Supreme Court of IndiaSupreme Court · 2022Division BenchAppeals allowed (to the extent stated).

Jaspal Singh & Others v. The State of Haryana and Others

Case / Petition Number:
Civil Appeal Nos. 7516-7521 of 2022
Neutral Citation:Jaspal Singh & Others v. State of Haryana and Others, 2022 SCR 670

Case Synopsis & Summary

Jaspal Singh & Others v. The State of Haryana and Others concerns land acquisition under the Land Acquisition Act, 1894 for the Jhajjar Thermal Power Plant in Haryana. The Land Acquisition Collector awarded Rs. 16,00,000 per acre; the Reference Court enhanced to Rs. 17,64,350 per acre; the High Court reduced to Rs. 16,00,000 per acre. The appellants contended that lands similarly situated to those acquired for the Arawali Power Company Private Limited should receive compensation at Rs. 25,00,000 per acre, citing the Supreme Court’s decision in that case (Civil Appeal No. 8757 of 2016, decided 05.09.2017). They argued that the lands in Jharli (west side of Bahu Road) and those acquired for Arawali (east side) were across Bahu Road and part of survey No. 73, overlapping geographically, making them similarly situated. The respondents argued that the Arawali decision was in peculiar facts and not to be treated as precedent; they pointed to sale deeds and evidence being post-notice and not reliably comparable. The Court examined the record, notes that the two land parcels are similarly situated and across the same road, and concluded that the just compensation warranted is Rs 22,00,000 per acre, with statutory benefits including interest. The decision clarifies how the Arawali judgment should be interpreted, particularly with respect to sale deeds executed post-section 4. The appeals are allowed to that extent, with costs denied.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • M. R. Shah
  • M. M. Sundresh
Judgment Date
2022-10-20
Court Decision / Holding
Appeals allowed to the extent stated: compensation for lands acquired for Jhajjar Thermal Power Plant is fixed at Rs 22,00,000 per acre with all statutory benefits including interest; however, the appeals arising out of RFAs 4322/2016, 4682/2016, 804/2017, and 805/2017 shall not be entitled to interest on the enhanced amount for the period of delay; no costs.
Final Disposition
Appeals allowed (to the extent stated).

Parties to the Case

Appellants / Petitioners

  • Jaspal Singh and Others

Respondents

  • The State of Haryana
  • Jhajjar Thermal Power Plant

Legal Representation & Advocates

Counsels for Petitioners

  • • Ankit Gyan
  • • Aarsh Choudhary

Counsels for Respondents

  • • Neeraj Kishan Kaul

Provisions of Law Cited

Section 4 of the Land Acquisition Act, 1894Section 6 of the Land Acquisition Act, 1894Section 11 of the Land Acquisition Act, 1894

Legal Doctrines & Maxims

  • Bona fide sale deeds (subsequent sale exemplars) may be considered in peculiar facts of a case
  • Just and reasonable compensation
  • Peculiar facts of the case not to be treated as general precedent

Submissions & Arguments

Contentions of Appellants / Petitioners

The landowners argued that lands acquired for Jhajjar Thermal Power Plant and those for Arawali Power Company Private Limited are similarly situated; they relied on the Arawali Power Company Private Limited decision granting Rs 25,00,000 per acre and contended that the lands across Bahu Road (survey No. 73) are effectively the same parcel of land split by the road. They urged that 25 lakh per acre (subject to reasonable deduction for post‑notice sale deeds) should apply and that the Court should ensure just and reasonable compensation with full statutory benefits.

Contentions of Respondents

The State and Jhajjar Thermal Power Plant argued that the Arawali decision is not binding precedent and that sale exemplars post‑notice cannot automatically control compensation. They pointed to evidence being post‑notice and argued for adherence to the lower award (Rs. 16,00,000 per acre) or an appropriately justified amount based on site-specific evidence. They also opposed treating the two parcels as uniformly situated and emphasized potential differences in timing and context.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (1)

Case NameCitationTreatmentExplanation
Arawali Power Company Private LimitedCivil Appeal No. 8757 of 2016Partly Overruled / LimitedThe Court uses the Arawali decision to justify higher compensation but confines its applicability; the famous caveat in that judgment—“peculiar facts of the case and not to be treated as precedent”—is interpreted narrowly, restricting its general precedential effect and applying it primarily to post‑Section 4 sale deeds.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,998 words•~14 min read

