HYTHRO POWER CORPORATION LTD. v. DELHI TRANSCO LTD.

Case / Petition Number:
Civil Appeal No. 5315 of 2003
Neutral Citation:SUPREME COURT REPORTS [2003] SUPP. I S.C.R.

Case Synopsis & Summary

This Supreme Court judgment deals with the referability of disputes to arbitration under the Arbitration and Conciliation Act, 1996. The Delhi High Court had declined to refer the parties’ disputes to arbitration under Section 11 on the ground that there was no written arbitration agreement as per the Notification inviting Tender (NIT) and subsequent correspondence. The appellant contends that the NIT’s arbitration clause, read with exchange of correspondence and acceptance, created an arbitration agreement, and that under Section 16 the Arbitral Tribunal is empowered to determine the existence and validity of an arbitration agreement. The designate of the Chief Justice, acting under Section 11, and the High Court, however, acted in adjudicatory fashion on the issue of existence/validity, which the appellant argues is improper because Section 11 deals with administrative functions and Section 16 governs the tribunal’s jurisdiction to decide existence/validity. The Court cites Konkan Railway decisions (three-judge and Constitution Bench) and Nimet Resources and Food Corporation of India to reiterate that the designation under Section 11 is administrative and not judicial, and that disputes on the existence of an arbitration agreement must be decided by the arbitral tribunal. The appeal is allowed, the orders quashed, and the matter remanded for constitution of an arbitral tribunal under the arbitration clause in the NIT with reference under Section 11.”

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • SHIVARAJ V. PATIL
  • D. M. DHARMADHIKARJ
Judgment Date
2003-07-30
Court Decision / Holding
Appeal allowed. The impugned order(s) of the Delhi High Court are quashed. The case is remanded to the Chief Justice or his designate for hearing the parties on the limited question of constitution of an arbitral Tribunal in accordance with the arbitration clause in the NIT and for making a reference for arbitration under Section 11 of the Arbitration and Conciliation Act, 1996. Costs shall abide the final results of the arbitration proceedings.
Final Disposition
Appeal allowed; impugned orders quashed; remanded for constitution of arbitral Tribunal under Section 11 and reference to arbitration in accordance with the NIT.

Parties to the Case

Appellants / Petitioners

  • HYTHRO POWER CORPORATION LTD.

Respondents

  • Delhi Transco Ltd.

Legal Representation & Advocates

Counsels for Petitioners

  • • Sudhir Chandra
  • • Dharmesh Mishra
  • • Rajat Navet (for the Appellant)

Counsels for Respondents

  • • Rakesh Kumar Sharma

Provisions of Law Cited

Arbitration and Conciliation Act, 1996 - Section 11Arbitration and Conciliation Act, 1996 - Section 16Constitution of India, 1950 - Article 226Arbitration and Conciliation Act, 1996 - Section 7(4)(b)Arbitration and Conciliation Act, 1996 - Section 11(6)

Legal Doctrines & Maxims

  • Administrative function vs judicial function doctrine under Section 11
  • Minimize the supervisory role of courts in arbitral process
  • Arbitral Tribunal's exclusive jurisdiction to decide existence/validity of arbitration agreement under Section 16
  • Legislative intent underlying the 1996 Act to minimize court involvement in arbitration

Submissions & Arguments

Contentions of Appellants / Petitioners

The designate of the Chief Justice under Section 11 acts only administratively and cannot adjudicate on the existence or validity of the arbitration agreement. The arbitration clause within the NIT, read with correspondence and acceptance, constitutes an arbitration agreement and the dispute is therefore referable to arbitration under Section 16. The High Court’s and the Section 11 order erred in adjudicating the existence of the agreement; the matter should be referred to an Arbitral Tribunal for determination of existence/validity per Section 16. The decisions in Konkan Railway (three-judge and Constitution Bench) and Nimet Resources, as well as Food Corporation of India, support this approach; hence the appeal should be allowed and the case remanded for constitution of an arbitral tribunal.

