High CourtSingle JudgeApplication dismissed.

India Household and Healthcare Ltd. v. LG Household and Healthcare Ltd.

Case / Petition Number:Arbitration Petition No. 18 of 2005
Neutral Citation:...

Case Details & Bench

Court
High Court
Hon'ble Judges
  • S. B. Sinha
Judgment Date
2007-03-08
Court Decision / Holding
Application dismissed. The petition under Section 11(5)/(6) of the Arbitration and Conciliation Act, 1996 was dismissed as not maintainable at this stage, with no costs.
Final Disposition
Application dismissed.

Parties to the Case

Appellants / Petitioners

  • India Household and Healthcare Ltd.

Respondents

  • LG Household and Healthcare Ltd.

Legal Representation & Advocates

Counsels for Petitioners

  • • Dushyant Dave
  • • Udaya Kumar Sagar
  • • Beena Madhvan
  • • R.K. Joshi
  • • Shashank Kumar
  • • Hari Kumar G.
  • • Manjula Gupta

Counsels for Respondents

  • • R.F. Nariman
  • • Ashok H. Desai
  • • Devraj Ashok
  • • Vikas Mehta

Case Synopsis & Summary

This is a civil appellate jurisdiction matter under sections 11(5) and (6) of the Arbitration and Conciliation Act, 1996, filed as Arbitration Petition No. 18 of 2005. The petition concerns appointment of an arbitrator in a dispute arising from a Memorandum of Understanding dated 1 November 2003 and a Licence Agreement dated 8 May 2004, containing an arbitration clause (12.2) which provides for a common arbitrator if agreed or two arbitrators, one by each party. The respondent contends that the MOU and Licence Agreement were vitiated by fraud, allegedly involving Korean officials, with misrepresentation and forged signatures; the Madras High Court had issued interim injunction on 6 October 2005 restraining the petitioners from acting on the MOU, Licence Agreement and related minutes, which was later made absolute by an order on 21 January 2006. The applicant argues that where an arbitration agreement exists, the court should uphold it (Section 5 of the Act), that Section 16 allows the arbitrator to determine the validity of the arbitration clause, and that the dispute lies within the arbitration clause. The respondent counters that the entire agreement is void due to grave fraud and that the injunction and bifurcation issues render the petition premature. The Court ultimately dismissed the application as not maintainable at this stage, noting noncompliance with agreed arbitration procedures and the impact of the injunction.

Provisions of Law Cited

Arbitration and Conciliation Act, 1996 - Section 11(5) and (6)Arbitration and Conciliation Act, 1996 - Section 16Arbitration and Conciliation Act, 1996 - Section 8Arbitration and Conciliation Act, 1996 - Section 45Arbitration and Conciliation Act, 1996 - Section 5Code of Civil Procedure - Order XXXIX, Rule 2Code of Civil Procedure - Section 151

Legal Doctrines & Maxims

  • Doctrine of comity or amity
  • Fraud vitiates all solemn acts
  • Ipso jure (arbitration clause independence from contract)

Submissions & Arguments

Contentions of Appellants / Petitioners

Applicants argued that there exists a valid arbitration agreement in the 8 May 2004 Licence Agreement (Clause 12.2) allowing a common arbitrator or two arbitrators, with disputes arising out of the MOU and Licence being referable to arbitration. They maintain the arbitration clause is valid and should be enforced under Section 11(5)/(6), and that Section 16 permits the arbitrator to rule on the validity of the arbitration clause. They contend that once an arbitration agreement exists, judicial intervention is barred except to determine the existence of the agreement; the dispute over LG’s logo falls within the scope of arbitration; fraud affecting the contract does not automatically nullify the arbitration clause unless the contract itself is void ab initio; comity and UNCITRAL principles favor upholding the arbitration agreement.

