This is a 1983 Supreme Court decision in Civil Appeal Nos. 2853 and 2863/82 (Allahabad High Court matters) arising from contractor Kamaluddin & Co. and the Directorate General of Supplies and Disposals (DGS&D) of the Government of India. The core issue concerns interpretation of Clause 18 (Recovery of Sums Due) and Clause 24 (Arbitration) of the standard form contract, and the ambit of Section 41 of the Arbitration Act, 1941, including its Second Schedule, regarding interim injunctions in proceedings under the Act. The appellant alleged there was no concluded contract containing an arbitration clause and sought an injunction under Section 33 and 39(1)/(2) CPC to restrain the Union of India from withholding or recovering sums claimed under other pending bills. The DGS&D had cancelled the contract for delayed supply, incurring extra costs (Rs. 92,364), and threatened to withhold payments on other contracts. The Allahabad High Court held that Section 41(b) allows injunctions only for the purposes of arbitration proceedings before the Court and cannot restrain withholding of amounts in respect of other bills. The Supreme Court, after reviewing prior rulings and the Full Bench decision in Mohan Meakin Breweries, held that Clause 18 empowers the Union of India to withhold the amount by appropriation or set-off against other contracts; however, an injunction restraining withholding would be beyond Section 41(b). It affirmed that the appeals are to fail and dismissed them, with costs to be borne by the parties. The decision clarifies the locus of arbitration-related injunctions and the interpretation of contract clauses in the context of cross-contract set-offs.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • D. A. Desai
  • V. Balakrishna Eradi
  • R. B. Misra
Judgment Date
1983-08-12
Court Decision / Holding
Appeals dismissed. The Court held that Clause 18 confers ample power on the Union to withhold the amount by appropriating it from sums due under other contracts; an injunction restraining withholding would be beyond the scope of Section 41(b) of the Arbitration Act. The Court approved the limitation that injunctions under Section 41(b) are only for the purpose of and in relation to arbitration proceedings, and that restraining withholding would effectively direct payment, which is not permissible. The order thus upheld the prevailing practice that the Union may withhold sums, while restraining recovery or appropriation of damages pending adjudication. Costs to be borne by the parties.
Final Disposition
Appeals dismissed

Parties to the Case

Appellants / Petitioners

  • Kamaluddin & Co.

Respondents

  • Union of India

Legal Representation & Advocates

Counsels for Petitioners

  • • D. C. Singhania
  • • Raju Ramachandran
  • • Mukul Mudgal
  • • J. P. Gupta

Counsels for Respondents

  • • K. G. Bhagat (Addl. Solicitor General)
  • • Girish Chandra
  • • C. V. Subba Rao
  • • R. N. Poddar

Provisions of Law Cited

Arbitration Act, 1941Section 41(b) of the Arbitration Act, 1941Section 41 of the Arbitration Act, 1941Second Schedule to the Arbitration Act, 1941Section 33 of the Arbitration Act, 1941Code of Civil Procedure, 1908Order 39 (Rules 1 & 2) of the CPCSection 151 CPCClause 18 (Recovery of Sums Due)Clause 24 (Arbitration) of the standard form contract

Legal Doctrines & Maxims

  • Golden rule of construction: when the words of a statute are clear, plain and unambiguous, give effect to that meaning irrespective of consequences.
  • Headings prefixed to a section cannot control the plain words of the section, but may aid interpretation in cases of ambiguity.
  • The duty of a judge is to expound and not to legislate.
  • Words should be read structurally and in context, not in isolation.

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants contended there was no concluded contract containing an arbitration clause, and thus no arbitration proceedings or valid arbitration clause to invoke Section 41. They sought a negative injunction restraining the Union of India from withholding amounts due under pending bills, arguing that Clause 18 was not a blanket power to withhold and that the court could grant injunctive relief under Section 41 read with the Second Schedule and CPC Order 39. They urged that ‘any claim for the payment of a sum of money’ should be read to include only amounts due and payable, not damages pending adjudication.

Contentions of Respondents

The Union of India argued that there was a concluded contract containing an arbitration clause and Clause 18 empowered withholding or appropriation of sums due under other contracts. They maintained that Section 41(b) grants the court power to pass interim injunctions for the purpose of and in relation to arbitration proceedings, and the injunction in question would amount to an order directing payment, which is impermissible in arbitration proceedings. They asserted that the sought relief would subvert the contract’s enforcement mechanism and disrupt set-offs under Clause 18.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (4)

Case NameCitationTreatmentExplanation
Union of India v. Raman Iron Foundry3 S.C.R. 556 (1974)OverruledThe Supreme Court overruled the observations in Raman Iron Foundry regarding the scope of Section 41(b) and interim injunctions related to arbitration proceedings.
Mohan Meakin Breweries v. Union of IndiaA.L.R. 1975 Delhi 248PositiveApproved by the Court as supportive authority for the restricted use of injunctions in arbitration matters and the need to keep them within Section 41(b)'s limits.
Air Foam Industries v. Union of IndiaAIR Delhi (not clearly stated in document)Mentioned OnlyMentioned as part of the line of authorities considered in Delhi High Court and later discussions; not directly applied in the ratio.
Marwar Teni Factory v. Union of India(not clearly stated in document)Mentioned OnlyReferenced among earlier cases but not central to the ratio of the present decision.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•7,272 words•~34 min read

