Jayantibhai Raojibhai Patel, appointed as Headmaster of Nagar Parishad High School under the Municipal Council of Narkhed, faced a misappropriation allegation in 1994. An inquiry initially exonerated him, but a second inquiry led to a finding of guilt and his removal on 29 June 1996. The High Court quashed the removal in 2014 but directed that retiral benefits be paid with continuity of service up to superannuation, while withholding back wages. The Municipality contended that back wages should not be granted, particularly for a Class-C municipality with limited finances, and highlighted a stay granted by the District Collector which impeded reinstatement. The appellant urged that once illegality of termination is established, the normal rule of back wages and reinstatement with continuity should apply, a principle established in Hindustan Tin Works and Deepali Gundu Surwase, and argued that reasons were required for de novo disciplinary inquiries. The Supreme Court examined the back-wages jurisprudence, emphasizing that reinstatement with continuity and full back wages is the default presumption, while permitting departure in exceptional circumstances. In light of the long delay (nearly two decades) and the financial constraints of the municipality, the Court awarded a lump-sum compensation of Rs 5 lakhs for back wages for the period between removal and retirement, in addition to retiral benefits, and disposed of the appeal with no costs. The decision reflects a balanced approach to back wages in prolonged litigations involving public bodies.”

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Landmark Cases
Hon'ble Judges
  • Dr Dhananjaya Y Chandrachud
  • Indira Banerjee
Judgment Date
2019-08-21
Court Decision / Holding
The appeal is disposed of. The appellant is awarded a lump-sum of Rs 5 lakhs as back wages for the period from the date of removal to the date of retirement, in addition to retiral benefits, to be paid within two months from receiving a certified copy of the order. There shall be no order as to costs.
Final Disposition
Appeal disposed with lump-sum back wages of Rs 5 lakhs along with retiral benefits; costs none.

Parties to the Case

Appellants / Petitioners

  • Jayantibhai Raojibhai Patel

Respondents

  • Municipal Council, Narkhed
  • Others (Ors.)

Provisions of Law Cited

Section 79(6) of the Municipal Councils, Nagar Panchayats and Industrial Townships Act, 1965Section 25-F, Industrial Disputes Act, 1947Section 11-A, Industrial Disputes Act, 1947

Legal Doctrines & Maxims

  • Reinstatement with continuity of service and back wages is the normal rule in wrongful/illegal termination cases.
  • There cannot be a straightjacket formula for awarding back wages; decisions rely on the facts and exercise of judicial discretion.
  • The burden of proof lies on the party asserting a fact (positive averment).
  • Rules of reason and justice must guide decisions; decisions must be according to law and not mere humour.
  • Lack of infrastructure and manpower causing delay in litigation should not unduly penalise the employee; extraordinary delays may be justified for the employer’s burden.
  • In cases of illegal termination the employer is the wrongdoer and the employee is the sufferer; courts should not reward delay or denial of rightful dues to the employee.
  • Courts should follow established precedents (e.g., Hindustan Tin Works, Deepali Surwase) while considering exceptional circumstances such as financial constraints of the employer.

Submissions & Arguments

Contentions of Appellants / Petitioners

Appellant contends that once the High Court found the removal unlawful, the normal rule of back wages should follow the illegality; relies on Hindustan Tin Works and Deepali Gundu Surwase to argue for reinstatement with continuity and full back wages, subject to exceptions only for valid reasons. He objects to de novo inquiry without adequate reasons for discarding the first inquiry and seeks back wages for the intervening period, despite the lengthy delay and financial constraints faced by the Municipality.

