Case Synopsis & Summary

Jai Krishan (D) TR. LRS. v. State of Uttarakhand concerns compensation under the Land Acquisition Act, 1894 for 36 acres of land in Mussoorie taken for extension of the Lal Bahadur Shastri National Academy of Administration. The Reference Court enhanced compensation for the land from Rs. 1.80 lakh to Rs. 19.76 lakh and for trees from Rs. 1.05 lakh to Rs. 4 lakh. The Uttarakhand High Court, applying the belting-area principle—based on the premise that Mussoorie land is sloppy and hilly—held that a flat rate could not be applied to the entire 36 acres and dismissed 12% additional compensation under Section 23(1A) and 15% interest under the proviso to Section 28. The Supreme Court, in a two‑judge bench, set aside the High Court’s belting-area reasoning, noting that Mussoorie’s status as a tourist hub with immense potential value did not justify presuming non-uniform land value without pleadings or evidence. It affirmed the Reference Court’s valuation of Rs. 54,896 per acre for the land and held that the award under Section 18 is to be understood in the broader statutory scheme. The Court also held that the landowner claim for 12% enhanced compensation under Section 23(1A) from the date of notification and 15% interest under Section 28 should be awarded, with payment within three months. It cites Gurpreet Singh, Sunder, and Chhanga Singh for principles on staged compensation and interest on excess amounts.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • Sudhansu Jyoti Mukhopadhaya
  • Dipak Misra
Judgment Date
2014-07-01
Court Decision / Holding
Appeals allowed in part. The High Court’s belting-area reasoning is set aside; the reference court’s valuation is upheld; the appellants are entitled to 12% enhanced compensation under Section 23(1A) from the date of publication of the notification and 15% interest under the proviso to Section 28 of the LA Act, with payment within three months. There shall be no order as to costs.
Final Disposition
Appeals allowed (partly)

Parties to the Case

Appellants / Petitioners

  • Col. Jai Krishan (D) TR. LRS.
  • Mahesh Chandra

Respondents

  • State of Uttarakhand

Legal Representation & Advocates

Counsels for Petitioners

  • • Mohit D. Ram

Counsels for Respondents

  • • Saurabh Trivedi
  • • Ashutosh Kr. Sharma
  • • Anil Katiyar
  • • Rahul Narayan

Provisions of Law Cited

Section 4 of the Land Acquisition Act, 1894Section 6Section 23(1)Section 23(1A)Section 23(2)Section 28Section 34Section 31Section 27Section 18

Legal Doctrines & Maxims

  • Belting area principle in land valuation (sectional principle used in hills/hilly terrain)
  • Two-stage determination of compensation under the LA Act (first award under sections 23(1)/23(1A)/23(2) with interest under section 34; second stage on reference under section 18 with further deposits)
  • Execution cannot go behind the decree (exceptional principle discussed in relation to solatium/interest in execution)
  • Interest on excess compensation under Section 28
  • Interest on solatium as discussed in Sunder and Chhanga Singh (execution/claims interplay)

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants argued that the High Court erred in applying the belting-area principle to determine compensation, especially since Mussoorie is a renowned tourist location with adjacent development and the exemplar sale deed showed Rs. 54,896 per acre; in absence of pleadings, the belting-area approach cannot be invoked. They urged that 12% additional compensation under Section 23(1A) and 15% interest under the proviso to Section 28 were mandatory and should be awarded from the date of notification. They also pointed to the procedural timeline for deposits and the need to align deposits with the enhanced amounts on reference.

Contentions of Respondents

The respondents contended that Mussoorie’s land is sloppy and hilly, justifying the belting-area method for a true market value, and argued against automatic application of the Section 23(1A) enhancement and interest. They maintained that the High Court correctly considered the belting-area principle and that the award should reflect the established rates and the appropriate method of deposit based on the statutory framework.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (3)

Case NameCitationTreatmentExplanation
Gurpreet Singh v. Union of India2006 (7) Suppl. SCR 422PositiveCited as authority on the stages and deposits of compensation, and the corresponding application of Sections 23(1) and 23(1A).
Sunder v. Union of India2001 (3) Suppl. SCR 176PositiveCited to support the proposition that solatium and related interest concerns arise in excess compensation and execution.
Chhanga Singh and Anr. v. Union of India and Anr.2012 (4) SCR 275PositiveCited for guidance on the application of staged compensation and the interplay of judgments with respect to solatium and interest.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•5,227 words•~24 min read

