Indian Overseas Bank vs M/s RCM Infrastructure Ltd. and Another

Case / Petition Number:
Civil Appeal No. 4750 of 2021

Case Synopsis & Summary

This Civil Appeal challenges the NCLAT’s dismissal of an appeal by Indian Overseas Bank against orders of the NCLT, Hyderabad, in an insolvency and SARFAESI chain involving M/s RCM Infrastructure Ltd. The bank had extended credit to the corporate debtor, which defaulted, leading to its NPAs and a sale of secured assets under the SARFAESI Act. Meanwhile, the corporate debtor filed for CIRP under the IBC, resulting in moratorium under Section 14. Two auctions were held; the second auction was confirmed and sale certificates issued, with 25% of the bid paid and the remainder scheduled for payment. The ex-promoter then moved the NCLT under Section 10 of the IBC, triggering CIRP and a moratorium that, in the Bank’s view, rendered SARFAESI actions improper. The NCLT set aside the sale in July 2020; the NCLAT upheld that order. The Supreme Court analyzed whether CIRP moratorium prevents SARFAESI proceedings and whether a sale completed under SARFAESI during CIRP can be undone. It held that once CIRP begins, moratorium prohibits foreclosure or enforcement actions including SARFAESI; it also held that such sales under SARFAESI would be complete only when Rules 8–9 formalities are satisfied, and the sale could not be reversed in CIRP. Consequently, the appeal is dismissed and concurrent orders are left intact, with no costs awarded.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Landmark Cases
Hon'ble Judges
  • L. Nageswara Rao
  • BR Gavai
Judgment Date
2022-05-18
Court Decision / Holding
The appeal is dismissed. No order as to costs. Pending applications, if any, disposed of in terms of this order.
Final Disposition
Appeal dismissed. No costs. Pending applications disposed of in terms of this order.

Parties to the Case

Appellants / Petitioners

  • Indian Overseas Bank

Respondents

  • M/S RCM Infrastructure Ltd.
  • Respondent No. 2 (former Managing Director of M/S RCM Infrastructure Ltd)

Legal Representation & Advocates

Counsels for Petitioners

  • • Shri Tushar Mehta (Solicitor General)

Counsels for Respondents

  • • Shri C.S. Vidyanathan (Senior Counsel)
  • • Shri K.V. Viswanathan (Senior Counsel)
  • • Shri Aditya Verma (Counsel)

Provisions of Law Cited

Section 13(2) of the SARFAESI ActSection 13(4) of the SARFAESI ActRule 8 of the Security Interest (Enforcement) Rules, 2002Rule 9(4)(a) of the SARFAESI Rules, 2002Section 60 of the Transfer of Property Act, 1882Section 13(8) of the SARFAESI ActSection 14 of the Insolvency and Bankruptcy Code, 2016Section 14(1)(c) of the IBCSection 10 of the IBCSection 31(1) of the IBCSection 238 of the IBCSection 52 of the IBCSection 65 of the IBCSection 54 of the Transfer of Property Act, 1882Section 14(1)(c) of IBCSection 65 IBCSection 238 IBC

Legal Doctrines & Maxims

  • Mala fide intent / mala fides
  • Forum shopping
  • Bona fide purchasers
  • IBC as a complete code with overriding effect (Section 238)
  • Priority and rights of creditors established prior to insolvency
  • Intention of the parties determining transfer of property (relevant to title passage)

Submissions & Arguments

Contentions of Appellants / Petitioners

The applicant bank contends that the initiation of CIRP by the ex-promoter was mala fide and sword of Section 65 IBC; moratorium under Section 14 blocks any foreclosure or enforcement actions including SARFAESI; the sale under SARFAESI was intended to stall the process and the CIRP proceedings should not be allowed to reverse the sale; Section 238 overrides other laws; the sale was completed upon full/partial payments under SARFAESI Rules 8-9 and the Bank’s claim should be realized from the sale proceeds; the continuation of SARFAESI actions during CIRP violated moratorium and Section 14(1)(c). The bank also relies on decisions that sale transfers on confirmation or after payment as per Arvind Kumar, Kaliaperumal, Shakeena, Karthik, and Hindon Forge. The bank argues that civil remedies under IBC prevail and the relief sought by ex-promoter would undermine the IBC proceedings.

