Jawaharlal Wadhwa v. Haripada Chakroberty

Case / Petition Number:
Civil Appeal No. 2678 of 1985
Neutral Citation:1988 Supp. 3 S.C.R.

Case Synopsis & Summary

This is a Supreme Court decision arising from a dispute over two interlinked transactions in the early 1970s involving loan-financed construction on a refugee settlement plot in Delhi. The respondent acquired a government-backed housing loan of Rs. 15,000 and, with Appellant No. 1, executed an agreement to sell the plot and house with monthly installments to amortize the loan. A second agreement, dated January 29, 1974, titled as an “agreement for construction,” provided that the respondent would complete the house and pay Rs. 1,15,000 to the appellant within three years, with Appellant No. 1 retaining possession until payment. The respondent allegedly occupied the property; disputes emerged over validity, possession, and remedies. The case traversed through the district court, an arbitrator’s award adverse to the appellants, and successive High Court decisions culminating in this Court’s intervention. The central legal issues concern whether the contract breach by the respondent constituted an anticipatory breach and the proper remedies, and whether Section 53A protection allowed continued possession pending performance. The High Court dismissed the objections to the arbitration award; on appeal the Supreme Court clarified that anticipatory breaches may terminate or permit specific performance only if readiness and willingness to perform are shown, and held that there was no error of law requiring setting aside. Ultimately, the objections were dismissed and the award upheld with decree to be drawn. The decision underscores the proper approach to awards and the limits of correcting errors of law on the face of an award.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • Sabyasachi Mukharji
  • M. H. Kania
  • S. Ranganathan
Judgment Date
1988-10-14
Court Decision / Holding
Objections to the Award dismissed; the judgment in terms of the Award; decree to be drawn up; no order as to costs.
Final Disposition
Objections to the arbitration award disposed of in favor of upholding the award; decree to be drawn in terms of the award; no costs.

Parties to the Case

Appellants / Petitioners

  • Jawaharlal Wadhwa
  • Wife of Jawaharlal Wadhwa

Respondents

  • Haripada Chakroberty

Legal Representation & Advocates

Counsels for Petitioners

  • • M. C. Bhandare
  • • Sandeep Narain
  • • Shri Narain

Counsels for Respondents

  • • Dr. Shankar Ghosh
  • • N. R. Choudhary

Provisions of Law Cited

Arbitration Act, 1940 - sections 30, 33 and 34Transfer of Property Act, 1882 - section 53A

Legal Doctrines & Maxims

  • Anticipatory breach of contract; where such breach occurs, the other party may sue for damages or keep the contract alive and sue for specific performance only if they show readiness and willingness to perform.
  • Error of law on the face of the award; a legal proposition basis for setting aside an award when the award itself or documents incorporated in it state a legal proposition that is erroneous (Champsey Bhara & Co. v. Jivraj Balloo Spinning & Weaving Co. Ltd.; Kanpur Nagar Mahapalika v. Mis Narain Das Haribansh; Union of India v. A. L. Rallia Ram).
  • Section 53A protection to a transferee under the Transfer of Property Act, 1882 when the transferee has performed or is ready to perform their part of the contract.

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants contended that the award was vitiated by an error of law; the arbitrator correctly reproduced the Section 53A framework but erred in applying it to the repudiation by the respondent. They argued that the contract, though possibly unregistered, protected the appellants under Section 53A due to possession and continued performance by the appellants. They stressed that the respondent’s January 16, 1976 repudiation (before mutual obligations were performed) constituted anticipatory breach, which either terminates the contract or allows specific performance only if the aggrieved party remains ready and willing to perform.

Contentions of Respondents

The respondents argued that the award correctly set out the law and applied Section 53A to deny protection beyond January 1976 given the contract terms and the respondent’s position; they asserted that repudiation did not absolve the appellants from continued obligations under the agreement and that the award correctly concluded that the respondent’s possession could be restricted under the terms of the sale agreements.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (9)