In The Court Record

Jai Krishan (D) TR. LRS. v. State of Uttarakhand

A # [2014] 6 S.C.R. 996 # JAi KRISHAN (D) TR. LRS. _v._ # STATE OF UTTARAKHAND & ORS. (Civil Appeal Nos. 5889-5893 OF 2014) B # JULY 01, 2014 # **[SUDHANSU JYOTI MUKHOPADHAYA AND DIPAK MISRA, JJ.)** _Land Acquisition Act, 1894:_ c _ss.23(1), 23(1A), 23(2), 28 -Acquisition of 36 acre of land in Mussorie_ - _For extension of Lal Bahadur Shastri National_ - - _Academy Award of compensation Enhanced by reference_ - _court High Court applying principle of belting area held that_ 0 _[land ][in Mussorie is ][sloppy ][and ][hilly ][and, therefore, ][for ] assessing true market value, flat rate cannot be applied for entire 36 acres and also rejected claim of 12% additional compensation u/s.23(1A) and interest_ @ _15% p.a. as_ - _provided under proviso to s.28 Held: High Court noticed thai Mussoorie is an important tourist place and it is the land of_ E _immense potential value, but without any basis or pleadings, presumed that total land in Mussoorie is sloppy and hilly_ - _High Court also accepted that the market value of the land in question is Rs. 54, 8961- per acre as decided by the reference court; therefore in absence of any pleading on the_ F _part of State, it was not open for the High Court to apply the_ - _principle of belting area It is not disputed that the site of new town of the acquired land is almost at the same elevation as Mussoorie as it has been developed as a Hill resort and has_ - _immense potential value It was adjacent to the Lal Bahadur_ G _Shastri National Academy, which was the beneficiary of such_ - _acquisition For the said reason, the part of the impugned judgment in so for as it related to the valuation of land is set aside and the award passed by the reference court_ is _upheld_ - _The reference court awarded enhanced compensation but_ **H** 996 JAi KRISHAN (D) TR. LRS. _v._ STATE OF UTTARAKHAND 997 A _deposited the amount in the Court after expiry of one year_ - A _In the circumstances, the appellants are also entitled to_ - _interest@ 15% p.a. under proviso to s.28 of the Act High :court failed to notice that the provisions of s.23(1A) of the Act 'are mandatory and the claimants-appellants are also entitled to 12% enhanced compensation for the period commencing_ B _from the date of publication of Notification uls. 4 of the Act._ _ss.23(1), 23(1A), 23(2), 28_ - _In the scheme of the Act, it is seen that the award of compensation is at different stages_ - - _The first stage occurs when the award is passed Obviously,_ c _the award takes in all the amounts contemplated by ss.23(1), 23(1-A), 23(2) and the interest contemplated by s.34 of the Act_ - _The second stage occurs on_ a _reference u/s. 18 of the_ - _Act When the reference court awards enhanced compensation, it has necessarily to take note of the enhanced amounts payable uls.23(1), s.23(1-A), s.23(2) and interest on_ D _the enhanced amount as provided in s. 28 of the Act and costs in terms of s._ 27 - _The Collector has the duty to deposit these_ - _amounts pursuant to the deemed decree thus passed This has nothing to do with the earlier deposit made or to be made under and after the award_ - _If the deposit made, falls short of_ E _the enhancement decreed, there can arise the question of appropriation at that stage, in relation to the amount enhanced on the reference._ c **A Notification under Section 4 of the Land Acquisition Act, 1894 was issued on 14th September, 1977 for the purpose of acquiring land measuring 36 acres situated at Glenmire Estate, Cosycot and Cosynook in Mussoorie. The acquisition was so made for the purpose of extension of Lal Bahadur Shastri National Academy, Mussoorie. The Special Land Acquisition Officer determined the compensation at Rs. 4.89 Lacs. The appellant-claimants filed reference under Section 18 of the Act.** F G **The reference court enhanced the amount of** H 998 SUPREME COURT REPORTS [2014] 6 S.C.R. A compensation of land from Rs.1.80 lacs to Rs.19.76 lacs and that of trees from Rs.1.05 lacs to Rs.4 lacs. Aggrieved, the State filed appeal before the High Court. The High Court applied the principle of Belting area and held that the land in Mussorie is sloppy and hilly and, therefore, for B assessing true market value, flat rate cannot be applied for entire land of 36 acres. The High Court also rejected the claim of 12% additional compensation under Section 23(1A) and interest @ 15% per annum as provided under proviso to Section 28 of the Act. The instant appeal was c filed challenging the order of the High Court. ## Partly allowing the appeal, the Court HELD: 1. The High Court noticed that Mussoorie is an important tourist place and it is the land of immense o potential value. But without any basis or pleadings, the High Court presumed that total land in Mussoorie is sloppy and hilly. The High Court though noticed the exemplar sale-deed dated 31.3.1977 which showed the market value of the land at Rs. 54,896/- per acre and the E said sale-deed pertained to the land nearer to the Lal Bahadur Sastri National Academy, but without any basis, observed that the rate mentioned in the sale-deed cannot be applied as exemplar for entire land acquired. The value of the land cannot be said to be same for all the 36 acres F acquired as part of the land would be nearer to it and part of it would be a far. The said observation made by the High Court was not based on any evidence but on presumption and surmises. It cannot be a ground that the Mussoorie is a hilly place and therefore the principle of Belting area is to be applied. It was not the case of the G State of U.P. that in all land acquisition proceedings in Mussoorie, the principle of .Belting area is applied. In this background, on mere presumption it was not open to the High Court to apply principle of belting area for determination of compensation. The High Court also H accepted that the market value of the