Contentions of Respondents

The respondents rely on the primacy of CIRP and moratorium under IBC (Sections 14 and 14(1)(c)); once CIRP is initiated, SARFAESI actions are prohibited; the sale’s title transfer occurs only after full payment and compliance with Rules 8-9, and the sale certificate does not pass title until the terms are satisfied; the NCLT’s order setting aside the sale was appropriate to protect the moratorium and to safeguard the rights of creditors under the IBC; reliance is placed on cases holding the IBC as a complete code (Innoventive Industries, Monnet Ispat, Ghanashyam Mishra) and on the concept that the sale under SARFAESI can be regulated within CIRP by the IBC framework; the sale and subsequent actions were lawful within the CIRP and should not be reversed.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (10)

Case NameCitationTreatmentExplanation
Vidhyadhar v. Manikrao and Another(1999) 3 SCC 573DistinguishedThe Court notes that Vidhyadhar held sale transfers on execution/registration even with partial payments; however, this case deals with statutory SARFAESI sale during CIRP, distinguishing the facts.
B. Arvind Kumar v. Govt. of India and Others(2007) 5 SCC 745PositiveCited to support that sale becomes absolute on confirmation; informs the transfer of title upon proper confirmation.
Kaliaperumal v. Rajagopal and Another(2009) 4 SCC 193PositiveDiscusses transfer of title depending on registration and payment, emphasizing the primacy of intention of the parties.
Hindon Forge Private Limited v. State of Uttar Pradesh through District Magistrate, Ghaziabad and Another(2019) 2 SCC 198PositiveUsed to support the idea of transfer and sale completion in SARFAESI contexts.
Shakeena and Another v. Bank of India and Others(2019) SCC OnLine SC 1059PositiveHeld sale certificate does not require registration and the sale process is complete on issuance of the sale certificate.
S. Karthik and Others v. N. Subhash Chand Jain and Others(2020) SCC OnLine SC 198PositiveSupports that sale completion can be linked to the sale certificate in SARFAESI contexts.
Anand Rao Korada, Resolution Professional v. Varsha Fabrics Private Limited and Others(2020) 14 SCC 198PositiveDemonstrates IBC’s overriding effect and mechanisms around CIRP.
Innoventive Industries Limited v. ICICI Bank and Another(2018) 1 SCC 407PositiveAffirms that IBC is a complete code with overriding effect over other laws.
Principal Commissioner of Income Tax v. Monnet Ispat and Energy Limited(2018) 18 SCC 786PositiveReinforces IBC’s supremacy over other laws.
Ghanashyam Mishra and Sons Private Limited through the Authorized Signatory v. Edelweiss Asset Reconstruction Company Limited through the Director and Others(2021) 9 SCC 657PositiveAffirms the overriding provisions of the IBC in relevant contexts.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•4,367 words•~20 min read