Case NameCitationTreatmentExplanation
International Contractors Ltd. v. Prasanta Kumar Sur[1961] 3 SCR 579DistinguishedCited to discuss anticipatory breach; the court distinguishes the present facts from that decision.
Champsey Bhara and Co. v. Jivraj Balloo Spinning and Weaving Co. Ltd.[1922-23] LR So IA 324; 1923 AC 480PositiveDefined the concept of 'error of law on the face of the award' and its limits.
Kanpur Nagar Mahapalika v. Mis Narain Das Haribansh[1970] 2 SCR 28; (1969) 2 SCC 620PositiveReiterated the standard for ‘error of law on the face of the award’ as used with Champsey Bhara.
Coimbatore District Podu Thozillar Sangam v. Balasubramania Foundry and Others[1987] 3 SCC 723PositiveHeld that an error of law can be corrected in an arbitration award; supports the present Court’s approach.
State of Orissa & Ors. v. Mis Lall BrothersJudgment Today S.C. 552PositiveNoted that courts cannot speculate in absence of reasons; supports the need for reasoned Awards.
Union of India v. A. L. Rallia Ram[1964] 3 S.C.R. 164; AIR 1963 SC 1685PositivePart of the foundation for evaluating arbitral awards and ‘error of law’ standards.
Jivarajbhai Ujamshi Sheth & Ors. v. Chintamanrao Balaji & Ors.[1964] 5 S.C.R. 480PositiveCited in the context of Champsey Bhara and the error‑of‑law doctrine.
K. P. Poulose v. State of Kerala and Another[1975] 2 SCC 236Mentioned OnlyNot particularly helpful to the current case; referred to as not assisting the argument.
Makineni Nagayya and Others v. Makineni BapammaAIR (45) 1958 A.P. 504Mentioned OnlyNot necessary to refer; not a binding authority for the present issue.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•4,830 words•~22 min read

