K. P. Chowdhary v. State of Madhya Pradesh & Ors.

Case / Petition Number:
Civil Appeal No. 669 of 1965
Neutral Citation:1966 SCR 920

Case Synopsis & Summary

This is a Civil Appeal arising from the Madhya Pradesh High Court’s dismissal of a writ petition challenging the recovery of a deficiency on two forest contracts auctioned by the State. The appellant bid the highest amounts but disputes arose over the marking of trees, after which he refused to sign the contract and pay instalments. The State sought to recover the shortfall as arrears of land revenue under Section 155(b) of the Madhya Pradesh Land Revenue Code, arguing that an implied contract arose from the auction terms. The High Court had held that recovery was permissible under Section 155(b) and that an implied contract existed despite the absence of a formal written contract, and thus the State could recover. The Supreme Court, however, held that Article 299(1) of the Constitution mandates no implied contract between the Government and another person; thus recovery under Section 155(b) for implied contracts cannot stand. It reinforced that the decisions interpreting Section 175(3) of the Government of India Act, 1935 (now Article 299(1)) require a contract to be in full compliance to bind the Government, and implied contracts are not permissible. The matter was remanded to consider whether any other legal provision could permit recovery, with costs borne by the parties."

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • P. B. Gajendragadkar
  • K. N. Wanchoo
  • M. Hidayatullah
  • J. C. Shah
  • S. M. Sikri
Judgment Date
1966-03-15
Court Decision / Holding
Appeal allowed. The Supreme Court held that there can be no implied contract under Article 299(1) of the Constitution, so Section 155(b) cannot be used to recover the deficiency as arrears of land revenue. The matter is remanded to the High Court to determine if any other provision of law permits recovery in light of the auction conditions; costs of this Court are borne by the parties.
Final Disposition
Appeal allowed; remanded for further investigation by the High Court to consider other legal provisions for recovery; costs to be borne by the parties.

Parties to the Case

Appellants / Petitioners

  • K. P. Chowdhary

Respondents

  • State of Madhya Pradesh
  • Ors.

Legal Representation & Advocates

Counsels for Petitioners

  • • D. J. Goyal

Counsels for Respondents

  • • N. Shroff

Provisions of Law Cited

Art. 299(1) of the ConstitutionMadhya Pradesh Land Revenue Code, s. 155(b)Indian Forest Act, ss. 82 and 85Forest Contract Rules, rr. 28 and 29Government of India Act, 1935, s. 175(3)Indian Contract Act, s. 70

Legal Doctrines & Maxims

  • No implied contract between the Government and another person due to mandatory Art. 299(1)
  • The word 'shall' in s. 175(3) is obligatory (mandatory)
  • State should not be burdened with unauthorised contracts
  • Authority for contracts with the Government must be proper (no unauthorised ad hoc authority)
  • Implied contracts arising from auction conditions cannot bind the Government under Art. 299(1)

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant contends that there was no contract between the Government and himself either before bidding or after the auction as required by Art. 299(1) of the Constitution. Because there can be no implied contract between the Government and another person, recovery under s. 155(b) of the Madhya Pradesh Land Revenue Code is not permissible. He argues that the contract in writing was never signed, and the conditions of auction cannot create a binding contract that would justify recovery as arrears of land revenue. He also asserts that the State’s reliance on the Forest Act provisions is unsupported since there was no valid contract to breach.

Contentions of Respondents

The State contends that by accepting the auction conditions, the appellant entered into an implied contract under which the deficiency on re-auction could be recovered as arrears of land revenue under s. 155(b). It argues that the auction terms, as read with the relevant rules and acts, create a liability for the bidder when the contract is not completed, and that the matter can be pursued under forest contract provisions or other applicable laws.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (5)

Case NameCitationTreatmentExplanation
State of Bihar v. Messrs. Karam Chand Thapar[1962] 1 S.C.R. 827PositiveHeld that s. 175(3) requirements apply to binding government contracts; mandatory nature supports no implied contracts.
Seth Bikhrai Jaipuria v. Union of India[1962] 2 S.C.R. 880PositiveEmphasised that s. 175(3) requires proper execution and authority; supports the principle against implied contracts.
State of West Bengal v. Messrs. B.K. Mondal and Sons[1962] Supp. 1 S.C.R. 876PositiveAffirmed mandatory character of s. 175(3).
Chaturbhuj Vithaldas Jasani v. Moreshwar Prashram[1954] S.C.R. 817PositiveExplained constraints around government contracts and writing requirements.
Union of India v. A. L. Rai Ram[1964] 3 S.C.R. 164Partly Overruled / LimitedHeld that compliance with s. 175(3) may not always require a formal document; applied selectively in later contexts; used here to illustrate nuances in contract formalities.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,519 words•~16 min read