Contentions of Respondents

Respondents submit that the entire MOU and Licence Agreement are tainted by grave fraud committed by officers representing the petitioner, and therefore the arbitration agreement cannot be treated as valid. They rely on SBP & Co. v. Patel Engineering Ltd. (Constitution Ben ch) to argue that fraud can render the entire agreement void and thus voids the arbitration agreement. They point to absence of the original agreement for signature comparison, the Madras High Court injunction order dated 6 October 2005 (confirmed 21 January 2006), and the possibility that the arbitration clause contains ambiguities or overlaps with lit igation. They argue that some disputes fall outside the arbitration scope, and that neither party has appointed an arbitrator, rendering the petition premature. They urge adherence to the agreed procedure and the injunctions already in place.

Cited Precedents (11)

Case NameCitationTreatmentExplanation
SBP & Co. v. Patel Engineering Ltd and Anr.(2005) 8 SCC 618PositiveConstitution Bench decision cited to explain judicial authority on fraud and arbitration; used to frame the approach that fraud can affect the arbitration agreement and that the court may decide certain questions but ultimately should honor the arbitration framework where valid.
Hamza Haji v. State of Kerala and Anr.(2006) 7 SCC 416PositiveCited to support the proposition that fraud vitiates solemn acts and has material effect on enforceability.
Prem Singh and Ors. v. Birbal and Ors.(2006) 5 SCC 353PositiveCited for its stance on fraud affecting enforceability of contracts/arbitration clauses.
Jai Narain Parasrampuria (Dead) and Ors. v. Pushpa Devi Saraf and Ors.(2006) 7 SCC 756PositiveCited in context of fraud and validity; used to reinforce importance of fraud considerations in arbitration.
Sukanya Holdings (P) Ltd. v. Jayesh H. Pandya and Anr.(2003) 5 SCC 531PositiveCited regarding non-splitting a suit and limits of referring disputes to arbitration; later distinguished in Rashtriya Spat Nigam Ltd. & Anr. v. Verma Transport Co.
Rashtriya Spat Nigam Limited and Anr. v. Verma Transport Company(2006) 7 SCC 275DistinguishedNoted as having distinguished Sukanya Holdings; used to show conflicting approaches to bifurcation/arbitration in related contexts.
Mis Transmission Corporation of A.P. Ltd. & Ors. v. Mis Lanco Kondapalli Power Pvt. Ltd.(2006) I SCC 540Mentioned OnlyCited in injunctive/comity discussion; not central to the main holding.
Morgan Securities and Credit Pvt. Ltd. v. Modi Rubber Ltd.(2006) 14 SCALE 267Mentioned OnlyCited for injunctive/comity considerations; not central to the decision on arbitration.
Manohar Lal Chopra v. Rai Bahadur Rao Raja Seth Hirata!AIR (1962) SC 527Mentioned OnlyCited in the context of injunction jurisprudence and judicial comity.
National Highways Authority of India and Anr. v. Bumihiway DDB Ltd. (JV) and Ors.(2006) 9 SCALE 564PositiveCited to emphasize that parties must comply with the agreed arbitration procedure.
Pandey and Co. Builders Pvt. Ltd. v. State of Bihar and Anr.(2006) 11 SCALE 665PositiveCited to discuss the philosophy of the 1996 Act and its difference from old regimes; supports upholding arbitration in the appropriate context.

Diagnostic Tool

Beta

Does this judgment govern your specific facts?

Don't risk relying on a distinguishable precedent. Enter your facts or proposition below. We will test it against India Household and Healthcare Ltd. v. LG Household and Healthcare Ltd. and instantly map out authorities that support, challenge, or govern your position.

Extracted Judgment Text

Exact text extracted from official judgment records.