In The Court Record

Indian Overseas Bank vs M/s RCM Infrastructure Ltd. and Another

## **REPORTABLE** ## **IN THE SUPREME COURT OF INDIA CIVIL APPELLATE JURISDICTION** ## **CIVIL APPEAL NO. 4750 OF 2021** **INDIAN OVERSEAS BANK ...APPELLANT(S)** **VERSUS** **M/S RCM INFRASTRUCTURE LTD. AND ANOTHER** **...RESPONDENT(S)** ## **J U D G M E N T** ## **B.R. GAVAI, J.** **1.** This appeal challenges the judgment dated 26[th] March 2021 passed by the National Company Law Appellate Tribunal, Principal Bench, New Delhi (hereinafter referred to as “the NCLAT”) in Company Appeal (AT) (Insolvency) No. 736 of 2020, thereby dismissing the appeal filed by the present appellant­Indian Overseas Bank, which was in turn filed challenging the order dated 15[th] July 2020 passed by the National Company Law Tribunal, Hyderabad Bench­1, Hyderabad (hereinafter referred to as “the NCLT”) in I.A. 1 No.832 of 2019 in C.P. (IB) No. 601/10/HDB/2018, vide which the learned NCLT had allowed the application filed by the respondent No.2 herein, former Managing Director of the respondent No.1 herein­M/s RCM Infrastructure Ltd. (hereinafter referred to as the "Corporate Debtor”) and set aside the sale of the assets of the Corporate Debtor. **2.** The facts in brief, giving rise to filing of the present appeal, are as under: The appellant Bank had extended certain credit facilities to the Corporate Debtor. However, the Corporate Debtor failed to repay the dues and the loan account of the Corporate Debtor became irregular. As such, on 13[th] June 2016, the loan account of the Corporate Debtor came to be classified as “Non­Performing Asset” (NPA). **3.** The appellant Bank issued a Demand Notice under Section 13(2) of the Securitisation and Reconstruction of Financial Assets and Enforcement of Security Interest Act, 2002 (hereinafter referred to as the “SARFAESI Act”), calling upon the Corporate Debtor and its guarantors to repay the outstanding amount due to the appellant Bank. Since the 2 Corporate Debtor failed to comply with the Demand Notice and repay the outstanding dues, the appellant Bank took symbolic possession of two secured assets mortgaged exclusively with it. The same was done by the appellant Bank in exercise of powers conferred on it under Section 13(4) of the SARFAESI Act read with Rule 8 of the Security Interest (Enforcement) Rules, 2002 (hereinafter referred to as the “said Rules”). One of the said properties stood in the name of Corporate Debtor and the other in the name of Corporate Guarantor. An E­auction notice came to be issued on 27[th] September 2018 by the appellant Bank to recover the public money availed by the Corporate Debtor. **4.** In the meantime, on 22[nd] October 2018, the Corporate Debtor filed a petition being CP(IB) No. 601/10/HDB/2018 under Section 10 of the Insolvency and Bankruptcy Code, 2016 (hereinafter referred to as “the IBC”) before the learned NCLT. In the first E­auction held on 6[th] November 2018, no bids were received. As such, the second E­auction notice came to be issued on 27[th] November 2018, which was scheduled to be held on 12[th] December 2018. In 3 the second E­auction, three persons became successful bidders by offering jointly a price of Rs.32.92 crore for both the secured assets. On 13[th] December 2018, the sale was confirmed in favour of the successful bidders/auction purchasers in the public auction. The successful bidders deposited 25% of the bid amount, i.e., Rs.8.23 crore including the Earnest Money Deposit of the said amount and the appellant Bank issued a sale certificate to them. The auction purchasers were directed to pay the balance 75% of the bid amount within 15 days, i.e., prior to 28[th] December 2018. **5.** It appears that the auction purchasers, on 28[th] December 2018, addressed a letter to the appellant Bank seeking handing over of peaceful and vacant possession of the secured assets and also prayed for extension of time to pay the balance 75% of the bid amount till 8[th] March 2019. The request made by the auction purchasers was accepted by the appellant Bank on 29[th] December 2018. It is the case of the appellant Bank that in exercise of its powers under Rule 9(4)(a) of the said Rules, it extended the period till 8[th] 4 March 2019 for payment of the balance 75% of the bid amount. **6.** The learned NCLT, vide order dated 3[rd] January 2019, admitted the petition filed by the ex­promoter of the Corporate Debtor. As a result of the said order passed under Section 10 of the IBC, the Corporate Insolvency Resolution Process (hereinafter referred to as “the CIRP”) of the Corporate Debtor commenced. A moratorium as provided under Section 14 of the IBC was notified and an Interim Resolution Professional (hereinafter referred to as “the IRP”) was also appointed. **7.** The appellant Bank on 21[st] January 2019, filed its claim in Claim Form­C with the IRP, upon it coming to know about the admission of the insolvency petition filed by the Corporate Debtor. According to the appellant Bank, since the balance 75% of the bid amount was not yet received on the said date, it was not excluded from the claim filed before the IRP. During the pendency of the CIRP, the appellant Bank accepted the balance 75% of the bid amount, i.e., Rs.24.69 crore on 8[th] March 2019. Upon receipt of the 5 payment, the appellant Bank submitted its revised claim in Claim Form­C to the IRP on 11[th] March 2019. The appellant Bank also intimated the IRP about the successful sale of the said secured assets. The promoter of the Corporate Debtor, i.e., respondent No.2 herein, thereafter filed an application being I.A. No.832/2020 in the pending company petition being CP(IB) No. 601/10/HDB/2018, thereby praying the learned NCLT to set aside the security realization during the CIRP period carried out by the appellant Bank or in the alternative to cancel the impugned transaction. Vide order dated 15[th] July 2020, the learned NCLT passed an order thereby allowing the said application filed by the respondent No.2 and setting aside the sale of the property owned by the Corporate Debtor. Being aggrieved thereby, the appellant Bank filed an appeal being Company Appeal (AT) (Insolvency) No. 736 of 2020 before the learned NCLAT and the same was rejected by the impugned judgment dated 26[th] March 2021. Being aggrieved thereby, the present appeal. **8.