In The Court Record

Kamaluddin v. Union of India

607 KAMALUD,PIN ANSARI & CO. _v._ UNION OF INDIA _Augus/ 12, 1983_ (D.A. DESAI, V. BALAKRISHNA ERADI AND R. B MISRA, JJ.]. _Arbitration Act, 1941!-'-cls._ (a) _and_ (b) _off- 41-Interpretation_ _[of- Court_ _has power under cl._ (b) _to_ _issue interim injunctions_ _only_ _for_ _the purpose .of and in_ _relation to the arbitration proceedings_ _before the_ _Court._ _Contracts with Government oflndia-cl.18_ _of Standard_ _Form_ _of Contract_ _-Interpretation of- Whether for fulfilment_ _of a_ _claim_ _for payment of a sum of_ _money arising under a contract_ _the_ _Government has power to withhold sum due_ _under other contracts_ ? A B ##### c _lnterpretation-'Headings' cannot be used_ ~o _give different_ _'effect_ _to_ _clear_ **D** _words_ _in the section._ ~. ' The DGS&D) representing the Government of India, had entered into a contract with the appellent firm for supply of some timber. Clause 18 of the standard form of contract, uqder the head "Recovery of sums due", provided _inter alia_ that whenever any claim for payment of a sum of money arose out of or under the contract against the contractor, the purchaser shall be entitled to recover such sum by appropriatina: any sum then due or which at any time **B** thereafter may become due to the contractor under any other contract with the pUrchaSer. Clause 24 thereof provided for arbitration in the event of any dispute arising J:>etween the parties. The appellant failed to supply th~ timber. The [ GS&D cancelled the contract, made ·risk purchases at extra cost and issued notice ca11ing upon the appellant to pay the extra .cost incuried and threatening to withhold the amount from the payments due under the pending **F** bills of other contracts. The appellant moved a petition under s. 33 of the Arbitration Act, 1940 alleging that there was no concluded contract in existenc.e between the parties, con.taining any arbitration clause and praying for an injunction restraining the Union of India frotn appropriating, withhokfins or recovering the amount claimed from its other bills. The High Court held that under s. 41 of the Act it could only grant an injunction restraining the Union **-G** of India from appropriating or recovering the amount of damages claimed from the other pending bills of the appellant, and rejetted the prayer for grant of injunction restraining the Union of India from witholding payi:uents of the other pending bills. Dismissing the appeal, HELD: I. Clause 18 of the standard form of contract confers **ample** power upon th(( Union, Qf lndia _tq_ \Vithholcl the .._mount and nQ injunction B A 8 c D E F 608 SUPll.BME COURT ll.EPORTS [1983] 3 s.c.ll.. order could ·be passed restraining: the UniCjl of India from withholding tl!ie amount. [623 BJ (i) The golden rule of c_onstruction is that when the words of a statiite are cle~r. plain and unambiguous, that is, they are reasonably susceptible to only one meaning, the Courts a·re bound to give effect to that meaning irres .. pective of the consequences. 'The dory of a judge_ is to expound and not to legislate a is 'rundamental rule. If this principle is applied to the interpretation of cl. 18 of the standard form of contract it would be clear that the clause unequivoCally contemplates a claim for payment. It does not contemplate the amount due and, therefore, the heading of this clause which talks of only 'Recovery of sums due' will not control cl. 18. Headings cannot be used to give a different Cffect to clear words in the section where there cannot be any doubt as to the ordinary meaning of the words. The clause gives wide pow:rs to the Union of India to recovei: the amount ciaimed by approprialing any sum then due or which at af:1.y time ·thereafter may recorne due to thc- contractor under other contracts. [620 A-G] (li) Clau~ 18 was slightly differently worded earlier when it read 'whenever under this contract any sum of money is recoverable from and payable by the contractor'. _But this formUla was deliberately and advisedly altered when the present standard form was introduced by substituting the words .~whenever any claim for payment of a sum of money arises' and this change in phraseology indicated that in order to attract the applicability.of ihe present cl. 18, it was not necessary that there should be a sum of money due and payable by the contractor to the purchaser, but it Was enough if there was a mere claim on the part of the purchaser for payment of a sum of money by the contractor irrespective of the fact whether such sum of money was presently due and payable or not. Even after the change in the language of cl. 18 the Union of India cannot b"e injuncted fro~ withholding the amount under other bills oft he contractor. But it can certainly be injuncted from recovering or appropriating it to the damages claimed. [620 H~621A, Gj _Union of India_ v. _Raman_ _Iron_ _Foundry,_ (1974] 3 S.C.R. 556 overruled. 2. An injunction order restraining the Union of India from withholdina the amount due to the contractor under other pending bills virtually amounts to a direction to pay the amount to the contractor-appellant. Such an order was beyond the purview of cl. (b) of s. 41 of the Arbitration Act. [621 H-622 A] _j_ G (i) ·Clause (b) of s. 41 confers power on the court to pass orders in respect of any of the· matters set out in the Second Schedule which _inter alia_ includes 'interim injunction'. But this power to pass an order of injunction can onlY be exercised 'for the purpose ·of and in relation to arbitration proceedings• before the Court. [615H] H In the instant case the proceedings before the Court were. pursuant to an application made under s. 33 of the Act in which the appellant had taken the stand that there was no concluded contract between the parties ~qntainin9 an arbitratio~ 'flause. Th<;:r~fore, H j$ difficult to say that the _11_ ~·, l l lf J} 1. UNION 609 application for injunction moved by the appellant was for the purpose of and in relation to arbitration proceedings. That apart, the amount due to the appellant under the pending bills was not the subject-matter of the present proceedings and, therefore, the injuncti~n order restraining the respondent from withholding the amount due to the appellant under the pending bills in respect of other contracts could not be said to be for the purpose of and ih - relation to the present arbitration proceedings. [616 A, C, 617 A-BJ A _Union_ _of India_ v. _Raman_ _Iron_ _Foundry,_ (1974] 3 S.C.R. 556, referred to. 8 _Mohan_ _Meakefl_ _Bre.weries_ v. _Union_ _of_ _India,_ A.LR. 1975 Delhi 248, approved. (ii) The contention that cl. (a) ·of s. 41 makes the Code of Civil Procedure applicable to all proceedings before the Court and to all appeals under the Act and, therefore, the appellant was entitled to .. invoke 0. 