Janamma and Others v. State of Kerala and Others

Case / Petition Number:
WP(C).No. 7335 of 2006

Case Synopsis & Summary

This writ petition concerns land acquired for the National Thermal Power Corporation project under award No. 465/92. The seven petitioners challenged delays in the reference of their references under Section 18 of the Land Acquisition Act to a competent court and claimed they did not receive any communication from the reference court. The petitioners submitted references for enhancement; however, Exts.P1–P7 letters from the Special Tahsildar asserted that the references were made to the Sub Court, Mavelikkara, but independent inquiry revealed that no such references were received by the Sub Court. In response, the petitioners issued Exts.P8–P14 lawyer notices demanding action and the cases be brought before the Sub Court, Mavelikkara. The petition seeks mandamus or other appropriate relief to ensure prompt reference. The court examined procedural requirements under Rule 16A(2) of the Land Acquisition (Kerala) Rules, Rule 377 and Rule 378(3) of the Civil Rules of Practice, and the Proviso to Rule 16. It held that the Land Acquisition Officer must ensure that the reference is properly made and received by the Court, otherwise the claimant cannot be prejudiced by others' delay. Relying on Jameson v. State of Kerala and Ram Kumar v. Union of India, the court found serious prejudice to petitioners based on inaction. It directed the third respondent to transmit the relevant references to the Sub Court, Mavelikkara within two months, make necessary entries in Form Nos. 21 and 23, reconstruct records if needed, and inform the petitioners.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • K. T. Sankaran
Judgment Date
2006-12-20
Court Decision / Holding
Writ petition allowed; directed the third respondent to transmit the reference records relating to Exts.P1–P7 to the Sub Court, Mavelikkara within two months, ensure that the records are available, and to reconstruct the records if necessary; petitioners to be informed; the writ petition disposed of accordingly.
Final Disposition
Disposed of with directions as above; reference records to be sent to Sub Court, Mavelikkara within two months.

Parties to the Case

Appellants / Petitioners

  • Janamma, Puthen Tharayil, Nangyarkulangara, Chingoli
  • Lakshmikutty Omana, Sreenilayam, Cheppad P.O.
  • Jacob Alexander, Ulluruppil, Chingoli Village, Nangyarkulangara
  • Gomathi, Kunnel Veedu, Chingoli, Karthikappally
  • Chinnamma, Kunjanthundil, Nangyarkulangara, Chingoli
  • Kunjamma, Kanjoor Koikkal, Kottakkakam, Cheppad P.O.
  • Indira, Pallithekkethil, Kanjoor, Kottakkakam, Chingoli

Respondents

  • State of Kerala represented by the Secretary to the Government in the Department of Revenue, Government Secretariat, Thiruvananthapuram
  • District Collector, Alappuzha
  • Special Tahsildar, Land Acquisition (General), Alappuzha

Legal Representation & Advocates

Counsels for Petitioners

  • • George Varghese (Perumpallikuttiyil)
  • • Sreelekha Puthalath
  • • A.R. Dileep

Counsels for Respondents

  • • Government Pleader (L.G. Suresh Babu)

Provisions of Law Cited

Section 18 of the Land Acquisition ActSection 19 of the Land Acquisition ActRule 16A(2) of the Land Acquisition (Kerala) Rules, 1990Rule 377 of the Civil Rules of PracticeRule 378(3) of the Civil Rules of PracticeProviso to Rule 16 of the Land Acquisition (Kerala) RulesForm No. 21Form No. 23

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioners contend that despite filing under Section 18 and seeking reference, no communication or records were received by the Sub Court, and letters Exts.P1–P7 allegedly show references that were never received. They issued lawyer notices Exts.P8–P14 demanding action and urged the Court to refer the cases to the Sub Court, Mavelikkara. They seek mandamus and prompt action, asserting ongoing prejudice and delay in obtaining enhanced compensation.