In The Court Record

Jaspal Singh & Others v. The State of Haryana and Others

670 SUPREME COURT REPORTS[2022] 15 S.C.R. 670 [2022] 15 S.C.R. A ## JASPAL SINGH & OTHERS v. THE STATE OF HARYANA AND OTHERS ## B (Civil Appeal Nos. 7516-7521 of 2022) OCTOBER 20, 2022 ## **[M. R. SHAH AND M. M. SUNDRESH, JJ.]** _Land Acquisition Act,1894 – ss.4,6,11 – Compensation – Enhancement of – Lands were acquired for Jhajjar Thermal Power Plant under the provisions of 1894 Act – Acquisition collector_ C _determined and awarded compensation @ Rs. 16,00,000/- per acre – Reference court enhanced amount of compensation @ Rs.17,64,350 per acre – High Court reduced the amount of compensation to Rs. 16,00,000/- per acre – Before Supreme Court, landowners placed reliance upon the decision of the case Arawali Power Company Private Limited where compensation @_ D _25,00,000/- per acre was awarded and contention was raised that the lands acquired in the present case and lands acquired for_ Arawali Power Company Private Limited _are similarly situated – Held: Both the lands in present case and the lands in issue in the case of_ Arawali Power Project _are similarly situated – Further, held that considering_ - E _the Evidence on record and sale instances and considering the fact that landowners shall be entitled to just and reasonable compensation and taking in consideration of the_ Arawali Power Company Private Limited _case into account – Compensation @22,00,000/- per acre was awarded – Judgement and order passed by High Court was modified accordingly._ ## F **Allowing the appeals, the Court** - **HELD: 1. Considering the evidence on record and the sale** - **instances which were relied upon on behalf of the landowners and while considering the fact that the landowners shall be entitled to just and reasonable compensation for the lands acquired and** - G **taking into consideration the decision of this Court in the case of** _**Arawali Power Company Private Limited**_ **, this Court is of the opinion that if the landowners in the present case are awarded compensation at the rate of Rs. 22,00,000/- per acre, the same can be said to be just and reasonable compensation. [Para 8][676-** - H **C-E]** 670 JASPAL SINGH & OTHERS v. THE STATE OF HARYANA AND 671 OTHERS **Arawali Power Company Private Limited** _(Civil Appeal No. 8757 of 2016 and connected appeals decided on 05.09.2017 by the Supreme Court)_ _**–**_ **relied on.** A CIVIL APPELLATE JURISDICTION: Civil Appeal Nos. 75167521 of 2022. From the Judgment and Order dated 21.03.2022 of the High Court of Punjab and Haryana at Chandigarh in RFA Nos. 484 of 2019, 3480 and 3457 of 2014, 4699 of 2015, 4513 and 4515 of 2018. B ## With Civil Appeal Nos. 7524-7531, 7447-7448, 7449-7477, 7478-7512, 7513, 7545-7579, 7544, 7581-7584 of 2022. C Shyam Divan, Rameshwar Singh Malik, Neeraj Kishan Kaul, Sr. Advs., Gaurav Agrawal, Pallav Mongia, Ankush Mangal, Tushar Srivastava, Rakesh Dahiya, Aditya Dahiya, Satyavan Kudalwal, Kapil Dahiya, Akshat Jain, Aditya Dahiya, Deepkaran Dalal, Raunaq Dalal, D Tonish Singh, Dalel Singh, Ajay Pal, Mayank Dahiya, Ms. Priyanka C., Kuldeep Singh Kochaliya, Jitesh Malik, Satish Kumar, Nirnimesh Dube, Ankur S. Kulkarni, Susheel Joseph Cyriac, Ms. Sonia Dube, Ms. Uditha Chakravarthy, M/S. Lex Regis Law Offices, Samar Vijay Singh, Vipin Singh Bansal, Ms. Amrita Verma, Advs. for the appearing parties. The Judgment of the Court was delivered by E ## **M. R. SHAH, J.** 1. Feeling aggrieved and dissatisfied with the impugned common judgment and order dated 21.03.2022 passed by the High Court of Punjab and Haryana at Chandigarh in R.F.A. No. 2086/2016 and other allied first appeals, by which the High Court has allowed the appeals preferred by the respondents herein and has dismissed the appeals preferred by the appellants herein – original claimants/landowners, the original claimants/landowners have preferred the present appeals. F 2. The facts leading to the present appeals in a nutshell are as G under: That the lands situated at village Jharli, District Jhajjar, Haryana came to be acquired for Jhajjar Thermal Power Plant. Notification under Section 4 of the Land Acquisition Act, 1894 (hereinafter referred to as the ‘Act 1894’) came to be issued on 09.04.2007. Declaration under H 672 SUPREME COURT REPORTS [2022] 15 S.C.R. - A Section 6 of the Act, 1894 was issued on 13.11.2007. The Land Acquisition Collector declared the award under Section 11 of the Act, 1894 and determined and awarded compensation at Rs. 16,00,000/- per acre. The Reference Court enhanced the amount of compensation to Rs. 17,64,350/- per acre. The acquiring body/beneficiary as well as the original claimants/landowners both preferred appeals before the High - B Court challenging the judgment and award passed by the Reference Court, awarding compensation at Rs. 17,64,350/- per acre. By the impugned common judgment and order, the High Court has allowed the appeals preferred by the State/acquiring body and dismissed the appeals preferred by the original claimants/landowners and has reduced the - C amount of compensation to Rs.16,00,000/- per acre, as determined and awarded by the Land Acquisition Collector. The impugned common judgment and order passed by the High Court is the subject matter of present appeals at the instance of the original claimants/landowners. - 2.1 At this stage, it is required to be noted that in the present case - D the acquiring lands of village Jharli were on the west side of Bahu Road, Jhajjar, Haryana. Simultaneously, the lands of village Jharli situated on the east side of Bahu Road, Jhajjar, Haryana came to be acquired for Arawali Power Company Private Limited. The said lands were just opposite of the land acquired for Jhajjar Thermal Power Plant and in one case – in the case of Jagvir (appellant in Civil Appeal Nos.7447- - E 7448/2022), the lands acquired for both the projects were out of the same survey No. 73. For acquisition of the lands for Arawali Power Company Private Limited, notification under Section 4 of the Act, 1894 was issued on 16.01.2007. Declaration under Section 6 was issued on 12.04.2007. The Land Acquisition Collector determined and awarded - F compensation at Rs. 16,00,000/- per acre. The Reference Court also determined compensation at Rs.16,00,000/- per acre. However, the High Court enhanced the amount of compensation to Rs. 29,00,400/- per acre. By common judgment and order dated 05.09.2017, this Court allowed the appeals preferred by Arawali Power Company Private Limited and dismissed the appeals preferred by the landowners/original claimants by - G determining compensation at Rs.25,00,000/- per acre (Civil Appeal No. 8757 of 2016 and connected appeals, decided on 05.09.2017). 