39 of the Code to get an injunction order even if the conditions of cl. (b) of s. 41 were not satisfied cannot te accepted. Clause (a) of s. 41 makes only the procedural rules of the Code applicable to the proceedings in court under the Arbitration Act. This clause does not authorise the court to pass an order of injunction. If the above contention is accepted, appeals would lie under ss. 96, 100 or 104 of the Code. But the Act itself provides for appeal under s. 39. Besides, if cl, (a) of s. 41 gave wide powers to pass an order of injunction, c1. (b) of s. 41 would become otiose. 616 D-FJ (iii) Jf an order injuncted a party from withholding the amount due to the other side under pending bills in _other contracts, the order necessarily means that the amount must be paid. It will be a contradiction in terms to say that a party is injuncted from withholding the amount and yet it can withhold the amount as of right. In any case if the· injunction order is one which a party was not bound to comply with, the Court would be loath and reluctant to pass such an ineffective injunction order. An injunction order is passed only for the purpose of being carried out. (618 D-E:.J c D E _Union_ _of India_ v. _Raman_ _Iron_ _Foundry,_ [1974] 3 S.C.R. 556; Observations F to the contrary held inconsistent with the law laid down in the case. CIVIL APPELLATE JtiRtSDJCT!ON: Civil Appeal Nos. 2853 and 2863 of 1982. From the Judgment and Order dated the- 24th January, 1980 of the Allahabad High Court in Civil Revision No. 3452 of 1978. _D.C. Singhania, Raju Ramachandran, Muhul Mudgal, JP Gupta_ for th~ appellant in C.A. No. 2854/82. _S.N. Kacker,_ _D.C._ _Singhania, Raju Ramachandran, Mukul_ _Mudgal J.P. Gupta_ for the appellant in C.A. No. 2863/82. G H y A B ##### c D E F G H 610 SUPREME COURT REPORTS (19831 3 s.c.R. _K.G. Bhagat_ Addi. Solicitor General for the respondent in C.A. No. 2853/82. . . _Girlsh_ _Chandra,_ - C. _V._ _Subba Rao_ and _R.N._ _Poddar_ for respondent.in C.A. No. 2863/82. The Judgment of the Court was delivered by MISRA J. These two corinec.ted appeals by special leave are directed against the judgment and order of the Allahabad High Court and Pelhi. High Court dated 24th January, 1980 and I 3th November, 1979 respectively. The first one arises out of proceedings under s 20 of the Arbitration Act while the other arises out of proceedings under s. 33 of the Arbitration Act. These appeals raise a common. question regarding the interpretation of cl. 18 of the general conditions of contract contained· ·in. the .standard from of contract entered into by the parties and the ambit and scope of s. 41 'of the Arbitration Act. The facts giving rise to these appeals follow a common pattern and it would, therefore, be sufficient if we set out the facts relating to. Civil Appeal No. 2863 of 1982 to bring out clearly the points which arise for consideration in these appeals. The appellant in this appeal is a registered firm and carries on the business of manufacturing and selling timber. The Directorate General of Supplies and Disposals (for short, DGS&D) functions as a purchase organisation for the Government of India and makes purchases for various departments. In response to <1n invitation for tender by the DGS&D for the sµpply of Bijasal logs first class the appellant firn'l made an offer to supply 1016 cubic metres at a flat rate of Rs. 669 per cubic metre. The DGS&D accepted the tender on 24th of December, 1973. Pursuant to the acceptance of the tender a standard form of contract was drawn up containing various clauses. Two important clauses of that standard from of contract with which . we are mainly concerned are els. 18 and 24, which read : ·, "18. _Recovery of Sums Due_ : Whenever any claim for the payment of a sum of money arises out of or under the contract against the contractor, the purchaser shall be entitled to recover such sum by appropriating in whole or . in part, the security, . . ' if any, deposited . by tl:\e contrac 6ii #### r ## • ' ( kAMALlJDDIN _v._ UNION _(Misra,_ J.) tor, and for the pnrpose aforesaid, shall be entitled to sell and/or realise securities forming the whole or part of any such security deposit. In the event of the security being insufficient, the balance and if no security has been taken from the contractor, the entire sum recoverable shall be recovered by appropriating any sum. then due or which at any time thereafter may become due to the contractor under the contract or any other contract with the purchaser or the Government or . any person contracting through the Secretary. If such'.,Sum even be not SHfficient to cover the full amount recoverable, the contractor shall on demand pay to the purchaser the balance remaining **due .....** ... ". "24. _Arbitration_ : In the event of any question, dispute or difference arising under these conditions or any special conditions of contract, or in connections· with this contract (except as to any matters the decision of which is specially provided for by these or the special conditions) the same shall be referred to the sole atbitra- · tion of any officer in the Ministry of Law, appointed to be the arbitrator by the Director General of Supplies and Disrosals. It will be no objection that the arbitrator is a Government servant, that he had to deal with the matters to which the contract relates or that in the course of his duties as a Government servent he has expressed views on all or any of the matters in dispute or difference. The award of the arbitrator shall be final aQ.d binding on the parties.to this contract." The appellant, however, I ailed to supply the goods. The contract was cancelled on 28th of August, 1974 at the risk and cost of the appellant. The DGS&D claims _tp_ have made risk purchases incurring an extra cost of Rs. 92,364. By notice dated ·27th December, 1974 the DGS&D called upon the appellants to pay that amount failing which alternating arrangements would be made to recover the same. It appears that there were some. other cpntracts between the appellant and the respondent whereunder the appellant has supplied goods and payments were due to it under pending bills. The appellant firm moved a petition under s. 33 of the Arbitration Act before the court a1leging that there was no conclude\) A B c D E F G_ H A B ###### c D E F G H 612 SUPREME COURT REPORTS lt983I ~ s.c.R.. contract in existence between the parties containing any arbitration clause and prayed _inter a/ia_ for determining the e~istencc, validity and effect of the alleged arbitration agreement. The stand of the Union of India on the other hand is that there-was a concluded contract between the parties and the appellant firm was hound by the acceptance of the tender. As the Union of India threatened to withhold the amount . of Rs. 92, 364 from the payments due under the pending bills of other contracts, the.appellant firm sought for an injunction. Under s. 41 read with Second Schedule of the Arbitration Act, and 0. 