In The Court Record

Jawaharlal Wadhwa v. Haripada Chakroberty

JAWAHARLAL WADHWA AND ANOTHER _v._ HARJPADA CHAKROBERTY OCTOBER 14, 1988 [SABYASACHJ MUKHARJI, M.H. KANIA AND S. RANGANATHAN, JJ.] _Arbitration Act, 1940-Sections 30,33 and_ _34-Award-Setting_ _aside-Only_ _an_ _error_ _of law_ _and not mistake_ _of fact committed by_ _Arbitrator justiciable before Court._ _Transfer_ _of_ _Property Act, i88;;-Section_ _53A-Anticipatory_ _breach of contract-Option to_ _claim damages-Otherwise keep contract_ _alive by_ _pe1fornung_ _its part of contract_ _(..lfUi._ sho~v _readiness and willing-_ _ness in_ _order to claini. specific pe1forn1ance-Tra11sfcree in possession of_ _premises-Stopped paying monthly instalments-Could not claim pro-_ _tection under section 53A._ The respondent had taken a loan of Rs.15,000 from the Ministry of Defence for construction of a house on a plot allotted to him. As the amount of loan was insufficient to complete the construction, he took a loan of Rs.S,000 from Appellant No. I and on 6th September, 197 J he entered into an agreement to sell the house and the plot to Appellant No. I. The aforesaid amount of Rs.S,000 was shown as advance of sale price. Clause 2(b) of the Agreement provided that the appellant.purchaser shall pay to the seller /respondent a sum of Rs. !OS every month against the sanctioned loan of Rs.15,000 till the full amount is recovered from the respondent. The payment of Rs. I OS per month was made by the appellant only up to January 1976 and this payment covered upto 23 instalments, and more than JOO instalments remained unpaid. A B ##### c D E F On January 29, 1974 another agreement, for construction, was entered into between Appellant No. I and the respondent. Under this agreement, Appellant No. I was to complete construction of the house and after the completion of the house the respondent was to return the cost of G construction amounting to Rs. I, 15,000 including appellant's profit of Rs.20,000 and security amount ofRs.15,000 deposited by the Appellant No. 1 with the respondent, within three years in a lump sum and on such payment the Appellant No. I was to hand over the possession of the building and the plot to the respondent. Till that amount wa• paid, - Appellant No. 1 was entitled to possess and occupy and enjoy the build- H ~ 513 514 SUPREME COURT REPORTS [ 1988) Supp. 3 S.C.R. A 'ing. The house was not completed but the appellants who are husband and wife were occupying the same. According to the respondent this transaction was sham and bogus and he repudiated the same. Disputes arose between the parties. B #### c D E F G The respondent filed a suit claiming for the return of possession of the said plot of land and house. The application of the appellant under s. 34 of the Arbitration Act was dismissed. In the appeals preferred by the appellant the Additional District Judge, appointed a sole arbitrator with the consent of'the parties. The arbitrator made and published his award which went against the appel· !ants. The High Court dismissed the appeal filed by the appellants against the order of the District Judge dismissing their application chal· lenglngthe Award. This Court, in appeal, set aside the award of the Arbitr.ator and also the judgment of the High Court and appointed Shri A.C. Gupta, a former Judge of this Court as the sole arbitrator. It was contended before the said Arbitrator that the agreement for sale was not registered and might not convey any interest to appellant No. 1 in the property, but the appellants, who had been put in possession of the said land and construction, were entitled to retain possession under the protection afforded by s. 53A of the Transfer of Property Act. The arbitrator made and published his award which went against the appellants. The arbitrator held from the receipts filed, that the respondent.paid only rent up to January 1976 which covered 23 instalments only, and more than 100 instalments remained to be paid, and that there was no valid reason why the respondent should have failed to carry out his obligation under the contract. The arbitrator further held that the respondent could not, therefore, claim that bis possession was protected, under s. 53A of the Transfer of Property Act, and was, therefore, not entitled to retain possession of the disputed property beyond January 1976. In the objections filed by the appellants challenging the award before this Court it was contended that the award is bad in law and liable to be set aside as there is an error of law disclosed on the face of the award as the statements contained in the award ran counter to the settled position in law that wrongful repudiation by the respondent of H the contract by his letter dated 16 January, 1976, before mutual obliga· J.L. WADHWA _v_ HARIPADA 515 tions under the contract were carried out, amounted to an anticipatory breach of contract by him and therefore the Appellant No. l is absolved from carrying out his remaining obligation under the contract, and could claim specific performance of the same even though he failed to carry out his remaining obligations under the contract. Dismissing the objections and upholding the award, the Court, HELD: I. It is settled in law that where a party to a contract commits an anticipatory breacl• of the contract, the other party to the contract may treat the breach as putting an end to the contract and sue for damages, but in that event he cannot ask for specific performance. The other option open to tbe other party, namely, the aggrieved party, .fa that he may choose to keep the contract alive till the time for perfor mance and claim specific performance but, in that event, he cannot claim specific performance of' the contract unless he shows his readiness and willingness to perform the contract. [SllB-C] _International Contractors Ltd._ v. _Prasanta Kumar_ _Sur,_ [1961] 3 SCR 579, distinguished. 