Contentions of Respondents

Respondents submit that retiral benefits were already paid and pension continues; back wages should not be awarded given the Municipality’s limited finances and the time elapsed. They argue that the de novo inquiry was a strategic response and that there was a stay on reinstatement; any back wages must be weighed against the financial burden on the local authority and the possibility of unfair outcomes given the period of service and the delay.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (7)

Case NameCitationTreatmentExplanation
Hindustan Tin Works (P) Ltd v Employees(1979) 2 SCC 80PositivePrinciple that reinstatement with continuity of service and back wages is the normal relief in illegal termination; later decisions follow this doctrine.
Deepali Gundu Surwase v Kranti Junior Adhyapak Mahavidyalaya(2013) 10 SCC 324PositiveEstablished framework for back wages, including exceptions and burden of proof, guiding the present decision.
CSHA University v BD Goyal(2010) 15 SCC 776PositiveEmphasized the need for recording reasons when differing with an enquiry report; used to justify de novo inquiry procedure requirements.
Surendra Kumar Verma v Central Government Industrial Tribunal-cum-Labour Court(1980) 4 SCC 443PositiveDiscussed exceptional circumstances for denying back wages and the general preference for reinstatement with back wages.
P.G.I. of Medical Education & Research v. Raj Kumar(2001) 2 SCC 54PositiveCited as part of back wages jurisprudence influencing the Court’s approach.
Indian Railways Construction Co. Ltd. v. Ajay Kumar(2003) 4 SCC 579PositivePart of the jurisprudence on back wages and reinstatement considerations.
Susannah Sharp v Wakefield(1891) AC 173PositiveEarly doctrine cited on the reasoned exercise of discretion and legal standards for judgments.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,613 words•~17 min read

In The Court Record

Jayantibhai Raojibhai Patel v Municipal Council, Narkhed & Ors.