In The Court Record

K. P. Chowdhary v. State of Madhya Pradesh & Ors.

A B ## c D E F G H manner provided in Art. 299( 1) could get away by saying that an implied contract may be inferred on the. facts and circumstances of a particular c.se. This is of coune not to say that if there ii a valid contract as enwaged by Art. 299(1), there may not be implications arisin~ out of such a contract. The eecond consequen.co which follows from the1e decisions ii that if the contract between the Government and another person i!I not in full compliance with Art. 299(1) it would be no contract at all and could not be enforced either by th• cto.oruaent or tty the other persoa as K. P. CHOWDHARY _v._ STATE OF MADHYA PRADESH & ORS. _March_ 15, 1966 [P.B. GAJENDRAGADKAR, C.J. K.N. WANCHOO, M. HIDAYATIJLLAH, J.C. SHAn AND S.M. S1KR1. JJ.] _Con.srtitution_ _oj lndla,_ 1950, _A.rt._ _299(1)-lmplled eontrac11,_ _if_ _permis-_ _sible._ _Madhya Pradesh Land Revenue Code, s._ _155(b)-Recovery_ _under_ _impli-_ _ed contract._ The appellant gave tho high'"t bids for two foreat contracts at an auction. As the amount of the contract waa more than what the Division Forest Officer coqld accept, the matter waa referred to the Chief Conser vation of Forests who had the necessary authority to accept the bids. Aftsr the cloee of the auction the appellant had signed the contract form as required, and tho document& were aen.t to the Chief Conservator of Fortets for unction and signature. Before the Chief Conservator of Foresta could accept the contract, the appellant railed a dispute as to the marking of the trees. . _As_ that diapute waa not settled to tho satisfaction of the appellant he refused to complete the contract. The Divisional Forest Officer pve notice to the appellant that if he did not complete the formalities action would bo taken under the conditions of the auction to re-auction the contract and if there WM My deficiency it would be recovered from him. He did not comply and ultimately he was infon»ed that the two contracts had been cancelled and would be re-auctioned at hii risk. The contracts were re-auctioned at which there was certain deficiency in the amount. A letter was written to the Tehsildar for recovering this deiclent a.mount from the appellant as arrears of land revenue as per the cond.tiom of auction. Thereupon, the appellant filed .a writ petition challenging the recovery of the amount -.is arrears of land revenue as the contract was not signed or completed by him. The High Court dismissed the petition. In appeal to this Com:t. HELD: Section 155(b) of the Madhya Pradesh Land Revenue Code does not assist the State in realising this amount as arrears of land revenue. What was said in the earlier caecs by this Court with respect to s. 175(3) of the Governm&nt of India Act, 1935 applies w:th equal force to Art. 299(1) of the Constitution. Two consequences follow from these d~isons. #### The first is that m view of Art. 299( 1) there can be no implied contract between the Government and another penon, tho reason being that if 1uch implied contracts between the Government and another person were allowed, they would in effect make Art. 299(1) weleas for then a person who had a contract with Government which waa not executed at all in the a centract. [J24 A.DJ 920 SUPREME COURT REPORTS [1966) 3 s.c.R. _S1at1 of &luv_ v. _Mf1._ _Karam Cltand Tlrapar_ (1962) _2_ S.C.R. 827, _$1tlt_ _BikltrtJ,/_ _Joipurilll_ v. _Union of India_ (1962) 2 S.C.R· 880, _Stall_ _of the_ _Wat_ _&tilal_ v. _M11._ _B.K. Molfdal_ (1962) Supp. 1 S.C.R. 876, _Chaturbhuj Yitha/das_ _Ja1411t_ v. _M<>ralrwar_ _Prashram_ (1954) S.C.R. 817, _and_ (S) _Unio11_ _of_ _Jndiav._ _A.L._ _Ra/Ito_ Rmlt,[1964) 3 S.C.R. 164, followed. A In the present case there was no contract between the appellant and tho Go\-ernment before he bid at the auction oor was there any contract B between him and the Government after the auction was over as required by Art. 299( 1) of the Constitution. A3 there can be no implied conlraet between the Government and another person in view of the mandatory provision of Art. 299( l) of the Constitution there can be no queitioo of recoveiy of any money under an implied contract under cl. (b) of s. 155 of the Madhya Pradesh Land Revenue Code. [924 B-HJ CIVIL APPELLATF. JURISDICTION : CIVIL APPEAi. No. 669 OP C 1965. Appeal by special leave from the judgment and order dated October 5, 1961 of the Madhya Pradesh High Court in M. P. ## No. 153 of 1961. • D _J._ _P._ _Goyal,_ for the appellant. _1. N. Shroff,_ for the respondents. The Judgment of the Court was delivered by Wanchoo J. This is an appeal by special leave against the judgment of the Madhya Pradesh High Court. The brief facts E necessary for present purposes are these. A notice was issued by the Divisional Forest Officer, Jabalpur Division for auction of various contracts in that division in July 1959. The conditions of the auction specified _inter a/ia_ (a) that no person would be allowed to bid for any forest contract