2.2 Before the High Court, at the time of hearing of the present appeals, the original claimants/landowners relied upon the decision of this Court in the case of Arawali Power Company Private Limited (supra). H ## JASPAL SINGH & OTHERS v. THE STATE OF HARYANA AND 673 OTHERS [M. R. SHAH, J.] However, considering the observations made by this Court while awarding compensation at the rate of Rs. 25,00,000/- per acre that “in the peculiar facts and circumstances of the case and not to be treated as precedent “, the High Court has not followed the said judgment and has determined compensation at the rate of Rs. 16,00,000/- per acre, as determined by the Land Acquisition Collector. Hence, the present appeals at the instance of the landowners/original claimants. 3. Shri Shyam Divan, learned Senior Advocate appearing on behalf of the original claimant/landowner in Civil Appeal Nos. 7447-7448 of 2022, arising out of R.F.A. Nos. 2086 & 2087 of 2016 has vehemently submitted that the lands acquired in the present case for Jhajjar Thermal Power Plant and the lands acquired for Arawali Power Company Private Limited are similarly situated. It is submitted that even in the case of the appellant/landowner/original claimant in Civil Appeal Nos. 7447-7448/ 2022, the land in both the cases have been acquired out of the very land bearing survey No. 73 and in between only one road – Bahu Road is passing. It is submitted that therefore the appellant shall be entitled to the compensation at the rate of Rs. 25,00,000/- per acre, as determined by this Court in the case of _Arawali Power Company Private Limited (supra)_ . 3.1 It is further submitted that the landowners/original claimants are entitled to just compensation. It is submitted that as such there is no difference between the lands acquired for Jhajjar Thermal Power Plant and the lands acquired for Arawali Power Company Private Limited, except that one road – Bahu Road is passing between the lands acquired for both the projects. It is submitted that it may not be that for one part of the land, the compensation will be at Rs. 16,00,000/- per acre and for another part of the very land/survey No. 73, the compensation will be at Rs. 25,00,000/- per acre. Therefore, it is prayed to allow the present appeals accordingly. 3.2 The other learned Senior Advocates/Advocates appearing for the respective landowners/original claimants have adopted the submissions made by Shri Shyam Divan, learned Senior Advocate. A B C D E F G 4. All these appeals are opposed by Shri Neeraj Kishan Kaul, learned Senior Advocate representing the Jhajjar Thermal Power Plant. 4.1 So far as the reliance placed upon the decision of this Court in the case of _Arawali Power Company Private Limited (supra)_ is H 674 SUPREME COURT REPORTS [2022] 15 S.C.R. - A concerned, it is submitted that the said judgment may not be applied as in the said judgment, it is specifically observed by this Court that the said judgment is in the peculiar facts and circumstances of the case and not to be treated as precedent. It is submitted that therefore the High Court has rightly not awarded compensation as awarded in the case of Arawali _Power Company Private Limited (supra)_ . B 4.2 It is submitted that in the present case the claimants relied upon two sale exemplars/sale deeds which were executed in the year 2010, i.e., post Section 4 notification and one sale deed/sale exemplar dated 16.05.2007 was with respect to small parcel of land. It is submitted that therefore the High Court has rightly not relied upon on the sale C exemplars/sale deeds post Section 4 notification. It is submitted that thereafter having observed that the claimants/landowners have not led any evidence to give the comparative geographical location and evidence to the effect that these sale instances are comparable, the High Court has rightly allowed the appeals preferred on behalf of the Jhajjar Thermal D Power Plant and has rightly determined the compensation at the rate of Rs. 16,00,000/- per acre. 4.3 Learned counsel representing the State of Haryana has supported the impugned common judgment and order passed by the High Court and has fully endorsed the submissions made by the learned counsel E appearing on behalf of the Jhajjar Thermal Power Plant. 5. We have heard learned counsel for the respective parties at length. - At the outset, it is required to be noted that with respect to the - lands acquired for Arawali Power Company Private Limited for which - F notification under Section 4 of the Act, 1894 was issued on 16.01.2007, this Court had determined the compensation at the rate of Rs. 25,00,000/- per acre. It is required to be noted that the lands acquired in the present case and the lands acquired for Arawali Power Company Private Limited were of the same village Jharli, District Jhajjar, Haryana. - G The only difference is that the lands acquired for Jhajjar Thermal Power Plant are on the west side of Bahu Road, Jhajjar, whereas the lands acquired for Arawali Power Project were on the east side of Bahu Road, Jhajjar. The lands acquired in both the cases are just across the Bahu Road, Jhajjar, Haryana. At this stage, it is required to be noted that out of the lands acquired, the land bearing survey No. 73 owned by the original - H