**REPORTABLE** ## **IN THE SUPREME COURT OF INDIA CIVIL APPELLATE JURISDICTION** **Civil Appeal No 6188 of 2019 (Arising out of SLP(C) No 8112 of 2019)** ## **Jayantibhai Raojibhai Patel** **…Appellant** ## **Versus** **Municipal Council, Narkhed & Ors. …Respondents** ## **J U D G M E N T** ## **Dr Dhananjaya Y Chandrachud, J** 1 The appellant was appointed on 1 July 1986 as a Headmaster of the Nagar Parishad High School conducted by the Municipal Council of Narkhed in the District of Nagpur. On 5 February 1994, a notice to show cause was issued to him, levelling an allegation of misappropriation of Rs 5,000. After the appellant submitted a reply on 6 February 1994, the first respondent appointed a former Deputy Education Officer, Shri Marathe as an inquiry officer. A charge-sheet was issued to the Signature Not Verified Digitally signed by SANJAY KUMAR Date: 2019.08.21appellant on 8 June 1994. The inquiry officer submitted a report on 25 July 1994, 16:32:54 IST Reason: holding that the appellant was not guilty of the misconduct he was charged with. 1 2 On 27 August 1994, the first respondent resolved to appoint another inquiry officer to conduct an inquiry into the charges against the appellant. A former Chief Officer, Shri Sontakke was appointed as an inquiry officer. The appellant objected to the convening of a second inquiry by his letter dated 24 September 1994. The new inquiry officer issued a notice to show cause to the appellant on 26 September 1994. The appellant objected to the appointment. In the meantime, on 10 October 1994 the first respondent called upon the appellant to show cause what action should be taken pursuant to the report of the first inquiry officer. On 8 November 1994, the first respondent inferred that the report of Shri Marathe was not acceptable to the appellant and proceeded with the inquiry under Shri Sontakke. 3 The new inquiry officer submitted his report on 20 April 1995, holding the appellant guilty of misappropriation of funds and defalcation. On the basis of the report of the inquiry officer, a notice to show cause was issued to the appellant to which he submitted his reply. The first respondent then passed a resolution removing the appellant. This was followed by an order of removal dated 29 June 1996. The appeal filed by the appellant before the Regional Director, Municipal Administration, Nagpur Division under Section 79 (6) of the Municipal Councils, Nagar Panchayats and Industrial Townships Act 1965 was dismissed on 31 August 1996. 4 The appellant instituted a writ petition before the High Court to challenge his removal. The High Court, by its judgment and order dated 12 August 2014 quashed 2 the order of removal. The appellant had already attained the age of superannuation. The High Court held that no back-wages should be paid to the appellant for the period for which he had not rendered service. However, the High Court directed the disbursement of retiral benefits to the appellant, treating him to be in service with continuity of service until the date of superannuation. 5 The submission which has been urged on behalf of the appellant in support of the appeal is that once the High Court found that the appellant had wrongfully been removed from service, the general principle that back-wages must follow a determination in regard to the illegality of termination should be applied. This was sought to be supported by relying upon the decisions of this Court in **Hindustan Tin Works (P) Ltd** v **Employees (** “ **Hindustan Tin Works** ” **)[1]** and **Deepali Gundu Surwase** v **Kranti Junior Adhyapak Mahavidyalaya (** “ **Deepali Surwase** ”)[2] . 6 After notice was issued in these proceedings, a counter affidavit has been filed on behalf of the first respondent. It has been submitted that pursuant to the order of the High Court, retiral benefits amounting to Rs 27 lakhs have been paid to the appellant in July 2015 after deduction of tax. Moreover, the appellant is drawing a pension of Rs 31,500 per month. The first respondent submitted that within two years of the removal, it had taken necessary steps to reinstate the appellant but the order could not be implemented as a result of a stay granted by the District Collector. The first respondent submitted that the appellant ought not to be granted > 1 (1979) 2 SCC 80 > 2 (2013) 10 SCC 324 3 back-wages for the period for which he has not worked, particularly having regard to the fact that it is a „Class-C‟ municipality with a limited income. The rival submissions now fall for our consideration. 7 The High Court has held that the action of the Municipal Council in proceeding with a _de novo_ inquiry was vitiated since no reasons were recorded by the Municipal Council. The High Court held that even if a _de novo_ inquiry was permissible under the rules, no reason was furnished for discarding the report of the first inquiry officer and convening a fresh enquiry. Moreover, the appellant had objected to the appointment of Shri Sontakke as an inquiry officer since he was an ex-officer of the Municipal Council who was occupying quarters allotted to him at the material time. Hence, the High Court held that the removal was illegal. However, the High Court denied back-wages for the period between the date of dismissal and the date on which the appellant attained the age of superannuation. The appellant has been granted his retiral dues on the basis of continuity of service. The judgment of the High Court has not been challenged by the Municipal Council. 8 The view of the High Court that a fresh appointment of an inquiry officer could not have been made without recording reasons why the disciplinary authority disagreed with the enquiry report is correct. This is borne out by the decision of this Court in **CSHA University** v **BD Goyal[3] ,** where a three judge Bench of this Court observed: > 3 (2010) 15 SCC 776 4 “7. It is no doubt true that the punishing authority or any higher authority could have disagreed with the finding of the enquiring officer, but in such a case the authority concerned is duty-bound to record reasons in writing and not on _ipse dixit_ can alter the finding of an enquiring officer. The order of the Vice-Chancellor, which was produced before us does not satisfy the requirements of law in the matter of differing with the findings of an enquiring officer..” 