Tenetowl LogoTenetowl
High Court of KeralaKerala High Court · 2006Single JudgeOP 11476/98 N dismissed; OP 25381/98 V disposed...

INDO AMERICAN HOSPITAL, WEST GATE, VAIKOM v. SENIOR SUPERINTENDENT, ELECTRICAL MAJOR SECTION, VAIKOM; ASSISTANT EXECUTIVE ENGINEER, KSEB MAJOR SECTION, VAIKOM; ELECTRIC INSPECTOR (APPOINTED UNDER SECTION 36 OF THE INDIAN ELECTRICITY ACT 1910 FOR THE VAIKOM AREA), KSEB BOARD, VAIKOM; KERALA STATE ELECTRICITY BOARD, represented by its Chairman, Trivandrum

Case / Petition Number:
OP 11476/98 N & 25381/98 V

Case Synopsis & Summary

Two original petitions (OP 11476/98 N and OP 25381/98 V) filed by Indo American Hospital challenging KSEB demands for energy charges for 1994–1997. The petitioner alleges meter and CT wiring faults and seeks referral of disputed energy readings to the Electrical Inspector under Section 26(6) of the Indian Electricity Act, 1910. Relying on Bombay Electricity Supply & Transport Undertaking v. Laffans (India) (P) Ltd. and Another (2005 (4) SCC 327), the petitioner argues that where meter readings are contested or records are compromised (e.g., a burnt meter), the Electrical Inspector should determine the correct consumption and the licensee may revise demands accordingly; the petitioner contends that the demand based on average consumption is justified in such circumstances. The Respondents contest that the dispute is not about a malfunctioning meter but about reversed CT/wiring, i.e., a human error that does not automatically invoke Section 26(6); they rely on M/s. Southern India Marine Products v. Company (Private) Ltd. Kerala State Electricity Board and Another (ILR 1995 (3) Ker. 573) and Belwal Spinning Mills Ltd. & Others v. U.P. State Electricity Board (1997) 6 SCC 740 to argue that disputes under Section 26(6) require inspection and reference. The court distinguishes the factual scenario from a pure meter defect, aligning with the Southern India Marine decision that wrong wiring/CT connections can cause under-registration without triggering Section 26(6). OP 11476/98 is dismissed; OP 25381/98 is disposed of with a direction to file an appeal, and the competent authority is to hear and pass orders within two months from filing, if appeal is preferred.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • K. M. Joseph
Judgment Date
2006-12-19
Court Decision / Holding
OP 11476/98 N – dismissed; OP 25381/98 V – disposed of with directions to file an appeal; if appeal filed within one month, the competent authority to consider and pass orders within two months.
Final Disposition
OP 11476/98 N dismissed; OP 25381/98 V disposed of with directions to file an appeal; if appealed within one month, the competent authority to consider and pass orders within two months from filing.

Parties to the Case

Appellants / Petitioners

  • The Indo American Hospital, West Gate, Vaikom, owned by Bahuleyan Charitable Foundation, represented by its Managing Director SMT. K. J. Bhageeradhy

Respondents

  • The Senior Superintendent, Electrical Major Section, Vaikom
  • The Assistant Executive Engineer, KSEB Major Section, Vaikom
  • The Electric Inspector (appointed under Section 36 of the Indian Electricity Act 1910 for the Vaikom area), KSEB Board, Vaikom
  • The Kerala State Electricity Board, represented by its Chairman, Trivandrum

Legal Representation & Advocates

Counsels for Petitioners

  • • Sri. M. Pathrose Mathai
  • • Sri. Saji Varghese

Counsels for Respondents

  • • Sri. A. Sudhi Vasudevan, SC, KSEB

Provisions of Law Cited

Indian Electricity Act, 1910, Section 36 (Electrical Inspector appointment)Indian Electricity Act, 1910, Section 26(6)Indian Electricity Act, 1910, Section 26(4) and its proviso

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioners contend that where the meter readings are disputed or records are compromised (e.g., meter burnt) the dispute should be referred to the Electrical Inspector under Section 26(6) of the Indian Electricity Act, 1910, following the rationale in Bombay Electricity Supply & Transport Undertaking v. Laffans (2005) (4) SCC 327. They rely on paras. 13–14 to argue that the demand can be revised on the basis of correct consumption estimates, and that the discovery of faults in metering or CT wiring warrants reference and recalculation, with immediate relief by revising the demand to reflect actual usage. They also cite prior Kerala decisions interpreting Section 26(6) to support a reference to an Electrical Inspector and to preserve evidence (e.g., meter as not functioning or burning).