## A ## INDIA HOUSEHOLD AND HEALTHCARE LTD. _v._ ## LG HOUSEHOLD AND HEALTHCARE LTD. ## MARCH 8, 2007 ## B [S.B. SINHA, J.] _Arbitration and Conciliation Act, 1996-Section 11(5) and (6)Appointment of arbitrator-Application under-Maintainability of-Held: Not maintainable since the arbitration agreement was vitiated by fraud-_ C _High Court passed injunction order that the applicant was restrained from taking any action in terms of the agreement and the same became Jina/Doctrine of comity or amity required a Court not to pass order in conflict with another order passed by competent court of law-Procedure and mechanism agreed by the parties not complied with-Applicant did not_ D _appoint its arbitrator nor called upon the other party to appoint its arbitrator in terms or the arbitration agreement-A/so, the relief sought fell outside the scope of arbitration agreement._ The petitioner and the respondent entered into Memorandum of Understanding. Thereafter, the parties entered into a licence agreement which E contain1~d an arbitration clause and in terms thereof parties if agreed could appoint a common arbitrator or otherwise one arbitrator could be appointed by each of the parties to the agreement. Dispute arose in regard to the use of Logo L.G. It is alleged that the respondent did not appoint arbitrator inspite of notice. Respondent contended that the purported MOU and licence F agreement were vitiated by fraud. Respondent filed suit for injunction against petitioners. High Court granted injunction and restrained the petitioners from acting on the MOU and the licence agreement. Hence the present application by the petitioners under section 11(5) and (6) of Arbitration and Conciliation Act, 1996 for appointment of arbitrator. ~ ## G Dismissing the petition, the Court HELD: I. I. Where existence of an. arbitration agreement can be found, apart from the existence of the original agreement, the Courts would construe the agreement in such a manner so as to uphold the arbitration agreement. H 726 INDtA HOUSEHOLD A~D HEALTHCARE LTD ,._ LtJ HOL'SEHOLD AND HEALTIKARE L 11) 727 -..-1 However, when a question of fraud is raised, the same has to be considered differently. Fraud, as is well known, vitiates all salemn acts. A contract would mean a valid contract; an arbitration agreement would mean an agreement which is enforceable in law. (Para 10( (732-E( _SBP & Co._ v. _Patel Engineering Ltd. and Anr.,_ (2005) 8 SCC 618; _Hamza Haji_ v. _State of Kera/a and Anr.,_ (2006) 7 SCC 416; _Prem Singh and_ B _Ors._ v. _Birbal and Ors.,_ (2006) 5 C 353 and _Jai Narain Parasrampuria (Dead) and Ors._ v. _Pushpa Devi Saraf and Ors.,_ (2006) 7 SCC 756, relied on. 1.2. The power exercised by Chief Justice or his designate under section 11(5) & (6) of Arbitration and Conciliation Act, 1996 is no longer an C administrative power. The purported arbitration agreement is an international commercial arbitration agreement. Section 16 of the 1996 Act which is in Chapter 4 of Part I thereof may not, thus, be applicable in this case. Even if it applies, the jurisdiction of the arbitrator to determine his own jurisdiction is on the basis of that arbitration clause which may be treated as an agreement D independent of the other terms of the contract and his decision that the contract is null and void shall not entail _ipso jure_ the validity of the arbitration clause. But. the question would be different where the entire contract containing the arbitration agreement stands vitiated by reason of fraud of this magnitude. It may be noticed that Part II of the 1996 Act contains a provision for approaching the court. Section 45 of the 1996 Act contains a non-obstante clause. E Therefore, a judicial authority, may entertain an application at the instance of a party which alleges that there exists an arbitration agreement whereupon judicial authority may refer the parties to arbitration, save and except in a case where it finds that the said agreement is null and void, inoperative and incapable of being performed. Section 8 of the 1996 Act, however, is differently F worded. Thus, as and when a question in regard to the validity or otherwise of the artitration agreement arises, a judicial authority would have the jurisdiction under certain circumstances to go into the said question. (Paras 12 and 13) (733-E, F, G, H; 734-A) 1.3. Not only the parties to the agreement but also those officers who G have negotiated on behalf