Supreme Court of IndiaSupreme Court · 1996Division BenchAppeal allowed (no costs)

Jaipur Development Authority v. Mahavir Housing Co-operative Society, Jaipur etc.

Case / Petition Number:
Civil Appeal No. 12662 of 1996

Case Synopsis & Summary

This Supreme Court decision deals with compensation under the Land Acquisition Act in relation to land acquired for Jaipur Urban Development Scheme. The Jaipur Development Authority challenged awards of the Land Acquisition Officer and the Rajasthan High Court in two cooperative-society matters (Jai Ambe Co-operative Housing Society Ltd. and Mahavir Housing Co-operative Society) where compensation had been enhanced by the reference Court. The Court noted collusion and fraud in the acquisition proceedings and shortage of documentary evidence, concluding that the matter could be decided on merits by the Court itself rather than remand. It determined the appropriate quantum of compensation by fixing two times the Land Acquisition Officer’s awards: Rs. 15,000 per bigha for Jai Ambe Co-op Housing Society and Rs. 22,000 per bigha for Mahavir Housing Co-op Society, taking into account market value and the lack of credible evidence. The Court discussed applicable law changes, including the Central Amendment Act 68 of 1984 and amendments to the Rajasthan statutes, and clarified the periods and rates for interest (6% p.a. up to Aug 1, 1987 and 15% p.a. thereafter on enhanced compensation), along with solatium at 30% on enhanced compensation. It held that the additional amount under Section 23(1-A) was not permissible, reaffirming related precedents. The appeals were allowed with no costs, and the reference-court strictures were upheld.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • K. RAMASWAMY
  • FAIZAN UDDIN
  • G.B. PATTANAIK
Judgment Date
1996-09-18
Court Decision / Holding
Appeal allowed. The Court increased compensation to Rs. 15,000 per bigha for Jai Ambe Co-operative Housing Society and Rs. 22,000 per bigha for Mahavir Housing Co-operative Society; interest on enhanced compensation at 6% p.a. from May 25, 1984 to Aug 1, 1987, and 15% p.a. thereafter until deposit; solatium at 30% on enhanced compensation; no additional amount under Section 23(1-A). The decision preserves the reference court’s strictures where applicable and dismisses the entitlement to the additional amount under Section 23(1-A). The appeals are allowed without costs.
Final Disposition
Appeal allowed (no costs)

Parties to the Case

Appellants / Petitioners

  • Jaipur Development Authority

Respondents

  • Mahavir Housing Co-operative Society
  • Jai Ambe Co-operative Housing Society Ltd.
  • State of Rajasthan

Legal Representation & Advocates

Counsels for Petitioners

  • • Dr. Shankar Ghose
  • • A.K. Goel

Counsels for Respondents

  • • Tapas Ray
  • • S.M. Jain
  • • Sushil Kr. Jain
  • • A.P. Dhamija
  • • Mrs. Pratibha Jain
  • • Prakash Shrivastava

Provisions of Law Cited

Land Acquisition Act, 1894Rajasthan Land Acquisition Act, 1953Central Amendment Act 68 of 1984Rajasthan Urban Improvement Act, 1959Rajasthan Urban Improvement Act, 1959 (Amendment Act 29 of 1987)Section 23(1-A) of the Land Acquisition ActSection 28 (proviso)Section 4(1) of the Rajasthan Land Acquisition Act, 1953Section 18 of the Land Acquisition ActSection 11 of the Land Acquisition ActSection 47 of the CPCSections 151 and 152 CPC

Legal Doctrines & Maxims

  • Fraud/unraveling of entire procedure due to collusion; fraud vitiates proceedings
  • Subsequent purchasers cannot have a higher right than the original owner

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant argued that the acquisition and compensation proceedings were tainted by fraud and collusion, with insufficient documentary evidence supporting the claimed market value. Since the reference proceedings were conducted amid irregularities, the Court should determine just compensation on merits rather than rely on the parroted findings of the reference court. The case involved reliance on sale deeds and certificates, but many materials were not properly filed, and the circumstances required the Court to exercise its own judgment to fix a fair amount. The Appellant contended that the High Court's award was inadequate given the evidence and the collusive process.