Contentions of Respondents

Not explicitly detailed in the judgment; Government Pleader sought time for instructions; case disposed of on merits.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
Jameson v. State of Kerala2006 (3) KLT 186PositiveCited as establishing that failure of an opponent to submit records should not be at the claimant's cost; supports timely submission of records to the Reference Court.
Ram Kumar and others v. Union of India and others(1991) 2 SCC 247PositiveIllustrates the duty of the Collector to refer under S.18 and to furnish full information to the court; supports prompt reference and disclosure.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•1,992 words•~10 min read

In The Court Record

Janamma and Others v. State of Kerala and Others

IN THE HIGH COURT OF KERALA AT ERNAKULAM PRESENT : THE HONOURABLE MR. JUSTICE K.T.SANKARAN WEDNESDAY, THE 20TH DECEMBER 2006 / 29TH AGRAHAYANA 1928 **WP(C).No. 7335 of 2006(W** ) PETITIONERS: 1. JANAMMA, PUTHEN THARAYIL, NANGYARKULANGARA, CHINGOLI. 2. LAKSHMIKUTTY OMANA, SREENILAYAM, CHEPPAD P.O. 3. JACOB ALEXANDER, ULLURUPPIL, - CHINGOLI VILLAGE, NANGYARKULANGARA. 4. GOMATHI, KUNNEL VEEDU, CHINGOLI, KARTHIKAPPALLY. 5. CHINNAMMA, KUNJANTHUNDIL, NANGYARKULANGARA, CHINGOLI. 6. KUNJAMMA, KANJOOR KOIKKAL, KOTTAKKAKAM, CHEPPAD P.O. 7. INDIRA, PALLITHEKKETHIL, KANJOOR, KOTTAKKAKAM, CHINGOLI. BY ADVS. M/S.GEORGE VARGHESE(PERUMPALLIKUTTIYIL) SREELEKHA PUTHALATH AND A.R.DILEEP RESPONDENTS: 1. STATE OF KERALA, REPRESENTED BY - THE SECRETARY TO THE GOVERNMENT IN THE DEPARTMENT OF REVENUE, GOVERNMENT SECRETARIAT, THIRUVANANTHAPURAM. 2. DISTRICT COLLECTOR, ALAPPUZHA. 3. SPECIAL TAHSILDAR, LAND ACQUISITION (GENERAL), ALAPPUZHA. GOVERNMENT PLEADER SRI.L.G.SURESH BABU THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON 20/12/2006, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING: ## **APPENDIX** ## **PETITIONERS' EXHIBIT** S: - EXT.P1 TRUE COPY OF THE LETTER DATED 15.3.2005 ISSUED BY THE THIRD RESPONDENT TO THE FIRST WRIT PETITIONER. - EXT.P2 TRUE COPY OF THE LETTER DATED 15.3.2005 ISSUED BY THE THIRD RESPONDENT TO THE SECOND WRIT PETITIONER. - EXT.P3 TRUE COPY OF THE LETTER DATED 15.3.2005 ISSUED BY THE THIRD RESPONDENT TO THE THIRD WRIT PETITIONER. - EXT.P4 TRUE COPY OF THE LETTER DATED 15.3.2005 ISSUED BY THE THIRD RESPONDENT TO THE FOURTH WRIT PETITIONER. - EXT.P5 TRUE COPY OF THE LETTER DATED 15.3.2005 ISSUED BY THE THIRD RESPONDENT TO THE FIFTH WRIT PETITIONER. - EXT.P6 TRUE COPY OF THE LETTER DATED 15.3.2005 ISSUED BY THE THIRD RESPONDENT TO THE SIXTH WRIT PETITIONER. - EXT.P7 TRUE COPY OF THE LETTER DATED 15.3.2005 ISSUED BY THE THIRD RESPONDENT TO THE SEVENTH WRIT PETITIONER. - EXT.P8 TRUE COPY OF THE LETTER DATED 24.9.2005 ISSUED BY THE COUNSEL FOR THE FIRST WRIT PETITIONER TO THE THIRD RESPONDENT. - EXT.P9 TRUE COPY OF THE LETTER DATED 24.9.2005 ISSUED BY THE COUNSEL FOR THE SECOND WRIT PETITIONER TO THE THIRD RESPONDENT. - EXT.P10 TRUE COPY OF THE LETTER DATED 24.9.2005 ISSUED BY THE COUNSEL FOR THE THIRD WRIT PETITIONER TO THE THIRD RESPONDENT. - EXT.P11 TRUE COPY OF THE LETTER DATED 24.9.2005 ISSUED BY THE COUNSEL FOR THE FOURTH WRIT PETITIONER TO THE THIRD RESPONDENT. - EXT.P12 TRUE COPY OF THE LETTER DATED 24.9.2005 ISSUED BY THE COUNSEL FOR THE FIFTH WRIT PETITIONER TO THE THIRD RESPONDENT. EXT.P13 TRUE COPY OF THE LETTER DATED 24.9.2005 ISSUED BY THE COUNSEL FOR THE SIXTH WRIT PETITIONER TO THE THIRD RESPONDENT. EXT.P14 TRUE COPY OF THE LETTER DATED 24.9.2005 ISSUED BY THE COUNSEL FOR THE SEVENTH WRIT PETITIONER TO THE THIRD RESPONDENT. ## **RESPONDENTS' EXHIBIT** S: NIL //TRUE COPY// AHZ/ ## **K.T. SANKARAN, J.** ## **---------------------------------** **W.P.(C).NO. 7335 OF 2006** **--------------------------------Dated this the 20[th] day of December,2006** ## **JUDGMENT** When the Writ Petition came up for admission on 13.3.2006, the Government Pleader appeared for the respondents and sought time to get instructions. The case was thereafter posted on several occasions. Till today, the Government Pleader has not received any instructions in the matter. Therefore, the Writ Petition is being disposed of on the merits. 2. Lands belonging to the petitioners were acquired for the purpose of National Thermal Power Corporation. Award No.465/92 was passed. Applications were submitted by the petitioners under Section 18 of the Land Acquisition Act for reference. The petitioners did not receive any communication from the reference court or from the ## W.P.(C) NO.7335 OF 2006 :: 2 :: office of the second respondent, District Collector. The petitioners filed representations before the third respondent, The Special Tahsildar, Land Acquisition (General). Third respondent issued Exts.P1 to P7 letters to the petitioners individually stating that the reference was made to the Sub Court, Mavelikkara. It is stated that on enquiry, the Writ Petitioners came to know that no such references have been received by the Sub Court, Mavelikkara, as mentioned in Exts.P1 to P7 letters. Thereupon, the petitioners individually caused to issue Exts.P8 to P14 lawyer notices to the third respondent pointing out that the enquiries made in the Sub Court, Mavelikkara revealed that the award was not sent on the date mentioned in the letter issued by the third respondent. The third respondent was requested to take necessary steps immediately. No reply was issued by the third respondent to Exts.P8 to P14 lawyer notices. The prayer in the Writ Petition is to issue a writ of mandamus or any other ## W.P.(C) NO.7335 OF 2006 :: 3 :: appropriate writ, direction or order to refer the cases to the Sub Court, Mavelikkara. 3. When an application for reference is made, it shall be dealt with promptly. Rule 16A(2) of the Land Acquisition (Kerala) Rules, 1990 states that as soon as the reference application is received, the Land Acquisition Officer shall make necessary entries in the Register in Form Nos.21 and 23. Rule 377 of the Civil Rules of Practice provides that when a reference is made by the Collector, the reference shall be accompanied by the records which form the basis of the reference. Rule 378(3) of the Civil Rules of Practice states that the application before the Collector for reference shall be treated as a plaint and investigation shall be with reference to the claim made therein. Proviso to Rule 16 of the Land Acquisition (Kerala) Rules states that in the case of application presented to the Land Acquisition Officer for reference to Court, it shall be ## W.P.