2. It is an error of' law and not a mistake of fact committed by the Arbitrator which is justiciable in the a1>plication before the Court. [52IAJ If there is no legal proposition either in the award or in any document annexed to the award which is erroneous and constitutes the basis of the award and the alleged mistakes or alleged errors, are only mistakes of fact the award is not amenable to corrections by the Court. [522A-B] _Coimbatore District Podu Thozillar Sangam_ v. _Balasubramania_ _Foundary and Others,_ [1987] 3 SCC 723; _Clzampsey Bhara and Co._ v. _Jivraj Balloo Spinning Weaving Co. Ltd.,_ [1922-23] LR 50 IA 324, 1923 AC 480; _Kanpur Nagar Mahapalika_ v. _Mis Narain Das Haribansh,_ [1970] 2 SCR 28, 1969 2 SCC 620 and _State o/Orissa_ _&_ _Ors._ v. _M;s_ _Lall_ A ###### u #### c D E F - _Brothers,_ [1988] Judgment Today S.C. 552, refe?Ted to. G In this case, what the arbitrator has done is to set out in his award the relevant portion of s. 53A of the Transfer of Property Act, in terms of the said section. There can be no dispute that these provisions have **been correctly set out. There is** **thus no error** **in** **the proposilion of** ~a\~' set out by the learned Arbitrator in the award. It may be that there is aa H 516 SUPREME COURT REPORTS [1988] Supp. 3 S.C.R. A error, although that is by no means certain, in the application of these principles in coming to the conclusion that, notwithstanding the repudiation of the said contract by the respondent; Appellant No. l was not absolved in the facts and circumstances of the case from his obligation to pay the r'emaining instalments of Rs.105 per month as provided under the contract. [52IF-G] B CIVIL APPELLATE JURISDICTION: Civil Appeal No. 2678 of 1985. #### c From the Judgment and order dated 30.4.1985 of the Delhi High Court in F.A.0. No. 270 of 1982. M.C. Bhandare, Sandeep Narain and Shri Narain for the Appellants. Dr. Shankar Ghosh and N.R. Choudhary for the Respondent. D The Judgment of the Court was delivered by KANIA, J. The .hearing before us now relates to certain objec· lions filed to the Award made by Shri A.C. Gupta a former Judge of this Court who was appointed the sole arbitrator to adjudicate upon the dispute between the parties pursuant to the Order of this Court E dated 18th November, 1987 in the circumstances as set out hereinafter. In order to appreciate the objections, it is necessary to refeF to certain facts. The Settlement Commissioner, Government of India allotted Plot No. 631 at Chitranjan Park, New Delhi measuring 160 sq. yds to F the Respondent under the Settlement Scheme for the refugees from Pakistan fqr a total price of Rs.4,800. This allotment was made by the Settlement Commissioner on behalf of the Rehabilitation Department of the Government of India. The Respondent applied for a loan from the Ministry of Defence for construction of the house on the said plot and a loan of Rs.15,000 was sanctioned in his favour. Under the House G Construction Rules of the Government, the plans and estimates had to be submitted along with the application "and a sanctioned amount was paid in four instalments at different stages of construction. The Respondent started the construction of a building on the said land. By the end of 1973, the Respondent had constructed a house on the said plot upto the roof level. By that time he had obtained and used up a sum of H Rs.12,000 out of the loan sanctioned to him and only a balance of ## _r_ J.L. WADHWA _v._ HARIPADA [KANIA, J.] 517 Rs.3,000 remained to be paid to him under the said loan. According to the Respondent, this amount was not sufficient for the final completion of the house and he, therefore, sought the help of Appellant No. 1 who advanced a sum of Rs.5,000 to him. In September, 1973 the Respondent entered into an agreement dated September 6, 1973 to sell the house and the said plot to the Appellant No. 1. The aforesaid amount of Rs.5,000 given by way of loan was shown in that agreement as an advance paid towards the sale price. The Respondent also executed a General Power of Attorney in favour of Appellant No. 1 _inter alia_ enabling him to carry on construction work on the said land A B on behalf of the Respondent. According to the Respondent, the house was not complete but the Appellants who are husband and wife were occupying the same. Under circumstances, we need not discuss here, C on January 29, 1974 another agreement was entered into between Appellant No. 1 and the Respondent which has been described as an agreement for construction. Under that agreement, Rs.80.000 was to be paid by the Respondent as the price of the construction to be put up by Appellant No. 1 "n the said plot and he was to charge Rs.20,000 as the profits and labour charges. He was to deposit Rs.15,000 with the D Respondent, this transaction was sham and bogus. Disputes arose betspondent was to return the amount of Rs. 1, 15,000 within three years in a lump sum and on such payment, Appellant No. 1 was to hand over the possession of the building and the plot to the Respondent. Till that amount was paid, Appellant No. 1 was entitled to possess and occupy and enjoy the same and to receive rents thereof. According to the E Respondent, this transaction was sham and