at the auction unless he had signed the sale notice in token of his agreement to abide by the condi· F tions thereof and deposited a sum of Rs. 500/- as earnest money in respect of each forest contract before bidding therefore; (b) that the Divisional Forest Officer reserved to himself the power without assigning any reason to accept the highest or any bid, (c) that the consideration due under a contract was to be payable where it exceeded Rs. 3,0CX>/-, in four equal instalments, the first G instalment being payable immediately at the close of the auction; (d) that the successful bidder had to sign immediately at the close of the auction the bid-sheet for the contract knocked down in bis • favour; (e) that the sales of contracts beyond the power of sane· tion of the Divisional Forest Officer were subject to the sanction of the competent authority and the successful bidder was bound H by his bid until orders were passed by the competent authority; (f} that the contract clecd and the security bond were to be executed by the successful bidder and his surety immediately at the close CHOWDHARY _v._ M. P. STATE _(Wanchoo, 1.)_ 921 A B ## c ' A of the auction; (g) that if the successful bidder fails to pay the full amount of the consideration, or the first instalment or to furnish the security required or to complete the formalities, the earnest money deposited by him was to be forfeited to Government and the contract would be re-auctioned at the risk of the successful bidder and any deficiency happening on such re-sale would be re B coverable from the successful bidder as arrears of land revenue; and (h) that the act of bidding was deemed to be a complete and unreserved acceptance of these conditions and others which are not material for our purposes. The appellant bid for two contracts at the auction:and his-were the highest bids. As the amount of the contract money was ## c more than what the Divisional Forest Officer could accept, the matter was referred to the Chief Conservator of Forests who had the necessary authority to accept the bids. After the close of the auction the appellant had signed the contract form and a surety signed the security bond as required. These documents were sent to the Chief Conservator of Forests for sanction and signature. Before however the Chief Conservator of Forests could accept the D contract, the appellant raised a dispute as to the marking of the trees according to the material notified at the time of the auction. As that dispute was not settled to the satisfaction of the appellant he refused to complete the contract or to pay the first instalment in respect thereof. Eventually the Divisional Forest Officer gave notice to the appellant on July 29, 1959 that if he did not complete E the formalities within a week, action would be taken under the conditions of auction to re-auction the contract and if there was. any deficiency it would be recovered from him and the earnest money would be forfeited. He did not however pay the first instalment due and ultimately on November 25, 1959 he was informed that the sale of the two contracts sold in the auction held on July 20, 1959 in his favour had been cancelled by the Chief Conservator of Forests and the amount of earnest money had been forfeited. He was also informed that the two contracts would be re-auctioned at his risk. Thereafter the contracts were reauctioned in January 1960. At the re-auction there was a deli-· ciency in the two contracts together of Rs. 51,500/-. The appellant was therefore asked to send this amount to the Divisional Forest Officer. When he failed to do so, a letter was addressed to the Tehsildar Jabalpur by the Divisional Forest Officer for recovering this amount as arrears of land revenue under the conditions of auction. Thereupon the appellant filed a writ petition out of which the present appeal has arisen. The case of the appellant was that the claim of the respondent-State for recovery of the deficiency on re-sale was not covered by either s. 82 of the Indian Forest Act (No. 16 of 1927) or rules 28 and 29 of the Madhya Pradesh Forest M12Sup.Cl/66-13 D #### ' E 922 SUPREME COURT REPORTS [1966] 3 S.C'.R. Contract Rules or under any other provision of the law, and the A amount therefore could not be recovered as arrears of land revenue as the contract was not signed or completed by him. He therefore claimed the issue of an appropriate writ 4uashing the notice issued to him and stopping the respondent from recovering as arrears of land revenue the sum of Rs. 51,500/-. The State contested the case and contended that recovery of the amount could B be effected as arrears of land revenue under s. 82 of the Indian Act read with rr. 28 and 29 of the Forest Contract Rules in view of the conditions of auction, which the appellant had accepted. The petition was heard finally by a Full Bench of the High Court in view of a reference by a Divisional Bench. The Full Bench seems to have held that rr. 28 and 29 of the Forest Contract C Rules did