land in question was JAi KRISHAN (0) TR. LRS. _v._ STATE OF 999 UTIARAKHAND Rs. 54,896/- per acre as decided by the reference court; A therefore in absence of any pleading on the part of State of U.P., it was not open for the High Court to apply the principle of belting area. It was not disputed that the site of new town of the acquired land was almost at the same elevation as Mussoorie as it was developed as a Hill B resort and had immense potential value. It was adjacent to the Lal Bahadur Shastri National Academy, which was the beneficiary of such acquisition. For the said reason, the part of the impugned judgment passed by the High Court in so for as it related to the valuation of land is set c aside and the award passed by the reference court under Section 18 is upheld. [Paras 10, 11 and 12] [1004-G-H; 1005-A-H] 2. In the scheme of the Act, it is seen that the award of compensation is at different stages. The first stage D occurs when the award is passed. Obviously, the award takes in all the amounts contemplated by Section 23(1), Section 23(1-A), Section 23(2) and the interest contemplated by Section 34 of the Act. The whole of that amount is paid or deposited by the Col Ir ctor in terms of E Seclion 31 of the Act. At this stage, no shortfall in deposit is contemplated, since the Collector has to pay or deposit the amount awarded by him. If a shortfall is pointed out, it may have to be made up at that stage and the ·principle of appropriation may apply, though it is difficult to F contemplate a partial deposit at that stage. On the deposit by the Collector under Section 31 of the Act, the first stage comes to an end subject to the right of the claimant to notice of the deposit and withdrawal or acceptance of the amount with or without protest. The second stage G occurs on a reference under Section 18 of the Act. When the reference court awards enhanced compensation, it has necessarily to take note of the enhanced amounts payable under Section 23(1 ), Section 23(1-A), Section 23(2) and interest on the enhanced amount as provided H F G H 1000 SUPREME COURT REPORTS [2014] 6 S.C.R. A in Section 28 of the Act and costs in terms of Section 27. The Collector has the duty to deposit these amounts pursuant to the deemed decree thus passed. This has nothing to do with the earlier deposit made or to be made under and after the award. If the deposit made, falls short B of the enhancement decreed, there can arise the question of appropriation at that stage, in relation to the amount enhanced on the reference. The claimants are entitled to additional compensation @ 12% per annum as provided u/s 23(1A) of the L.A. Act. [Para 14) [1007-E-H; 1008-A-D] c _Gurpreet Singh_ vs. _Union of India_ (2006) 8 SCC 457: 2006 (7) Suppl. SCR 422 - relied on. 3.The reference court awarded enhanced compensation but such amount was deposited in the D Court after the date of expiry of period of one year. In the circumstances, the appellants are also entitled to interest @ 15% per annum under proviso to Section 28 of the L.A. Act. The High Court failed to notice that the provisions of Section 23(1A) of the L.A. Act are mandatory and the · E claimants-appellants are entitled to 12% enhanced compensation for the period commencing from the date of publication of Notification under Section 4 of the L.A. Act. The High Court also failed to appreciate that the appellants are entitled to interest@ 15% per annum as F contemplated under proviso to Section 28 of the L.A. Act as the compensation was paid after the expiry of period of one year. The High Court instead of dismissing the review petition ought to have condoned the delay, reason of which was sufficiently explained by appellant and G ought to have allowed the revision application in favour of the appellant. The part of the impugned judgment is set aside so far as it related to payment of compensation for the land and the award passed by the reference court to the extent above and the respondents are directed to pay 12% enhanced compensation in terms of Section H 1001 # JAi KRISHAN (D) TR. LRS. _v._ STATE OF UTTARAKHAND 23(1A) and another 15% interest in terms of proviso to A· Section 28 of the L.A. Act. [Paras 17 to 20) [1010-E-H; 1011-A-C] _Sunder vs. Union of India_ (2001) 7 SCC 211: 2001 (3) Suppl. SCR 176 ; _Chhanga Singh and Anr. vs. Union of_ B _India and Anr._ (2012) 5 sec 763: 2012 (4) SCR 275- relied on. Case Law Reference 2006 (7) Suppl. SCR 422 Relied on Para 14 2001 (3) Suppl. SCR 176 Relied on Para 16 2012 (4) SCR 275 Relied on Para 16 CIVIL APPELLATE JURISDICTION Civil Appeal Nos.5889-5893 of 2014 From the Judgment and Order dated 16.07.2005 in FA No.325/1995, FA No. 56/2001 dated 04/07/2008 in RA No. 87/ 2005, DCA No.7478/2005 dated 26/02/2010 in RA No. 35/ 2010, DCA No: 636/2010 of the High Court of Uttarakhand at E Nainital. Mohit D. Ram, for the Appellants. Saurabh Trivedi, Ashutosh Kr. Sharma, Anil Katiyar, Rahul Narayan for the respondents. The Judgment of the Court was delivered by SUDHANSU JYOTI MUKHOPADHAYA, J 1. Leave gran~d. 2. These appeals are directed against the judgment and 'order dated 16th July, 2005 passed by the High Court of Uttaranchal (now Uttarakhand) at Nainital in first Appeal No. 56 of 2001 (Old No.325/1995). By the impugned judgment, the Division Bench of the High Court partly allowed the appeal n 1002 SUPREME COURT REPORTS [2014] 6 S.C.R. . A preferred by the State of U.P., set aside part of the judgment and award dated 23rd March, 1995 passed by the Reference Court. 3. The factual matrix of the case is as follows: B A Notification under Section 4 of the Land Acquisition Act, 1894 was issued on 14th September, 1977 for the purpose of acquiring land measuring 36 acres situated at Glenmire Estate, cosycot and cosynook in Mussoorie. The acquisition was so made for the purpose of extension of Lal Bahadur Shastri C National Academy of Administration, Mussoorie. Thereafter follow up Notification under Section 6 of the LA.Act was issued on 30th January, 1978 which was also published. The possession of the land was taken over on 3rd July, 1986. The Special Land Acquisition Officer, after hearing the parties D passed the award on 27th November, 1984 determining the amount of compensation at Rs.4,89,615.75. 