Jagdamba Paper Industries (Pvt.) Ltd. v. Haryana State Electricity Board & Ors.

Case / Petition Number:
Writ Petition Nos. 4167/68, 7346-53, 7689-97, 8638, 8640-41, 9899 of 1982, 910-912 of 1983, 7987-91 of 1982 and 29, 1642 of 1983; Civil Appeals Nos. 2464-65 of 1982.
Neutral Citation:[1984] SCR 167

Case Synopsis & Summary

The present petitions seek to challenge unilateral enhancements in security deposits introduced by the Haryana State Electricity Board (the Board) for both meter security and the security for payment of energy charges. Starting from 1968 the Board began collecting security deposits from consumers to ensure timely clearance of energy dues; for industrial consumers, security per kW was Rs. 30, later increased to Rs. 100 per kW from 1 April 1981. The Board also introduced separate security deposits for meters, ranging from Rs. 5,000 to Rs. 10,000 for industrial consumers. In October 1980 the Board decided to augment these deposits further, while reserving under Clause 31 of the standard contract to amend schedules and conditions at any time. The petitioners challenged these unilateral increases on grounds that they were not justified, that the Board acted under contractual authority improperly, and that the statutory framework (the Indian Electricity Act, 1910/1948) did not authorize such security demands. The Supreme Court held that the Board possesses statutory power under s.49(1) of the Indian Electricity (Supply) Act, 1948 to determine supply conditions, including security deposits, provided the power is not exercised arbitrarily or unreasonably. It approved guidance from earlier cases (Bisra Stone) and related decisions, but directed modifications: meter security escalation to be limited, a new formula to be devised by Oct. 1, 1983, with security interest adjusted to 10% from Oct. 1, 1983, and a reduction of meter-security increments by 50%. The petitions were dismissed with no costs.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • Amarendra Nath Sen
  • Ranganath Misra
Judgment Date
1983-09-29
Court Decision / Holding
The petitions were dismissed. The Court upheld the Board's general power to revise security deposits under s.49(1) but directed that the increases in security deposits be moderated and that a new formula be formulated and implemented by October 1, 1983. The Court ordered that the meter-security escalation be cut by 50% (to Rs. 2,500–Rs. 5,000 for industrial meters) while maintaining overall security for payment. Interest on security deposits was raised from 8% to 10% per annum with effect from October 1, 1983. The Court noted that no order on costs would be issued and that the Board would also ensure a more controlled, policy-driven approach to avoid arbitrary imposition of charges. It clarified that the Board’s power is consistent with statutory provisions and is not an unguided exercise of monopoly power.
Final Disposition
Petitions dismissed; Board’s power to revise conditions affirmed with directions to modify the security formula and implement changes by 1 October 1983; no order as to costs.

Parties to the Case

Appellants / Petitioners

  • Jagdamba Paper Industries (Pvt.) Ltd. and other petitionersConsumers in the writ petitions

Respondents

  • Haryana State Electricity Board (the Board)
  • (and others)

Legal Representation & Advocates

Counsels for Petitioners

  • • S.B. Bhasme
  • • B.R. Kapur
  • • S.R. Srivastava
  • • C.P. Mittal
  • • D.B. Vohra
  • • K.G. Bhagat
  • • Vimal Dave
  • • Ms. Kalash Mehta
  • • A.K. Goel
  • • Sarda Jitter (as stated in document)

Counsels for Respondents

  • • Parmod Dayal
  • • K.K. Jain
  • • A.D. Sanger

Provisions of Law Cited

Indian Electricity (Supply) Act, 1948, s.49(1)Indian Electricity (Supply) Act, 1948, s.39(1)Clause 22 of the Standard-Contract AgreementClause 31 of the Standard-Contract AgreementIndian Electricity Act, 1910, Schedule, Clause VI (and its first proviso, sub-para (a))Section 79 of the Indian Electricity Act (1948)Constitution of India, Art. 32

Legal Doctrines & Maxims

  • Public utility service and monopoly should not be abused by extracting undue profits or imposing excessive burdens.
  • A statutory authority (Board) must act within the framework of statutory provisions and not arbitrarily or unreasonably.
  • The Board, as a public utility, may revise tariffs and related conditions under its contractual powers, but such revisions must be reasonable and justified by the statutory framework.