of tbe respective companies are also parties therein. LG Corporation which is the owner of the LG logo is also a party therein. Therein, an order of injunction had been passed. In terms of the said order of injunction, the applicant herein was prohibited from taking any action in terms of the said agreement which would include the arbitration clause also. The H 728 SUPREME COURT REPORTS [2007) 3 S.C.R. A order dated 21.01.2006 has become final. No appeal has been preferred thereagainst. The applicant could have filed an appropriate application for· modification of the order of injunction which it did not choose to do. The doctrine of comity or amity required a court not to pass and order which would be in conflict with another order passed by a competent court of law. The courts have jurisdiction to pass an order of injunction not only under Order :XXXIX, B Rule 2 of the Code of Civil Procedure but also under Section 151 thereof. [Para 151 [734-C, D, E[ _Mis Transmission Corporation of A.P. Ltd. & Ors._ v. _Mis Lanco Kondapalli Power Pvt. Ltd.,_ (2006) I SCC 540; _Morgan Securities and Credit_ C _Pvt. Ltd._ v. _Modi Rubber Ltd,_ (2006) 14 SCALE 267 and _Manohar Lal Chopra_ v. _Rai Bahadur Rao Raja Seth Hirata!,_ AIR (1962) SC 527, referred to. _Law Governing Injunctions' by Spelling and Lewis',_ referred to. 1.4. A court while exercising its judicial function would ordinarily not pass an order which would make one of the parties to the lis violate a lawful D order passed by another court. !Para 18) (735-CJ 1.5. Applicant prayed for reliefs with regard to the issue of use of LG logo. The said prayers fell outside the arbitration agreement since LG Logo belongs to LG Corporation which is the owner of the trade mark and was not E party to arbitration agreement. It had filed a separate suit. [Paras 19 and 20! (735-D, E( _Sukanya Holdings (P) Ltd._ v. _Jayesh H. Pandya and Anr.,_ (2003) 5 SCC 531, relied on. 1.6. By reason of a notice dated 15.04.2005, only a request had been F made to nominate a person in Chennai with whom the respondent could "interact to agree on the arbitrator to whom the claims can be made to decide the disputes between the parties". Applicant has not appointed its arbitrator. Respondent has also not been called upon to appoint its arbitrator by the said notice or otherwise. An application for appointment of an arbitrator, therefore, G is not maintainable unless the procedure and mechanism agreed to by and between the parties is complied with. (Paras 22 and 23) (735-F, G( _National Highways Authority of India and Anr._ v. _Bumihiway DDB Ltd_ · _(JV) and Ors.,_ (2006) 9 SCALE 564, relied on. H _Pandey and Co. Builders Pvt. Ltd_ v. _State of Bihar and Anr.,_ (2006) 11 c ~ !~DIA HOUSEHOLD AND HEALTIKARE LTD.•·. LG HOUSEHOLD AND HEALTHCARE LTD. [SB SINHA. J J 729 _,. SCALE 665 and _Rashtriya /spat Nigam Limited and Anr._ v. _Verma Transport_ A _Company,_ (2006( 7 SCC 275, referred to. CIVIL APPELLATE JURISDICTION : Arbitration Petition No. 18 of 2005. Dushyant Dave, Udaya Kumar Sagar, Beena Madhvan, R.K. Joshi, Shashank Kumar, Hari Kumar G. and Manjula Gupta for the appellant. R.F. Nariman, Ashok H. Desai, Devraj Ashok and Vikas Mehta for the respondent. The Judgment of the Court was delivered by S.B. SINHA, J. I. This application under Sub-sections (5) and (6) of Section 11 of the Arbitration and Conciliation Act, 1996 (for short "the 1996 Act") has been filed for appointing an arbitrator on the respondent's purported · · failure to do so in spite of notice dated 15.04.2005. ~ ). 2. Allegedly, an agreement was entered into by and between the parties D hereto on 8.05.2004. The said agreement contained an arbitration clause being Clause 12 thereof, the relevant portion whereof reads as follows: "12.2 In the event of any dispute or difference arising between the parties hereto or as to the rights and obligations under this agreement or as to any claim monetary or otherwise of one party to another, such E dispute or difference shall be referred to arbitration of a common arbitrator, if agreed upon, otherwise to two or more arbitrators, one to be appointed by each of the parties to this agreement and such arbitration shall be governed by the Arbitration and Conciliation Act, 1996, for the time being in force. The venue for such arbitration shall F be in India or as is mutually decided otherwise. Until a finality is achieved in the arbitration or litigation, the