9 Several judgments of this Court have laid down the principles pertaining to the grant of back wages. In **Hindustan Tin Works** , a three-judge Bench of this Court adjudicated on the criterion for grant of back-wages where a termination has been held to be illegal. The appellant in that case was a private limited company with an industrial unit. The Labour Court held that the retrenchment of employees by the appellant was not bona fide and awarded full back wages to the employees, which was challenged before the Supreme Court. This Court made the following observations: “9. It is no more open to debate that in the field of industrial jurisprudence a declaration can be given that the termination of service is bad and the workman continues to be in service. The spectre of common law doctrine that contract of personal service cannot be specifically enforced or the doctrine of mitigation of damages does not haunt in this branch of law. The relief of reinstatement with continuity of service can be granted where termination of service is found to be invalid. It would mean that the employer has taken away illegally the right to work of the workman contrary to the relevant law or in breach of contract and simultaneously deprived the workman of his earnings. If thus the employer is found to be in the wrong as a result of which the workman is directed to be reinstated, the employer could not shirk his responsibility of paying the wages which the workman has been deprived of by the illegal or invalid action of the employer. **Speaking realistically, where termination of service is questioned as invalid or illegal and the workman has to go through the gamut of litigation, his capacity to sustain himself** 5 **throughout the protracted litigation is itself such an awesome factor that he may not survive to see the day when relief is granted. More so in our system where the law's proverbial delay has become stupefying. If after such a protracted time and energy consuming litigation during which period the workman just sustains himself, ultimately he is to be told that though he will be reinstated, he will be denied the back wages which would be due to him, the workman would be subjected to a sort of penalty for no fault of his and it is wholly undeserved. Ordinarily, therefore, a workman whose service has been illegally terminated would be entitled to full back wages except to the extent he was gainfully employed during the enforced idleness. That is the normal rule. Any other view would be a premium on the unwarranted litigative activity of the employer. If the employer terminates the service illegally and the termination is motivated as in this case viz. to resist the workmen's demand for revision of wages, the termination may well amount to unfair labour practice. In such circumstances reinstatement being the normal rule, it should be followed with full back wages…** ” (Emphasis supplied) The Court further clarified that while the payment of full back wages would be the normal rule, there can be a departure from it where necessary circumstances have been established: “11. In the very nature of things there cannot be a straightjacket formula for awarding relief of back wages. All relevant considerations will enter the verdict. More or less, it would be a motion addressed to the discretion of the Tribunal. Full back wages would be the normal rule and the party objecting to it must establish the circumstances necessitating departure. At that stage the Tribunal will exercise its discretion keeping in view all the relevant circumstances. But the discretion must be exercised in a judicial and judicious manner. The reason for exercising discretion must be cogent and convincing and must appear on the face of the record. When it is said that something is to be done within the discretion of the authority, that something is to be done according to the Rules of reason and justice, according to law and not humour. It is not to be 6 arbitrary, vague and fanciful but legal and regular (see Susannah Sharp v. Wakefield [(1891) AC 173, 179] ).” Taking note of the financial problems of the appellant company, the Court granted compensation to the extent of 75% of back wages. The principle laid down in **Hindustan Tin Works** has been followed by other decisions of this Court.[4] ## 10 In **Surendra Kumar Verma v. Central Government Industrial Tribunal-cum-** **Labour Court[5]** , the termination of the services of the appellants was held to be in contravention of Section 25-F of the Industrial Disputes Act by the Labour Court, but the appellants were denied the payment of back wages. In appeal, a three-judge bench of this Court observed **:** “6… Plain common-sense dictates that the removal of an order terminating the services of workmen must ordinarily lead to the reinstatement of the services of the workmen. It is as if the order has never been, and so it must ordinarily lead to back wages too. But there may be exceptional circumstances which make it impossible or wholly inequitable vis-à-vis the employer and workmen to direct reinstatement with full back wages. For instance, the industry might have closed down or might be in severe financial doldrums; the workmen concerned might have secured better or other employment elsewhere and so on. In such situations, there is a vestige of discretion left in the court to make appropriate consequential orders. The court may deny the relief of reinstatement where reinstatement is impossible because the industry has closed down. The court may deny the relief of award of full back wages where that would place an impossible burden on the employer. In such and other exceptional cases the court may mould the relief, but ordinarily the relief to be awarded must be reinstatement with full back wages. That relief must be awarded where no > 4 P.G.I. of Medical Education & Research v. Raj Kumar, (2001) 2 SCC 54; Indian Rly. Construction Co. Ltd. v. Ajay Kumar, (2003) 4 SCC 579 ; Deepali Gundu Surwase v. Kranti Junior Adhyapak Mahavidyalaya, (2013) 10 SCC 324 5 (1980) 4 SCC 443 7 special impediment in the way of awarding the relief is clearly shown. True, occasional hardship may be caused to an employer but we must remember that, more often than not, comparatively far greater hardship is certain to be caused to the workmen if the relief is denied than to the employer if the relief is granted.” 11 In **Deepali Surwase** , the appellant had been employed as a teacher in a primary school run by a trust. The services of the appellant had been terminated by the management of the school pursuant to an ex-parte inquiry proceeding. The School Tribunal quashed the termination of the appellant‟s services and issued a direction for the grant of full back wages. In appeal, the High Court affirmed the view of the Tribunal that the termination was illegal, but set aside the direction for grant of back wages. In appeal, a two-judge Bench of this Court laid down the following principles: “22. The very idea of restoring an employee to the position which he held before dismissal or removal or termination of service implies that the employee will be put in the same position in which he would have been but for the illegal action taken by the employer. The injury suffered by a person, who is dismissed or removed or is otherwise terminated from service cannot easily be measured in terms of money…The reinstatement of such an employee, which is preceded by a finding of the competent judicial/quasi-judicial body or court that the action taken by the employer is ultra vires the relevant statutory provisions or the principles of natural justice, entitles the employee to claim full back wages **. If the employer wants to deny back wages to the employee or contest his entitlement to get consequential benefits, then it is for him/her to specifically plead and prove that during the intervening period the employee was gainfully employed and was getting the same emoluments. The denial of back wages to an employee, who has suffered due to an illegal act of the employer would amount to indirectly punishing the employee concerned and** 8 **rewarding the employer by relieving him of the obligation to pay back wages including the emolument.” (Emphasis supplied)** ## The Court laid down the following principles to govern the payment of back wages: **“38.1** . In cases of wrongful termination of service, reinstatement with continuity of service and back wages is the normal rule. **38.2** . The aforesaid rule is subject to the rider that while deciding the issue of back wages, the adjudicating authority or the court may take into consideration the length of service of the employee/workman, the nature of misconduct, if any, found proved against the employee/workman, the financial condition of the employer and similar other factors. **38.3.