Contentions of Respondents

There is no written arbitration agreement; without a valid arbitration clause the dispute cannot be referred to arbitration. The designate under Section 11 cannot adjudicate on the existence/validity of an arbitration agreement and the High Court’s writ petition should stand. The NIT’s arbitration clause cannot be read into the contract unless a clear and definite arbitration agreement exists in writing; the reasons given by the High Court were correct and there is no jurisdictional basis to refer the dispute to arbitration.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (5)

Case NameCitationTreatmentExplanation
Konkan Railway Corporation Ltd. v. Mehul Construction Co.[2000] 7 SCC 201PositiveThree-judge and Constitution Bench decisions held that the Chief Justice or his designate under Section 11 exercises administrative functions and cannot adjudicate on the existence of an arbitration agreement; hence the arbitration clause should be referred to the Arbitral Tribunal under Section 16.
Konkan Railway Corporation Ltd. v. Rani Construction P. Ltd.[2002] 2 SCC 388PositiveAffirms the principle that issues concerning the arbitration agreement are to be decided by the Arbitral Tribunal, not by the designate under Section 11, reinforcing the need for reference when a potential arbitration clause exists.
Nimet Resources Inc. v. Essar Steels Ltd.[2000] 7 SCC 497PositiveCited to illustrate the nuanced view that the designate under Section 11 may decide existence of an arbitration agreement in certain contexts, but where the correspondence is unclear, Section 16 should govern the question.
Food Corporation of India v. Indian Council of Arbitration and Ors.JT (2003) 5 SC 480PositiveAcknowledges the trend that avoids judicial adjudication of the existence of arbitration agreements and emphasizes referral to arbitration where appropriate.
Wellington Associates Ltd. v. Kirti Mehta[2000] 4 SCC 272DistinguishedEarlier view that the designate’s jurisdiction to decide existence of arbitration agreement could be wide; later decisions distinguish this view in favor of the Konkan Railway rulings.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,522 words•~12 min read

In The Court Record

HYTHRO POWER CORPORATION LTD. v. DELHI TRANSCO LTD.