Contentions of Respondents

The respondents contended that the awards and the additional amounts (Section 23(1-A)) were improperly sought to be altered post-factum, and that the Court should not grant enhanced compensation or the added amounts under Section 23(1-A). They emphasized that the central amendments and the statutory framework govern the permissible remedies and the timing of interest and solatium, arguing that the Court’s interference should be limited and guided by judicial precedents on illegality and jurisdiction.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (6)

Case NameCitationTreatmentExplanation
Umed Industries & Land Development Co. & Ors. v. State of Rajasthan & Ors.[1995] 2 SCC 563PositiveUsed to apply that Central Amendment Act 68 of 1984 would apply from August 1, 1987 to acquisitions in Rajasthan.
Prem Nath Kapur and Anr. v. National Fertilizers Corp. of India Ltd. and Ors.[1996] 2 SCC 71PositiveHeld that the power to grant additional amount under Section 23(1-A) and enhanced interest and solatium arose from amendments under Act 68 of 1984.
Union of India v. Raghubir Singh[1989] 3 SCR 316PositiveConstitution Bench principle that fraud/unravels the entire procedure, justifying jurisdictional remedies.
Bai Shaloiben v. Spl. LA.O.(1996) 4 SCALE 636PositiveEchoes the principle that fraud can nullify improper awards; supports unanimity on illegality due to fraud.
State of Punjab & Ors. v. Mohinder Singh Randhawa & Anr.[1993] Supp. 1 SCC 49Mentioned OnlyCited for reference but not central to the decision on enhancement/illegality.
Jai Ambe Co-operative Housing Society Ltd.—Mentioned OnlyMentioned as a related case; no official citation provided in text.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,154 words•~10 min read

In The Court Record

Jaipur Development Authority v. Mahavir Housing Co-operative Society, Jaipur etc.