4. _Col. Jai Krishan_ (since deceased) represented by Lrs. (appellant herein) and Mahesh Chandra- respondent no.8, got E filed reference under Section 18 of the L.A. Act. The said reference No. L.A.154 of 1985 heard by the Additional District Judge, Dehradun. The aforesaid claimants alleged before the Reference Court that considering the fact that Mussoorie is a famous tourist place, its land is of immense potential value, the market value of the land in question is Rs.25 lakh per acre. As F such they claimed compensation for 36 acres of acquired land. They further claimed that the value of the constructed building cannot be assessed less than Rs. 100/- per sq. feet and, therefore, considering the plinth area of 3786 sq. feet of Glenmire building, 2528 sq. ft. of Cosynook building and other G construction, the valuation should be Rs.6,31,400/- and after deducting the amount on account of depreciation factor the value of building is Rs. 4,73,550/-. There were 6990 trees on ( the aforesaid 36 acres of land. The claimants also submitted before the reference court that considering the fact that value H of the trees which has been assessed @ Rs.15/- per tree, JAi KRISHAN (D) TR. LRS. _v._ STATE OF 1003 UTTARAKHAND [SUDHANSU JYOTI MUKHOPADHAYA, J.] should have been at least Rs.50/- per tree. In reply, the stand of the State of U .P. was that the claimants have already claimed Rs.7,50,000/- as compensation for the acquired land and as such they are not entitled to claim any amount more than that. It was further pleaded that the land being sloppy a_nd uneven as such it cannot be assessed more than Rs.5,000/- per acre. The respondents based their claim on the basis of the rate shown in exemplar sale deed dated 26th December, 1976. 5. The Reference Court after framing necessary issues, taking into consideration the evidence and hearing the parties enhanced the amount of compensation of land from Rs.1,80,000/- to Rs.19,76,000/- and that of trees from Rs.1,05, 155.50 to Rs.4,00,000/-. Aggrieved by the order passed by the Reference Court the State and Union of India preferred the appeal. A B C D 6. The Division Bench of Uttarakhand High Court by the impugned judgment dated 16th July, 2005 applied the principle of Belting area on following presumption: _"No doubt that Mussoorie is an important tourist place and its land is of immense potential value but simultaneously it is also true that the land in Mussoorie is sloppy and hilly. As such for assessing_ a _true market value that flat rate, for entire land of 36 acres, cannot be applied."_ 7. The claimants also claimed 12% additional compensation u/s 23(1A) of the L.A. Act, which the Court below had not granted. The claimants also claimed that they were entitled to receive a sum of Rs. 7,01,875/- towards Fuel value/ Timber value of the tree standing on the acquired land as approved by the retired Forest Ranger. They also pleaded that the compensation having been paid after more than one year from the date on which possession was taken, they are entitled for interest @ 15% per annum as provided under proviso to Section 28 of the L.A. Act. Such claim was made by the E F G H 1004 SUPREME COURT REPORTS [2014) 6 S.C.R. A appellant and another by means of cross-objections. However, the High Court without deliberating on such issues as raised in the cross objections passed the impugned judgment. In the circumstances, the appellant and another preferred Review Petition No. 87 of 2005 before the High Court with a petition B for condonation of delay. 8. The impugned judgment was delivered on 16th July, 2005 and a review petition was filed on 15th September, 2005 i.e. after 30 days delay. The appellant and another took specific C plea that their lawyer used to come from Allahabad to Nainital who when came to know about the judgment, applied for the certified copy of it on 4th August, 2005 which was delivered on 9th August, 2005. Thereafter sometime was taken to file the review petition. The High Court dismissed the petition for condonation of delay and review petition on the ground of nonD prosecution. The restoration petition filed by the appellant was also dismissed. 9. Learned counsel for the appellants submitted that the High Court wrongly applied the principle of belting area. The E 36 acres of land is adjacent to the Lal Bahadur Shastri National Academy of Administration. Mussoorie and is located at tourist spot. He further contended that the appellants were entitled for 12% additional compensation u/s 23(1A) in addition 15% solatium u/s 28 of the L.A.Act in view of delayed payment of F compensation after more than one year. The stand of the learned counsel for the respondent-State is that the High Court rightly applied the principle of belting area as the land is sloppy and uneven. 