A ## HYTHRO POWER CORPORATION L TO. _v._ ## DELHI TRANSCO LTD. ## JULY 30, 2003 ## B ## [SHIVARAJ V. PATIL AND D.M. DHARMADHIKARJ, JJ.] _Arbitration and Conciliation Act, 1996-Sections 11 and 16-Constitution of India, 1950-Article 226-Nominee or designate of Chief Justice-Dispute_ C _regarding validity and existence of arbitration agreement and its reference to arbitrator-Jurisdiction to adjudicate-Held: Designate of the Chief Justice acting under Section /I merely exercises administrative function thus, has no jurisdiction to adjudicate upon such dispute and also the High Court exercising power under Article 226 has no jurisdiction-Only arbitral Tribunal is conferred with jurisdiction to decide such dispute as provided under Section_ D _16(1)._ Appellant-Corporation filed an application for reference of its disputes with the respondent for adjudication through the arbitration in accordance with arbitration clause in the alleged agreement arrived at between them. Single Judge of High Court acting as designate or nominee E of the Chief Justice, in exercise of his powers under Section 11 of the Arbitration and Conciliation Act, 1996 rejected the prayer as no agreement in writing was executed by the parties with an arbitration clause. Appellant-Corporation filed a writ petition. Division Bench dismissed the same. Hence the present appeal. ## F Appellant-Corporation contended that when the nominee or designate of the Chief Justice, invokes its power under Section 11 of the Act, it merely exercises administrative functions and has no jurisdiction to adjudicate upon the contentious issues between the parties on 'the existence or the validity of the arbitration agreement'; and that only G 'arbitral tribunal' is conferred with jurisdiction to decide the existence or validity of the arbitration agreement as provided in Section 16(1) of the Act. ## Allowing the appeal, the Court H 940 94} HYTHRO POWER CORPN. LTD. i·. DELHI TRANSCO LTD. HELD: 1. The designate of the Chief Justice acting administratively A under Section It of the Arbitration and Conciliation Act, 1996 and the Division Bench of the High Court exercising powers under Article 226 of the Constitution erred in adjudicating upon the dispute regarding 'the validity and existence of the arbitration agreement' and holding that the dispute was not referable to arbitration. Appellant sought reference of its B disputes with the respondent/company for adjudication through the arbitration in accordance with arbitration clause in the alleged agreement arrived at between them. Whether an arbitration agreement can be said to have existed by recourse to arbitration clause in the Notice Inviting Tender was itself a dispute which deserved to be referred to the arbitral Tribunal in accordance with the arbitration clause. Section 16 empowers C the arbitral Tribunal to decide the question of existence and validity of the arbitration agreement. Thus, the order of Single Judge under Section 11 of the Act and order of Division Bench of High Court in writ petition under Article 226 are quashed. [945-E-H; 946-A) _Konkan Railway Corporation Ltd._ v. _Mehu/ Construction Co.,_ [2000) 7 D SCC 201; _Konkan Railway Corporation Ltd._ v. _Rani Construction P. Ltd.,_ [2002) 2 SCC 388; _NimetResources Inc._ v. _Essar Steels Ltd.,_ [20001 7, SCC 497 and _Food Corporation of India v. Indian Council of Arbitration and Ors. etc. etc._ JT 12003) 5 SC 480, referred to. E 2. The case is remanded to the Chief Justice or his designate for hearing the parties on the limited question of constitution of an arbitral Tribunal in accordance with the arbitration clause in the NIT and for making a reference for arbitration in accordance with Section 11 of the Act. [946-A-B) F CIVIL APPELLATE JURISDICTION : Civil Appeal No. 5315 of 2003. From the Judgment and Order dated 29.8.2001 of the Delhi High Court in C.W. No. 2675 of 2001. Sudhir Chandra, Dharmesh Mishra and Rajat Navet for Pradeep Kumar G Bakshi for the Appellant. Rakesh Kumar Sharma for the Respondent. The Judgment of the Court was delivered by H 942 SUPREME COURT REPORTS [2003] SUPP. I S.C.R. A **DHARMADHIKARI, J.** Heard learned counsel appearing for the parties. Leave to appeal, as prayed for. is granted. The appellant Hythro Power Corporation Limited has approached this Court aggrieved by rejection of its application under Section 11 of the Arbitration and Conciliation Act, 1996 (hereinafter referred to as the "Act" B for short). The learned judge of the Delhi High Court acting as designate or nominee of the Chief Justice, in exercise of his powers under Section 11 of the Act, by his order dated 7 .12.2000 came to the conclusion that no agreement in writing having been executed by the parties with an arbitration clause, the prayer made by the appellant for seeking a reference of the disputes raised C to arbitral Tribunal has to be rejected. Aggrieved by refusal of the learned judge of the Delhi High Court to make a reference to the arbitration, the appellant-Corporation filed a Writ Petition in the High Court of Delhi. The Division Bench of the High Court by the impugned order dated 29 .8.200 I came to the same conclusion that D there exist no written arbitration agreement and hence the dispute between the parties cannot be referred for arbitration under Section 11 of the Act. The appellant-Corporation therefore has approached this Court by seeking leave under Article 136 of the