not apply to the case as they dealt with breaches arising after the contract in writing had been executed. In this case the admitted position was that the contract in writing had never been signed by the Chief Conservator of Forests and therefore the question which fell to be considered, according to the Full Bench, was whether the liability arising under the conditions of auction D could be enforced and the deficiency on re-auction recoverd as arrears of land revenue even without the execution of a valid)( contract in writing. On this question the Full Bench went on to hold that this was a case of an implied contract resulting from the appellant's accepting the conditions of auction and that such an implied contract was not hit by Art. 299 of the Constitution as E that applied plainly to contracts which are required to be reduced to writing and an implied contract in its very nature was not such a contract. Finally the full Bench held that s. 155(b) of the Madhya Pradesh Land Revenue Code, 1959, applied to this case of implied contract and the amount could be recovered thereunder as arrears of land revenue. On this view the petition was dismissed. The High Court having refused to grant a certificate, the appell:mt-J- F applied for and obtained special leave from this Court; and that is how the matter has come before us. ' Two questions arise for decision in this appeal. The first is whether the High Court's view that Art. 299 of the Constitution docs not hit an implied contract and therefore the amount could be recovered under s. 155(b) of the Madhya Pradesh Land Revenue Code is correct. The second is that if that view is not correct, whether the amount can be recovered as arrears of land revenue under any other provision of law. G It may be mentioned that Art. 299(1) of the Constitution with H which we are concerned is practically in the same terms as s. 175(3) of the Government of India Act, 1935. This Court had occasion 1to deal with s. 175 in _The_ _State_ _of Bihar_ v. _Messrs._ _Karam_ CHOWDHARY _v._ M. P. STATE _(Wanchoo,_ **J.)** 923 _Chand Thapar(')_ It held that under s. 175(3), three conditions had to be satisfied before a binding contract against the Government could arise. These three conditions are: **(1)** the contract must be expressed to be made by the Governor or the GovernorGeneral, (ii) it must be executed m writing, and (iii) the execution should be by such persons and in such manner as the Governor or the Governor-General might direct or authorise. This Court further held in that case that s. 175(3) did not prescribe any particular mode in which the authority must be conferred and where an _ad hoc_ authority was conferred on any person, the requirement must be held to be satisfied. The matter was again considered by this Court in _Seth Bikhrai_ _Jaipuria_ v. _Union_ _of India(2)_ It was again emphasised that s. 175(3) of the Government of India Act, 1935, required that a contract, if **it** was to bind the Government, had (a) to be expressed to be made by the Governor or Governor General, (b) to be executed on behalf of the Governor or Governor General, and (c) to be executed by an officer duly appointed in this behalf and in such manner as the Governor or the Governor General directed or authorised. It was also held that the provisions of s. 175(3) were mandatory, as the object of enacting these provisions was that the State should not be saddled with liability for unauthorised contracts. The matter was considered again by this Court in _State_ _of_ _West Bengal_ v. _Messrs._ _B._ _K._ _Monda! and Sons(')_ It was held that the provisions contained in s. 175(3) were mandatory. The intention of Parliament in enacting the provision was that the State should not be burdened with liability based on unauthorised contracts. The provision was made in public interest and so the word "shall" used therein must be held to make it obligatory and not directory. Further the case of _Chaturbhuj Vithaldas Jasani_ v. _Moreshwar Prashram(_ _[4]_ _)_ was explained in that decision and it was held that it should be confined to its own facts in the context of the Representation of the People Act. Finally it was held in that case that s. 70 of the Indian Contract Act (No. 9 of 1872) could be invoked against the Government if the person invoking **it** could show that he had acted lawfully and had not intended to act gratuitously and the State had enjoyed the benefit. Lastly this court had occasion to consider the matter again in _Union_ _of India_ v. _A._ _L._ _Ra Ilia_ _Ram,(5)_ and it was held that so long as all the requirements of s. 175(3) of the Government of India Act were fulfilled and were clear from the correspondence, s. 175(3) did not necessarily require the execution of any formal document. (l) [1%2] l S.C.R. 827. (2) [1962] 2 S.C.R. 880. (3) [1962] Supp. l s.C.R. 876. (4) [1954] S.C.R. 817. ( 5) [1964] 3 S.C.R. 164. •• **A** **B** **D** #### • E **F** ' G ,• ### ' **H** 924 SUPREME COUllT REPORTS [1966] 3 S.C.R. What was