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioners argued that the unilateral enhancement of security deposits—both for meter security and for payment of energy bills—lacked statutory basis, was not contemplated by the Electricity Acts, and violated the essence of the контрактual relationship under the standard agreements. They contended that s.49(1) of the 1948 Act authorizes only terms for supply, not arbitrary hikes in security, and that the first proviso to Clause VI of the 1910 Act could not justify such increases. They further argued that the Board’s power to amend schedules (Clause 31) cannot be used to impose large, instantaneous, non-consensual surcharges, especially where the meters were installed years earlier and the contractual obligations had been accepted.

Contentions of Respondents

The Board contended that it has statutory power under s.49(1) to determine terms of supply, including security deposits, and that Clause 31 permits amendment of schedules. It argued that securing timely payments and protecting the Board’s assets (meters and equipment) is a legitimate function of a public utility. It asserted that tariff-like adjustments for security are analogous to tariff revisions and are permissible so long as exercised non-arbitrarily. The Board also relied on prior jurisprudence (e.g., Bisra Stone) to justify its authority to modify conditions in response to changes in cost and risk.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (8)

Case NameCitationTreatmentExplanation
Krishna Cement Works v. The Secretary APSEBAIR 1979 AP 291PositiveApproved the principle that security for timely payment may be demanded and that the Board has power to determine such terms under existing statutes.
Bisra Stone Lime Company Ltd. v. Orissa State Electricity Board & Anr.[Bisra Stone case cited in judgment]PositiveUsed to support the Board's statutory power under s.49(1) to determine supply terms including security deposits.
M/s. B.R. Oil Mills v. Assistant Engineer (D), RSEB, Bharatpur & Anr.AIR 1981 Raj 108DistinguishedListed among cases referred to but distinguished in the Court’s reasoning regarding statutory limits on security.
M/s. Goodyear India Ltd. v. H.S.E.B. & Ors.CW 4765/81 (Goodyear India Ltd. decision, 9.4.82, PB&H HC)Mentioned OnlyCited and discussed as part of the background, but the Supreme Court did not adopt its reasoning; AP and Rajasthan views were preferred.
Modi Industries Ltd. (Steel Section) v. U.P. State Electricity BoardAIR 1979 All. 375DistinguishedCited among authorities but distinguished in the present decision.
M/s. Devidayal Metal Industries v. The Municipal Corporation for Greater Bombay & Anr.AIR 1980 BombayDistinguishedCited but distinguished in the Court’s discussion of security deposits.
Kishan Cement Works v. The Secretary, APSEBAIR 1979 AP 291PositiveApproved the Andhra Pradesh view supporting Board’s right to determine security deposits under the act.
J... (Bisra Stone reference)[1976] 2 SCR 307PositiveCited as authority supporting the Board’s power to revise supply terms under statutory provisions.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•4,273 words•~20 min read

In The Court Record

Jagdamba Paper Industries (Pvt.) Ltd. v. Haryana State Electricity Board & Ors.