Constitution. The factual background and nature of dispute giving rise to the prayer E for arbitration under Section 11 by the appellant-Corporation need examination. The respondent Delhi Transco Limited issued a Notice Inviting Tenders (NIT) for awarding the work of Erection, Testing and Commissioning of balance work of 220 KV DC Tower Line from Samaypur to Mehrauli. The NIT contained clause 25 which is anarbitration clause. Pursuant to the NIT, the appellant submitted its tender. The respondent issued a letter of intent in favour of the appellant. According to the appellant, the respondent also sent a detailed letter showing acceptance of the award of the work to the appellant. It was also indicated that all terms and conditions of the NIT would form part of the contract. F ## G According to the appellant, the exchange of letters and correspondence between the parties, pursuant to the issuance of NIT and submission of offer by the appellant and its acceptance by the respondent constituted a contract and as the terms and conditions in the NIT, on which the contract was awarded, contained clause 25 providing forum of arbitration, "arbitration H agreement" as defined in Section 7(4)(b) of the Act had come into existence HYTHRO POWER CORPN. LTD. r. DELHI TRANSCO LTD. [DHARMADHIKARL l] 943 to enable the appellant to invoke the said arbitration clause. Learned Senior Counsel appearing for the appellant relies on a threejudge bench decision of this Court in _Konkan Railway Co1poratio11 ltd._ v. _Mehul Construction Co.,_ [2000] 7 SCC 20 I and the Constitution Bench Judgment of this Court in _Konkan Railway Corporation Ltd._ v. _Rani Construction P. ltd.,_ [2002] 2 sec 388. On behalf of the appellant, it is B argued that, as has been held by this Court in the cases (supra), the nominee or designate of the Chief Justice, when its power is invoked under Section 11 of the Act, merely exercises administrative functions and, therefore, has no jurisdiction to adjudicate upon the contentious issues between the parties on 'the existence or the validity of the arbitration Agreement.' It is submitted C that 'arbitral tribunal' to whom the dispute is referred is alone conferred with jurisdiction to decide the existence or validity of the arbitration agreement as provided in Section 16( I) of the Act. On the facts and background of the dispute briefly indicated above, we find that the designate of the Chief Justice acting administratively under D Section 11 and the Division Bench of the High Court exercising powers under Article 226 of the Constitution were clearly in error in adjudicating upon the dispute regarding 'the validity and existence of the arbitration agreement' and holding that the dispute was not referable to arbitration. This Court in _three-Judge Bench_ decision and the _Constitution-Bench_ E decision in the case of _Konkan Railway_ (supra) has held that the Chief Justice or his designate under Section 11 of the Act exercises purely administrative functions and it is not open to him to discharge any judicial function of adjudicating the dispute even regarding the 'existence of arbitration agreement.' Whether the letters and exchange of correspondence between the parties, F pursuant to the NIT, can constitute a contract and an 'arbitration agreement' can be read into the same in terms of Section 7(4)(b) of the Act was a question solely within the jurisdiction of 'arbitral tribunal' under Section 16 of the Act. See decision in the case of _Nimet Resources Inc._ v. _Essar Steels Ltd.,_ (2000] 7 SCC 497 wherein Justice Rajendra Babu of this Court acting as designate of the Chief Justice of India while exercising powers under G Section 11 of the Act, observed thus:- "! am conscious of the fact that M. Jagannadha Rao, J. in _Wellington Associates Ltd_ v. _Kirti Mehta,_ [2000] 4 SCC 272 held that the jurisdiction of the nominee of the Chief Justice of India to decide the question is not excluded by Section 16 of Act and such a power can H I- 944 SUPREME COURT REPORTS (2003] SUPP. I S.C.R. B c A be exercised in a suitable case. On this basis, it is no doubt permissible under Section 11 of the Act to decide a question as to the existence or otherwise of the arbitration agreement but when the correspondence or exchange of documents between the parties are not clear as to the existence or non-existence of an arbitration agreement, in terms of Section 7 of the Act the appropriate course would be that the arbitrator should decide such a question under Section 16 of the Act rather the Chief Justice of India or his nominee under Section 11 of the Act. I take this view because the power that is exercised by the nominee of the Chief Justice of India under Section 11 of the Act is in the nature of an administrative order. In such a case, unless the Chief Justice of India or his nominee can be absolutely sure that there exists no arbitration agreement between the parties it would be difficult to state that there should be no reference to arbitration. Further such a view may not be conclusive in view of the nature of the powers that are exercised under Section 11 (6) of the Act." D In the latest decision of two-Judge Bench of this Court in the case of _Food Corporation of India_ v. _Indian Council of Arbitration and Ors. etc. etc.,_ JT (2003) 5 SC 480, similar view was taken. In that case reference of dispute to arbitration was opposed on the ground that under the arbitration clause