Contentions of Respondents

The respondents contend that the dispute here is not about a malfunctioning meter but about a wrong connection/CT wiring (reverse CT connection) which caused under-recording of consumption. They rely on ILR 1995 (3) Ker. 573 (Southern India Marine Products) to argue that Section 26(6) is not invoked for cases where the meter itself is technically sound but wiring or CT connections are wrong. They also cite Belwal Spinning Mills Ltd. (1997) 6 SCC 740 for general principles about the necessity of Electrical Inspector referencer and the limits of 26(6). They emphasize lack of a proper reference prior to taking action and submit that such disputes should be considered in appeal rather than by a direct reference under 26(6).

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (4)

Case NameCitationTreatmentExplanation
Bombay Electricity Supply & Transport Undertaking v. Laffans (India) (P) Ltd. and Another2005 (4) SCC 327DistinguishedPetitioners relied on paras. 13–14 to allow petitions; however, the present facts involve a wrong CT connection rather than a defective meter, leading the court to distinguish this decision.
M/s. Southern India Marine Products v. Company (Private) Ltd. Kerala State Electricity Board and AnotherILR 1995 (3) Ker. 573PositiveCourt aligns with this Division Bench decision, holding that disputes arise from wrong wiring/CT connections and that 26(6) can be inapplicable where the meter itself is not defective.
Belwal Spinning Mills Ltd. And Others v. U.P. State Electricity Board and Another((1997) 6 SCC 740)Mentioned OnlyQuoted to discuss the scope of 26(6) and the need for referencer to Electrical Inspector, but the decision itself is not applied to control the outcome in this case.
Bharat Barrel case—Mentioned OnlyReferenced in context of disputes over meter correctness and connections; not applied as controlling authority.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,348 words•~11 min read

In The Court Record

INDO AMERICAN HOSPITAL, WEST GATE, VAIKOM v. SENIOR SUPERINTENDENT, ELECTRICAL MAJOR SECTION, VAIKOM; ASSISTANT EXECUTIVE ENGINEER, KSEB MAJOR SECTION, VAIKOM; ELECTRIC INSPECTOR (APPOINTED UNDER SECTION 36 OF THE INDIAN ELECTRICITY ACT 1910 FOR THE VAIKOM AREA), KSEB BOARD, VAIKOM; KERALA STATE ELECTRICITY BOARD, represented by its Chairman, Trivandrum