39, rr. 1 and 2 read with s. 151 of the Code of Civil Procedure, restrainicg the respondents from appropriating, withholding or recoverin~ the amount claimed from its other bills in any manner whatsoever. As there was cleavage of opinion between the Judges of the same High Court on the question whether such an injunction as prayed for could be issued under s. ~I of the Arbitration Act, the learned Single Judge referred the matter to a larger Bench. The learned Single Judge's own view was that such an injunction could be issued under s: 41. The Division Bench on reference, however, held that the Court. could grant an injunction restraining the respondent from apporpriating or recovering the amont of damages claimed from appellant's other pending bills, but no order restraining the Union of India from withholding payments of the other pending bills could be issued under s. 41 of the Arbitration Act in as much as it would amount to a direction to pay the amount due under other bills and such a prayer would virtually amount to seeking a relief for decreeing the claim of the appellant in those contracts. The appellant has come up before this Court against this order by special leave, .as stated earlier. It appears that a large number of applications under s. 33 Of the Arbitration Act had been moved in Delhi High Court in similar matters. ' In some of the cases injunctions were also issued by the learned Single Judge restraining the respondents from recovering, appropriating or withholding the amount from other bills of the contractors. One of thes'e matters _Union._ _of_ _India_ v. _Air_ _Foam_ _Industries_ was taken to this Court, which was decided by the Court along with _Union_ _of India_ v. _Raman Iron Foundry.(')_ In that case (l) A.l.R. 1974 S.C. 1265. _)._ KAMALUDDIN _Y._ UNION _(Misra,_ _J.)_ 613 the Union of India put forward the extreme claim that by virtue of cl. 18 of General Conditions of Contract it ·was entitled to recover damages claimed _by_ appropriating any sum which 'may become due to the contractor under ot~er pending bills from the Union of India. This Court, however, negatived the plea on the ground that the amount of damages claimed by the Union was only a claim and unless there was adjudication of the claim by Court or admission by the contractor the Union of India had no authority to appropriate the· amount due under pending biJls of the contractor towards the satisfaction of its claim for damages. While construing the scope of s. 41 (b).of the Arbitration Act this Court held : "The Court has, therefore, power under s. 41 (b) read with Second Schedule to issue interim injunction, but such interim injunction can only be "for the purpose of · and in relation to arbitration proceedings". The arbitration proceediugs in the present case were for determination of the mutual claims of the appellant and the respondent arising out of the contract coutaill_ed in the acceptance of tender dated 16th July, 1968. The question whether any amounts were payabl~ by the appellant to the respondent under other contracts was not the subject matter of the arbitration proceedings. The Court obviously could not, therefore, make au interim order which, though ostensibly in form an order of interim injunction, in substance amounted to a direction to the appellant to pay the amounts due to the respondent under other contracts. Such an interim order would clearly not be for the purpose of or in relation to the arbitration proceedings as required by s. 41 (b)." . Having laid down the above dictum on the interpretation of s. 41 of the Arbitration Act this Court· proceeded _tp_ analyse the impugned order of injunction in that case. In its opinion the order · ' of injunction did nof expressly or by necessary implication carry any direction to the· Union cif India to pay the arrnunts due to the respondent under other contracts. It is not only in forrn but (liso in substance a negative injunction. It has no positive content. What it does is merely to injunct the appellant from recovering _suo_ _motu_ the damages claimed by it from out of the pending bills of the A n ##### c D E F G H A 8 c D E F G H 614 SUPRE.Mll COURT REPORTS . (1983] 3 S.C.R, respondent. It does not direct that the appellant shall pay such amounts to the responden\. The appellant Union of India can still refuse to pay such amounts if it thinks it has a valid defence and if the appellant does so, the only remedy to the respondent would be to take measures in an appropriate forum for recovery of such amounts, where it would be. decided whether the appellant· is liable to pay such amounts to the respondent or not. No breach of the order of interim injunction as such would be Involved in nonpayment ·of such amounts by the respondent to the appellant. The only thing which the appellant is interdicted from doing ·is to make recovery of its claim for damages b'y appropriating such ·amounts in satisfaction of the claim. That is clearly within the power of the Court under s. 41 (b) because the claim for damages forms· the subject matter of the arbitration proceedings and the Court can always say that until such claim is adjudicated upon, the. appellant shall be restrained from recovering it by appropriating other amounts due to the respondent. The order of interim injunction made by the learned Judge cannot, therefore, be said to be outside the scope of his power under s. 41 (b) read with the Secorid Scl~_edule. - Following this judgment. of the Supreme Court the Delhi High • Court started modulating its injunctions accordingly and refused to include the word "withholding" in the order of injunction on the ground that the order in those terms really would mean an order to make the payment which was specifically forbidden in terms of the above judgment of this Court. As some doubt was raised in the Delhi High Court as to the exact scope of the ratio of the _Union_ _of_ _India_ v. _Raman Iron Foundry_ (supra) the matter was referred to a full Bench apparently to reconsi• der the earlier Division Bench judgments in _Marwar Teni Factory_ v. _Union_ _of India(')_ and _Air Foam Industries_ v. _Union_ _of_ _India.('!_ The full Bench _Mohan Meakin Breweries_ v. _Union_ _of India(')_ took the view that though an injunction could be granted in those matters restraining the Union of India from adjusting or recovering any damages claimed by it from other pending bills of the contractor no order of injunction restraining the Union of India from withholding the payments due to the· contractor under other pending bills could be issued. (I) A.I.R .. 1975 Delhi 27 .• (2) A.I.R. 1973 Delhi 253. (31 A.I.R, 1975 Delhi 248. KAMALUDDJN _v._ UNION _(Misra,_ _1.)