in exchange for plot allotments, with contestants paying a reduced price to acquire plots. Executions proceeded and plots were delivered. The High Court later set aside the compromise decree, holding that the allotment of land by an award in land acquisition proceedings lacked jurisdiction and was inexecutable, relying on precedents such as Jaipur Development Authority v. Radhey Shyam and Secretary v. Daulat Mal Jain. The Supreme Court, while acknowledging the discretionary nature of Article 136, held that this case does not justify upsetting the compromise. It directed the state to restore appeals for merits and to determine quantum of monetary compensation excluding plots, while also directing allotment of smaller plots (about 250 sq yards) in another scheme within three months to maintain consistency with earlier judgments. The land must be used for the public purpose for which it was acquired. The appeals were disposed of with these directions under Article 142 for complete justice.

2002-11-13

Shrawan Bhadaji Bhirad and Ors. v. State of Maharashtra

Shrawan Bhadaji Bhirad and others, members of the Bhirad family, were convicted by an Additional Sessions Judge under sections 147, 148 and 307 read with section 149 IPC for forming an unlawful assembly and assaulting Ganesh Dhage with swords, causing extensive injuries and a prolonged hospitalisation. Ganesh Dhage survived and implicated the appellants, naming them in the dying/dependant statements, which were corroborated by eyewitnesses. The High Court upheld the Sessions Court’s conviction, rejecting the appellants’ contention that the victim did not know the assailants’ names and that the names were a product of enmity. In appeal, the appellants argued that their alleged involvement had no basis and was speculative. The Court emphasised that the dying declaration, though recorded after severe injuries and while the victim was in medical care, had significant content; and even if considered under Section 164 CrPC rather than as a strict dying declaration, it remained corroborated by the testimony of the eye-witnesses. The Court found overwhelming evidence on record supporting the prosecution’s case and concurred with the concurrent findings of the Sessions Judge and the High Court. Accordingly, the appeal was dismissed, bail bonds cancelled, and the appellants were to serve the remainder of their sentences.

2002-10-10

Alla China Apparao and Ors. v. State of Andhra Pradesh

Alla China Apparao and six co-accused were convicted by the trial court under Sections 302/149 and 148 of the IPC, and each was sentenced to life imprisonment, with a concurrent one-year term on the 148 IPC count and a fine. The High Court affirmed the convictions against the appellants while acquitting three others. The prosecution’s case rests on four eyewitnesses who say the deceased was attacked near his house, dragged to a wall, and slain by multiple appellants; medical and objective evidence were said to corroborate the eyewitnesses. The appellants contend that the three acquitted co-accused show the same evidence cannot justify conviction of the others; the witnesses were partisan, and there was no independent corroboration; the lack of injuries beyond what witnesses described and alleged dragging marks undermine the case; and a delay in forwarding the FIR to the Magistrate merits acquittal. The State argues the eyewitnesses were credible, corroborated by medical evidence and police findings, that non-examination of other witnesses is not fatal, and that the absence of dragging marks or blood on weapons does not negate the prosecution. The Court holds that eyewitness credibility is supported by evidence, the delay was within reasonable limits given workload, and the case remains trustworthy. The appeal is dismissed and the convictions upheld.