** We have heard Shri Tushar Mehta, learned Solicitor General appearing on behalf of the appellant Bank, Shri C.S. 6 Vidyanathan, learned Senior Counsel appearing on behalf of the impleading applicants, i.e., the auction purchasers, Shri K.V. Viswanathan, learned Senior Counsel appearing on behalf of the respondent No.1 and Shri Aditya Verma, learned counsel appearing on behalf of the respondent No.2. **9.** Shri Tushar Mehta submitted that the very initiation of the voluntary insolvency proceedings under Section 10 of the IBC, by the ex­promoter of the Corporate Debtor, was with _mala fide_ intent and as such, hit by Section 65 of the IBC. It is submitted that the loan account of the Corporate Debtor was classified as “NPA” on 13[th] June 2016. Thereafter on 18[th] April 2018, the appellant Bank issued a Demand Notice under Section 13(2) of the SARFAESI Act. He submitted that since the Corporate Debtor failed to make the payment, a symbolic possession came to be undertaken by the appellant Bank under Section 10 of the SARFAESI Act and an E­auction notice was issued on 26[th] September 2018. He submitted that the said notice was challenged by the Corporate Debtor by filing an application being SA No. 340/2018 before the learned Debt Recovery Tribunal­II, 7 Hyderabad (hereinafter referred to as “the DRT”). However, no stay was granted by the DRT in the said application. It is submitted that on the contrary, an order came to be passed on 29[th] October 2018 by the learned DRT, whereby confirmation of sale was stayed, subject to deposit of Rs.12 crore by the Corporate Debtor. The Corporate Debtor failed to do so. After that, with _mala fide_ intent, instead of making payment, a petition came to be filed under Section 10 of the IBC by the Corporate Debtor for the sole purpose of stalling the sale. He further submitted that the second E­auction notice was issued on 27[th] November 2018, which resulted in sale of the two properties. **10.** Shri Mehta submitted that the order of the learned NCLT, admitting the petition under Section 10 of the IBC, came to be passed only on 3[rd] January 2019, i.e., prior to confirmation of sale. He submitted that it is thus clear that the CIRP was initiated only to stall the SARFAESI proceedings. It is submitted that though the issue with regard to Section 65 of the IBC was subsequently raised by the appellant Bank, neither the learned NCLT nor the learned 8 NCLAT had considered the same. It is submitted that the _mala fide_ intention of the IRP is clear inasmuch as since the ex­promoters could not submit a credible plan, the learned NCLT, vide order dated 7[th] February 2022, has ordered for liquidation. It is submitted that a perusal of the said order dated 7[th] February 2022 would reveal that the delay was caused at the instance of the IRP, who has been seen to be helping the ex­promoters. **11.** Shri Mehta further submitted that since the moratorium under Section 14 of the IBC has ceased to subsist after the order directing liquidation was passed under Section 52 of the IBC, the secured creditors were allowed to realise their security interest. It is therefore submitted that now, there is no bar on the appellant Bank to realise its money. **12.** Shri Mehta submitted that in view of the provision of Section 54 of the IBC, the sale was complete after the appellant Bank had received 25% of the bid amount and the said was confirmed. He submitted that merely because a part of the sale consideration was received subsequently, it could 9 not affect the sale. A reference in this respect is placed on the judgments of this Court in the cases of _**Vidhyadhar v. Manikrao and Another[1]**_ , _**B. Arvind Kumar v. Govt. of India and Others[2]**_ and _**Kaliaperumal v. Rajagopal and Another[3]**_ . **13.** It is lastly submitted by Shri Mehta that Section 14(1)(c) of the IBC interdicts any action to foreclose, recover or enforce any security interest including any action under SARFAESI. However, it does not undo actions which have already stood completed. **14.** Shri Vaidyanathan, learned Senior Counsel also supported the submissions of the learned Solicitor General made on behalf of the appellant Bank. It is submitted that the promoters of the Corporate Debtor have indulged into forum shopping with the malicious intent and as such, the learned NCLT ought not to have granted relief in their favour. It is submitted that the applicants were _bona fide_ purchasers and put into possession and therefore should not be - 1 **(1999) 3 SCC 573** 2 **(2007) 5 SCC 745** 3 **(2009) 4 SCC 193** 10 disturbed. It is submitted that the Corporate Debtor’s right in respect of the mortgaged property is the right of redemption under Section 60 of the Transfer of Property Act, 1882 (hereinafter referred to as “the TP Act”). It is submitted that under Section 13(8) of the SARFAESI Act, as amended in 2016, the right of redemption is lost on issuance of public notice of auction or tender. **15.** Shri Vaidyanathan further submitted that the _mala fide_ intention of the Corporate Debtor and the IRP are glaring inasmuch as the applicants were successful auction purchasers and they were not added as party respondents in the proceedings before the learned NCLT. Relying on paragraph (21) of the Insolvency Law Committee Report, 2018, Shri Vaidyanathan submitted that the rights and priorities of creditors established prior to insolvency under commercial laws should be upheld to preserve the legitimate expectations of creditors and encourage greater predictability in commercial relationship. **16.** Shri Viswanathan, learned Senior Counsel has supported the impugned judgment passed by the learned 11 NCLAT as well as the order passed by the learned NCLT. He submitted that the title of the secured assets cannot be conveyed to the auction purchasers merely upon confirmation of sale even before receiving full sale consideration. He submitted that the title would be passed over only after receipt of the full consideration and issuance of sale certificate. The learned Senior Counsel submitted that such contentions are totally contrary in view of various provisions of the SARFAESI Act, the said Rules as well as Sections 14(1)(c), 31(1) and 238 of the IBC. He submitted that only after the transfer takes place under Rules 8 and 9 of the said Rules, the title would be passed over to the auction purchasers. He relies on the judgment of this Court in the case of _**Hindon Forge Private Limited and Another**_ _**v. State of Uttar Pradesh through District Magistrate, Ghaziabad and Another[4]**_ . **17.