Licensor shall have no right to cancel the agreement and appoint any third party or enter into agreement with any party for the sale/ importation or manufacture of. the products/ provision of services in the territory." G 3. Respondent, however, contends that the said agreement was preceded by a Memorandum of Understanding dated 1.11.2003. Respondent further contends that the said purported Memorandum of Understanding an(:! licence agreement dated 8.05.2004 are vitiated by a fraud of a very large magnitude fructified by a criminal conspiracy hatched between Mis. K.P. Jayram Pillai and Vijay R. Singh representing the petitioner and _Mis._ C.H. Kim and B.K. H ## 730 ## SUPREME COURT REPORTS [2007) 3 S.C.R. - A[Jung ][representing ][the ][respondent. ][The ][petitioner -][company ][bribed ][the ][said ] C.H. Kim and B.K. Jung for the purpose of creation of the aforesaid documents. They had already been convicted and sentenced to undergo imprisonment by the Korean Criminal Court. It was contended that they misused their official position to advance private benefit There seems to be a substantial and reasonable nexus to promote personal advantage. There was furthermore no - B ostensible authority on their part to represent the company. The said Memorandum of Understanding also contravenes the Korean laws in terms whereof the execution thereof required the prior approval of and a duly executed power of attorney from the Representative Director and the Chief Executive Officer of the respondent which did not exist in the present case. - c 4. Respondent has also filed a suit in the Madras High Court wherein by an order dated 6.10.2005, a learned Single Judge of the said High Court directed: ,,.._ .. - "I. That I. India Household and Health Care Limited, through Mr. - D Vijay R. Singh its Managing Director 2. Mr. K.P. Jayaram _Clo_ India Household and Health Care Ltd. and 3. Mr. Vijay R. Singh, the respondents 1 to 3 herein, their agents, men, assigns, representatives, employees or any one claiming through or under them be and are hereby restrained by an order of interim injunction until further orders of this Court directly or indirectly acting on the so called MOU dated - E November I, 2003, the License Agreement and the minutes dated May 8, 2004 respectively, or deriving any other benefit based upon the so called MOU, the License Agreement and Minutes, in any manner whatsoever." 5. The said interim order has been confirmed by an order dated 21.01.2006 - F stating: "That the order of interim injunction granted in pur~uance of the order dated 06/10/2005 restraining the First, Second and Third Respondents, therein their agents, men, assigns, representatives, employees or any one claiming through or under them from directly or indirectly acting on the so called MOU dated November I, 2003, the License Agreement and the minutes dated May 8, 2004, respectively, or deriving any other benefit based upon the so called MOU. the License Agreement and Minutes, in any manner whatsoever together be and is hereby made absolute." G > ).. ' ~[, ] - t H INDlA H0l[1] SEHOLD A'.'\D HE..\L THC ARE LTD. 1·. LG HOUSEHOLD _:\'.SD_ HEALTHCARE LTD. fS.B SINl-i..\. J l 73 } 6. This Court's attention was further drawn to the fact that in the plaint A _) of the said suit it had categorically been stated that the private respondents therein hatched their conspiracy to defraud the respondent and for the purpose of obtaining bribes, commissions and kickbacks and in that view of the matter the entire agreement is vitiated in law. 7. Mr. Dushyant Dave, learned senior counsel appearing on behalf of[B ] the petitioner, in support of this application, would submit: - (i) the execution of the agreement dated 8.05.2004 has not been denied or disputed. - (ii) The correspondences have been passed between the parties c between the period 8.05.2004 and 5.02.2005 and dispute arose in regard to the use of the logo 'L.G .' - (iii) The arbitration agreement being a part of the contract, the validity or otherwise thereof can be gone into by the arbitrator in terms of Section 16 of the 1996 Act. D _..(_ - (iv) Once an arbitration agreement is found to exist; having regard to Section 5 thereof, no judicial authority can exercise any jurisdiction in the matter . - (v) This Court, having regard to the philosophy underlying the 1996 Act should uphold the arbitration agreement between the parties.