10. As noticed above, the High Court noticed that G Mussoorie is an important tourist place and it is the land of immense potential value. But without any basis or pleadings, the High Court presumed that total land in Mussoorie is sloppy and hilly. The High Court though noticed the exemplar sale-deed dated 31..3.1977 (paper no. 17-C) which shows the market H value of the land at Rs. 54,896/- per acre and the said sale- JAi KR I SHAN (D) TR. LRS. _v._ STATE OF 1005 UTIARAKHAND [SUDHANSU JYOTI MUKHOPADHAYA, J.] deed pertains to the land nearer to the Lal Bahadur Sastri National Academy. But without any basis, the High Court observed as under: _'We are of the view that the rate mentioned in this saledeed cannot be applied as ·exemplar for entire land acquired. Value of the land cannot be said to be same for all the 36 acres acquired as part of the land would be nearer to it and part of it would be_ a _far._ " The aforesaid observation made by the Division Bench of the High Court is not based on any evidence but on presumption and surmises. It cannot be a ground that the Mussoorie is a hilly place and therefore the principle of Belting area is to be applied. It was not the case of the State of U.P. that in all land acquisition proceedings in Mussoorie the principle of Belting area is applied. In this background on mere presumption it was not open to the High Court to apply principle of belting area for determination of compensation. The High Court has also accepted that the market value of the land in question is Rs. 54,896/- per acre as decided by the Reference Court; therefore in absence of any pleading on the part of State of U.P. it was not open for the High Court to apply the principle of belting area. 11. It has not been disputed that the site of new town of the acquired land is almost at the same elevation as Mussoorie as it has been developed as a Hill resort and has immense potential value. It is adjacent to the Lal Bahadur Shastri National Academy, which is the beneficiary of such acquisition. 12. For the reason aforesaid, the part of the impugned judgment dated 16th July, 2005 passed by the High Court in so for as it relates to the valuation of land is set aside and the award passed by the Revisional Court under Section 18 is upheld. A B C D E F G H 1006 SUPREME COURT REPORTS [2014] 6 S.C.R. A 13: The provisions of Section 23(1A) of the L.A. Act mandate as follows: B _"23 Matters to be considered in determining_ ' - _compensation. (1) In determining the amount of compensation to be awarded for land acquired under this Act, the Court shall take into consideration_ _first, the market value of the land at the date of the publication of the notification under section 4, sub-section (1 );_ c _secondly, the damage sustained by the person interested, by reason of the taking of any standing crops or trees which may be on the land at the time of the Collector's taking possession thereof,·_ D _thirdly, the damage (if any}, sustained by the person interested, at the time of the Collector's taking possession of the land, by reason of severing such land from his other land;_ E F _fourthly, the damage (if any), sustained by the person interested, at the time of the Collector's taking_ possession _of the land, by reason of the acquisition injuriously affecting his other property, movable or immovable, in any other manner, or his earnings;_ _fifthly, if, in consequence of the acquisition of the land by the Collector, the person interested is compelled to change his residence or place of business, the reasonable expenses (if any) incidental to such change; and_ G _sixthly, the damage (if any) bona fide resulting from diminution of the profits of the land between the time of the publication of the declaration under section 6 and the time of the Collector's taking_ possession _of the land._ H JAi KRISHAN (D) TR. LRS. _v._ STATE OF 1007 UTTARAKHAND [SUDHANSU JYOTI MUKHOPADHAYA, J.] _[(1 A) In addition to the market-value of the land, as above_ A _provided, the Court shall in every case award an amount calculated at the rate of twelve per cent per annum on such market value for the period commencing on and from the date of the publication of the notification under Section 4, sub-Section (1 ), in respect of such land to the_ B _date of award to the Collector or the date of taking possession of the land, whichever is earlier."_ _Explanation- In computing the period referred to in this sub-section, any period or periods during which the proceedings for the acquisition of the land were held up on account of any stay or injunction by the order of any Court shall be excluded.]"_ C 14: _In Gurpreet Singh vs. Uni<;m of India,_ (2006) 8 SCC 457 this Court noticed the claim which envisages award of D :::ompensation at different stages. In all the stages, it is necessary to take note of the provisions of Sections 23(1) and 23(1-Af In Gurpreet Singh (supra) this Court held as under: _"32. In the scheme of the Act, it_ is _seen that the award of_ E _compensation_ is _at different_ stages. _The first stage occurs when the award is_ passed. _Obviously, the award takes in all the amounts contemplated by Section 23(1), Section 23(1-A), Section 23(2) and the interest contemplated by Section 34 of the Act. The whole of that amount_ is _paid or deposited by the Collector in terms of Section 31 of_ F _the Act. At this stage, no shortfall in deposit_ is _contemplated, since the Collector_ has _to pay or deposit the amount awarded by him. If_ a _shortfall_ is _pointed out, it may have to be made up at that stage and the principle of appropriation may apply, though it_ is _difficult to_ G _contemplate_ a _partial deposit at that stage. On the deposit by the Collector under Section 31 of the Act, the first stage_ comes _to an end subject to the right of the claimant to notice of the deposit and withdrawal or acceptance of the amount with or without protest._ H G H 1008 SUPREME COURT REPORTS [2014) 6 S.C.R. A s c _33. The second stage occurs on a reference under Section 18 of the Act. When the Reference Court awards enhanced compensation, it has necessarily to take note of the enhanced amounts payable under Section 23(1), Section 23(1-A), Section 23(2) and interest on the enhanced amount as provided in Section 28 of the Act and costs in terms of Section 27. The Collector has the duty to deposit these amounts pursuant to the deemed decree thus passed. This has nothing to do with the earlier deposit made or to be made under and after the award. If the deposit made, falls short of the enhancement decreed, there can arise the question of appropriation at that stage, in relation to the amount enhanced on the reference._ " In view of the decision in _Gurpreet Singh(Supra),_ we hold D that the claimants are entitled to additional compensation @ 12% per annum as provided u/s 23(1A) of the L.A. Act. 15. Section 28 of the L.A. Act deals with interest payable on excess compensation which reads as under: E F "28. _Collector may be directed to pay interest on excess compensation.