bogus. Disputes arose between the parties and the Respondent filed a suit in August 1977 claiming for the return of the possession of'the said plot and the house. A notice of motion under section 34 of the Arbitration Act I 940 for stay taken out by the Appellants was dismissed. An appeal was preferred against the said decision. In the appeal, which came up for hearing F before the Additional District Judge, Delhi, with the consent of the parties, Shri Bakshi Man Singh was appointed as the sole arbitrator to adjudicate upon the disputes in the suit. The said Shri Bakshi Man Singh died in July 1979 without making any award. On an application by the Respondent, the learned Additional District Judge filled up the vacancy by appointing Shri Hari Shanker, Advocate, as the sole G arbitrator. Shri Hari Shanker made and published his award which went against the Appellants. According to the Appellants, the said award was made _ex parte._ The appellants challenged the award by filing objections under sections 30 and 33 of the Arbitration Act before the learned Additional District Judge and applied for setting aside the said award. This application was dismissed by the learned Additional H **518** SUPREME COURT REPORTS [ 1988] Supp. 3 S.C.R. _A_ District Judge. The Appellants filed an appeal against this decision on October .14, 1982 before the Delhi High Court but the said appeal was dismissed by the learned Single Judge of that High Court on April 30, 1985. This decision of the learned Single Judge was challenged before this Court by way of Special Leave Petition under Article 136 of the Constitution. Leave was granted and the present Appeal came to be B numbered as aforesaid. This Appeal came up for hearing before a Division Bench of this Court on November 18, 1987. After hearing learned Counsel for the parties, in order to ensure faifplay in the action, this Court set aside the award of the Arbitrator and also the judgment of the Delhi High Court and appointed Shri A.C. Gupta, a former Judge of this Court, as the sole arbitrator to adjudicate upon _C_ the disputes between the parties. The arbitrator was directed to make his award with shortreasons within four months from the receipt of the copy of the order. Certain other conditions like payment of compensation and additional expenses· were imposed on the Appellants. Pursuant to the said order of this Court, the said Shri A.C. Gupta entered upon the reference and made and published his award on fl 1vlarch 18, 1988. Under the said award, it was held that the Respondent was entitled to a sum of Rs.58,498.60p and interest on this amount at the rate of 18 per cent per annum from the date of the reference to the date of the award which worked out to a sum of Rs.3,510. Taking into account the amount paid by the Respondent initially towards the arbitrator's remuneration and others costs and E after setting off the dues of Appellants against the Respondent, it was held that the Respondent-claimant was entitled to· recover possession of the disputed building from the Appellants and that a sum of Rs.57, 753 was payable by the Appellants to the Respondent. It is this award which is challenged before us now. F Th<) sole submission made by Mr. Bhandare, learned Counsel for the Appellants is that the award is bad in law and liable to be set aside as 1.herc is an error of law disclosed on the face of the award. In this connection, Mr. Bhandare drew our attention to clause 2(b) of the agreement to s<:ll dated September 6, 1973 referred to earlier. The carller pari of the llgreement set out that the purchaser (Appellant ##### G No. I) had puid to the seller (Respondent) a Slifil of Rs.S,000, the tecdpt of which was acknowledged by the Respondent and the balance amo11nt jlf1yab1c was to be paid in the manner set out in the said clause . 2(b) which rum: u5 follows: # • H "'the purchaser shall pay to the se11er Rs.1.05 each month MJ!,Uinrit the snnctlorted lonn of Rs.15;000 by the fifth day of J.L. WADHWA _v._ HARIPADA [KANIA, J.] 519 every English Calendar month till such time the full amount of loan is recovered from the seller by the Government of India. The first instalment shall commence with effect from 5th October, 1973. The purchaser, if he desires, can also deposit the actual remaining amount towards this loan at any time in Jump sum to the Government of India on behalfof the seller." A B It is a common ground that the sum of Rs. 105 per month referred to clause 2(b) of the said agreement was paid by the Respondent only upto January 1976 and that this payment covered uptci 23 instalments and more than 100 instalments were remammg unpaid. Mr. Bhandare pointed out that it was contended by the Appellants before the arbitrator that, although the agreement for sale between C the parties was not registered and might not convey and interest to Appellant No. 1 in the property, the Appellants had been put in possession of the said land and construction pursuant to the said agreement since September 1973, as appears from the agreement of sale, and, in view of this, Appellants were entitled to retain possession D under. the protection afforded~by Section 53A of the Transfer of Property Act, 1882. He drew our attention to the following statements contained in the award of the learned Arbitrator: "The Respondent who has been in possession of the property since September 1973 as would appear from the E first agreement for sale, claimed that his possession was protected under Section 53A of the Transfer of Property ###### Act ....., Section 53A affords protection to a transferee