l65 •· .. JAGADAMBA PAPER INDHSTRIES (PVT.) LTD. ETC. ETC. v. t HARYANA STATE ELECTRICITY BOARD & ORS. ETC. _September 29,_ _198 3_ (AMARENDRA NATH SEN AND RANGANATH MISRA; jJ.) _Indian Electricity (Supply) Act, 1948, Sections 39(1) read with clauses 22_ _and 31_ _of_ _tf1e_ _Standard-Contract Agreement to supply_ _electricity-Power {)j the_ _Board to amend, revise and change schedule_ _of tariff and charges and conditions_ _of supply of electricity-Whether_ _the_ _power can_ _be_ _assailed_ _so_ _long_ _it is not_ _exercised arbitrarily or unreasonably-Sub-para_ (a) _of the first proviso_ _to_ _c/a14se_ _VI of the Indian Electricity Act,_ _1910,_ _scope of._ A c #### From 1968, the Haryana ~tate Electricity Board has been collecting security from every consumer to ensure timely cleafance of energy bills and in D th'e case of industrial consumers ·the security was worked out at Rs. 30 per KW. With effect from 1st April 1981. thC amount was changed to Rs. 100 per KW. Similarly in regard to the industrial meter a different basis has been adopted and from April ·1, 1981 the security deposit now varies between . Rs. 5,000 and Rs. 10,000 in regard to industrial consumers. The petitioners have therefore, challenged the said unilateral increase on the ground that the enhancement is without any jUstification. E Dismissing the petitions, the Court HELD : I. To contend that the Eleetricity (Supply) Act, 1948 and the Rules made thereunder do not contemplate any provision f~r security for the timely payment of energy charges "is not correct. Sub-para (a) of the first ·proviso to clause VI. of the schedule to the Indian Electricity Act, 1910 would be applicable and what would be sufficient security should bC left to' the Electricity Board to decide. [I 71 E-F] - _K'ishna Cement Works_ v. _The Secretary APSEB,_ AIR 1979 AP 291 approved. _Mfs. B._ _R. Oil Mills_ v. _Assistant Engineer_ (D). _(RSEB), BharatPur_ & _Anr.,_ AIR 1981 Raj. 108; and _M/s. Goodyear India Ltd._ v. _H.S.E.B._ & _Ors._ CW. 4765/81 dated 9.4.82 Pb. & Haryana H.C. referred to _Modi Industries_ _Ltd. (Steel Section)_ v. _U.P. State Electricity Board_ AIR 1979 AU. 375; _M/s._ _Devidayal Metal Industries_ v. _The Municipal_ _CorporatiOfl_ _for Greater Bombay_ & _Anr._ AIR 1980 B!im. 154 distinguished. 2:1 Section 49{1) of the Indian Electricity {Supply) Act, 1948 clearly indicates that the Board may supply electricity to any person upon such terms and conditions as the Board thinks fit. Jn exercise of this power the BO':l.rd F G H A B c E F G H SUPREME COURT !i.HPORTS [19S4j i s.c.il. had initially . introduced the condition regarding security and each of . the petitioners had accepted the term. The Board has been conferred statutory power under s. 49(1) of the Act to determine the cOnditions on the basis of _ whic;:h supply is to be made. This Court in _J!irra_ _Stone Lime C1mpany Ltd._ _&_ _Anr. Etc._ v. _Orissa State Electricity Board_ & _Anr.,_ [1976) 2 SCR' 307., took the view that enhancement of rates by way of surcharge w<is well within the pOwer of the Board to fix or revise the rates of tariff under the proyisiQns of the Act. What applied to the tariff would equally apply to the security, that being a condition in the contract of supply. Each of the petitioning consu1ners had agreed to furnish security in cash for payment of energy bills at the time of entering into their respective supply agreements. There was no challenge.iri these writ petitionS that the demand of security at the time of entering-into supply agreements has to be struck down as being without jurisdiction. . [172 G-H; E-F] 2:2 Under clause 31 of the Agreement the. Board reserved to itself the right to amend, cancel or add to any of the schedules and conditions at a~y time. The provisions of this clause are similar to clause 13 of the agreement which came to be considered in Bisra Lime· Stone Company's Case (supra). Therefore, the Board had authority under the agreement itself to amend the conditions. In ex:ercise of that power the Board has now raised the additional. demand. (173 A·BJ 2:3. It·is true that the affairs of the Boards 'in the different States of the country are not upto the expectation of the co~sum,ers and there have been instances which give rise to genuine anguish and dissatisfaction. The scheme of the Act clearly i~dicates a legislative m¢1.ndate that the Board should manage its co1nmercial activities in such a way that it does not make any loss. It is alS'o clear that the Board being a public utility organisation is not expected to make any undue profit by abusing its monop6ly position. An inbuilt system of controi and supervision has been set up and the State Governments have been. given power to give policy directions. Situation seems to have arisen when stricter control and supervision are called for and if oI'ganiSational changes and provision for greater control appear necessary, to improve the functioning of the Boards, steps should be taken without delay in this regard. The Board should always remeinber that it is a public utility service and not a _governmental a8;ency enjoying wide pOwers and expecte.d to have a share in the governance of the country. On the facts placed that the stand of the ·Board that a demand equal to the energy bill of two m.onths . or a little more is not unreasonable.,) When the Boa.rd has the power to unilaterally revise the, conditions of supply, it must follow that the demand of higher additional security for payment of eq~_rgy bills is unassailable, provided that the power is not exercised arbitrarily or unreasonably. [173 E-H;.174 A-BJ 3:1. The argument that the security should be in the shape Of Bank guarantee does not call for consideration, in view of the acceptance of the court's, suggestion to increase the interest @ 10% per annum on Per with the interest payable by the Scheduled Banks. 