** Shri Viswanathan further submitted that Section 13(8) of the SARFAESI Act itself provides a right of redemption of secured assets to the owner/debtor. He relies 4 **(2019) 2 SCC 198** 12 on the judgment of this Court in the case of _**S. Karthik and Others v. N. Subhash Chand Jain and Others[5]**_ in support of this proposition. **18.** Shri Viswanathan submitted that upon approval of the Resolution Plan (hereinafter referred to as “the RP”), in view of Section 31(1) of the IBC, all the debts stand legally resolved and the same is binding on all parties including the Corporate Debtor, its employees, members, creditors, all Govt. dues and the successful resolution applicant would be entitled to start on a clean slate. The learned Senior Counsel submitted that the Jural relationship of Creditor­Debtor would get altered/severed under a new contract upon approval of a new RP. It is submitted that as a consequence, the security created under the old contract would stand released by operation of law and the relationship would be governed by the terms of the approved plan and the mortgage created under the old contract would get extinguished/novated. It is submitted that in any case, in view of Section 238 of the IBC, the provisions contained 5 **2020 SCC OnLine SC 787** 13 therein will override all other laws for the time being in force and the provisions of the IBC would also prevail over any other instrument having effect by virtue of any other law. A reliance in this respect is placed on the judgment of this Court in the case of _**Anand Rao Korada, Resolution**_ ## _**Professional v. Varsha Fabrics Private Limited and**_ ## _**Others[6]**_ . **19.** Shri Viswanathan further submitted that the continuation of any proceeding including the proceeding under the SARFAESI Act is totally illegal in view of Section 14(1)(c) of the IBC. It is, therefore, submitted that the continuation of any action under the SARFAESI Act by the appellant Bank and the receipt of the balance sale consideration was violative of Section 14(1)(c) of the IBC. He submitted that the amount payable by the Corporate Debtor to the other Financial Creditors is much more than the amount received by the appellant Bank during the pendency of the CIRP. He submitted that under the provisions of the IBC, all the Financial Creditors would be entitled to a share 6 **(2020) 14 SCC 198** 14 in the amount received upon realization of the assets of the Corporate Debtor and the appellant Bank cannot keep it in entirety. **20.** Shri Viswanathan submitted that the allegations with regard to _mala fide_ are made only in order to prejudice the Court. It is submitted that in the petition filed under Section 10 of the IBC, the Corporate Debtor has clearly mentioned about declaration of NPA by both the appellant Bank and Andhra Bank and also initiation of auction process by both the Banks. He submitted that in any case, initiation of the proceedings under the IBC for overall resolution of debts of the Corporate Debtor cannot be labelled as a _mala fide_ attempt. He submitted that Section 65 of the IBC expressly provides for the mechanism and the remedy for addressing frivolous or malicious proceedings initiated under the SARFAESI Act. However, the appellant Bank has chosen not to take recourse to such proceedings. As such, the allegations of _mala fide_ cannot be heard. **21.** Shri Verma, learned counsel also supported the impugned judgment passed by the learned NCLAT as well as 15 the order passed by the learned NCLT and the submissions made by Shri Viswanathan. It is submitted that the appellant Bank has never challenged the order dated 3[rd] January 2019, vide which the learned NCLT commenced the CIRP. He submitted that though the order of liquidation was passed by the learned NCLT on 7[th] February 2022, the same has been stayed by the learned NCLAT on 8[th] March 2022. **22.** It is further submitted by Shri Verma that as a matter of fact, after the CIRP was initiated, the appellant Bank itself has submitted its claim in Claim Form­C on 21[st] January 2019 for an amount of Rs.79.94 crore, which included the full value of the assets. It is, therefore, submitted that the appellant is estopped from contending that the amount of Rs.8.23 crore cannot be included in the amount available for CIRP. **23.** For appreciating the rival submissions, it will be apposite to refer to Section 14(1)(c) of the IBC: “ **14. Moratorium** .—(1) …… ( _a_ ) ……; ( _b_ ) …….; 16 ( _c_ ) any action to foreclose, recover or enforce any security interest created by the corporate debtor in respect of its property including any action under the Securitisation and Reconstruction of Financial Assets and Enforcement of Security Interest Act, 2002 (54 of 2002); ” ………. **24.** It is thus clear that after the CIRP is initiated, there is moratorium for any action to foreclose, recover or enforce any security interest created by the Corporate Debtor in respect of its property including any action under the SARFAESI Act. It is clear that once the CIRP is commenced, there is complete prohibition for any action to foreclose, recover or enforce any security interest created by the Corporate Debtor in respect of its property. The words “including any action under the SARFAESI Act” are significant. The legislative intent is clear that after the CIRP is initiated, all actions including any action under the SARFAESI Act to foreclose, recover or enforce any security interest are prohibited. **25.** It will also be relevant to refer to Section 238 of the IBC: 17 “ **238. Provisions of this Code to override other laws** . —The provisions of this Code shall have effect, notwithstanding anything inconsistent therewith contained in any other law for the time being in force or any instrument having effect by virtue of any such law.” **26.** It could thus be seen that the provisions of the IBC shall have effect, notwithstanding anything inconsistent therewith contained in any other law for the time being in force or any instrument having effect by virtue of any such law. **27.** It has been consistently held by this Court that the IBC is a complete Code in itself and in view of the provisions of Section 238 of the IBC, the provisions of the IBC would prevail notwithstanding anything inconsistent therewith contained in any other law for the time being in force. A reference in this respect could be placed on the judgments of this Court in the cases of _**Innoventive Industries Limited v. ICICI Bank and Another[7]**_ , _**Principal Commissioner of Income Tax v. Monnet Ispat and Energy Limited[8]**_ and 7 **(2018) 1 SCC 407** 8 **(2018) 18 SCC 786** 18 _**Ghanashyam Mishra and Sons Private Limited through the Authorised Signatory v. Edelweiss Asset Reconstruction Company Limited through the Director and Others[9]**_ . **28.