on certain conditions, one of w!iich is that 'the transferee has per- F formed or is willing to perform his part of contract'. tJnder the agreement for sale, the respondent was required to pay the claimant a monthly sum of Rs. 105 to enable the latter to pay the instalments in discharge of _the_ house building Joan. From the receipts filed it appears that the respondent paid otlly upto January 1976 which covered 23 instalments (l only and more than 100 insialinents remained to be paid. There is no valid rcawn why he should have fnilecl to car1·y out his obligation under the contract. Thus it camiot be said that the respondent had performed 01· was willing to perform his part of the contract therefore, the rcspondetit was not entitled to retain possession of the disputed prn• H perty beyond January 1976." A B #### c D E F G H 520 SUPREME COURT REPORTS [ 1988] Supp. 3 S.C.R. It was submitted by Mr. Bhandare that these statements clearly disclose an error apparent on the face of the award. It is pointed out by him that, prior to February 1976, the Respondent by his Advocate's notice dated 16. 1. 1976 had repudiated the said agreement for sale by contending in his notice that it had been procured by fraud, undue influence and coercion practised by Appellant No. 1 and it was submitted that the said repudiation was wrongful and in view thereof Appellant No. 1 was absolved from his obligation to make any further payment of Rs.105 per month or to continue to be re_ady and willing to perform the agreement. It was submitted by him that the aforestated statements contained in the award ran counter to the settled position in law and disclosed a clear error of law on the face of the award. He drew our attention to the decision of this Court in _International Con-_ _tractors Ltd._ v. _Prasanta Kumar Sur.,_ [1961] 3 S.C.R. 579. In that case the appellant had purchased the property in dispute from the respondent'but soon thereafter there was an agreement for reconveyance of the property to the respondent within a period of two years for almost the same value for which it was sold. Before the expiry of the stipulated period, the respondent entered into correspondence with the appellant, asking for the compti::tion of the agreed reconveyance and intimating that the purchase money was ready to be paid, but after some further correspondence, the appellant's solicitors, on his behalf, repudiated the agreement for reconveyance. The respondent then did not tender the price agreed to be paid and filed a suit for specific performance. The suit was dismissed by the trial court on the ground that the respondent had not paid the money. The High Court reversed the decision and decreed the suit. On an appeal to this Court, it was held that as the appellant had totally repudiated the contract for reconveyance and had failed to perform his part of the contract, it was open to the respondent to sue for its enforcement and the High Court was right in holding that respondent was entit.led to a decree for specific performance. In our view, Mr. Bhandare may be right in contending that this decision does show that it has been held by this Court that in certain circumstances once a party to a contract has repudiated a contract, it is not necessary for the other party to tender the amount payable under the contract in the manner provided in the contract in order to successfully claim the specific performance of the contract. The decision, however, nowhere lays down that where one party to a contract repudiates the contract, the other party to the contract who claims specific performance of the contract is absolved from his obligation to show that he was ready and willing to perform the contract. Mr. Bhandare's argument really is to the effect that the Respondent wrongly repudiated the contract by his said letter dated 16th January, J.L. WADHWA _v._ HARIPADA [KANIA, J.] 521 1976, before all the mutual obligations under the contract .had been carried out, that is to say, he committed an anticipatory breach of the contract and in view of this, Appellant No. 1 was absolved from carrying out his remaining obligations under the contract and could claim specific performance of the same even though he failed to carry out his remaining obligations under the contract and might have failed to show his readiness and willingness to perform the contract. In our view, 'this argument cannot be accepted. It is settled in law that where a **party to a contract commits an** **anticipatory breach of the contract, the** other party to the contract may treat the breach as putting an end to the contract and sue for damages, but in that event he cannot ask for specific performance. The other option open to the other party, namely, the aggrieved party, is that he may choose to keep the contract alive till the time for peformance and claim specific performance but, in that event, he cannot claim specific performance of the contract unless he shows his readiness and willingness to perform the contract. The decision of this Court in _International Contractors Limited_ v. _Prasanta Kumar Sur.,_ (supra), properly analysed, only lays down that A B ##### c in certain circumstances it is not necessary for the party complaining of D an anticipatory breach of contract by the other party to offer to perform his remaining obligations under the contract in order to show his readiness and willingness to perform the c5mtract and claim specific performance of the said contract. Mr. Bhandare also referred to the decision of the Andhra Pradesh High Court in _Makineni