## **IN THE HIGH COURT OF KERALA AT ERNAKULAM** **PRESENT :** **THE HONOURABLE MR. JUSTICE K.M.JOSEPH** **TUESDAY, THE 19TH DECEMBER 2006 / 28TH AGRAHAYANA 1928** **OP.No. 11476 of 1998(N)** **---------------------------------** **PETITIONER:** - **-------------------** **THE INDO AMERICAN HOSPITAL, WEST GATE, VAIKOM, OWNED BY BAHULEYAN CHARITABLE FOUNDATION, REPRESENTED BY ITS MANAGING DIRECTOR SMT. K. J. BHAGEERADHY.** - **BY ADV. SRI.M.PATHROSE MATHAI SRI.SAJI VARGHESE** **RESPONDENTS:** **----------------------** **1. THE SENIOR SUPERINTENDENT, ELECTRICAL MAJOR SECTION, VAIKOM.** **2. THE ASSISTANT EXECUTIVE ENGINEER, KSEB MAJOR SECTION, VAIKOM.** **3. THE ELECTRICITY INSPECTOR (APPOINTED UNDER SECTION 36 OF THE INDIAN ELECTRICITY ACT 1910 FOR THE VAIKOM AREA), KSEB BOARD, VAIKOM.** **4. THE KERALA STATE ELECTRICITY BOARD, REPRESENTED BY ITS CHAIRMAN, TRIVANDRUM.** **BY ADV. SRI. A. SUDHI VASUDEVAN, SC, KSEB.** **THIS ORIGINAL PETITION HAVING BEEN FINALLY HEARD ON 3.3.2006 ALONG WIT OP NO.25381/98, THE COURT ON 19.12.2006 DELIVERED THE FOLLOWING:** ## **K. M. JOSEPH, J.** **-----------------------------------------------O.P. NOS. 11476/98 N & 25381/98 V -----------------------------------------------Dated this the 19[th] December, 2006** ## **JUDGMENT** The petitioner in both the writ petitions is one and the same. Petitioner is a consumer having electric connection. Ext.P2 is the Statement of amounts paid towards electricity bills for the period between 7/94 and 7/97. Ext.P3 was a demand notice dated 22.5.1998 requiring the petitioner to pay Rs.3,25,235/= stated to be the charges for electrical energy supplied from 7/94 to 7/97. Petitioner addressed Ext.P4. In OP No.25381/98, after referring to the very same Exhibits and the interim order passed staying Ext.P3, reference was made to Ext.P6. Ext.P6 is under challenge in the second writ petition. ## **O.P. NO. 11476 OF 1998 N** 2. The relief sought is a direction to the respondent Board to apply to the Electrical Inspector of the area for estimating the OP 11476/98 & 25381/98 2 quantity of energy supplied by the Board. Learned Senior Counsel for the petitioner, Shri M. Pathros Mathai, relied on the decision of the Apex Court in Bombay Electricity Supply & v. Transport Undertaking Laffans (India) (P) Ltd. And Another ((2005 (4) SCC 327). He would contend that paragraphs 13 and 14 of the said Judgment should result in the Original petitions being allowed. Paragraphs 13 and 14 are extracted below: “13. For the period for which, according to the appellant, the meter was not correct, none of the parties has referred the dispute to the Electrical Inspector. The meter though it is alleged by the appellant to have remained not correct, readings have been regularly recorded, bills raised and also paid by the consumer, respondent 1. According to Section 26 (6), the readings would bind the appellant and Respondent 1 both. It has never been the case of the appellant at any stage that the meter was not correctly recording the consumption of electricity on account of being non-functional due to any fraud committed or device or trick adopted by the consumer, Respondent 1 or that the body seal of the meter was found broken or tampered with. Respondent 1 was accepting and honouring the demands raised by the appellant and, therefore, Respondent 1 cannot be expected to have raised a dispute and sought for a reference for determination by the Electrical Inspector. The appellant could not have, therefore, revised the demand for such period based on average consumption during the previous year. There is yet OP 11476/98 & 25381/98 3 another reason why the entitlement of the appellant to recover charges from Respondent 1 may have to be denied. According to the proviso appended to subsection (4) of Section 26, the licensee cannot take off or remove any such meter as to which difference or dispute of the nature described in sub-section (6) has arisen until the matter has been determined by the Electrical Inspector. The purpose is to preserve the evidence. The dispute shall be expeditiously disposed of by the Electrical Inspector by applying scientific method of investigation to find out if the meter was incorrect and if so then what was the extent of error. In the present case, the meters said to be incorrect have been removed and replaced by the appellant. Admittedly, no dispute has been raised and referred to the Electrical Inspector. The most material evidence being the meter itself has been lost by the act of the appellant in removing the incorrect meter. The appellant cannot be permitted to take advantage of its own act and omission - the act of removing the meter and the omission to make a reference to the Electrical Inspector. 14. The material available on record before us does not enable the separation of the impugned demand by bifurcating the same into two on the criterion discussed hereinabove. The appellant shall have to be left free to examine its records and then revise its demand. We may clarify that the demand raised by the appellant based on the average consumption during the similar period in the last year is justified, in the facts and circumstances of the present case, for the period for which the reading was lost on account of the meter having been found burnt. Accordingly, the calculation based on the record of consumption for the corresponding period from the previous year shall hold goods. The appellant shall 4 OP 11476/98 & 25381/98 raise a demand accordingly and the first respondent shall be bound to honour the same. So far as the period for which the meter is said to be incorrect, the demand has not been revised by basing it on the finding arrived at by the Electrical Inspector and hence is not available to be revised. The meter is alleged by the appellant to be not correct and yet the appellant has not made a reference to the Electrical Inspector under Section 26(6). The appellant cannot now be allowed to raise an additional demand over and above the demand raised through the bills which were issued for that period and paid by the first respondent. The right to raise additional bills stands lost by the appellant for its failure to proceed in accordance with Section 26(6) of the Electricity Act, 1910.” 