** Ordinarily, an employee or workman whose services are terminated and who is desirous of getting back wages is required to either plead or at least make a statement before the adjudicating authority or the court of first instance that he/she was not gainfully employed or was employed on lesser wages. If the employer wants to avoid payment of full back wages, then it has to plead and also lead cogent evidence to prove that the employee/workman was gainfully employed and was getting wages equal to the wages he/she was drawing prior to the termination of service. This is so because it is settled law that the burden of proof of the existence of a particular fact lies on the person who makes a positive averment about its existence. It is always easier to prove a positive fact than to prove a negative fact. Therefore, once the employee shows that he was not employed, the onus lies on the employer to specifically plead and prove that the employee was gainfully employed and was getting the same or substantially similar emoluments. **38.4.** The cases in which the Labour Court/Industrial Tribunal exercises power under Section 11-A of the Industrial Disputes Act, 1947 and finds that even though the enquiry held against the employee/workman is consistent with the rules of natural justice and/or certified standing orders, if any, but holds that the punishment was disproportionate to the misconduct found proved, then it will have the discretion not to award full back wages. However, if the Labour Court/Industrial Tribunal finds 9 that the employee or workman is not at all guilty of any misconduct or that the employer had foisted a false charge, then there will be ample justification for award of full back wages. **38.5.** The cases in which the competent court or tribunal finds that the employer has acted in gross violation of the statutory provisions and/or the principles of natural justice or is guilty of victimising the employee or workman, then the court or tribunal concerned will be fully justified in directing payment of full back wages. In such cases, the superior courts should not exercise power under Article 226 or 136 of the Constitution and interfere with the award passed by the Labour Court, etc. merely because there is a possibility of forming a different opinion on the entitlement of the employee/workman to get full back wages or the employer's obligation to pay the same. The courts must always keep in view that in the cases of wrongful/illegal termination of service, the wrongdoer is the employer and the sufferer is the employee/workman and there is no justification to give a premium to the employer of his wrongdoings by relieving him of the burden to pay to the employee/workman his dues in the form of full back wages. **38.6.** In a number of cases, the superior courts have interfered with the award of the primary adjudicatory authority on the premise that finalisation of litigation has taken long time ignoring that in majority of cases the parties are not responsible for such delays. Lack of infrastructure and manpower is the principal cause for delay in the disposal of cases. For this the litigants cannot be blamed or penalised. It would amount to grave injustice to an employee or workman if he is denied back wages simply because there is long lapse of time between the termination of his service and finality given to the order of reinstatement. The courts should bear in mind that in most of these cases, the employer is in an advantageous position vis-à-vis the employee or workman. He can avail the services of best legal brain for prolonging the agony of the sufferer i.e. the employee or workman, who can ill-afford the luxury of spending money on a lawyer with certain amount of fame. Therefore, in such cases it would be prudent to adopt the course suggested in Hindustan Tin Works (P) Ltd. v. Employees [Hindustan Tin Works (P) Ltd. v. Employees, (1979) 2 SCC 80 : 1979 SCC (L&S) 53] .” 10 12 In the present case the first inquiry resulted in a report which came to the conclusion that the charge of misconduct was not substantiated. Upon finding that the convening of a fresh inquiry without recording reasons was contrary to law, the High Court would have ordinarily granted liberty to the Municipal Council to take a fresh decision after due notice to the appellant. Such a course of action was, however, rendered impracticable by supervening events. The writ petition instituted by the appellant before the High Court in 1996 remained pending for nearly eighteen years. The appellant had been removed from service on 29 June 1996. Considering the lapse of time, reopening the proceedings would not be expedient in the interest of justice particularly when the appellant had, in the meantime, attained the age of superannuation in 2005. Relegating the appellant to a protracted course of action by restoring the proceedings before the disciplinary authority would also not be fair and proper after a lapse of nearly fourteen years since his retirement. 13 Having due regard to the principles which have been enunciated in **Deepali Surwase** by this Court, the High Court was not, in our view, justified in denying the back-wages to the appellant altogether. Bearing in mind the circumstances which have been noted above, a lumpsum compensation should be directed to be paid. 14 The ends of justice would be met by directing that the appellant be paid an amount quantified at Rs 5 lakhs in full and final settlement of his claim for backwages for the period between the date of the order of removal and the date on which he attained the age of superannuation. This payment to the appellant shall be made 11 in addition to the retiral benefits to which he is entitled in terms of the order of the High Court. The payment of Rs 5 lakhs shall be made within a period of two months from the date of receipt of a certified copy of this order. 15 The appeal is accordingly disposed of. There shall be no order as to costs. **……...……..…...…...….....………........J.** **[Dr Dhananjaya Y Chandrachud]** **………....…..…....…........…….…........J. [Indira Banerjee]** **New Delhi; August 21, 2019.** 12
End of Judgment Record
Browse All Landmark Cases Judgments
2019-01-22