landowner – Jagvir (appellant in Civil Appeal Nos. 7447-7448 of 2022) JASPAL SINGH & OTHERS v. THE STATE OF HARYANA AND 675 OTHERS [M. R. SHAH, J.] was also acquired for both the projects. The resultant effect pursuant to A the impugned judgment and order passed by the High Court would be that with respect to some portion of land out of survey No. 73 acquired for Jhajjar Thermal Power Plant, the landowner will get compensation at the rate of Rs. 16,00,000/- per acre and with respect to other parcel of land out of survey No. 73 acquired for Arawali Power Project, the B landowner will be getting compensation at the rate of Rs. 25,00,000/per acre. 6. Having considered the location of the lands acquired for Jhajjar Thermal Power Plant as well as Arawali Power Project, we are of the opinion that the lands acquired for both the projects can be said to be similarly situated with some difference in the time gap of issuance of section 4 notification. Once the landowners whose lands have been acquired for Arawali Power Project are held to be entitled to compensation at Rs. 25,00,000/- per acre, the landowners whose lands have been acquired for Jhajjar Thermal Power Plant cannot be denied the just and reasonable compensation. There will be a vast difference in amount of compensation for the lands acquired for Jhajjar Thermal Power Plant and the Arawali Power Project, which as observed hereinabove can be said to be similarly situated. In one case, the landowners/claimants are held to be entitled to compensation at the rate of Rs. 16,00,000/- per acre (in the case of lands acquired for Jhajjar Thermal Power Plant) and with respect to the lands acquired for Arawali Power Project, the landowners/claimants are entitled to compensation at the rate of Rs. 25,00,000/- per acre. 7. It may be true that while determining compensation at the rate of Rs. 25,00,000/- per acre by this Court in the case of _Arawali Power Company Private Limited (supra)_ , the words used are “in the peculiar facts of the case and not to be treated as precedent”. However, the said words “in the peculiar facts of the case and not to be treated as precedent” are to be considered in the context in which the same are used. From the observations and order passed by this Court, wherever the words used are “in the peculiar facts of the case and not to be treated as precedent”, the same can be said to be with respect to consideration of the sale deeds which were executed in the year 2010 (post section 4 notification). As the sale deeds/sale exemplars which were considered by this Court were post section 4 notification, this Court had taken into consideration the sale deeds post section 4 notification by observing that C D E F G H 676 SUPREME COURT REPORTS [2022] 15 S.C.R. - A it was agreed between the parties that the subsequent sale deeds were _bona fide_ and could be taken into consideration. The observations that “in the peculiar facts of the case and not to be treated as precedent” are to be construed while considering the sale deeds executed post section 4 notification. As per the settled position of law, normally the sale deeds/ sale exemplars post section 4 notification may not be taken into - B consideration. However, as it was agreed between the parties that the subsequent sale deeds were _bona fide_ and could be taken into consideration, to that and in the peculiar facts of the case and not to be treated as precedent, this Court had taken into consideration the subsequent sale deeds and determined compensation at Rs. 25,00,000/- - C per acre after giving a reasonable deduction, i.e., 15% deduction. 8. However, at the same time, considering the evidence on record and the sale instances which were relied upon on behalf of the landowners and while considering the fact that the landowners shall be entitled to just and reasonable compensation for the lands acquired and taking into D consideration the decision of this Court in the case of _Arawali Power Company Private Limited (supra)_ , we are of the opinion that if the landowners in the present case are awarded compensation at the rate of Rs. 22,00,000/- per acre, the same can be said to be just and reasonable compensation. The impugned common judgment and order is required to be modified to the aforesaid extent. E 9. Now so far as the landowners in the appeals arising out of RFA Nos. 4322/2016, 4682/2016, 804/2017 and 805/2017 are concerned, considering the order passed by the High Court dated 17.08.2018 passed while condoning the delay in filing/refiling the appeals on condition that the landowners shall not be entitled to interest on the enhanced amount F of compensation, if any, the landowners shall not be entitled to interest for the period of delay in filing/refiling the said appeals before the High Court. 10. In view of the above and for the reasons stated above, the present appeals succeed. The impugned common judgment and order G passed by the High Court is hereby modified and it is observed and directed that the landowners whose lands have been acquired for Jhajjar Thermal Power Plant shall be entitled to compensation at the rate of Rs. 22,00,000/- per acre. The landowners shall also be entitled to all the statutory benefits including interest which may be available under the H Act, 1894. However, it is observed and directed that so far as the JASPAL SINGH & OTHERS v. THE STATE OF HARYANA AND 677 OTHERS [M. R. SHAH, J.] landowners in the appeals arising out of RFA Nos. 4322/2016, 4682/ A 2016, 804/2017 and 805/2017 are concerned, they shall not be entitled to any interest on the enhanced amount of compensation for the period of delay in filing/refiling the appeals before the High Court. 11. All these appeals are allowed to the aforesaid extent. However, in the facts and circumstances of the case, there shall be no order as to B costs. Ankit Gyan (Assisted by : Aarsh Choudhary, LCRA) Appeals allowed. C D E F G H
End of Judgment Record
Browse All Supreme Court of India (2022) Decisions
2022-12-09