** It is the contention of the appellant Bank that the sale in question was complete on its confirmation on 13th December 2018 and as such, the admission of the petition on 3rd January 2019 by the learned NCLT would not affect the said sale. Relying on the provisions of Section 54 of the TP Act, the learned Solicitor General submitted that merely because a part of the payment was received subsequently after initiation of CIRP, it will not deprive the appellant Bank from receiving the said money in pursuance to the sale which has already been completed. A reliance in this respect is placed on various judgments of this Court. **29.** Insofar as the judgment of this Court in the case of _**Vidhyadhar**_ (supra) is concerned, no doubt that it has been held that even if the full price of the property has not been paid, the transaction of the sale will take effect and the title 9 **(2021) 9 SCC 657** 19 would pass on that transaction. This Court has further held that the real test is the intention of the parties. It has been held that the parties must intend to transfer ownership of the property and that they must also intend that the price would be paid either in praesenti or in future. However, it is to be noted that in the said case, the defendant No.2 had not only executed the sale deed in favour of the plaintiff but had presented it for registration, admitted its execution before the Sub­Registrar before whom the remaining part of the sale consideration was paid and thereafter, the document was registered. **30.** In the case of _**B. Arvind Kumar**_ (supra), the property in question was a suit property and was sold in a public auction. The sale was confirmed by the District Judge, Civil and Military Station, Bangalore. What has been held by this Court is that when a property is sold by public auction in pursuance of the order of the court and the bid is accepted and the sale is confirmed by the court in favour of the purchaser, the sale becomes absolute and the title vests in the purchaser. It has been held that a sale certificate is 20 issued to the purchaser only when the sale becomes absolute. It was held that when the auction purchaser derives title on confirmation of sale in his favour and a sale certificate is issued evidencing such sale and title, no further deed of transfer from the court is contemplated or required. Additionally, in the said case, the Court found that the sale certificate itself was registered. **31.** In the case of _**Kaliaperumal**_ (supra) also, the sale deed was registered on partial payment of consideration. However, in spite of registration of the sale deed, in the facts of the said case, the Court held that what was important is the intention of the parties. It was held that normally the ownership and the title of the property will pass to the purchaser on registration of the sale deed with effect from the date of execution of the sale deed. However, that was not an invariable rule. What was paramount, was the intention of the parties. In the facts of the said case, the Court held that the parties intended that the ownership of the property would be transferred to the appellant only after the receipt of the entire sale consideration by the vendors as a condition 21 precedent. Upon interpretation of the sale deed, the Court found that the title was intended to be passed only on the payment of the balance consideration. **32.** It is further to be noted that the present case arises out of a statutory sale. The sale would be governed by Rules 8 and 9 of the said Rules. The sale would be complete only when the auction purchaser makes the entire payment and the authorised officer, exercising the power of sale, shall issue a certificate of sale of the property in favour of the purchaser in the Form given in Appendix V to the said Rules. **33.** In the case of _**Shakeena and Another v. Bank of India and Others[10]**_ , which was a case arising out of SARFAESI Act, this Court has held that the sale certificate issued in favour of the respondent No.3 did not require registration and that the sale process was complete on issuance of the sale certificate. The same has been followed by this Court in the case of _**S. Karthik**_ (supra). **34.** Undisputedly, in the present case, the balance amount has been accepted by the appellant Bank on 8[th] 10 **2019 SCC OnLine SC 1059** 22 March 2019. The sale under the statutory scheme as contemplated under Rules 8 and 9 of the said Rules would stand completed only on 8[th] March 2019. Admittedly, this date falls much after 3[rd] January 2019, i.e., on which date CIRP commenced and moratorium was ordered. As such, we are unable to accept the argument on behalf of the appellant Bank that the sale was complete upon receipt of the part payment. **35.** In view of the provisions of Section 14(1)(c) of the IBC, which have overriding effect over any other law, any action to foreclose, recover or enforce any security interest created by the Corporate Debtor in respect of its property including any action under the SARFAESI Act is prohibited. We are of the view that the appellant Bank could not have continued the proceedings under the SARFAESI Act once the CIRP was initiated and the moratorium was ordered. **36.** Insofar as the contention of the appellant Bank that the petition filed by the Corporate Debtor was mala fide is concerned, we do not find any merit in the said contention. All the details with regard to action taken by the appellant 23 Bank have been specifically mentioned in the petition filed by the Corporate Debtor. Insofar as the contention with regard to liquidation order being passed is concerned, the same is already under challenge before the learned NCLAT. As such, we need not make any observation with regard to the same. **37.** We, therefore, find that no case is made out for interfering with the concurrent orders passed by the learned NCLT dated 15[th] July 2020 and learned NCLAT dated 26[th] March 2021. **38.** In the result, the present appeal is dismissed. Pending application(s), if any, shall stand disposed of in the above terms. No order as to costs. **……..….......................J. [L. NAGESWARA RAO]** **…….........................J. [B.R. GAVAI]** **NEW DELHI; MAY 18, 2022.** 24
End of Judgment Record
Browse All Landmark Cases Judgments
2019-01-22