174 E; CJ 3:2. In regard to the enhanced security for the meter the explanation advanced by the Board is that the meters are required to be replaced ~r many ... ##### ' y JAGDAMBA PAPER _v._ H.s.li. BOARD _(Ranganath Misra,_ i.) 167 costly parts have _to_ be su.bstituted by way of repair. In view of the High ·cost of the meters the Board is justified in enhancing the security. PetitionCrs have not disputed their obligation to furnish security for the meter. But the chaUenge is to the enhancement. Indisputably all the meters to the petitioning consumers have been supplied prior to the decision to enhance the security. Keeping in view the likelihood of replacement or substantial repair, the court suggested that the escalation n1ay be reduced by 50% to which the Board has accepted. The Board under took to evolve a new formula accordingly and introduce it from 1-10-83 and not to enforce the rates impugned. (174 E-G; H; 17S, A] ORIGINAL JURISDICTION: Wr;t Petition No: 4167"68, 7346·53, 7689-97, 8638, 8640-41, 9899 of 1982, 910-912 of 1983, 7987-91 of 1982 and 29, 1642 of 1983. (Under article 32 of the Constitution) AND. Civil Appeals Nos. 2464-65 of 1982. Appeals by Speciai'leave from the Judgment and Order dated the 9th April, 1982 of the Punjab and Haryana High Court in C.P. Nos. 4805 and 5184 of 1981. _For_ _the appearing Petitioners/Appel/ams:_ _S.B .. Bhasme,_ _B.R. -.Kapur,_ _S.R. Srivastava,_ _C.P. Mittal,_ _D.B._ _Vohra,_ _K.G._ _Bhagat, Vimal Dave, Ms. Kai/ash Mehta, A.K. Goel_ and _Sar~a _Ji{itter._ _For_ _Respondent_ : _Parmod Dayal, K.K. Jain_ and _A.D. Sanger ._ The Judgment of the Court was delivered by RANGANATH MISRA, J. : Each of these writ petitions is by a consumer of electric energy which has entered into a contract with the Haryana State Electricity Board ('Board' for short), and challenge in these petitions under Article - 32 of the Constitution is to the enhancement of security unilaterally made by the Board both in respect of meter as also for the payment of the energy dues. Clause 22 of the ~tanuard contract stipulates ; A B c D E F G H # ' ##### ###### 'A B c D E 168 sui>RllMll eoinl.r R.EroRts fi984] i s.c.ii.. I "22. _Security Deposit :_ (a) ·Before commencing or resuming supply to a consumer the Board may require the consumer to lodge with the Board as security for the payment by the consumer of his monthly bills' and for the value of the meters·and/or other apparatus belonging to the Board and installed at the consumer's premises a deposit, which may not be tr~nsferable, calculated as follows : Rs. 10.00 per KW ' of connected load or part thereof in the case of domestic ; Rs. 20 per 'KW of connected load or part thereof in· case of commercial and Rs. 30 per KW of connected load or part thereof in case .of industrial/agricultural/bulk supply/street lighting consumers plus the following amount per m~ter : (I) (2) (3) ( 4) For medium industrial supp!y and bulk supply above 20 KW and up to '100 KW. "" ## ' (5) For industrial and bulk supply above 100 KW. Rs. 100.00 Rs. 200.00 F The security is obtainable in casli' and an interest - · at the rate of 4% per annum shall be payable on security deposits of Rs. 50.00 and above. No interest will be 'payable if a connection is disconnected within a year of giving supply. ' G (b) The Board will be at liberty at any time to demand further security deposit from consumers who have habitually defaulted in making. payments of their monthly dues." Clause 31 provides : "31. _Rights of Board_ _to_ _revise schedules_ _of_ _tariffs_ _and charges and conditions_ _of supply:_ Subject to -clause ' \. iAGDAMBA PAPER _v._ iU.B. BOARD _(Ranganath_ _Misra,_ J.) 169 30 above (relating to interpretation) the Board reserves the righi'at any time to amend, cancel, or add to. any of these. schedules and conditions." Eich of the contracts contains detailed provisions for security ·deposi(as provided under clause 22. The Board enhanced the tariff by almost four times but the enhancement of tariff has not been challenged by the consumers, who have filed these writ petitions. Thereafter the Board decided in October 1980 that with effect from April l, 1981', the security contemplated under clause 22 both in regard to the meter as also for due payment of the energy bills should be enhanced and fixed a new schedule. Challenge in these petitions is to the enhancement in regard to both the meter as also security for due payment of energy bills ·made unilaterally by 'the Board. As <his is the common question arising in all these writ petitions, they are being disposed of by a common judgment. The petitioning consumers have contended 1hat the enhancement made in the security amount towards the meter is without any justification. It is all the more so where meters have been installed several years before .and there {s no change in the circumstances justifying an enhancement in the security deposit for it. Challenge is also advanced against the enhancement of the security deposit in the matter of payment of energy bills. From 1968 the Board had introduced the condition of taking a security from every consumer to ensure timely clearance of energy bills and in the case of industrial consumers the security was worked out 'at Rs. 30 per KW. With effect from April 1, 1981, in place of Rs. 30 per KW Rs. 100 per KW has been substituted. It is contended that on ace.aunt of this enhancement most of the petitioning consumers have been called upon to furnish additional security to the tune .of several lakhs of rupees. Similarly in regard to the meter a different basis has been adopted and·V:om April I, 1981, the security deposit now varies between Rs. 5000 an~ Rs. 10,000 in regard to industrial consumers. After the enhancement came into force the Bo.ard throvgh its prescribed officers called upon the petitioning consumers to make additional security deposits on both counts, within a time indicated. According 'to the petitioners the Electricity (Supply) Act, 1948 ('Act' for i!ihort) and the Rules made thereunder do not contemplate any provision of security for the timely payment of energy charges. The Board has not frame·d any Regulations ~under s. 79 of the Act A B ' c D E F G H ;· A B c D E F G H i76 stii'koo c0URr iuiroRrs for demanding security of the type in · issue. According to the petitioners as the supply is controlled under an agreement entered into between the Board and . the petitioning consumers, unilateral escalation would be contrary to any acceptable notion of contract Reliance is placed on behalf of the petitioners on the decision of the Allahabad.High Court in _Modi Industries_ _Ltd._ _(Steel_ _Section)_ v. _U.P._ _State Electricity'Board(l),_ and that of the Bombay High Court in M/s. _Devldayal Metal_ _Industries_ v. _The_ _Municipal_ _Corporation_ _for_ _Greater l!ombay_ _and._ AIJ1°'.