A # JAIPUR DEVELOPMENT AUTHORITY _v._ MAHA VIR HOUSING CO-OP., SOCIETY, JAIPUR ETC. ## SEPTEMBER 18, 1996 [K. RAMASWAMY, FAIZAN UDDIN AND G.B. PATTANAIK, JJ.) B _Land Acquisition Act, 1894:_ _Compensation-Award of-In the given circumstances of the case two_ C _times more than what was granted by the Land Acquisition Officer would be the just compensation-Central Amendment Act applicable from August 1, 1987 to the acquisition in State of Rajasthan-Hence only 6% p.a. interest payable prior to 1.8.1987 and thereafter at 15% p.a. on the enhanced compensation till date of deposit in Cowt-Also entitled to solatium on the_ D _enhanced cpmpensation at 30o/u-Not entitled to additional amount._ _Umed Industries & Land Development Co. & Ors._ v. _State of Rajasthan & Ors.,_ (1995] 2 SCC 563; _Prem Nath Kapur and Anr._ v. _National Fe1tilizers Corpn. of India Ltd. and Ors.,_ (1996] 2 SCC 71; _Union of India_ v. _Raghubir Singh,_ (1989] 3 SCR 316 and _Bai Shaloiben_ v. _Sp/. LA.O.,_ (1996) 4 SCALE E 636, relied on. _State of Punjab & Ors._ v. _Mohinder Singh Randhawa & Anr.,_ [1993] Supp. 1 SCC 49, referred to. CIVIL APPELLATE JURISDICTION: Civil Appeal No. 12662 of 1996 Etc. F From the Judgment and Order dated 20.12.9~ of the Rajasthan High Court in R.P. No. 1059 of 1993. G Dr. Shankar Ghose and A.K. Goel for the Appellant. Tapas Ray, S.M. Jain, Sushil Kr. Jain, A.P. Dham.ija, Mrs. Pratibha Jain and Prakash Shrivasatava for the Respondents. The following Order of the Court was delivered : 491 SUPREMECOURTREPORTS (1996)SUPP.6S.C.R. 492 A Leave granted. ,.. Notification under Section 4(1) of the Rajasthan Land Acquisition Act, 1953 was published on August 21, 1969 acquiring a large extent of 484 bighas 11 biswas of land for Jaipur Urban Development Scheme by different notifications. An extent of 4 acres 5 biswas (9845 sq. yds.) relates to B the acquisition in appeal arising out of SLP (C) No. 14811/94 .. ln respect of the appeal rising out of SLP (C) No. 6519/94, an extent of 10 bighas 7 biswas was acquired. The Land Acquisition Officer. determined the compensation by his award dated July 16, 1981 and 9ctober 12, 1981 respectively determining the compensation at the rate of Rs. 5,000 per bigha to C the respondent - Jai Ambe Co-op. Housin~ Society and Rs 7,500 per bigha to the respondent - Mahavir Housing Co-op. Society. On reference, the civil Judge enhanced the compensation at the rate of Rs: 40,000 per bigha. As regards the award of the Civil Judge, an appeal was filed against the respondent - Jai Ambe Co-op. Society Ltd. The learne.d single Judge in D appeal No. 142/92 has confirmed the same by judgment dated May 2, 1994. · As regards the award in favour of Mahavir Housing Co-operative Society, no appeal was filed. But in execution an objection has been raised· regarding additional amount award under Section 23(1-A) which was negatived. On revision, the High Court in Revision No. 1059/93 dated December 20, E 1993 confirmed the sanie. Thus, these appeals by special leave. B When the matter relating to M~avir Housing Co-operative Society initially came up, notice was confined in respect of Section 23(1-A), but later when it was brought to our notice of the fraud and collusi?n between the officers entrusted with the prosecution on behalf of the appellant.and F the claimants, we have indicated to the counsel that we would go into the ·question of determination of the compensation. Thus, these cases are heard together. It is seen that from the evidence adduced before the reference Court in respect of Jai Ambe Co-operative Housing Society except one claimant Mr. Garg, not documentary evidence has been adduced in supG port of the claimant for enhancement. Two awards under Section 26 came to be filed in which one award relating to the Mahavir Housing Co-operative Society and another award relating to the same notification but an amount of Rs. 24,000 per bigha was awarded. As regards the claim in Mahavir Housing Co-operative Society is concerned, they relied upon a H judgment of the High Court in which the High Court has granted to some JAIPURDEV.AUTIIORITYv.MAHAVlRHSG.CO-OP.SOCY. 493 - lands at the rate of Rs. 12 per sq. yd. which relates to the acquisition