(C) NO.7335 OF 2006 :: 4 :: referred within a period of six months from the date of receipt of the application. 4. Rule 18 of the Land Acquisition (Kerala) Rules provides that the Registers mentioned therein shall be maintained in all the offices dealing with land acquisition work. A register of reference applications filed by awardees shall be maintained in Form No.23. Form 21 appended to the Kerala Rules is the form of register of land acquisition suits. The details regarding suits and reference cases are to be shown in the register of land acquisition suits. Column (8) provides the number and date of Collector's reference; column (9) provides the name of the Court and number of the Suit/OP/LAR. Name of Government Pleader engaged for defending the case on behalf of the Government, date on which written statement or counter affidavit was filed, date on which evidence was adduced in Court, date of hearing and date of decision of the Court and the gist of the decision ## W.P.(C) NO.7335 OF 2006 :: 5 :: are to be shown in columns (9) to (14). When an entry is made in the Register in Form No.23, the office of the third respondent is also bound to make necessary entries in the register in Form No.21. When an application for reference is made, it is the duty of the office of the Land Acquisition Officer to see that the reference application reaches the Court and to enquire about the further development of the case. The Land Acquisition Officer cannot simply say that the reference has been made to the Court and that there is no further information. The claimant is not expected to do anything as per the Land Acquisition Act or Land Acquisition (Kerala) Rules after he files an application for reference under Section 18 of the Land Acquisition Act. He need appear only before the Land Acquisition Court when he receives notice issued under Section 20 of the Land Acquisition Act. It is the duty of the Land Acquisition Officer to see that the reference application is promptly dealt with and the ## W.P.(C) NO.7335 OF 2006 :: 6 :: reference is duly made to the Court. The Land Acquisition Officer is bound to satisfy that the reference was duly made and it was received by the Court. Here there is nothing to show that the reference was sent to the Court and it was received by the Court. Except the statement in the letters marked as Exts.P1 to P7, there is no material to indicate that the reference papers were sent to the Court. In **Jameson** v. **State of Kerala** (2006 (3) KLT 186), it was held thus: “.. When the matter comes up before the Land Acquisition Court, the Collector and the claimant would be parties contesting against each other and the failure of such an opponent or opposite party of the claimant to submit the records to the Reference Court should not be at the cost of the claimant...” ## In **Ram Kumar and others** v. **Union of India and** **others** ((1991) 2 SCC 247), the Supreme Court held thus: “Under S.18 of the Act the only requirement for the person interested who had not accepted the award was to move a ## W.P.(C) NO.7335 OF 2006 :: 7 :: written application to the Collector requiring that the matter be referred for the determination of the court. One of the grounds for not accepting the award was the amount of compensation. Once such application was moved it was the duty of the Collector to make a reference to the court. Under S.19 of the Act while making the reference the Collector was required to state for the information of the court the particulars as mentioned in clauses (a) to (d) of sub-section (1) of S.19 of the Act. Thus it was the duty of the Collector to mention not only the situation and extent of land but even particulars of any trees, buildings or standing crops thereon. The agriculturist whose land is acquired may not be fully conversant with the khasra No. or area as entered in the revenue records and the Union of India or the State acquiring such land should not be allowed to take any advantage of such ignorance of the agriculturists. Once an application is moved for making a reference under S.18 of the Act it becomes the duty of the Collector to send full information to the court regarding the entire land acquired and it is thereafter the duty of the court to decide the matter in accordance with law.” 5. In this case, the award was passed in 1992. Exts.P1 to P7 letters issued by the Special Tahsildar would indicate that reference was made on different dates, namely, 6.12.1994, 18.2.1995, ## W.P.(C) NO.7335 OF 2006 :: 8 :: 19.6.1993, 10.3.1993, 14.9.1994, 13.1.1995 and 18.2.1995. Even in 2006, the petitioners have not received any notice from the reference court. In spite of Exts.P8 to P14 lawyer notices issued on 24.9.2005, the Special Tahsildar, Land Acquisition (General), did not say as to what happened to the reference. Valuable rights of the claimants are being defeated by the lethargy shown by the persons concerned in the office of the Special Tahsildar, Land Acquisition. If the petitioners were entitled to get enhanced compensation, they would have got it years before, if reference cases were promptly received by the reference court. The petitioners are seriously prejudiced since the reference cases did not reach before the court within a reasonable time after the date of the award. 6. In the facts and circumstances mentioned above, the Writ Petition is liable to be allowed. Accordingly, there will be a direction to the third respondent to send the records in respect of the ## W.P.(C) NO.7335 OF 2006 :: 9 :: reference applications mentioned in Exts.P1 to P7 to the Sub Court, Mavelikkara expeditiously and at any rate, within a period of two months from the date of receipt of a copy of this judgment. The third respondent shall see that the relevant records are made available before the court and that necessary entries are made in the appropriate registers. The petitioners shall be duly intimated after the reference papers are produced before the Sub Court, Mavelikkara. If necessary, the third respondent may re-construct the records and send the same to the Court, along with a copy of this judgment. The Writ Petition is disposed of as above. **(K.T.SANKARAN) Judge** ahz/ **K.T.SANKARAN, J. ------------------------** **-----------------------W.P.(C)NO.7335 OF 2006** ## **JUDGMENT** 20[th] December, 2006 ------------------------
End of Judgment Record
Browse All High Court of Kerala (2006) Decisions
2006-11-30