- -If the sum which, in the opinion of the Court, the Collector ought to have awarded as compensation is in excess of the sum which the Collector did award as compensation, the award of the Court may direct that the Collector shall pay interest on such excess at the rate of 67 [nine per centum] per annum from the date on which he took possession of the land to the date of payment of such excess into Court:_ G H _[Provided that the award of the Court may also direct that where such excess or any part thereof is paid into Court after the date of expiry of a period of one year from the date on which possession is taken, interest at the rate of fifteen per centum per annum shall be payable from the date of expiry of the said period of one year on the_ JAi KRISHAN (D) TR. LRS. _v._ STATE OF 1009 UTIARAKHAND [SUDHANSU JYOTI MUKHOPADHAYA, J.] _amount of such excess or part thereof which has not been paid into Court before the date of such expiry.]."_ A 16. In _Sunder vs. Union of India,_ (2001) 7 SCC 211 this Court held that the interested pecsons are also interested on amount of solatium. The Court further observed as under: B _"15. When the court is of the opinion that the Collector should have awarded_ a _larger sum as compensation the court has to direct the Collector to pay interest on such excess amount. The rate of interest is on_ a _par with the rate indicated in Section 34. This is so provided in_ C _Section 28 of the Act. xx xx xx"_ In _Gurpreet Singh_ (supra) the reasons in this regard was explained as under: _"54. One other question also was sought to be raised and_ D _answered by this Bench though not referred to it. Considering ·that the question arises in various cases pending in courts all over the country, we permitted the counsel to address us on that question. That question is whether in the light of the decision in Sunder(supra) the_ E _awardeeldecree-holder would be entitled to claim interest on solatium in execution though it is not specifically granted by the decree. It is well settled that an execution court cannot go behind the decree. If, therefore, the claim for interest on solatium had been made and the same_ F _has been negatived either expressly or by necessary implication by the judgment or decree of the Reference Court or of the appellate court, the execution court will have necessarily to reject the claim for interest on solatium .based on Sunder(Supra) on the ground that the_ G _execution court cannot go behind the decree. But if the award of the Reference Court or that of the appellate court does not specifically refer to the question of interest on solatium or in cases where claim had not been made and rejected either expressly or impliedly by the Reference_ H [2014] 6 S.C.R. c ## 1010 SUPREME COURT REPORTS A B D _Court or the appellate cow}, and merely interest on compensation is awarded, then it would be open to the execution court to apply the ratio of Sunder(supra) and say that the compensation awarded includes solatium and in such an event interest on the amount could be directed to be deposited in execution. Otherwise, not. We also clarify that such interest on solatium can be claimed_ ' _only in pending executions and not in closed executions and the execution court will be entitled to permit its recovery from the date of the judgment in Sunder (Supra)(19-9-2001) and not for any prior period. We also clarify that this will not entail any reappropriation or fresh appropriation by the decree-holder. This we have indicated by way of clarification also in exercise of our power under Articles 141 and 142 of the Constitution of India with a view to avoid multiplicity of litigation on this question."_ The aforesaid principle has also been followed by this ' Court in _Chhanga Singh and Another vs. Union of India and Another_ (2012) 5 SCC 763. E 17. The Reference Court awarded enhanced compensation but such amount was deposited in the Court after the date of expiry of period of one year. In the circumstances, we hold that the appellants are also entitled to F interest @ 15% per annum under proviso to Section 28 of the L.A. Act. 18. The High Court failed to notice that the provisions of Section 23(1A) of the L.A. Act are mandatory and the claimants-appellants are entitled to 12% enhanced G compensation for the period commencing from the date of publication of Notification under Section 4 of the L.A. Act. The High Court also failed to appreciate that the appellants are entitled to interest @ 15% per annum as contemplated under proviso to Section 28 of the_ L.A. Act as the compensation was H paid after the expiry of period of one year. JAi KRISHAN (D) TR. LRS. _v._ STATE OF 1011 UTIARAKHAND [SUDHANSU JYOTI MUKHOPADHAYA, J.] 19. The High Court instead of dismissing the review A petition ought to have condoned the delay, reason of which was sufficiently explained by appellant and ought to have allcwed the revision application in favour of the appellant. 20. In view of the findings recorded above, we set aside 8 the part of the impugned judgment dated 16th July, 2005 so far as it relates to payment of compensation for the land, uphold the award passed by the Reference Court to the extent above and direct the respondents to pay 12% enhanced compensation in terms of Section 23(1A) and another 15% interest in terms of proviso to Section 28 of the L.A. Act as C ordered above within three months .. 21. The appeals are allowed with the aforesaid observations and directions. There shall be no order as to costs. D pevika Gujral Appeals partly allowed.
End of Judgment Record
Browse All Supreme Court of India (2014) Decisions
2014-07-01