( [2] ) Before the Allahabad . High Court it was contended by thb consumer that the Board contracted with it to supply 9500 KW electrical energy. The rate schedule applicable to the consumer was HV-2 .. Under the_ agreement of December 31, 1970, the consumer had deposited with th~ Board a sum of Rs. 3,44,135 as security., The Board demanded a further security of Rs. 9,00,000. The consumer took the plea before the High Court that neither under the Indian Electricity Act, 1910 ('1910 Act' for short), nor the Act and the agreement for supply between the parties was the Board authorised to demand additional security. The Board, took the plea that the tariff had gone up from time to time and the then existing rate schedule was of 1974. Normally the meter reading was done after every 30 days or once in 30 days and it took about , 15 to 20 days thereafter to prepare the bill and to send it to the consumer. A-further period of 15 days was allowed to the consumer to make the payment. Seven ·days' disconnection notice after expiry of the due period was to be given to the consumer. It took 2 or 3 days thereafter to verify the accoul)ts an 1 take steps for disconnection on the ground of non-payment, of the energy bill. Thus a period of about 3 inonths·was necessary to collect the energy bills ·from the date of consumption. In order to safeguard .the financial interest of the Boar4 a sum equal to energy bill for three months on the average was demanded as security, Reiiance was. placed on clause VI of the Schedule to the 1910 Act for authorising the Board· to rise the additional demand of security. The Court to.ok the view a that clause VI of the Schedule to the 1910 Att had no application and came to the conclusion : "The Board is a statutory authority and has to act within the framework of the statutory provisions applicable to it. If the act of the Board is found to be not (I) A:T.R. 1979 All. 375. (2) A.I.R. 1980 Born. 154, 17! iAGDAMBA PAPER _V •_ . H.S.E. BOARD _(Ranganat!t_ _Misra,_ J.) in consonance with or in breach of some statutory provisions of law, rule or regulation, it is open to challenge in a petition under Art. 226 of the Constitution. In these petitions no contractual rights are sought to be enforced which may more suitably be agitated in a competent Civil Court as contended by the learned - counsel for the Board" . ~'1 ' ... #### t A learned single Judge of the Bombay High Court without referring to the Allahabad decision, came to the conclusion that the scheme of the Act made it clear that it was not open to the licenser to impose any financial burden in addition to what was provided for in the Act itself. If this were not so, the whole object of the Act, which is to ensure the supply of electricity to the consumers in a controlled manner at rates which have to be controlled and approved by the State Government would be destroyed. Because, in addition to the electricity charges, the 1icenser·may, by contract, provide for other charges and thus impose a greater financial burden on the consumer than contemplated in the Act itself. As against these decisions, reliance has been placed on a Bench decision of the Andhra Pradesh High Court in _Krfahna Cement Works_ v. _The_ _Secretary, APSEB(i),_ and a single Judge decision of the Rajasthan High Court in _M/s. B.R. Oil Mills_ v. _Assistant Engineer (D), RSEB,_ _Bharatpur and Anr.('),_ on behalf of the Board in support of the demand of security. The Andhra Pradesh High Court has taken the view that sub;para (a)·of the first proviso to clause VI of the .Schedule to the 1910 Act would be applicable and what would ·be sufficient security should be left t.o the Board to decide. The Andhra Pradesh Electricity Board had adopted similar justification as placed by th..e .Board before us to justify demand of enhanced security and dealing 'with such stand the ieanied Judge observed : "To our mind, fhis is a quite satifactory explanation of the reasons behind insistence on . cash security. Certainly a public utility service like Electricity Board cannot launch itself on litigation to recover consumption charges on a large scale. ·Power generation, which it does is an essential service and that shall never be allowed to .suffer on account of improper security. We (!) ~~A.I.R.~~ ~~1979~~ ~~A~~ .P. 291. (2) A.I.R. 1981 Raj. 108, A c D E F G H ' ~UPREME COURT REPORTs [i984] i s.c.il. A B c D E F G H Counsel for the Boa.rd has. also placed before us a Division Bench decision of the Punjab and Haryana High Court in _M/s._ _Goodyear India Ltd._ v. _Haryana State Electricity Board and Others('),_ where the decision of ihe Andhra Pradesh and Rajasthan High Courts have been followed. We have been .told that against that decision of the Punjab and Haryana High Court appeals have been preferred to this Court. We are of the View that the Board has been conferred statutory - power URder s. 49( I) of the Act to determine the conditions on the ·basis of which supply is to be made. 1 [This Court in ] _[Bisra Stone ]_ _Lime Company Ltd._ & _Aw. etc._ v. _Orissa State Electricity Board_ & _Anr.('Y,_ took the view that enhansement of rat~s by way of surcharge .was well within the power of the Board to fix or revise the rates of tariff under the provisions of the -Act.. What applied to . the tariff would equally apply to the security, that being a 'condition in the contract of supply. Each of the petitioning consumers had agr.eed to furnish security in cash for.payment of energy bills ·at the time of entering into their respective supply agreements. There was no challenge in these writ petitions that the demand of security at the ·time of entering into supply agreements has to be struck· down as being witl\out jurisdiction. Section 49(1) of the Act clearly indicates that the Board may supply electricity to any person upori such terms and conditions as the Board thinks fit. In exercise of this power the Board had initially introduced the condition regarding security and each ·oflhe petitione,s had accepted the term. (I) C.W. No. 4765/81 decided on 9.4.82. (2.