Baburaj v. State of Kerala

Baburaj, the appellant, was convicted under Section 302 IPC for intentionally causing the death of his wife Geetha by constrictive neck compression. The Thrissur Sessions Court had sentenced him to life imprisonment on a conviction based on circumstantial evidence. The Kerala High Court heard Crl.A. No. 794 of 2004, challenging that conviction. The occurrence occurred in the early hours of 1 February 2002, approximately at 1:30 A.M., at Engandiyoor, where Geetha was found dead in her home after prior quarrels between husband and wife. The FIR was lodged on 1 February 2002 by Geetha’s brother. Dr. Cyriac Job conducted the post-mortem on 1 February 2002 and found signs of asphyxia with constrictive force on the neck, as well as multiple ante-mortem injuries suggesting a struggle. The prosecution relied on motive—frequent quarrels between the spouses—and the accused’s presence in the house that night to connect him to the crime. The defense contended that timing of death could be earlier than alleged and that the chain of circumstantial evidence was not complete, possibly pointing to accidental death. The High Court evaluated the medical testimony, ocular and accepted witnesses, and found the circumstantial chain sufficient to prove guilt beyond reasonable doubt, applying the principle of last-seen-together, and upholding the Sessions Court’s verdict. The appeal was dismissed, and the conviction affirmed.