Duryodhan Rout v. State of Orissa

These appeals challenge a common judgment convicting Duryodhan Rout of rape and murder of a 10-year-old girl, Subhasini Bhoi. The trial court convicted him under IPC sections 376(f), 302, and 201 and sentenced him to death; on reference, the High Court remitted the death sentence for the 302 offence to life imprisonment while keeping the other sentences unchanged. The prosecution's case rested solely on circumstantial evidence. PW-1 and PW-2 saw the accused with the victim on a bicycle around 4 p.m. and returning alone about an hour later; PW-5 (father) and PW-6 (mother) testified that the child was taken on the pretext of talking on the phone. In custody, the accused confessed before PW-3 and PW-4, and under Section 27 of the Evidence Act the recovery of the body and the underwear was recorded; the autopsy by PW-9 indicated throttling and injuries consistent with rape. The chain of circumstances — last-seen with the victim, recovery of the corpse in the jungle, and the forensic findings — formed a robust basis for conviction. The central legal issue was whether sentences for multiple offences should run consecutively. The Court held that life imprisonment is the remainder of a convict's natural life, and the proviso to Section 31(2) Cr.P.C. prevents aggregation beyond fourteen years, thus consecutive sentences cannot be imposed where life imprisonment is one of the terms. Consequently, all IPC sentences should run concurrently; the death sentence for the 302 offence was replaced by life imprisonment, and the appeal was allowed in part.