[E ] 8. Mr. R.F. Nariman, learned senior counsel appearing on behalf of the respondent, on the other hand, would submit: >- _>_ - (i) in view of the Constitution Bench decision of this Court in _SBP_ F - _& Co._ v. _Patel Engineering Ltd and Anr.,_ (2005] 8 SCC 618, this Court is obligated to go into the question as to whether the entire · agreement is vitiated by fraud as a result whereof no valid arbitration agreement came into being. - (ii) a fraud of grave magnitude having been committed insofar as the G - officers representing the company had used different signatures, the entire agreement is vitiated. - '/ - (iii) The original agreement has not been produced before any court so as to compare the signatures of the persons with their original. - (iv) An order of injunction having been passed by a learned Judge H 732 SUPREME COURT REPORTS [2007] 3 S.C.R. A of the Madras High Court on 6.10.2005, this Court should not exercise its discretionary jurisdiction. - (v) The arbitration agreement is vague as it contemplates both litigation as also an arbitration. ## **B** - (vi) In any event, the applicant having not appointed its arbitrator in terms of the purported arbitration agreement, the application is premature. - (vii) As some of the disputes fall outside the scope of the arbitration agreement, this application is not maintainable. C 9. There cannot be any doubt whatsoever that there exists a sharp distinction between the provisions of the Arbitration Act, 1940 and the 1996 Act. The philosophy of the 1996 Act is different. The 1996 Act is required to be read keeping in view the UNCITRAL Model Rules. _[Pandey and Co. Builders Pvt. Ltd._ v. _State of Bihar and Anr.,_ (2006) **11** SCALE 665 and **D** _Rashtriya /spat Nigam Limited and Anr._ v. _Verma Transport Company,_ [2006] 7 SCC275] I 0. It is also no doubt true that where existence of an arbitration agreement can be found, apart from the existence of the original agreement, the Courts would construe the agreement in such a manner so as to uphold E the arbitration agreement. However, when a question of fraud is raised, the same has to be considered differently: Fraud, as is well known, vitiates all solemn acts. A contract would mean a valid contract; an arbitration agreement would mean an agreement which is enforceable in law. F ## G **H** 11. Before embarking upon the rival contentions noticed hereinbefore, we may notice that a 7-Judge Bench of this Court in _SBP & Co._ (supra) opined that an order passed by the Chief Justice or his designate under Subsection (5) or (6) of Section **11** of the 1996 Act is judicial in nature. It was stated: "39. It is necessary to define what exactly the Chief Justice, approached with an application under Section 11 of the Act, is to decide at that stage. Obviously, he has to decide his own jurisdiction in the sense, whether the party making the motion has approached the right High Court. He has to decide whether there is an arbitration agreement, as defined in the Act and whether the person who has made the request _**-'I**_ _->_ INOIA HOUSEHOLD AND HEALTHCARE LTD.,._ LG HOUSEHOLD A~D HEALTHCAaE LTD (SB. SINHA, J J 733 •• - before him, is a party to such an agreement. 1t iS11ecessary to indicate A that he can also decide the question whether the claim was a dead one; or a long barred claim that was sought to be resurrected and whether the parties have concluded tbe transaction by recording satisfaction of their mutual rights and obligations or by receiving the final payment without objection. It may not be possible at that stage, B to decide whether a live claim made, is one which comes within the purview of the arbitration clause. It will be appropriate to leave that question to be decided by the arbitral tribunal on taking evidence, along with the merits of the claims involxed in the arbitration. The Chief Justice has to decide whether the applicant has satisfied the conditions for appointing an arbitrator under Section 11(6) of the Act. C For the purpose of taking a decision on these aspects, the Chief Justice can either proceed on the basis of affidavits and the documents produced or take such evidence or get such evidence recorded,' as may be necessary. We think that adoption of this procedure in the context of the Act would best serve the purpose so11ght to be achieved by the Act of expediting the process of arbitration, without too many D approaches to the court at various stages of the proceedings before the Arbitral tribunal." 