of A 1964 and also a certificate issued by Tehsildar relating to some other village, which worked out at· the rate. of Rs. 44,000 per acre and the sale deeds in support thereof. One curious fact in both the cases that cannot be lost sight of is that the claimants have purchased these properties after the notification under Section 4(1) was published and a reference came to B be made at their instance to the civil Court. Though an opportunity was ~ven to the appellant, for well over 11 years, no counter affidavit has been filed. As a result, they were set _ex-parte._ Yet another curious aspect that we cannot lose sight of is that the reference Judge has merely with parrot-like _but traditional_ consideration swallowed what with witnesses has C stated that the market value is Rs. 50 per sq. yd. without ~ubjecting to any scrutiny as per the tests laid do~ by this Court. It is also to be noted that the same aspect was repeated by the learned Judge of the High Court in _Jai Ambe Co-operative Housing Society's_ case. The question, therefore, is : what would be the reasonable compen- D · sation to which the claimants are capable to get? In view of the settled legal position that the claimants f>eing the subsequent purchasers cannot have a higher right than that the original owner himself had. They cannot set up any title to the property on the basis of sale deeds and _consideration_ but may be entitled to the compensation obviously getting into the shoes of the E claimant. We need not go into the ques.tion of correctness whether or not . the reference is valid in this case, though open to doubt since t~at question was not raised at any stage much less in this Court. We proceed on the premise that the reference under Section 18 was valid. F As stated earlier, the entire process has gone on in collusion. When we have issued notice to the appellants as to what steps they have taken against the officers who are responsible even for not filing the .appeals or not contesting the matter, an affidavit has been filed in which it was stated that disciplinary action against the Land Acquisition Officer was taken and even the counsel who appeared for the Jaipur Development Authority was G in collusion and steps were taken by laying a complaint before the Bar Council for professional misconduct. We need not further dwell up on that fact but suffice it to state that the acquisition proceedings have proceeded in collusion and, therefore, they did not reflect the correct market value as is available in this case. As seen in _Jai Ambe Co-operative Housing Society's_ H SUPREME COURT REPORTS [1996) SUPP. 6 S.C.R. 494 A _ case, even their own sale deeds under which they have purchased from one Bhagwan Singh, who was said to be the original owner, were not even filed. Under these circumstances, we thought over the matter as to what would be the appropriate course to be adopted in this case. We are of the view that instead of relegating the matter again, we can ourselves decide the B matter on the basis of the evidence on record. Accordingly, we have considered the case on merits. It is seen that the Land Acquisition Officer has awarded compensa. tion at the rate of Rs. 7,500 per bigha to the lands purchased by Mahavir Co-operative Housing Society and Rs. 5,000 per bigha to the lands purC chased by J ai Ambe Co-operative Housing Society Ltd. Having regard to the facts and circumstances, we are of the considered view that two times more than what was granted by the Land Acquisition Officer would be the Just compensation in the given circumstances of the case. Accordingly, we determine the compensation to Jai Ambe Co-operative Housing Society D Ltd. at the rate of Rs. 15,000 per bigha and to the lands of Mahavir housing Co-operative Society Rs. 22,000 per bigha. As regards the State of Rajasthan the Land Acquisition (Amendment) Act, 68 of 1984 was extended w.e.f. April 30, 1987. But the State E legislature had amended the Rajasthan Urban Improvement Act, 1959 by Amendment Act 29 of 1987 w.e.f. August 1, 1987. In _Umed Industries_ & _Land Development Co_._ & _Ors._ v. _State of Rajasthan_ & _Ors.,_ [1995] 2 SCC 563, a Bench of two Judges had held that the Central