State of Himachal Pradesh & Anr. v. Pinju Ram & Others; State of Himachal Pradesh & Ors. v. Ganesh Dutt & Anr.

This batch of appeals concerns regularisation and monetary benefits of part‑time employees in Himachal Pradesh who were converted to daily‑wage status. The State had issued a policy on 27 February 2004: part‑time Class‑IV employees who had completed ten years of continuous service as on 31 December 2003 would be made daily wagers with prospective effect, and posts vacated by such employees would stand abolished; Education and Ayurveda were excluded from the policy. Revenue Chowkidars, engaged by Panchayats, were not covered by that policy and received separate treatment. Following writ petitions and an order of the Himachal Pradesh High Court and in light of later developments, the State drew‑up directions in 2011 (22 September) to give seniority to Revenue Chowkidars on the basis of ten years of service, but with wages from the date of actual appointment and without back‑dated monetary benefits; 7 July 2012 further instructions reiterated this stance for remaining part‑time employees, with monetary benefits not guaranteed in the interregnum. The respondents pressed for back wages dating from 1 January 2007 and broader coverage. The Supreme Court held that the 2007 back‑pay direction was unsustainable, clarified that seniority would count from ten years without past benefits, and that the 2011 policy and Moti Singh principle should guide the approach. The appeals are allowed; no costs. The related writ petitions are to be disposed of consistent with these directions.