State of Himachal Pradesh & Anr. v. Pinju Ram & Others; State of Himachal Pradesh & Ors. v. Ganesh Dutt & Anr.

This batch of appeals concerns regularisation and monetary benefits of part‑time employees in Himachal Pradesh who were converted to daily‑wage status. The State had issued a policy on 27 February 2004: part‑time Class‑IV employees who had completed ten years of continuous service as on 31 December 2003 would be made daily wagers with prospective effect, and posts vacated by such employees would stand abolished; Education and Ayurveda were excluded from the policy. Revenue Chowkidars, engaged by Panchayats, were not covered by that policy and received separate treatment. Following writ petitions and an order of the Himachal Pradesh High Court and in light of later developments, the State drew‑up directions in 2011 (22 September) to give seniority to Revenue Chowkidars on the basis of ten years of service, but with wages from the date of actual appointment and without back‑dated monetary benefits; 7 July 2012 further instructions reiterated this stance for remaining part‑time employees, with monetary benefits not guaranteed in the interregnum. The respondents pressed for back wages dating from 1 January 2007 and broader coverage. The Supreme Court held that the 2007 back‑pay direction was unsustainable, clarified that seniority would count from ten years without past benefits, and that the 2011 policy and Moti Singh principle should guide the approach. The appeals are allowed; no costs. The related writ petitions are to be disposed of consistent with these directions.