Amendment Act 68 of 1984 would apply for August 1, 1987 to the acquisition in State of Rajasthan. It is seen that in _Mahavir Housing Co-operative Society's_ case, F possession was delivered on May 24, 1984 after the stay was vacated by the civil Court since that civil Court granted stay of dispo_ssession on October 23, 1983. Therefore, the respondent-Society is not entitled to the interest prior to May 25, 1984. Therefore, the decree as regards payment of interest from the date of the notification till May 24, 1984 is clearly illegal. It is seen G that since that award of the reference Court is dated June 15, 1990, the claimants will be entitled to interest from May 25, 1984 at the rate of 6% per annum till August 1, 1987 and thereafter 15% per annum on the enhai:ced compensation till 'date of deposit in the Court. As regard the solatium is concerned, they are entitled to 30% solatium on the enhanced H compensation. As regards the additional amount under Section 23(1-A) is JAIPUR DEV. AUIBORITY _v._ MAHA VIR HSG. CO-OP. SOCY. 495 concerned, the claimants are not entitled to the additional amount since A the awards came to be passed by the Land Acquisition Officer on October 12, 1981 and July 16, 1981 in Mahavir Housing Co-operative Society and Jai Ambe Co-operative Housing Society Ltd. respectively. In _Prem Nath Kilpur and Anr._ v. _National Fertilizers Corpn. of India_ B _Ltd. and Ors.,_ [1996] 2 SCC 71, considered the entire case law by a bench of three Judges in paragraph 17 had held that the power to grant additional amount under section 23(1-A) and enhanced interest under the proviso to Section 28 and solatium at 30 per cent was due to amendments brought under Act 68 of 1984. Prior thereto the court has no power or jurisdiction c to grant them. Therefore, the additional amount, the excess rate of interest or solatium at 30 per cent granted were without jurisdiction and a nullity. The courts cannot correct the award of the decree in exercise of the power under Sections 151 and 152 C.P.C. This Court has relied upon the Constitution Bench decision in _Union o[ india_ v. _Raghubir Singh,_ (1989) 3 SCR 316. This Court has reiterated the same principle in another recent judg- D ment in _Bai Shakriben_ v. _Spl. LA.O.,_ (1996) 4 SCALE 636. Therefore, objection would be raised in execution under section 47. The award of the additional amount was one of without jurisdiction and so a nullity. c It is contended for the respondent in _Maliavir Housing Co- operative_ E _Society's_ case, that since the award was allowed to become final including grant of additional amount under Section 23(1-A), it is not open to the review at a later date since it is not one of initial lack of jurisdiction but an illegality has been committed in awarding the additional amount. In support thereof, learned counsel relied upon a judgment of this Court in F _State of Punjab & Ors._ v. _Mohinder Singh Randhawa & Anr.,_ [1993) Supp. 1sec49, paragraph 3. It is true that in a case where the proceedings were properly conducted and the order w'as allowed to become final, the mat,ter may be construed to be an order of illegalify. -when it is one of jurisdiction, .this Court has repeatedly, in plethora Qf precedents, had held that the courts have no jurisdiction to award additional amount under Section G 23(1-A) since the Collector had~ already passed the award ,under Section 11 and the benefit of additional amount would be confined to the period between the date of the notification under Section 4(1) and the award under Section 11 when the proceedings were pending-before him. In this case, since we have already recorded the finding that the award became H 496 SUPREME COURT REPORTS (1996) SUPP. 6 S.C.R. - A final due to collusion by the officers and the claimants, the principle of illegality in the award does not apply since fraud unravels the· entire procedure and makes the award a nullity. The appeals are accordingly allowed as indicated above, but in the circumstances, without costs. As regards strictures awarded by the referB · ence Court, they stands upheld. G.N. Appeal allowed.
End of Judgment Record
Browse All Supreme Court of India (1996) Decisions
1996-08-16