3. On the other hand, learned counsel for the Board relied on the decision in M/s. Southern India Marine Products v. Company (Private) Ltd. Kerala State Electricity Board and Another (ILR 1995 (3) Ker. 573). It is submitted by him that in this case, there was nothing wrong with the electrical meter or even the C.T. Meter. He would submit that during inspection it was detected that the C.T. Connection was in the reverse direction as a result of which the Meter recorded only consumption of one Phase alone out of the three Phases and among the remaining two Phases, one Phase was reading on OP 11476/98 & 25381/98 5 reverse direction as such neutralising the reading of the other Phases also. It is pointed out that it is due to the wrong C.T. Connection. Learned counsel for the petitioner would rely on the decision of the Apex Court in Belwal Spinning Mills Ltd. And Others v. U.P. State Electricity Board and Another ((1997) 6 SCC 740). Learned counsel relied on paragraphs 28 and 47 which read as follows: “28. The Solicitor General has submitted that in _Bharat Barrel_ case _the checked the appellant correctness of all meters of (sic) multiplying the - constant and of actual connections of CT operated meters and an additional check meter was installed and on comparison of the two meters, it was revealed that due to defective connections, the original meter was registering 76.6% less than of its actual use. Therefore, the revised bills of 76.6% of energy consumed from 1.6.1963 amounting to Rs.2,28,750.70 - was served on the respondent Company. The respondent disputed the revised bills and referred the dispute to the Electrical Inspector under Section 26(6) of the Electricity Act._ 47. On a conjoint reading of various subsections of Section 26 of the Electricity Act, it is evident that consumption of electricity or electrical quantity in the supply, shall be ascertained by means of a correct meter and the meter and other apparatus for recording the consumption of electricity by a consumer will be deemed to be correct if the recording OP 11476/98 & 25381/98 6 is within the permissible limit of error as prescribed. If a dispute as to the correctness of the meter is raised by any party for reference, such dispute can be decided only by the Electrical Inspector and both the licensee and the consumer have to accept the estimate of supply of electricity to the consumer as may be determined by the Electrical Inspector for the statutory period referred to in sub-section (6) of Section 26.” 4. This is not a case where the meter as such was not functioning. The contention is that the C.T. Connection was in the reverse direction. In other words, even the C.T. Meter was not out of order, contends the standing counsel. It was in similar circumstances that a Division Bench of this Court in M/s. v. Southern India Marine Products Company (Private) Ltd. Kerala State Electricity Board and Another (ILR 1995 (3) KER. 573) held that Section 26(6) of the Electricity Act is not applicable. The Court held as follows: “In all these cases the meters referred to above were capable of registering the amount of energy supplied. However, the meters could not register the amount of energy supplied due to the fact that the wiring given to the meter was not properly made. OP 11476/98 & 25381/98 7 Therefore, there is no question of dispute as to the correctness of the meter. But, it is only due to the wrong connection to the meter which has resulted in the meter not registering the quantity supplied to the consumer. It is a human error or omission either knowingly or not in properly connecting the meter. It is not disputed in all these cases that there was wrong connection of the wire to the meter which resulted in the meter rotating in reverse direction, showing only a lesser percentage of the actual consumption. Only if the question actually arise for consideration, there is an obligation to refer the dispute. It cannot be the intention of the legislature to refer “disputes” the moment the meter was not recording properly. It should be seen verified and decided that there is no manipulation, tampering or fraud with the wiring or connection to the meter. It is quite possible that meter could be made to go wrong or go wrong on its own due to accidental or mistaken connection to the meter. So long as there is no defect in the meter itself no question arise whether the meter is correct or not. Therefore, there is no scope for invoking sub-section (6) of section 26 of the Indian Electricity Act so as to decide as to whether the meter is correct or not.” It is, no doubt, contended on behalf of the petitioner that there was no communication served by the respondent Board apart from Ext.P3 and this is impermissible. They were not served with any report of the inspection, it is contended. The question, therefore, that arises for consideration is whether on the facts of OP 11476/98 & 25381/98 8 this case, could it be that Section 26(6) of the Indian Electricity Act, 1910 stands attracted. The contention of the Board that it is not attracted for the reason that there was nothing wrong either with the Meter or even with the Current Transformers. What was found during the inspection was that the connection was in the reverse direction resulting in the Meter recording consumption of one Phase alone out of the three phases. 5. I feel that this is a case which is covered by the Judgment of a Division Bench of this Court in M/s. Southern India Marine Products Company (Private) Ltd. v. Kerala State Electricity Board and Another (ILR 1995 (3) Ker. 573). This is not a case where the Meter was as such erroneous. It is only due to the connection being in the reverse direction that the correct consumption was not being registered in the Meter. It is true that there is a reference in paragraph 28 of the Judgment of v. the Apex Court in Belwal Spinning Mills Ltd. And Others U.P. State Electricity Board and Another ((1997) 6 SCC 740), to a case of original meter registering less than the actual use due OP 11476/98 & 25381/98 9 to defective connection and the matter being referred under Section 26(6) of the Indian Electricity Act. But, It cannot be said that the Apex Court has pronounced on the question that even in such a case, Section 26(6) of the Act is applicable. In such circumstances, I feel that there is no merit in OP No.11476/98 and it is accordingly dismissed. ## **O.P. NO. 25381 OF 1998 V** 6. What is challenged is Ext.P6. In this case, the amount is demanded for the period from 3/96 to 9/97. Contentions, of course, of the petitioner include that there is duplication as Ext.P3 is for the period from 7/94 to 7/97. Reliance is placed on Section 26(6) also. Ext.P6 refers to the Audit Report and detailed statements and they indicate that the question relates to the quota and consumption in excess. I do not think that the provision of Section 26(6) can be said to be attracted to such a situation. At any rate, I feel that this is a matter which can be OP 11476/98 & 25381/98 10 agitated in an appeal before the competent body. Accordingly, this Original Petition is disposed of directing that if the petitioner prefers an appeal before the competent body within a period of one month from the date of receipt of a copy of this Judgment, the said authority will consider the same after hearing the petitioner and pass orders in accordance with law within a period of two months from the date of filing the appeal. **K. M. JOSEPH, JUDGE** kbk. OP 11476/98 & 25381/98 11 **K. M. JOSEPH, J.** **OP NOS. 11476/98 N** ## **&** **25381/98 V** ## **JUDGMENT** **19th December, 2006.**
End of Judgment Record
Browse All High Court of Kerala (2006) Decisions
2006-11-30