_ 61S Following the Full Bench decision the Division Bench in the present case held that the Court in arbitration proceedings was not competent to issue an injunction restraining the Union of India from withholding the amount due to the appellan-contractor under ·other pending bills. jie only remedy of the appellant is to proceed outside the arbitration proceedings for the payments due under the pending bills, from the respondent. Th.e Court can, however, restrain the Union of India from recovering or appropriating the amount due to the appellant-contractor under pending bills towards the damages . claimed by the Union, unless it has been adjudicated upon or admitted by the other side. ' The first question that falls for consideration in this appeal is about the exact scope and ambit of s. 41 of the Arbitration Act. It will be appropriate at this stage to read s. 41 in order to appreciate the contention raised on behalf of the appellant.: . A **B** ###### c "4Y. Procedure and powers of Court :- Subject to **D** the provisions of this Act and of rules made thereunder (a) the provisions of the Code of Civil Procedure, 1908 shall apply to all proceedings before the Court, and to all appeals, under this Act, and **E** **F** (b) the Court shall have, for the purpose "of, and in relation to, arbitration proceeding, the same power of making orders in respect of any of the matters set out in the Second Schedule as it has for the purpose of, and in relation to, any proceedings before the Court :.:... ... provided that nothing in clause (b) shall bC taken to prejudice any power which may•be vested in an arbitrator or umpire for making orders with respect to any of such matters." **G** In view of cl. (b) of s. 41 the Court has been given power of passing orders in respect of any of the matters set out in second Schedule for the purpose of and in relation to · any proceedings before the Court. The Second Schedule of the Arbitration Act _inter_ _alia_ includes **H** ·interim injunction' and the 'appointment of receiver'. But the Court has got the power to pass an order of injunction only 'for the purpose of and in relation to arbitration proceedi~gs' before the Court. A B c D 616 SUPRilMi COURT REPoRTS t1~83) 3 s.c.R. The proceedings before the Court in the instant case was an application under s. 33 of the Arbitration Act. Section 33 of the Arbitration Act in so far as material for the case, provides : "33. Any party to an arbitration agreement or any person claiming under him desiring to challenge the existence or validity of an arbitration agreement or an award or to have the effect of either determined shall apply to the Conrt and the Court shall decide the question on affidavits." The appellant in the instant case took the stand that there was no concluded contract between the parties incl~ding arbitration. '.l'her~fore, the order of injunction passed in the instant case could not be for the purpose of and in relation to arbitration proceedings. Faced with this difficulty Shri S. N. Kacker, learned counsel for the appellant, fell back upon cl. (a) of s. 41 to contend that cl. (a) makes the Code of Civil Procedure applicable to all proceedings before the Court and to all appeals under the Act and, therefore, the appellant was entitled to invoke Order 39 of the Code to get an. injunction order even if the conditions of cl. (b) of s. 41 were not satisfied. We are afraid this contention cannot be accepted. Clause (a) of s. 41 makes only the procedural rules of the Code of Civil Procedure applicable to the proceedings in Court under the Arbitration Act. This clause does not ·authoritse the Court to pass an order of injunction. The power is conferred by cl. (b) of s. 41. The source of power, therefore, cannot be traced to cl. (a). If the contention of Shri Kac1cer is accepted, the appeals would lie under ss. 96, 1.00 or 104 of .the C.P.C. but the Arbitration Act itself provides for appeal 1mder s. 39. Besides, if cl.( a) of s.41 gave wide powers to pass an order of injunction, cl. (b) of s.41 would become otiose . The learned counsel for the appellant, however, contends that the arbitration proceedings relate to the claim for damages by the Union of India. Any act of the Union of India which purports to ·enforce the said claim for damages, before it has been duly adjudicated upon in arbitration proceedings is an act which relates to such arbitration proceedings. On the own case of the appellant that there was no concluded ·contract between the parties containing an arbitration clause it will _)_ ## • _)_ KAMALUDDIN _v._ UNION _{Misra,_ _J.)_ 617 be difficult to say that the· application for injunction moved by the appellant was for the purpose of and in relation to arbitration pro· ceedings. This apart, the amount due under the pending bills to the appellant was not the subject matter of the present proceedings and, therefore, the injunction order restraining the respondents from withholding the amount due to the appellant under the pending bills in respect of other ·contracts could not be said to be for the purpose of and in relation to the present arbitration proceedings. In this . view of the matter it was not open to the Court to pass the interim. injunction restraining the respondents from withholding the amount due to the appellant under pending bills in respect of other contracts. 1 The learned counsel Shri Kacker, however, strongly relied on the following observations of the Court in _Union_ _of India_ v. _Raman_ _Iron_ _Foundry_ (supra) : "But here the order of interim injunction made by the learned Judge does not, expressly or by necessary implication. carry any direction to the appellant to pay the· amounts due to the respondent under other contracts. It is not only in form but also in substance a negative injunction. It has no positive content. What it does is merely to injunct the appellant from recovering, _suo moto,_ the damages claimed by it from out of other amounts due to the respondent. It docs not direct that the appellant shall pay such amounts to the respondents. The appellant can still refuse to pay such amounts if it thinks it has a valid defence and if the appellant does so, the only remedy open to the respondent would be to take measures in an appropriate forum for recovery of such amounts where it would be decided whether the appellant is liable to pay such amounts to the respondent 'or not. No breach of the order of interim injunction as such would be involved in non-payment of such amounts by the appellant to the respondent. The only thing which the appellant is interdicted from doing is to inake recovery of. its claim for damages by appro. priating such amounts in satisfaction of the claim. That is clearly within the power of the Court under s. 41 (b) because the claim for damages forms the subject matter of the arbitration proceedings and the Court can always ysay . that until such claim is adjudicated upon, the appellant A B c D E F G H A B ##### c D E F G H 6i8 SUPREME COURT REPORTS It 9ibj 3 s.c:R. shall be restrained from