said in these cases with respect to s. 175(3) of the Government of India Act, 1935, applies with equal force to Art. 299 (I) of the Constitution. Two consequences follow from these decisions. The first is that in view of Art. 299(1) there can be no implied contract between the Government and another person, the reason being that if such implied contracts between the Government and another person were allowed, they would in effect make Art. 299(1) useless, for then a person who had a contract with Governn;ent which was not executed at all in the manner provided in Art. 299(1) could get away by saying that an implied contract may be inferred on the facts and circumstances of a particular case. This is of course not to say that if there is a valid contract as envisaged by Art. 299(1), there may not be implicacations arising out of such a contract. The second consequence which follows from the'e decisions is that if the contract between Government and another person is not in full compliance with Art. 299(1) it would be no contract at all and could not be enforced either by the Government or by the other person as a contract. In the pr~sent case it is· not in dispute that there never was a contract as required by Art. 299(1) of the Constitution. Nor can the fact that the appellant bid at the auction and signed the bid-sheet at the close thereof or signed the declaration necessary before he could bid at the auction amount to a contract between him and the Government satisfying all the conditions of Art. 299(1). The position therefore is that there was no contract between the appellant and the Government before he bid at the auction, nor was there any contract between him and the Government after the auction was over as required by Art. 299(1) of the Constitution. Further, in view of the mandatory terms of Art. 299(1), no implied contract could be spelled out between the Government and the appellant at the stage of bidding for Art. 299 in effect rules out all implied contracts between Government and another person. The view taken by the High Court that s. 155 (b) of the Madhya Pradesh Land Revenue Code which provides for recovery of money as arrears of land revenue would therefore enure in favour of the Government and enable it to recover the deficiency cannot be sustained. That clause provides for recovery of all moneys falling due to the State Government under any grant, lease or contract and says that they shall be recoverable in the same manner as arrears of land revenue. The High Court was of the view that the word "contract'" in this clause includes an implied contract. But if there can be no implied contract between the Government and another person in view of the mandatory provision of Art. 299(1) of the Constitution there can be no question of recovery of any money under an implied contract under cl. (b) of s. 155. The view therefore taken by the High Court that this amount could be recovered under s. 155(b) is not correct. A B ## c D E F G H CHOWDHARY _v._ M. P. STATE _(Wanchoo,_ J.) 925 This brings us to the second question, namely, whether the amount can be recovered under any other provision of law as arrears of land revenue. Jn this connection learned counsel for the State has referred us to s. 82 and s. 85 of the Indian Forest Act. The question whether the amount can be recovered either under s. 82 or under s. 85 of the Indian Forest Act read with the rules framed thereunder has not been investigated by the High Court. The view of the High Court that rr. 28 and 29 of the Forest Contract Rules apply after a contract in writing has been executed appears to be correct. But the question whether the State can still recover the amount as arrears of land revenue by virtue of the conditions of auction, even though rr. 28 and 29 do not apply has not been investigated. This question will require investigation before the petition can be finally disposed of. The appellant had claimed in para 17 of the petition that the claim of the State for recovery of the deficiency on re-sale was not covered under any other provision of law so as to make it recoverable as arrears of land revenue. That question has still to be investigated and it would be for the State to show whether the amount can be recovered under any provision of law or rules relating to forest contracts. So the matter will have to be remanded for further investigation on these lines. We therefore allow the appeal and hold that s. 155(b) of the Madhya Pradesh Land Revenue Code does not assist the State in realising this amount as arrears of land revenue. We however remand the matter to the High Court for determining after hearing both parties whether there is any other provision of law or rules which would permit the recovery of this amount in view of the conditions of auction. In the circumstances we order parties to bear their own costs of this Court. _Appeal allowed._ . •' A B ## c D E F #### '
End of Judgment Record
Browse All Supreme Court of India (1966) Decisions
1965-10-26