Baburaj v. State of Kerala

Baburaj, the appellant, was convicted under Section 302 IPC for intentionally causing the death of his wife Geetha by constrictive neck compression. The Thrissur Sessions Court had sentenced him to life imprisonment on a conviction based on circumstantial evidence. The Kerala High Court heard Crl.A. No. 794 of 2004, challenging that conviction. The occurrence occurred in the early hours of 1 February 2002, approximately at 1:30 A.M., at Engandiyoor, where Geetha was found dead in her home after prior quarrels between husband and wife. The FIR was lodged on 1 February 2002 by Geetha’s brother. Dr. Cyriac Job conducted the post-mortem on 1 February 2002 and found signs of asphyxia with constrictive force on the neck, as well as multiple ante-mortem injuries suggesting a struggle. The prosecution relied on motive—frequent quarrels between the spouses—and the accused’s presence in the house that night to connect him to the crime. The defense contended that timing of death could be earlier than alleged and that the chain of circumstantial evidence was not complete, possibly pointing to accidental death. The High Court evaluated the medical testimony, ocular and accepted witnesses, and found the circumstantial chain sufficient to prove guilt beyond reasonable doubt, applying the principle of last-seen-together, and upholding the Sessions Court’s verdict. The appeal was dismissed, and the conviction affirmed.