2018-08-14

Union Bank of India and Others v. C.G. Ajay Babu and Anr.

This is a Supreme Court of India appeal concerning the forfeiture of gratuity under the Payment of Gratuity Act, 1972. The respondent was a branch manager of the appellant bank and was dismissed on 3 June 2004 after disciplinary proceedings. A show-cause notice sought to forfeit gratuity due to misconduct involving moral turpitude, which was ordered on 20 April 2004. The High Court upheld the dismissal but held that gratuity could be paid since there was no financial loss to the bank, and that a bipartite settlement between the bank and employees permitted forfeiture only where misconduct caused financial loss. The Division Bench, however, held that forfeiture under Section 4(6) must be read together with Section 4(5) and that no loss was proven, thus entitling the employee to gratuity in accordance with the bipartite settlement. The Supreme Court agreed with the High Court that forfeiture is not automatic; it is controlled by Sections 4(5) and 4(6) of the Act and by the bipartite settlement, which requires loss to justify forfeiture. The Court emphasized that an act must constitute an offence involving moral turpitude and that conviction is generally required for forfeiture under 4(6)(b)(ii). The appeal is dismissed with no costs.

2018-09-25

Reema Salkan v. Sumer Singh Salkan

This is a Supreme Court of India criminal appeal under the Criminal Appellate Jurisdiction arising from a maintenance dispute under Section 125 Cr.P.C. The parties, married in 2002, had a protracted litigation history. The Family Court granted maintenance to the wife from 17 July 2003 to 8 December 2010, and held no maintenance thereafter. The High Court, in revision, partly allowed the application, directing Rs.9,000 per month from 9 December 2010 onward, while upholding the earlier period’s Rs.10,000 per month. This Court had earlier granted interim maintenance of Rs.20,000 per month in 2014 (Criminal Appeal Nos. 2347-2349 of 2014). The appellant contends there has been no change in circumstances since the interim order and that the respondent’s substantial assets, education, and overseas earnings establish the capacity to pay higher maintenance. The respondent defends the High Court’s reasoning, arguing that the Family Court’s assessment, demeanor observations, and the principle that maintenance should not be perpetual require careful scrutiny, and that the notional minimum wage approach used by the High Court is flawed. The overarching issue is the quantum of monthly maintenance payable to the appellant and whether the interim amount should be augmented beyond the period up to 2010.”

2019-12-03

M/s Embassy Property Developments Pvt. Ltd. v State of Karnataka & Ors.

This judgment concerns three Civil Appeals filed by a Resolution Applicant, the Corporate Debtor (through its Resolution Professional) and the Committee of Creditors, challenging an Interim Order of the Karnataka High Court staying an NCLT order in proceedings under the Insolvency and Bankruptcy Code, 2016. The NCLT Chennai had admitted an application under Section 7 of the IBC against M/s Tiffins Barytes Asbestos & Paints Ltd. and directed a moratorium under Section 14. The Interim Resolution Professional then sought a deemed extension of a mining lease under MMDR Act, 1957 and the Government of Karnataka rejected it. The NCLT, by an order dated 11.12.2018, set aside the Government’s order and directed execution of Supplement Lease Deeds for the period up to 31.03.2020. The Government of Karnataka challenged this in a High Court writ petition, which stayed the impugned NCLT order. The core issues were: (i) whether the High Court may interfere under Article 226/227 with an NCLT order in IBC when an appeal lies to the NCLAT, and (ii) whether fraud can be inquired into by NCLT/NCLAT in CIRP. The Court reiterates that IBC is a complete, umbrella code with a three‑tier mechanism (NCLT, NCLAT, Supreme Court) and that public‑law disputes arising from MMDR Act obligations lie outside IBC. It ultimately holds that while NCLT/NCLAT may inquire into fraud, they cannot adjudicate MMDR‑related public legal disputes; and the High Court’s writ jurisdiction in public‑law contexts remains permissible. The appeals are dismissed.