2014-12-16

Nand Kishore v. State of Madhya Pradesh

This is a criminal original jurisdiction writ petition under Article 32 challenging the continued incarceration of a convict under Section 302 IPC, with the petitioner contending entitlement to the Juvenile Justice (Care and Protection of Children) Act, 2000 (JJC Act) protections on the ground that he was a juvenile at the time of the offence (born 14 April 1980; incident on 18 June 1997). The Court scrutinized documentary and oral evidence from the Juvenile Justice Board indicating the petitioner’s true date of birth and concluded that on the date of occurrence he was 17 years 2 months 4 days old, thereby satisfying the juvenile criteria. The judgment clarifies a central legal question: whether the protections and benefits under the JJC Act, enacted in 2000, can be extended to those convicted before its coming into force if they were juveniles at the time of the offence. Relying on earlier decisions such as Hariram v. State of Rajasthan and Ajay Kumar v. State of Madhya Pradesh (and others), the Court held that a person who had not completed 18 years on the date of offence is entitled to the Act’s benefits as if the provisions had always existed, effectively retroactively applying the protective regime. The petition was allowed; the petitioner is to be released forthwith, with bail bonds and sureties discharged, reflecting the Court’s protective stance for juveniles in criminal proceedings.

2014-04-24

Vishal Goyal & Ors. v. State of Karnataka & Ors.

This batch of writ petitions under Article 32 concerns admissions to Post Graduate Medical and Dental courses in government medical/dental colleges and the state quota in private colleges in Karnataka for the 2014-2015 academic year. The petitioners, who completed MBBS/BDS in Karnataka, challenged sub-clause (a) of clause 2.1 of two National Board of Examinations Information Bulletins (PGET-2014) which defined “Karnataka Origin” to permit admission only to those who satisfy certain criteria, effectively excluding many who studied in Karnataka institutions. They argued this violates Article 14 (equality before law and equal protection of laws) and undermines merit-based selection for postgraduate courses. They invoked Dr. Pradeep Jain & Others v. Union of India (1984) to contend that institutional preference may be permissible but must conform to equality; Magan Mehrotra v. Union of India (2003), Saurabh Chaudhri v. Union of India (2003), and Nikhil Himthani v. State of Uttarakhand (2013) were cited to support the continuing emphasis on merit and equality. The State countered that Article 371J allows reservation for the Hyderabad-Karnataka region and argued that the Pradeep Jain framework applies only to government or state-instrumentality institutions and not to private colleges. The Court held sub-clause (a) ultra vires Article 14, directed fresh Information Bulletins, and ordered admissions in accordance with the law on the basis of existing entrance test results, with the general counselling schedule from Dr. Fraz Naseem & Ors. not applying for 2014-2015 Karnataka admissions.

2014-08-21

SINGH RAM (D) THR. L.Rs. v. SHEO RAM & ORS.

This is a Supreme Court of India decision on the limit of time within which a usufructuary mortgagee can seek relief, and the corresponding equity of redemption for the mortgagor. The appellants challenged the Punjab and Haryana High Court Full Bench’s view that there is no fixed time for redemption in a usufructuary mortgage and that the right to seek redemption arises on payment/deposit of mortgage money, irrespective of the mortgage date. The HP High Court’s decision was later reversed by a larger bench of this Court in the context of reconciling conflicting precedents such as Sampuran Singh, Prabhakaran and Jayasingh Dhyanu Mhoprekar, Parichhan Mistry and Harbans etc., emphasizing that Section 62 of the Transfer of Property Act confers a special right on the usufructuary mortgagor to recover possession, which begins only when the mortgage money is paid out of rents and profits or when paid/deposited by the mortgagor. Article 61 of the Limitation Act governs the period for redeeming or recovering possession (30 years from accrual of the right, unless restricted). The Court reaffirms the principle ‘once a mortgage, always redeemable’ and rejects a blanket 30-year extinguishment rule for usufructuary mortgages, upholding the Full Bench view of the Punjab and Haryana High Court and dismissing the appeals. The decision emphasizes equity, statutory recognition under Section 62, and the distinctive treatment of usufructuary mortgages.