2006-11-22

K. Gopi (D/o Late Ex.GS-142996 PNR) v Union of India and others

Petitioner K. Gopi, daughter of late Ex.GS-142996 PNR, sought compassionate appointment in the Border Roads Organisation after her father’s death on 03.03.2002. The petition, filed in 2004, contends that the family, comprising the petitioner, her brother and mother, was very poor and dependent on government employment. An application for compassionate appointment was made on 16.12.2003 but Ext.P4 rejected it, noting a revised policy that the dependent must be a major at the time of death. Subsequently, the government issued policy extensions (Ext.P7 and Ext.P8) allowing a three-year window, and the mother was advised to submit fresh documents. The petitioner argued that completion of 18 years by a dependent at death is not a precondition for eligibility. The respondents asserted that under the revised policy only those who were minor at death qualify; if the son attains 18 later, he may be advised to apply as per rules then in force. The court referred to a Kerala case (O.P.3338/2002) allowing merits-based consideration where there is no laches and noting that policy changes cannot retroactively defeat rights fixed as of death. It also cited Umesh Kumar Nagpal (1994) 4 SCC 138 to acknowledge the need for a reasonable period. Ultimately, the writ petition was allowed, directing the respondents to consider the claim on merits and dispose of it within four months.

2006-11-29

V. Bahuleyan v. State of Kerala and The Secretary to Government, Transport (C) Department, Government Secretariat, Thiruvananthapuram

V. Bahuleyan, a retired Regional Transport Officer, challenged Ext.P5 denying notional promotion to Deputy Transport Commissioner based on a pre-existing select list (Ext.P1) in which he was ranked No.4 as of 15 June 2002. A vacancy for the post arose on 1 December 2002 in the retirement vacancy of Sri Kunhambu, but Bahuleyan, though still in service, was bypassed and superseded by the immediate junior through Ext.P2 dated 6 January 2003. Disciplinary proceedings against him were initiated but later dropped as per Ext.P3 dated 23 August 2003, with his representation Ext.P4 dated 11 February 2004 seeking placement as Deputy Transport Commissioner with effect from 6 January 2003 and arrears. Ext.P5 dated 1 April 2004 rejected the claim. Bahuleyan contends that Note iii to Rule 28(b)(i)(7) of the Kerala State and Subordinate Services Rules provides that an officer included in a select list who is exonerated from major penalties must be promoted on the basis of his position in the list; if fully exonerated, retrospective promotion should be granted. Delhi Jal Board v. Mahinder Singh (JT 2000 (10) SC 158) is cited to support the right to be considered for promotion under Article 16. The High Court holds that Ext.P5 is unsustainable, and Bahuleyan is entitled to notional promotion from 1 December 2002, but no monetary benefits; salary and pension are to be fixed accordingly, and arrears, if any, to be settled within four months. The petition is allowed as above.

2006-12-11

The Correspondent and Chairman Standing Committee, MES, Central College Committee, MES Office, Kozhikode - Rep. by the General Secretary, Muslim Education Society, Kozhikode v. M. Syed Mohammed

This writ petition challenges execution of an order of the University Appellate Tribunal directing re-posting and monetary benefits to the respondent, an employee of a private MES college. The respondent had been moved from M.E.S. College, Kodungallur to M.E.S. College, Mampad, and claimed salary for the period he was kept out of duty. The University Appellate Tribunal held in his favour, and the High Court later directed payment of monetary benefits and posting, but the matter escalated to execution proceedings in which the petitioner (the MES management) contends that Sub Court Kozhikode lacks jurisdiction to execute the order under Calicut University Act, section 60(8). The petition traces the chain of litigation since the Tribunal’s order and a prior High Court order in CRP Nos.895/79 etc. The core issue is where an execution petition under the Tribunal’s order should be heard and executed: should it be the Sub Court with jurisdiction over the private college’s location, or the court where MES’s main office or the employee’s work was situated at the time of the appeal. The court ultimately held that Sub Court Kozhikode has no jurisdiction under section 60(8) and transferred the execution to Sub Court Manjeri, directing expeditious disposal within six months, while disposing of the writ petition.