recovering it by appropriating other amounts due to the respondent. The order of interim injunction made by the learned judge cannot, therefore,. be said to be outside the scope of his power under s.41 (b) read with the Second Schedule". With profound respect we find that the aforesaid observation is incongrous with the proposition of law laid down by this Court just before this observation. · We find it difficult to agree with the. oliservation of the Court that the impugned order in form and substance being the negative the respondent could refuse to pay such amounts if it thinks it has a valid defence, and if it chooses to do so there would be no breach of the injunction order. It is true t_hat the order of injunction in that case was in negative form. But if an order injuncted a party from withholding the amount due to the other side under pending bills in other contracts, the order necessarily means that the amount must be paid. If the amount h withheld there will be a defiance of the injunction ord_er and that party could be hauled up for infringing the injunction order. It will be a contradiction in terms to say that a party is injuncted from withholding the amount and yet it can withhold the amount as of right. In any case if the injunction order is one which a party was not bound to comply with, the Court would be loath - and reluctant tO pass such an ineffective injunction order. The court never passes an order for the fun of passing it. It is passed only for . the purpose of being carried· out. Once this Court came to the conclusion that the Court has power under s.41 (b) read with Second Schedule to issue interim injunction but such interim injunction can only be for the purpose of and in relation to arbitration proceedings and further that the question. whether any amounfs were payable by the appellant to the respondent '!nder other contracts, was not the subject matter of the arbitration proceedings and, therefore, the Court obviously could not make any interim order which, though O'stensibly in form an order of interim injunction, in substance amount to a direction to the appellant to pay the amounts due to the respon· dent under other contracts, ·and such. an order would clearly be not· for the purpose of and in relation to the arbitration proceedings; the subsequent obs~rvation of the Court that the order of injunction being negative in form and substance, there was no direction to the respondent to pay the amount due to the appellant under pending bills of oth_er contracts, is manifestly inconsistent with the proposition of Ja~ laid down by this Court in the same case. #### • _)_ _). ___ _··(_ _)_ # • KAMALUDPJN _v._ UNION _(Misra,_ _J.)_ 619 This leads us to the question of interpretation of cl. 18 of th• standard contract. Clause 18 has been quoted in extenso in the earlier part of the judgment. The argument by Shri K.. G. Bhagat, Addi. Solicitor General on behalf of the Union of India is' that what is required for attracting the appJicqbility of cl. 18 is a mere claim for payment of" a· sum of money arising out of or under the contract against the contractor and ·it is not necessary that a sum of money must be actually due and payable from the contractor to the purchaser. According to him, if the purchaser has a claim for payment of a sum of money against the contractor, he would be entitled to exercise the right given under cl. 18, even though such a claim may not be for a sum due and payable but may be for damages and it may be disputed by the contractor· and may, not have been adjudicated upon in a Court of I.aw or by arbitration. Shri Bhagat further submits that if the cla!l!l of the purchaser is not well founded and the appropriation made by the Union of India is unjustified, the contractor· can always institute a suit or start arbitration proceedings for recovering the sums due to him which have been wrongly appfopriated by the purchaser and_in such suit or arbitration proceedings, the court or tbe arbitrator, as the case may be, would examine the validity of the claim against which appropriation bas been made by the purchaser and if the claim is found to be unstist.oinable, set at naught the appropriation and pass a decree or award for the sums due to the contractor. But the court cannot and should not restrain the Union of India from exer- · cising its right of appropriation merely becanse Jbe claim against which appropriation is sought to be made by the purchaser is disputed by the contractor and is pending adjudication before a court of law or arbitrator. A B ###### c D E F Sbri Kacker on the other hand contends that though the words used in the opening part of cl. 18 are "any claim for the payment of a sum of money", which are general words of apparently wide . · G amplitude sufficient to cover even a claim for damages arising out of . the contract, a proper construction of the clause read as a whole clearly suggests that these words are intended to refer only to a claim for a snm due and payable .and do not take in a claim for damages which is disputed by the contractor. It is only when a claim for H damages is adjudicated upon by a civil court or an arbitrator ·and the breach of the contract is established and the amount of damages i:\Scertained and de9ree<;1 that a debt <;lue and payable comes into A B ###### c D E F G H 620 SUPREME COURT REPORTS (1983} 3 s.c;R. existence ; till then it is nothing more than a mere right to sue for damages, and it does not fall within the words of cl. 18. ·Moreover, cl. 18 merely provides a mode of recovery and it can h~ve no application where a claim, even though it be for a sum due and payable, is disputed by the contractor and has to be established in a court of law or by arbitration. Clause 18 applies only where a claim is either admitted, or in case of dispute, substantiated by resort to the judicial process. Therefore, when a purchaser has a claim for damages which is disputed by the contractor, the purchaser is not entitled under cl. 18 to recover the amount of its claim for damages by appropriating other sums due to the contractor until the claim for damages is adjudicateu upon and culminates in a decree. The respondent had consequently no right under cl. 18 to appropriate sums due to the appellant under other contracts in satisfaction of its claim for damages against the appellant, when the claim for damages was pending adjudication. This Court in _Union_ v. _Raman_ _Iron_ _Foundry_ (supra) while construing cl. 18 of the standard contract observed : "It is true that the words "any claim for the payment of a sum of money" occurring in the opening part of cl. 18 are words of great amplitude, wide ·enough to cover even a claim for damages, but it is a well settled rule of interpretation applicable alike to instruments as to statutes that the meaning of ordinary words is to be found not so much in strict etymological propriety of language nor even in popular use as in the subject or occasion on which they are used and the object which is intended to be attained. The context and collocation of a particular expression may show that it was not intended to be used in the sense which it ordinarily bears. Language is at best an imperfect medium of expression and a variety of meanings may often lie in a word or expression. The exact colour and shape of the meaning of any word or expression should not be ascertained by reading it in isolation, but it should be read structurally and in its context; for its meaning may vary with its contextual setting. We must, therefore, read the words 'any claim for the payment of a sum of money' occurring in the opening. part of cl. 18 not in isolation but in the context of the whole clause, for the intention Qf the parties is to be gathered not from one part of the t , .KAMALUDDIN _v._ UNION _(Misra,_ **J.)