MOHD. SABEER @ SHABIR HUSSAIN v. RM, U. P. STATE ROAD TRANSPORT CORP.

The appellant, Mohd. Sabeer (also known as Shabir Hussain), a scrap dealer, was a passenger in a UP State Road Transport Corporation bus when the driver rashly and negligently drove the vehicle, causing a collision near Ghaziabad in 2009. He sustained grave injuries including an amputation of the right lower limb and other bodily injuries. The Motor Accident Claims Tribunal (MACT) awarded Rs. 15,76,465 with interest; the High Court of Delhi enhanced the amount to Rs. 16,70,932. The Disability Certificate recorded 70% permanent disability. The High Court had treated the claimant’s functional disability as 35%, relying on post‑accident income reflected in IT returns, and erred in not adequately recognizing the impact on earning capacity of a self‑employed person who cannot drive. The Supreme Court held that the appellant’s functional disability should be treated as 60% for loss of future earning capacity and that permanent disablement warrants consideration of future prospects in addition to future income. It invoked National Insurance Co. v. Pranay Sethi to apply a 40% addition for future prospects, and directed compensation for prosthetic limb purchase and maintenance, as well as enhanced non‑pecuniary damages. The final award was increased to Rs. 38,70,120 with 9% interest from the date of application, and the appeals were allowed, emphasizing liberal, holistic justice to restore the claimant to his pre‑accident position in light of socio‑economic factors.