• [1976) 2 S.C.R, 307 • have alreally referred to the fact that it is reasonable on the part of the Board to require security for three months' - consumption charges. Now to require that amount to be deposited in the form of cash is eminently reasonable ... " 'The Rajasthan High Court has accepted the view of the Andhra Pradesh High Court. .We accept the view of the Andhra Pradesh High Court. ##### B c D - ). ##### shared by the consumers. We share the concern of the petitioners E and their counsel that the affairs of the Boards in the different States of the country are not upto the _expectation of the consumers and there have been instances which give rise to genuine .anguish and dissatisfaction. The scheme of the Act cleady indicates a legislative mandate that the Board should manage its commercial activities in F snch a way that it does not make any loss. It is also clear that the - Board being a public utility organisation is not expected to make any undue profit 'by abusing its monopoly positfon. An inbuilt system of control and supervision has been set up and the State lAGDAMBA PAPER _v._ H.S.E. BOARD _(Ranganath_ _Misra,_ J.) 173 Under clause 3 I of the agreement the Board reserved to itself · the right to amend, cancel or add to any of the schedules and conditions at any time. The provisions of this cfause are similar to clause 13 of the agreement which came to be considered in _Bisra_ _Lime Stone_ _Company's_ _case_ (supra). We ate, therefore, inclined to take the view that the Board had authority under the agreement itself to amend the conditions, In exercise of that power the Board has now raised the additional demand. We have already taken note of the fact that there has been a, steep escalation in the tariff. Counsel for the Board placed before us a statement which indicates that whi!e tariff has gone up almost four times, the demand for security raised by the Board is much less-it is· a little more than two times of the original security. On behalf of some of the petitioners it was contended that the security should represent the average energy bill for one month. It was claimed that the Legislature has set' up the Board as an . autonomous body with large powers and providing scope to act purely with a view to creating·an effective public utility service. The Board should not be permitted to act either arbitrarily or capriciously; nor should it manage its affairs in a disorderly way and taking advantage of its monopoly status pass on the incidence of such vice to be F Government~ have been given -power to.give policy directions: Situation seems to have arisen when stricter control and supervision are called for and if organisational changes and provision for greater control appe1r necessary, to improve the functioning of the Boards, steps should be taken without delay in this regard~ The Board should always remember that it is a public utility 'service and not a governmental agency enjoying wide powers and expected to have a share i11 the governance of the country. G H A B c D E G H 174 SUPREMB COURT REPORTS [1984] l s.c.R .. We agree, however, on the facts placed that the stand· of the Board that a demand equal to the energy bill of two months or a little more is not unreasonable. Once we reach the conclusion that the Board has power to unilaterally revise the conditions of supply, it must follow that· the demand of higher additional security for payment of energy bills is unassailable, provided that the power is not exercised arbitrarily or unreasonably. On the security amount interest at the rate of 4% was initially payable. The same has already been enhanced to 8% per annum. Since the amount is held as security, we indicated to the counsel for the Board that security· amount should bear the same interest ·as 'admissible on fixed deposits of Scheduled Banks for a term of years and we suggested keeping the present rate of interest in view that it should be enhanced to 10%. Board's counsel has now agreed that steps would be taken to enhance the present rate of interest of 8% to· 10% with effect from October 1, 1983. Once that is done, the argument that the security should be in the shape of Bank Gua!antee does not call for consideration. In regard to the enhanced security for the meter the explana· tion advanced by the Board is that the meters are required to be replaced or many costly parts have to be substituted by way of · repair. In view of the high cost of the meters the Board is justified in enhancing the security. .Petitioners have not disputed their obligation to furnish security for the meter. But the challenge is to the eni)ancement. Indisputably all the meters to the petitioning consumers have boon supplied prior to the decision to enhance the security. Keeping in view the likelihood of replacement or substantial repair, we suggested to learned counsel for the Board that the escalation may be reduced by 50%, i.e. in place of the enhanced demand varying between Rs. 5,000 and Rs. 10,000, 'it should be limited to Rs. 2,500 and Rs. 5,000. Learned counsel has agreed that steps would M taken by the Board to evolve a formula by which the demand for security for the·ineter would be revised being limited to Rs. 2,500 at the minimum and Rs. 5,000 at the maximum i'n regard to industrial meters in respect pf which the demand now,is between Rs. 5,000 and _Rs:_ 10,000. It would, therefore, follow that tltQ :floard WO\lld not eµforce its decision in re~ard to es¢alatio11 of _J._ ### JAGDAMBA PAPER _v._ H.S.E. BOARD _(Ranganoth_ _Misra,_ J.) 175 the meter security until the new formula is evolved and it will be open for the Board to ask for additional security effective from October 1, 1983, in accordance with the new formula towards security for the meter. We make no Order as. to costs. S.R. _Petions dismissed._ _A:_ 8 ##### . ""'i
End of Judgment Record
Browse All Supreme Court of India (1984) Decisions
1984-09-28