2006-11-22

K. Gopi (D/o Late Ex.GS-142996 PNR) v Union of India and others

Petitioner K. Gopi, daughter of late Ex.GS-142996 PNR, sought compassionate appointment in the Border Roads Organisation after her father’s death on 03.03.2002. The petition, filed in 2004, contends that the family, comprising the petitioner, her brother and mother, was very poor and dependent on government employment. An application for compassionate appointment was made on 16.12.2003 but Ext.P4 rejected it, noting a revised policy that the dependent must be a major at the time of death. Subsequently, the government issued policy extensions (Ext.P7 and Ext.P8) allowing a three-year window, and the mother was advised to submit fresh documents. The petitioner argued that completion of 18 years by a dependent at death is not a precondition for eligibility. The respondents asserted that under the revised policy only those who were minor at death qualify; if the son attains 18 later, he may be advised to apply as per rules then in force. The court referred to a Kerala case (O.P.3338/2002) allowing merits-based consideration where there is no laches and noting that policy changes cannot retroactively defeat rights fixed as of death. It also cited Umesh Kumar Nagpal (1994) 4 SCC 138 to acknowledge the need for a reasonable period. Ultimately, the writ petition was allowed, directing the respondents to consider the claim on merits and dispose of it within four months.

2006-11-29

V. Bahuleyan v. State of Kerala and The Secretary to Government, Transport (C) Department, Government Secretariat, Thiruvananthapuram

V. Bahuleyan, a retired Regional Transport Officer, challenged Ext.P5 denying notional promotion to Deputy Transport Commissioner based on a pre-existing select list (Ext.P1) in which he was ranked No.4 as of 15 June 2002. A vacancy for the post arose on 1 December 2002 in the retirement vacancy of Sri Kunhambu, but Bahuleyan, though still in service, was bypassed and superseded by the immediate junior through Ext.P2 dated 6 January 2003. Disciplinary proceedings against him were initiated but later dropped as per Ext.P3 dated 23 August 2003, with his representation Ext.P4 dated 11 February 2004 seeking placement as Deputy Transport Commissioner with effect from 6 January 2003 and arrears. Ext.P5 dated 1 April 2004 rejected the claim. Bahuleyan contends that Note iii to Rule 28(b)(i)(7) of the Kerala State and Subordinate Services Rules provides that an officer included in a select list who is exonerated from major penalties must be promoted on the basis of his position in the list; if fully exonerated, retrospective promotion should be granted. Delhi Jal Board v. Mahinder Singh (JT 2000 (10) SC 158) is cited to support the right to be considered for promotion under Article 16. The High Court holds that Ext.P5 is unsustainable, and Bahuleyan is entitled to notional promotion from 1 December 2002, but no monetary benefits; salary and pension are to be fixed accordingly, and arrears, if any, to be settled within four months. The petition is allowed as above.

2006-12-11

The Correspondent and Chairman Standing Committee, MES, Central College Committee, MES Office, Kozhikode - Rep. by the General Secretary, Muslim Education Society, Kozhikode v. M. Syed Mohammed

This writ petition challenges execution of an order of the University Appellate Tribunal directing re-posting and monetary benefits to the respondent, an employee of a private MES college. The respondent had been moved from M.E.S. College, Kodungallur to M.E.S. College, Mampad, and claimed salary for the period he was kept out of duty. The University Appellate Tribunal held in his favour, and the High Court later directed payment of monetary benefits and posting, but the matter escalated to execution proceedings in which the petitioner (the MES management) contends that Sub Court Kozhikode lacks jurisdiction to execute the order under Calicut University Act, section 60(8). The petition traces the chain of litigation since the Tribunal’s order and a prior High Court order in CRP Nos.895/79 etc. The core issue is where an execution petition under the Tribunal’s order should be heard and executed: should it be the Sub Court with jurisdiction over the private college’s location, or the court where MES’s main office or the employee’s work was situated at the time of the appeal. The court ultimately held that Sub Court Kozhikode has no jurisdiction under section 60(8) and transferred the execution to Sub Court Manjeri, directing expeditious disposal within six months, while disposing of the writ petition.