2022-01-25

Intercontinental Hotels Group (India) Pvt. Ltd. & ANR. v. Waterline Hotels Pvt. Ltd.

Intercontinental Hotels Group (India) Pvt. Ltd. & Anr. v Waterline Hotels Pvt. Ltd. is a Supreme Court decision addressing appointment of a sole arbitrator under Section 11(6) read with Section 11(12)(a) of the Arbitration and Conciliation Act, 1996, in a dispute arising from a Hotel Management Agreement (HMA) for renovating the Holiday Inn & Suites Bengaluru, Whitefield. The petitioners allege breach by Waterline Hotels, including non-payment of incentive management fee and related charges, culminating in Waterline’s email termination of the HMA on 12 October 2018 after rebranding the hotel as Miraya. The petitioners invoked arbitration; Waterline challenged the enforceability of the arbitration clause on the ground that the HMA is an unstamped instrument under the Karnataka Stamp Act. A Karnataka High Court ad‑interim relief was granted in 2018, but the Supreme Court’s judgment focuses on the scope of judicial interference at the pre‑appointment stage. The Court reiterates a pro‑arbitration stance, noting that arbitrability/validity are generally matters for the arbitrators, with a narrow exception to cut deadwood or to refer for authoritative settlement where necessary, invoking Vidya Drolia. It also analyzes stamp duty, observing that stamp duty has been paid (albeit disputed) and that the question of the correct stamp duty may be resolved later, not as a precondition to appointing an arbitrator. Consequently, the Court appoints Justice A. V. Chandrashekara as a sole arbitrator, directs SIAC to proceed under its rules, and allows the petition in terms stated, while leaving stamp duty issues for arbitration to determine later.

2022-02-01

The State of Sikkim v. Jasbir Singh & ANR

This appeal by the State of Sikkim challenges a High Court judgment upholding a Sessions Judge’s order directing a written notice to the Army’s commanding officer to transfer the case to a court-martial. The case concerns concurrent jurisdiction between a court-martial and an ordinary criminal court under the Army Act for an offence allegedly committed by Lance Naik Jasbir Singh during active service in Sikkim, with the FIR under IPC 302 and related charges. The High Court held that the procedure under Sections 125/126 Army Act, the 1978 Rules (Rules 3-5) and CrPC Rule 475 had not been observed and that the Army authorities had exercised their discretion to prefer a court-martial; thus, the court-martial alone would have jurisdiction. The Supreme Court, however, held that the offence falls into a category with concurrent jurisdiction under Sections 69 and 70 of the Army Act, and that where there is concurrent jurisdiction, the first instance discretion to choose the forum lies with the designated officer under Section 125. In the present case there was no decision by the designated officer to institute proceedings before a court-martial, and the sequence of events showed significant cooperation with the CrPC process. Consequently, the Sessions Judge’s competence to proceed in the criminal court was not in error, the High Court’s order is set aside, and the respondent-accused is to be transferred to civil custody to face trial in the criminal court. The appeal is allowed.

2022-07-22

Hemant Kumar Verma & Ors. v. Employees State Insurance Corporation & Ors.

This writ petition concerns whether junior resident doctors in ESIC-run medical colleges should be eligible for the 50% in-service reservation for postgraduate medical courses, a benefit presently available to Insurance Medical Officers Grade-II (IMO-II) recruited through competitive selection. ESIC recruits IMO-II and provides a 50% in-service quota for PG seats; however junior residents, who complete MBBS under bond and serve as part of ESIC's residency scheme, are not deemed in-service doctors. The petitioners argued parity with IMO-II because their qualifications, duties, and work environment are similar, and urged the Court to treat them as in-service to extend the 50% reservation to their batch. ESIC contends that junior residents are contractual, bond-based appointees governed by the ESIC Residency Scheme; IMO-II is a permanent post governed by the ESIC Staff and Condition of Service Regulations 1959; the bond reduction in 2020 and the 2018/2020 memoranda cannot convert junior residents into in-service doctors. The Court relies on precedents establishing institutional preference in PG admissions—Saurabh Chaudri v. Union of India, Yatin Kuma Jasubahi v. State of Gujarat, and Pradeep Jain v. Union of India — to acknowledge the legitimacy of institutional preference, but ultimately holds that junior residents and regular ESIC doctors are distinct categories and the in-service quota cannot be equitably extended to junior residents. The petition is dismissed.