Nagayya and_ _Others_ v. _Makineni Bapamma.,_ AIR (45) 1958 A.P. 504. We do not E consider it necessary to refer this decision as it does not carry the case of the Appellants any further. The ratio of the said decision in no way runs counter to the said position in law set out above. E In the case before us, what the arbitrator has done is to set out in his award the relevant portion of Section 53A of the Transfer of Pro- F perty Act in terms of the said section. There can be no dispute that these provisions.have been correctly set out. There is thus no error in the proposition' of law set out by 'the learned Arbitrator in the award. It may be that there is an error, although that is by no means certain, in t.he application of these principles in coming to the conclusion that, notwithstanding the repudiation of the said contract by the respon- G dent, Appellant No. 1 was not absolved from his obligation to pay the remaining instalments of Rs.105 per month as provided under the contract. In _Coimbatore District Podu Thozillar Samgam_ v. _Balasu-_ _bramania Foundary and others,_ [1987] 3 S.C.C. 723 it has been held by H · 522 SUPREME COURT REPORTS [ 1988] Supp. 3 S.C.R. A this Court that it is an error of law and not a mistake of fact committed by the Arbitrator which is justiciable in the application before the Court. If there is no legal proposition either in the award or in any document annexed to the award which is erroneous and constitutes the basis of the award and the alleged mistakes or alleged errors, are only mistakes of fact the award is not amenable to corrections by the Court. B In its judgment, the Court referred to the decision of this Court in _Union of India_ v. _A.L. Rallia Ram,_ [1964] 3 S.C.R. 164; AIR 1963 SC 1685 and, after referring to certain factors pertaining to awards in arbitration proceedings and the machinery devised by the Arbitration Act 1940, pointed,out that the award was the decision of a domestic tribunal chosen by the parties and the civil courts which were entrusted C with the power to facilitate arbitration and to effectuate the awards, could not exercise· appellate powers over the decisions. This Court reiterated that it was now firmly established that an award was bad on the ground of error of law on the face of it only when in the award itself or in_ a document actually incorporated in it, there was found some legal proposition which was the basis of the award and which was D erroneous. This view was enunciated by the Judicial Committee in _Champsey Bhara and_ _Co._ v. _Jivraj Ba/loo Spinning and Weaving_ _Co._ _Ltd.,_ [i922-23] LR _So_ IA 324; 1923 AC 480. This view was again reiterated and emphasised by this Court in _Kanpur Nagar Mahapalika_ v. _Mis Narain Das Haribansh,_ [ 1970] 2 S.C.R. 28; ( 1969) 2 SCC 620 where Ray, J., as the learned Chief Justice then was, observed at page E 30 of the Report relying on _Champsey Bhara_ case: F "An error of law on the face of the award meant that one could find in the award, or in a document actually incorporated thereto, as, for instance, a note appended by the arbitrator stating the reasons for his judgment, some legal proposition which was the basis of the award and which one **can say is erroneous."** Jn _State of Orissa_ & _Ors._ v. _Mis Lall Brothers,_ [1988] Judgment Today S.C. 552 it was held by a Bench of this Court that it is not open to the Court to speculate, where no reasons are given by the G arbitrator, as to what impelled him to arrive at his conclusions. Reference was made in this connection (see parai;raph 8) to the observations of the Judicial Committee in _Champsey Bhara_ & _Co._ v. _Jivraj_ _Balloo Spinning_ & _Weaving_ _Co . ./td._ and of this Court in _Jivarajbhai_ _Ujamshi Sheth_ & _Ors._ v. _Chintamanrao Balaji and Ors.,_ [1964] 5 S.C.R. 480. H J.L. WADHWA _v._ HARIPADA [KANIA, J.] 523 It was next contended by Mr. Bhandare that the award disclosed an error in law as certain important documents relied on by the Appel· !ants were not referred to or discussed in the award at all. In support of this contention Mr. Bhandare referred to the decision in _K. P._ _Poulose_ ###### v. State of Kera/a and Another, [1975] 2 s.c.c·. 236. In that case the arbitrator failed to take into account material documents, which were necessary to arrive at for a just and fair decision to resolve the controversy between the parties and it was held that this amounted to legal misconduct on the part of the arbitrator and his award liable to be set aside. This decision is not of much assistance in the case before us as it is not the contention of Mr. Bhandare that the award is bad on the ground of any misconduct of the arbitrator but on the ground that it discloses an error of law on the face of the record. Moreover, our at~ention has not been drawn to any particular document which was essential to resolve the controversy betwen the parties nor has it been demonstrated that any such document was not taken into account by the arbitrator. In view of this, there is no basis to support the contention of Mr. Bhandare which must be rejected. It cannot be even said in this case that the arbitrator was guilty of any legal misconduct or otherwise: The objections to the Award of Shri A.C. Gupta, therefore, fail and are dismissed. There will be a judgment in terms of the Award. Let the decree be drawn up accordingly. In the facts and circumstances of the case, there will be no order as to costs to the hearing before us. N.V.K. A B ### c D E
End of Judgment Record
Browse All Supreme Court of India (1988) Decisions
1988-10-05