C.I.T. v. Moon Mills Ltd.

Moon Mills Ltd., a Bombay-based factory, suffered a fire on 6 August 1948 destroying stock-in-trade, machinery and buildings. Insurance policies totalled Rs. 1,48,92,390, and the company received Rs. 65 lakhs in full settlement, paid on 27 March 1950. Of this amount, Rs. 27,06,593 related to losses on buildings and machinery. For 1949-50, Moon Mills did not include this sum in its return since it was received only in 1950. The Income-tax Officer treated the amount as receivable in December 1948 and included it in the 1949-50 assessment. The Appellate Assistant Commissioner held that such compensation could be taxed only under the fourth proviso to section 10(2)(vii) upon actual receipt. The Tribunal and Calcutta High Court upheld this view. The Commissioner contended that, on mercantile accounting, profits should be computed under section 13, and since the assessee had a right to receive the money in December 1948, it became part of taxable income in that accounting year. The Supreme Court held that compensation for loss of a capital asset, not actually received during the accounting year, cannot be taxed in that year. It distinguished between commercial profits and statutory income, and held that the expression "received" cannot be read as "receivable." The appeal was dismissed with costs."

1966-10-26

S. S. Rajalinga Raja v. State of Madras

This appeal concerns the assessment year 1957-58 under the Madras Plantations Agricultural Income-tax Act, 1955. The appellant, S. S. Rajalinga Raja, owned a cardamom plantation on a 50-acre estate and filed a return showing net income from the plantation. The Agricultural Income-tax Officer added to the income the value of cardamom stocks sold during the year, treating the sale as income for that year. The appellant contended that under the Act agricultural produce itself constitutes income at the time it is received, and tax should be levied only on the quantity derived in the year of account, excluding stock accumulated in earlier years; he also argued that his application to compound tax for earlier years implied that the stock sold in the year had already borne tax. The High Court dismissed revision of the assessment. The Supreme Court held that Section 3 read with the definition of agricultural income charges tax on the monetary return derived from plantation produce, and income does not require sale alone; disposal by sale, consumption or use in the assess-ee’s business may give rise to income. Mere receipt in prior years does not exempt income from being taxed in the year of sale. The Court distinguished Dooars Tea Co. Ltd. and noted Bhavani Tea Produce Co. Ltd. as non-controlling in this context. The appeals were dismissed with costs.

1965-10-27

UTKAL MACHINERY LTD. v. SHANTI PATNAIK

This Supreme Court decision concerns industrial adjudication over termination of an employee during a probationary period and the scope of appellate review of an Industrial Tribunal. Miss Shanti Patnaik, appointed in December 1961, was discharged on April 30, 1962. The Labour Court found the termination mala fide, illegal and unjustified, and awarded Rs. 9,600 as compensation in lieu of reinstatement. The management contended that the appointment was on probation for six months and that, in the absence of standing orders on punishment, unsatisfactory work could constitute misconduct, permitting termination as a contractual right. The Court clarified that while a discharge may be within a contract, a bona fide exercise of power by management is not automatically free from review; the Industrial Tribunal may examine whether the order is mala fide, amounts to victimisation or an unfair labour practice, or is capricious or irrational. The Court assumed, for argument, a six-month probation but found no proof of such probation in the evidence; it concluded the discharge was punitive and mala fide due to lack of evidence of unsatisfactory work. While upholding the Labour Court’s general approach, the Court reduced the compensation from two years’ salary to Rs. 4,800, with 6% interest, noting the modest tenure of service and absence of special circumstances.

1965-09-23

N. K. Mohammad Sulaiman v. N. C. Mohammad Ismail and Others

This is a Civil Appeal arising from a mortgage suit concerning immovable properties mortgaged in 1933 by M, K and L in favor of R to secure Rs. 20,000. After M’s death in 1937, R sued for enforcement in 1940 against Khader Miran’s heirs (three widows and a daughter) and other mortgagors. A preliminary mortgage decree was passed in 1940–41, the properties were sold in 1942, and the purchaser (Narsimha Reddy) later transferred them. The plaintiff, claiming to be the son of Khader Miran, filed suit in 1950 for partition and for redemption, asserting that he was entitled to his share. The defense argued that the decree of 1940 bound the estate as represented by those in possession, and that the subsequent inquiry had revealed only the three widows and a daughter as surviving heirs; other heirs were not impleaded. The trial court and the Andhra Pradesh High Court held that the plaintiff was bound by the earlier decree, having been sufficiently represented. On appeal, the Supreme Court held that the deceased’s estate may be represented by heirs brought on record after bona fide inquiry, and that when proper heirs are impleaded, the decree binds the entire estate, subject to fraud/collusion exceptions. The appeal was dismissed, with costs. The decision clarifies that the remedy and procedural rules govern whether the estate as a whole or just the impleaded portion is bound by a decree in mortgage actions.