12. The power of this Court, therefore, no longer is an administrative power. The purported arbitration agreement is an international commercial E arbitration agreement. Section 16 of the 1996 Act which is in Chapter 4 of Part I thereof may not, thus, be applicable in this case. Even if it applies, the jurisdiction of the arbitrator to determine his own jurisdiction is on the basis of that arbitration clause which may be treated as an agreement independent of the other terms of the contract and his decision that the contract is null and void shall not entail _ipso jure_ the validity of the arbitration clause. But, F the question would be different where the entire contract containing the arbitration agreement stands vitiated by reason of fraud of this magnitude. It may be noticed that Part II of the 1996 Act contains a provision for approaching the court. Section 45 of the 1996 Act contains a non-obstante clause. A judicial authority, therefore, may entertain an application at the instance of a G party which alleges that there exists an arbitration agreement whereupon judicial authority may refer the parties to arbitration, save and except in a case where it finds that the said agreement is null and void, inoperative and incapable of being performed. Section 8 of the 1996 Act, however, is differently worded. H 734 SUPREME COURT REPORTS " [2007) 3 S.C.R. J...._ G A 13. Thus, as and when a question in regard to the validity or otherwise of the arbitration agreement arises, a judicial authority would have the jurisdiction under certain circumstances to go into the said question. 14. Fraud, as is well known, vitiates all solemn acts. [See _Hamza Haji_ v. _State of Kera fa and Anr.,_ [2006] 7 SCC 416, _Prem Singh and Ors._ v. _Birbal_ B _and Ors,_ [2006] 5 sec 353 and _Jai Narain Parasrampuria (Dead) and Ors_ v. _Pushpa Devi Saraf and Ors.,_ [2006] 7 SCC 756] 15. The said issue is pending consideration before the Madras High Court. i'1ot only the parties to the agreement but also those officers who have C negotiated on behalf of the respective companies are also parties therein. LG Corporation which is the owner of the LG logo is also a party therein. Therein, an order of injunction had been passed. In terms of the said order of injunction, the applicant herein was prohibited from taking any action in terms of the said agreement which would include the arbitration clause also. The order dated 21.01.2006 has become final. No appeal has been preferred thereagainst. The [) applicant could have filed an appropriate application for modification of the order of injunction which it did not choose to do. The doctrine of comity or amity required a court not to pass and order which would be in conflict with another order passed by a competent court of law. The courts have jurisdiction to pass an order of injunction not only under Order XXXlX, Rule 2 of the Code of Civil Procedure but also under Section 151 thereof. E 16. This aspect of the matter has been considered in 'A Treatis•! on The Law Governing Injunctions' by Spelling and Lewis' wherein it is stated : "Sec. 8. Conflict and Loss of Jurisdiction. F Where a court having general jurisdiction and having acquired jurisdiction of the subject-matter has issued an ;njunction, a court of concurrent jurisdiction will usually refuse to interfere by issuance of a second injunction. There is- no established rule of exclusion which would deprive a court of jurisdiction to issue an injunction because of the issuance of an injunction between the same parties appertaining to the same subject-matter, but there is what may properly be termed a judicial comity on the subject. And even where it is a ca~;e of one court having refused to grant an injunction, while such refosal does not exclude another coordinate court or judge from jurisdiction, yet the granting of the injunction by a second judge may lead to H > INDIA HOUSEHOLD AND HEAL THC AREL TD ,. LG HOUSEHOLD AND HEAL THC AREL TD IS B SINHA. J] 73 5 ## complications and retaliatory action ... " A [See also _Mis Transmission Corporation of A.P. Ltd. & Ors._ v. _Mis Lanco Kondapalli Power Pvt. Ltd.,_ [2006] I SCC 540 and _Morgan Securities and Credit Pvt. ltd._ v. _Modi Rubber ltd.,_ (2006) 14 SCALE 267] 17. In _Manohar Lal Chopra_ v. _Rai Bahadur Rao Raja Seth Hirata!,_ AIR B (1962) SC 527, this Court injuncted a party from prosecuting a suit wherein power under Section l 0 of the Code of Civil Procedure could not have been exercised. 