** clause or the other but from the clause taken as a whole. It is in the light of this principle of interpretation that we must determine whether the words 'any claim for the payment of a sum of money' refer only to a claim for a sum due and payable which is admitted or in case of disputes, established in court of a Jaw or by arbitration or they also include a claim for damages which is disputed by the contractor." **621** **B** **c** **D** **E** **F** **G** **H** ' ### . -· \ The headings prefixed to a section or a group of sections in some modern statutes are regarded as preambles to those sections. They cannot control the plain words of the statutes but they may explain ambiguous words. The view· is now well settled that the ·headings or titles prefixed to a section or a group of sections can be referred to in determining .the meaning of doubtful- expressions. It is true that the court is entitled to look at the headings in an Act of Parliament to resolve any doubt they may have as to ambi· guous words. The law is clear that those headings cannot be used to give a different effect to clear words in the section where there cannot be any doubt as to the ordinary meaning of the words. The golden rule is that when the words of a statute are clear, plain and unambiguous, that is, they are reasonably susceptible to only one meaning, the courts are bound to give effect to that meaning irres· pective of the consequences. The duty of a Judge is to expound and not to legislate, is a fundamental rule. If we apply the same principle to the intrepretation of cl. 18 of the standard form of contract, it would be clear that the clause unequivocally contemp· !ates a claill:\ for the payment and it/ is open to the Union of India to appropriate any amount due to th(contractor under other pending bills. It does not contemplate the amount due and, therefore, the heading of this clause which talks \lf only· 'Recovery of sum due' will not control cl. 18. The clause in our opinion gives wide powers to the Union of India to recover the amount claimed by appropriating any sum then due or which at any time thereafter may become due to the contractor under other contracts. Clause 18 of the standard form of contract earlier was slightly differently_ worded and it read 'whenever under this contract any sum of money is recoverable from and payable by the contractor'. But this formula was deliberately and advisedly· altered when the present standard form was introduced and instead the words 'whenever any claim for payment of a sum of money arises' were ~ubstituted an_d this change in phraseology indicate<;! that in or<;l~r **A** **B** **c** **D** **E** **F** **G** **H** 622 SUPREME·COURT REPORTS . **fl983)** 3 S.C.R. to attract the applicability of the present cl. 18, it was not necessary that there should be a sum of money due aud payable by the contractor to the purchaser, but it was enough if there was a mere claim on the part of the purchaser for· payment of a sum of money by the contractor irrespective of the fact whether such sum of mo_ney was presently due and payable or not. This Court, however, did not attach importance to this aspect of the matter by observing : "We do nofthink it is legitimate to construe cl. 18 of the contract between the parties by reference to a corresponding clause which 'prevailed in an earlier standard form of contract. This is not a statute enacted by the legislature where it can be said that if the legislature has departed from the language used by it in an earlier enactment, it . would be a fair presumption to make that the alteration in the language was deliberate and it was intended.to convey a different .meaning. It is a Clause in a contract which we are construing and there any reference to a similar or dissimilar · clause in another contract would be irrelevant. The Court itself while interpreting cl. l 8 of the contract has observed: "It is true that the words "any claim for the payment of a sum of money" occurring in the opening part of cl. 18 arc words of great· amplitude, wide enough to cover even a claim for damages, but it is well settled rule of interpretation applicable alike to instrunient.s as - **to statutes ...... "** But while dealing with another aspect of cl. 18 observed to the contrary that it should not be construed as a statute. It may, however, be pointed out that even after the change in the language of cl. 18 of the standard agreement the Union of India cannot be injuncted from withholding the amount under other bills of the contractor. ·But it can certainly be injuncted from recovering or appropriating it to the damages claimed. Shri D. C. Singhania appearing along with Shri Kack~r substantially reiterated the same argument in his written note. We are clearly of the view that an injunction order restraining respondents from withholding the amount due under other pending '· . A B - _j_ KAMALUDDIN _v._ UNION _(Misra,_ J.) 623 bills to the· contractor virtually amounts to a direction to pay the amount to the contractor-appellant. Such an order was clearly beyond the purview of cl. (b) of s. 41 of the Arbitration Act. The Union of India has no objection · to the grant of an injunction restraining it from recovering or appropriating the a01ount lying with it in respect of other claims of the contractor towards its claim for damages. · But certainly cl. 18 of the standard contract confers ample power upon the Union of India to withhold the amount and no injunction order could be passed restraining the Union of India from withholding the amount. We find no error in the impugned order passed by the Allahabad or the Delhi High Courts in the two cases. The appeals,, C therefore, must fail and they are accordingly dismissed. In the circumstances of the case, however, we direct that the parties should bear their own costs. H.Lc. _Appeals dismissed._ D
End of Judgment Record
Browse All Supreme Court of India (1983) Decisions
1982-11-17