2018-08-14

Union Bank of India and Others v. C.G. Ajay Babu and Anr.

This is a Supreme Court of India appeal concerning the forfeiture of gratuity under the Payment of Gratuity Act, 1972. The respondent was a branch manager of the appellant bank and was dismissed on 3 June 2004 after disciplinary proceedings. A show-cause notice sought to forfeit gratuity due to misconduct involving moral turpitude, which was ordered on 20 April 2004. The High Court upheld the dismissal but held that gratuity could be paid since there was no financial loss to the bank, and that a bipartite settlement between the bank and employees permitted forfeiture only where misconduct caused financial loss. The Division Bench, however, held that forfeiture under Section 4(6) must be read together with Section 4(5) and that no loss was proven, thus entitling the employee to gratuity in accordance with the bipartite settlement. The Supreme Court agreed with the High Court that forfeiture is not automatic; it is controlled by Sections 4(5) and 4(6) of the Act and by the bipartite settlement, which requires loss to justify forfeiture. The Court emphasized that an act must constitute an offence involving moral turpitude and that conviction is generally required for forfeiture under 4(6)(b)(ii). The appeal is dismissed with no costs.

2018-09-25

Reema Salkan v. Sumer Singh Salkan

This is a Supreme Court of India criminal appeal under the Criminal Appellate Jurisdiction arising from a maintenance dispute under Section 125 Cr.P.C. The parties, married in 2002, had a protracted litigation history. The Family Court granted maintenance to the wife from 17 July 2003 to 8 December 2010, and held no maintenance thereafter. The High Court, in revision, partly allowed the application, directing Rs.9,000 per month from 9 December 2010 onward, while upholding the earlier period’s Rs.10,000 per month. This Court had earlier granted interim maintenance of Rs.20,000 per month in 2014 (Criminal Appeal Nos. 2347-2349 of 2014). The appellant contends there has been no change in circumstances since the interim order and that the respondent’s substantial assets, education, and overseas earnings establish the capacity to pay higher maintenance. The respondent defends the High Court’s reasoning, arguing that the Family Court’s assessment, demeanor observations, and the principle that maintenance should not be perpetual require careful scrutiny, and that the notional minimum wage approach used by the High Court is flawed. The overarching issue is the quantum of monthly maintenance payable to the appellant and whether the interim amount should be augmented beyond the period up to 2010.”

2019-12-03

M/s Embassy Property Developments Pvt. Ltd. v State of Karnataka & Ors.

This judgment concerns three Civil Appeals filed by a Resolution Applicant, the Corporate Debtor (through its Resolution Professional) and the Committee of Creditors, challenging an Interim Order of the Karnataka High Court staying an NCLT order in proceedings under the Insolvency and Bankruptcy Code, 2016. The NCLT Chennai had admitted an application under Section 7 of the IBC against M/s Tiffins Barytes Asbestos & Paints Ltd. and directed a moratorium under Section 14. The Interim Resolution Professional then sought a deemed extension of a mining lease under MMDR Act, 1957 and the Government of Karnataka rejected it. The NCLT, by an order dated 11.12.2018, set aside the Government’s order and directed execution of Supplement Lease Deeds for the period up to 31.03.2020. The Government of Karnataka challenged this in a High Court writ petition, which stayed the impugned NCLT order. The core issues were: (i) whether the High Court may interfere under Article 226/227 with an NCLT order in IBC when an appeal lies to the NCLAT, and (ii) whether fraud can be inquired into by NCLT/NCLAT in CIRP. The Court reiterates that IBC is a complete, umbrella code with a three‑tier mechanism (NCLT, NCLAT, Supreme Court) and that public‑law disputes arising from MMDR Act obligations lie outside IBC. It ultimately holds that while NCLT/NCLAT may inquire into fraud, they cannot adjudicate MMDR‑related public legal disputes; and the High Court’s writ jurisdiction in public‑law contexts remains permissible. The appeals are dismissed.