18. A court while exercising its judicial function would ordinarily not pass an order which would make one of the parties to the Jis violate a lawful C order passed by another court. 19. Furthermore, the applicant herein has also prayed for inter alia the following reliefs: "c. Whether the issue of use of LG logo is a valid and tenable ground D for the termination of agreements between the parties? , "' )'- ..; d. Whether the Petitioner is entitled under the agreements to continue with the production of the "Products" with LG logo as agreed between the parties?" 20. The said prayers fall outside the arbitration agreement since LG Logo belongs to LG Corporation which is the owner of the trade. mark. It is not a party to the arbitration agreement. It is allegedly has filed a separate suit. In a case of this nature, a Division Bench of this Court in _Sukanya Holdings (P) Ltd._ v. _Jayesh H. Pandya and Anr.,_ [2003] 5 SCC 531 held: "Secondly, there is no provision in the Act that when the subjectmatter of the suit includes subject-matter of the arbitration agreement as well as other disputes, the matter is required to be referred to arbitration. There is also no provision for splitting the cause or parties and referring the subject-matter of the suit to the arbitrators. It was further stated : E F G "The next question which requires consideration is - even if there is no provision for partly referring the dispute to arbitration, whether such a course is possible under. Section 8 of the Act. In our view, it H 736 SUPREME COURT REPORTS [200'.'] 3 S.C.R. ## A ## B would be difficult to give an interpretation to Section 8 under which bifurcation of the cause of action, that is to say, the subject-matter of· the suit or in some cases bifurcation of the suit between parties who are parties to the arbitration agreement and others is possible. This would be laying down a totally new procedure not contemplated under the Act. If bifurcation of the subject-matter of a suit was contemplated, the legislature would have used appropriate language to permit such a course. Since there is no such indication in the language, it follows that bifurcation of the subject-matter of an action brought before a judicial authority is not allowed. Secondly, such bifurcation of suit in two parts, one to be decided c by the Arbitral Tribunal and the other to be decided by th1: civil court would inevitably delay the proceedings. The whole purpose of speedy disposal of dispute and decreasing the cost of litigatio~ would be frustrated by such procedure. It would also increase the cost of litigation and harassment to the parties and on occasions there is D possibility of conflicting judgments and orders by two different forums." 21. We are, however, not oblivious of the fact that _Sukanya Holdings_ (supra) has been distinguished in _Rashtriya /spat Nigam Limited and Anr._ v. _Verma Transport Company,_ [2006] 7 SCC 275. The present case, however, is E covered by _Sukanya Holdings_ (supra). 22. By reason of a notice dated 15.04.2005, only a request had been made to nominate a person in Chennai with whom the respondent could "interact to agree on the arbitrator to whom the claims can be made to decide the disputes between the parties". F 23. Applicant has not appointed its arbitrator. Responden•: has also not been called upon to appoint its arbitrator by the said notice or otherwise. An application for appointment of an arbitrator, therefore, is not maintainable unless the procedure and mechanism agreed to by and betwe1:n the parties G is complied with. )-- ~ 24. In _National Highways Authority of India & Anr._ v. _Bumihiway DDB Ltd. (JV) & Ors.,_ (2006) 9 SCALE 564, it was opined:- H "44 ... The parties have entered into a contract after fully understanding the import of the terms so agreed to from which there cannot be any **INDIA MOUSEHOLO AND HEALTHC.\.RE LTD I'. LG HOUSEHOLD AND HEALTHCARE LTD [SB** sr~IL\, I.J **73 7** deviation. The Courts have held that the parties are required to comply A with the procedure of appointment as agreed to and the defaulting party cannot be allowed to take advantage of its own wrong." 25. For the views, I have taken, it is not necessary to consider the other submissions made at the bar. B 26. For the reasons aforementioned, this application is dismissed being not maintainable at this stage. No costs. N.J. Application dismissed.