Prem Thakur v. State of Punjab

Prem Thakur, a Nepali migrant worker, was convicted by a Sessions Judge under sections 302 and 201 IPC for the murder of five co-workers in the village of Rolu Majra and was sentenced to death, a conviction upheld by the Punjab and Haryana High Court on the grounds of motive (theft, since money found on none of the deceased), last seen in the company of the victims, and his alleged absconding. The Supreme Court, in a judgment delivered by Chief Justice Chandrachud, re-examines a case that rests entirely on circumstantial evidence. It reiterates the established principle that in circumstantial cases the circumstances must be capable of supporting the exclusive hypothesis of the accused’s guilt and must clinch the issue; otherwise, doubt arises and conviction cannot stand. The Court scrutinizes the three bases relied upon by the High Court and finds them insufficient: theft as motive does not directly connect Thakur to the crime, the fact that he was last seen with the victims is equivocal, and the absconding theory is not convincingly established given disbelieved arrest particulars. Medical evidence also undermines the claim that liquor-induced stupor explains all five killings. The Court concludes that the prosecution’s case does not exclude reasonable alternatives and acquits Thakur, allowing the appeal and ordering his release."

1983-10-01

K. P. Ganguly v. Lucknow University

This batch of Civil Appeals concerns admissions to postgraduate medical courses in Uttar Pradesh during 1981-82 and the propriety of provisional admissions ordered by courts while writ petitions were unresolved. The Uttar Pradesh Government issued a 3 December 1980 order, under s.28(5) of the UP State Universities Act, 1973, directing that admission to MD/MS and diploma courses be on merit as determined by MBBS performance. The Medical Council of India (MCI) Rules, framed under the Indian Medical Council Act, 1956, have statutory effect and bind colleges and universities; the Government order is meant to be consistent with those rules. Faced with massive arrears, the High Court had frequently compelled provisional admissions, causing candidates who may later be found ineligible or undeserving to complete courses and potentially displace others by creating vacancies. The Supreme Court examined whether these circulars and rules were validly anchored in constitutional and statutory authority and whether provisional admissions could be sanctioned as a general remedy. It held that provisional admissions should not be given as a matter of course, except in exceptional cases where a petitioner has a cast-iron case or the error is gross. The Court analyzed merit determinants (MBBS marks, housemanship requirements, and diploma considerations) and stressed that the Government Order and MCI Rules guide admissions and that overcrowding and compromised medical standards must be avoided. The judgment lists several appeals and delineates which were sustained or dismissed, while directing that some results be declared with conditions and others decided on merit.

1982-12-15

Asim Kumar Bose v. Union of India

Dr. Asim Kumar Bose, a Specialist Grade II radiologist attached to Irwin Hospital (Maulana Azad Medical College) challenged a 1973 Government of India decision denying him appointment as Associate Professor of Radiotherapy in Maulana Azad Medical College on the ground that he did not have five years' teaching experience as Reader/Assistant Professor in the relevant specialty. The Delhi High Court had upheld the decision, holding that teaching experience must be gained in a medical college or teaching institution in a formal teaching post. Bose contended that his ex-officio status as Radiologist-cum-Associate Professor of Radiology (in Irwin Hospital, an associate teaching hospital) counted as teaching experience for the purposes of Rule 8(2) and Annexure I to the Second Schedule of the Central Health Service Rules, amended in 1966, and that a liberal interpretation of 'as' — meaning 'in the capacity or' — was required. The Supreme Court agreed, noting that Irwin Hospital and GB Pant Hospital are associate hospitals of Maulana Azad Medical College and that teaching in the college is undertaken by Professors, Associate Professors, and Specialists; thus Bose’s teaching activity in the ex-officio post counted toward eligibility. It held that the recruitment rules must be interpreted broadly to avoid injustice to Specialists Grade II and directed re-advertisement for the vacant post, with UPSC empowered to relax qualifications. The Court quashed the High Court ruling and allowed the appeal.

1983-04-26

A. Janardhana v. Union of India and Others

A. Janardhana, an MES Class I officer promoted to AEE in 1962, challenged the revised inter-se seniority list Ex. 'D' (June 14, 1974) and the promotion panel dated January 13, 1975, arguing that the 1963 and 1967/68 seniority lists, drawn up when the MES rules were non‑statutory, remained valid and should govern inter‑se seniority. The 1974 revision linked to a quota 9:1 (direct recruits: promotees) and subsequent relaxation of that quota during emergencies (1959–1969) had the effect of pushing many earlier promotees down the seniority list, depriving them of anticipated promotions and even placement within the cadre. The writ petitions were dismissed by the High Court, and appeal reached the Supreme Court. The Constitution Bench in Bachan Singh v. Union of India (1972) and related authorities were examined to determine the nature of the Rules (1949 Rules and amendments) and whether the Government could relax the quota rule during emergencies without invalidating appointments. The Court held that the 1963 and 1967/68 lists were legal until 1969; the 1974 Ex. D and the 1975 panel were invalid because the quota link to the seniority rule collapsed when the rules were relaxed. Consequently, the 1974 list was quashed, the 1963/1967/68 lists were affirmed, and a fresh promotion panel had to be drawn consistent with those lists, with all post-petition promotions to be readjusted.