Gurpal Tuli and Ors. v. State of Punjab and Ors.

This Supreme Court decision concerns pay scales for teachers in the Punjab government schools in light of circulars issued in 1967, 1979, and 1957. The appellants—Masters and Mistresses holding M.A., M.Sc., B.T. or B.Ed. degrees—petitioned for the higher Lecturer’s grades set out in paragraph 2 of the Government Circular Letter dated July 29, 1967 (Rs. 300-25-450/25-600 for those with first and second division Master’s degrees; Rs. 250-25-400/25-550 for those with third-class Master’s degrees). They argued that they perform the same work as Lecturers and, under the principle of equal pay for equal work, are entitled to those higher grades; reliance was placed on Randhir Singh v. Union of India. The Punjab and Haryana High Court dismissed the writ petitions, and the Division Bench affirmed. The Court held that paragraph 2 of the July 29, 1967 circular creates a Lecturer’s Grade, and the number of Lecturer posts is limited; entitlement to those grades is contingent on holding Lecturer posts, not merely possessing postgraduate qualifications. The decision distinguishes Randhir Singh and notes that the July 29, 1967 circular operates on a different plane from the 1957 circular. Kirpal Singh Bhatia’s case is deemed of no assistance. Consequently, the appeals are dismissed, preserving the distinction between Lecturer posts and other teaching posts while acknowledging earlier clarifications remain applicable to the relevant posts.