Pfizer Ltd. v Mazdoor Congress and ors.

Pfizer Ltd. v Mazdoor Congress and ors is a Supreme Court appeal arising from writ petitions under Article 227 challenging the Bombay High Court’s reversal of Labour Court and Industrial Court findings that Pfizer had not committed an unfair labour practice in terminating two security staff, Waman S. Surve and R.B. Sail. The matter centers on the terminations of Surve and Sail after arrests in a theft case involving Pfizer property and the company’s loss of confidence in their suitability as watch and ward personnel. The Labour Court dismissed the complaints under Section 28 of the MRTU & PULP Act, and the Industrial Court upheld that dismissal; the High Court, however, intervened in a petition under Article 227, allowing an unfair labour practice claim under Item 1(1) of Schedule IV on the grounds of undue haste and ordering reinstatement with back wages. The apex court reverses, holding that undue haste is a question of fact to be determined on evidence and that no case under Item 1(1) was pleaded or proven before the lower fora or the High Court. It stresses that new arguments cannot be introduced at the Article 227 stage absent prior pleadings and evidence. The Court restores the Labour Court’s and Industrial Court’s decisions and allows Pfizer’s appeals, clarifying the evidentiary and pleading boundaries for unfair labour practices in industrial relations law.

1996-01-09

Union of India v. S.S. Uppal and Anr.

This appeal concerns the fixation of seniority for an officer absorbed into the Indian Administrative Service (IAS) from a state civil service quota. Respondent No.1, S.S. Uppal, a Development Officer in Madhya Pradesh’s Commerce and Industry Department, was considered for IAS absorption under Rule 8(2) of the IAS (Recruitment) Rules, 1954. A panel of four officers was prepared for vacancies arising up to 1 February 1989, with Uppal placed at serial No.4, making him eligible only for the February 1989 vacancy. Although the vacancy arose earlier, he was not appointed until 15 February 1989, and on 3 February 1989 the IAS (Regulation of Seniority) Rules were amended to introduce a weightage-based method for determining Year of Allotment (YOA) for those appointed by selection. Uppal challenged Rule 2 of the 1989 Amendment Rules as ultra vires and argued his seniority should be determined by the rules in force on 1 February 1989. The Central Administrative Tribunal accepted that the vacancy occurred before the amendment, so unamended rules should apply. The Supreme Court held that seniority in the IAS is determined by the rules in force on the date of appointment, not the date of vacancy, and that weightage cannot be retrospective unless provided. It emphasized that mere inclusion in a panel does not guarantee appointment and that the Central Government may amend seniority rules from time to time. The appeal was allowed, and the Tribunal’s order set aside.

1996-03-29

Thimmappa v. Siddaramakka

Thimmappa v. Siddaramakka concerns a deed of reconveyance attached to a sale of land. The reconveyance deed provided that if the respondent vendor repaid Rs. 5,000 within eight years from the sale date (July 20, 1968), the sale deed would be executed and registered in her favor. The respondent contended she offered payment before the eight-year period expired and sought specific performance through reconveyance; the appellant allegedly refused. The trial court accepted the respondent's evidence of offer within the period; the appellate court reversed, holding time was the essence of the contract and thus the suit was barred by limitation. The Karnataka High Court then set aside the appellate decree and restored the trial court’s decree. The Supreme Court held that, unless the deed of agreement of sale fixes a date for performance, time is not necessarily the essence of the contract. It found that Thimmappa had agreed to reconveyance conditioned on repayment within eight years, and that the respondent offered payment before expiry while the appellant refused to reconvey. The cause of action arose on expiry of eight years from July 20, 1973, but the suit was filed on July 20, 1976, within the period from the date of refusal (July 19, 1976). The Court concluded the suit was not barred by limitation, dismissed the appeal, and upheld the High Court’s restoration of the trial court’s decree.

1996-11-19

STATE OF UTTAR PRADESH AND ORS. v. V.K. JAIN

State of Uttar Pradesh and Ors. v. V.K. Jain concerns the regulation of compounded entertainment tax for cinema theatres under the Uttar Pradesh Entertainments and Betting Tax Act, 1979 and related Rules. The respondent cinema proprietor sought to reduce seating capacity from 540 to 450 for the 1995-96 year and to opt for the compounded tax system under Rule 24-A. The District Magistrate rejected both applications; the Allahabad High Court quashed that rejection, holding that the District Magistrate had no power to ignore or alter the seating capacity indicated in the option application. The State appealed to the Supreme Court. The Court held that a proprietor cannot enter into a composite agreement indicating a reduced seating capacity from the maximum stated in the licence, and the District Magistrate cannot adopt any seating capacity other than the maximum in the licence for Rule 24-A purposes. To reduce seating capacity, the proprietor must approach the licensing authority under Rule 14 of the U.P. Cinematograph Rules, 1951 to amend the licence, and only then can the amended capacity be used for Rule 24-A calculations. The decision emphasizes that the maximum seats fixed in the licence, not ad hoc figures, determine the governing base for taxation and that post-composition adjustments require proper licensing amendments. The Government suggests a clarifying recast of sub-rule (4) for the post-composition period to avoid litigation.