GIRJA SHANKAR TIWARI AND ANR. v. HIRDAY RANJAN CHAKRABORTY AND ANR.

This case concerns a dispute over occupancy and vacancy of a shop premises at Rae Bareli under the U.P. Urban Buildings (Regulation of Letting, Rent and Eviction) Act, 1972. The landlord’s successors claimed the premises had fallen vacant and sought allotment under Section 12, which deems vacancy if a landlord ceases to occupy the building or allows non-family occupancy. The premises had been rented originally to M/s Dhacca Swastic Aushadhalaya in 1946/1947. After its dissolution, an employee of the Aushadhalaya, Hirday Ranjan Chakraborty, continued occupying the premises and paid rent in the name of the Aushadhalaya, not in his own name. The Rent Controller found vacancy, and a Rent Control appeal upheld the controller’s view. The Allahabad High Court reversed, treating the Aushadhalaya as the tenant and the rent paid in its name as rent on behalf of Chakraborty, effectively denying deemed vacancy. The Supreme Court reversed the High Court, holding that Chakraborty’s occupation was by someone other than the tenant and that the deemed vacancy under Section 12 had occurred even though the building was not physically vacant. The Rent Controller’s order was restored, and the High Court’s decision set aside, with the appeal allowed.

1988-09-09

U.P. Bhoodan Yagna Samiti v. Braj Kishore

This appeal concerns land grants under the Uttar Pradesh Bhoodan Yagna Act, 1952 (Sections 14 and 15) made in 1968 to respondents described as traders living in Kanpur. The Additional Collector cancelled these pattas in 1976 on grounds that the respondents did not reside in the village where the plots were located, did not belong to the category of landless persons, and that the grants lacked government approval. The Allahabad High Court, in Misc. Writ Petitions, quashed the cancellation order and upheld the grants, holding that the respondents fell within the definition of “landless persons,” notwithstanding their urban residence and business. The UP Bhoodan Yagna Samiti challenged this in a Civil Appeal before the Supreme Court. The Court emphasizes interpreting the statute against its background and the philosophy of the Bhoodan movement, noting reliance on Vinoba Bhave and Jaya Prakash Narayan, and discusses the 1975 Amendment substituting “landless agricultural labourers” for “landless persons” in Section 14. It concludes that grants were to be made in accordance with the Bhoodan Scheme and to landless agricultural labourers resident in the village whose livelihood is agriculture; hence the basis for the amendment and its thrust to correct interpretation. Consequently, the appeals are allowed, the High Court’s judgment is set aside, the Additional Collector’s orders are restored, and costs are awarded to the appellants.

1988-08-16

A.S. GOKHALE v. R.T. OFFICER

Achyut Shivram Gokhale challenged the Bombay Regional Transport Authority’s refusal to issue a five‑day special permit under section 63(6) of the Motor Vehicles Act for the route Bombay–Shirdi, on grounds that the Maharashtra government had issued a scheme (under section 68‑D(3)) conferring exclusive contract carriage rights on the Maharashtra State Road Transport Corporation (MSRTC). The scheme listed seven saved categories and operated to exclude others from contract carriage on those routes, but the appellant argued that such a scheme does not bar special permits under section 63(6). The Regional Transport Authority had demanded a No Objection Certificate from MSRTC, and the Maharashtra State Transport Appellate Tribunal had held that a special permit is not a contract carriage permit and the scheme does not prevent issuing such permits. The Bombay High Court, however, set aside the Tribunal’s view. The Supreme Court clarified the law: a contract carriage permit under section 51 and a special permit under section 63(6) are distinct, though a special permit may share some features with a contract carriage permit. It held that the scheme’s exclusivity pertains to contract carriages under section 51 and does not bar special permits under section 63(6). It also distinguished Andhra Pradesh and Karnataka authorities, and found Adarsh Travels Bus Service distinguishable. The result is that a special permit can be issued notwithstanding the exclusive scheme, and the No Objection Certificate requirement was unwarranted.

1988-05-11

Bharat Petroleum Staff v. Bharat Petroleum Corporation Ltd.

This Supreme Court judgment concerns the pension rights of erstwhile Burmah Shell management staff following nationalisation under the Burmah Shell (Acquisition of Undertakings in India) Act, 1976, and their subsequent transfer to Bharat Petroleum Corporation Limited (the government company). The petitioners, i.e., the Burmah Shell management staff pensioners, sought two reliefs: (i) restoration of the commuted pension after 15 years as laid down in the Supreme Court’s Common Cause decision (AIR 1987 SC 210); and (ii) adequate escalation in pension to protect purchasing power given the rupee’s depreciation and rising living costs. The respondents argued that Burmah Shell’s pension scheme was funded, that the Common Cause decision could not be automatically extended to a public sector undertaking, and that any escalation would require funds beyond the existing pension fund, possibly necessitating government support. The Court held that the petitioners were entitled to a pension hike at the same rate as Hindustan Petroleum Corporation, directing the respondent to implement the increase from May 1, 1988 and to disburse the additional pension by July 31, 1988. It, however, reserved adjudication on restoration of commuted pensions, noting that issue was not to be decided in this petition. The judgment underscores the state’s welfare liability and judicial notice of the rupee’s devaluation, while ensuring a timely remedy for the petitioners.