1984-12-11

Goa Sampling Employees' Association v. General Superintendence Co. of India Pvt. Ltd. & Ors.

These appeals address whether the Central Government is the "appropriate Government" to refer five industrial disputes under Section 10(1)(d) of the Industrial Disputes Act, 1947, in the Union Territory of Goa, Daman and Diu. The Goa Sampling Employees' Association contended that iron ore samplers employed at Mormugao Port fall within the Dock Workers (Regulation of Employment) Act, 1948 as "dock workers" and, being in a major port within a Union Territory, the Central Government is the appropriate authority to refer the disputes. They also argued that in a Union Territory there is no State Government and thus the Central Government should perform functions of the State Government for the UT. The Central Government’s references were initially upheld by the Tribunal, but the Bombay High Court quashed them, holding the Central Government not to be the appropriate Government, since Goa, Daman and Diu is administered by an Administrator under Article 239, with the Administrator treated as the State Government for purposes of the Act. The Supreme Court reversed, holding that the General Clauses Act definitions and Constitutional provisions treat the Union Territory administration separately from a State Government; the Central Government is the appropriate Government for UTs in relation to industrial disputes. The Court directed expeditious disposal of the merits and awarded costs against the respondents.

1983-10-01

K. P. Ganguly v. Lucknow University

This batch of Civil Appeals concerns admissions to postgraduate medical courses in Uttar Pradesh during 1981-82 and the propriety of provisional admissions ordered by courts while writ petitions were unresolved. The Uttar Pradesh Government issued a 3 December 1980 order, under s.28(5) of the UP State Universities Act, 1973, directing that admission to MD/MS and diploma courses be on merit as determined by MBBS performance. The Medical Council of India (MCI) Rules, framed under the Indian Medical Council Act, 1956, have statutory effect and bind colleges and universities; the Government order is meant to be consistent with those rules. Faced with massive arrears, the High Court had frequently compelled provisional admissions, causing candidates who may later be found ineligible or undeserving to complete courses and potentially displace others by creating vacancies. The Supreme Court examined whether these circulars and rules were validly anchored in constitutional and statutory authority and whether provisional admissions could be sanctioned as a general remedy. It held that provisional admissions should not be given as a matter of course, except in exceptional cases where a petitioner has a cast-iron case or the error is gross. The Court analyzed merit determinants (MBBS marks, housemanship requirements, and diploma considerations) and stressed that the Government Order and MCI Rules guide admissions and that overcrowding and compromised medical standards must be avoided. The judgment lists several appeals and delineates which were sustained or dismissed, while directing that some results be declared with conditions and others decided on merit.

1984-03-15

Jitendra Singh Rathor v. Shri Baidyanath Ayurved Bhawan Ltd. & Anr.

Jitendra Singh Rathor, employed as a Librarian by the respondent, was terminated on 24 May 1977 for misconduct. Rathor filed a reference under section 33A of the Industrial Disputes Act, 1947 before the Industrial Tribunal, which held that the charge of misconduct had been established but that termination was not warranted, directing reinstatement of Rathor with half of his back wages and other benefits from the date of termination. The respondent employer challenged the award in a writ petition under Article 227 of the Constitution before the Patna High Court, which vacated the reinstatement and substituted compensation of Rs 15,000 in lieu of reinstatement, treating the 50% back wages as a valid element of punishment and concluding that reinstatement was not appropriate in view of loss of confidence. The Supreme Court allowed the appeal. It held that the High Court had no jurisdiction to interfere with the Tribunal’s direction to reinstate and to substitute a different remedy. It reaffirmed that Section 11A vests wide discretion in the Tribunal to vacate dismissal and grant reinstatement or other relief, and that withholding back wages may constitute a legitimate part of a reinstatement order but is not a substitute for the remedy itself. Accordingly, the Court restored the Tribunal’s award and directed full back wages with interest, overruling the High Court’s Rs 15,000 compensation.