the arbitrator was to be nominated by the Food Corporation of India E as the employer and not by the Indian Council of Arbitration which was the institution from whose panel the arbitrator was to be selected. The designate of the Chief Justice under Section 11 refused to make a reference and the High Court in Writ Petition by an elaborate judgment expressed its opinion on the dispute that the Food Corporation of India should have nominated the F arbitrator from the panel of Indian Council of Arbitration. In the context of that dispute, this Court observed thus: G "Unfortunately, the High Court in this case seems to have proceeded to adopt an adjudicatory role and returned a verdict recording reasons as to the very existence or otherwise of the agreement as well as the tenability and legality or otherwise of making a reference to an arbitrator." ## H "As indicated earlier even assuming without accepting for purposes of consideration that there is any infirmity in the arbitration clause ' t HYTHRO POWER CORPN. LTD."· DELHI TRANSCO LTD. [DHARMADHIKARI, J] 945 which go to undermine as claimed by the respondents the legality, A propriety and validity of the constitution of the Tribunal and/or even if there be any objections as to the existence of an enforceable or valid arbitration agreement, it had to be adjudicated by the very Arbitral Tribunal after a reference is made to it on being so constituted and it is not for the ICA or the learned Judge in the High Court to undertake B this impermissible adjudicatory task of adjudging highly contentious issues between the parties. As observed by the Constitution Bench of this Court, there is nothing in Section 11 of the 1996 Act that requires the party other than the party making the request to be noticed and that it does neither contemplate a response from the other party nor contemplate any decision by the Chief Justice or his nominee on any C controversy that the other party may raise, even in regard to its failure to appoint an Arbitrator within the stipulated period. The legislative intent underlying the 1996 Act is to minimize the supervisory role of . courts in arbitral process and nominate/appoint the Arbitrator without wasting time, leaving all contentious issues to be urged and agitated before the Arbitral Tribunal itself. Even under the old law, common D sense approach alone was commended for being adopted in construing an arbitration clause more to perpetuate the intention of parties to get their disputes resolved through the alternate disputes redressal me!hod of arbitration rather than thwart it by adopting a narrow, pedantic and legalistic interpretation." E Keeping in view the law as settled by this Court, the designate of the Chief Justice acting under Section 11 of the Act and the Division Bench of the High Court in exercise of power under Article 226 of the Constitution both acted under.a misconception of law and wrongly held that the disputes were not referable to the arbitration. The appellant sought reference of its F disputes with the respondent/ company for adjudication through the arbitration in accordance with arbitration clause in the alleged agreement arrived at between them. Whether on the facts mentioned above an arbitration agreement can be said to have existed by recourse to arbitration clause in NIT was itself a dispute which deserved to be referred to the arbitral Tribunal in accordance G with the arbitration clause. Section 16 empowers the arbitral Tribunal to decide the question of existence and validity of the arbitration agreement. The present appeal, therefore, deserves to succeed and is hereby allowed. The impugned order of the learned Single Judge passed under Section H 946 - SUPREME COURT REPORTS [2003] SUPP. 1 S.C.R. - A 11 of the Act and the order of the Division Bench of the High Court in Writ Petition under Article 226, both are quashed. The case is remanded to the Chief Justice or his designate for hearing the parties on the limited question of constitution of an arbitral Tribunal in accordance with the arbitration clause in the NIT and for making a reference for arbitration in accordance with - B Section 11 of the Act. The costs incurred by the parties in this case shall abide the final results of the arbitration proceedings. - N.J. - Appeal allowed.
End of Judgment Record
Browse All Supreme Court of India (2003) Decisions
2003-09-22

State of Punjab v. Pohla Singh and Anr.

This is a Supreme Court of India decision (September 22, 2003) arising from Criminal Appeal No. 901 of 1996, where the State of Punjab challenges acquittal by the Punjab and Haryana High Court of two respondents for offences under Section 302 read with Section 34 IPC. The trial court had convicted Pohla Singh and Balkaur Singh for homicidal death of Mandip Singh around 5.30 a.m. on 11 June 1991; the other two accused were given the benefit of doubt. The High Court acquitted the two respondents on the ground of delay in lodging the FIR and questioned the time of occurrence, treating these as improbable factors that undermined the prosecution case. The State contends that there is no embargo on appellate review of acquittals and that the High Court’s reasoning rests on surmises and conjectures, ignoring the eye-witnesses’ detailed testimony and the trial court’s careful evaluation. The Supreme Court agrees to re-appreciate admissible evidence to prevent miscarriage of justice, noting that unexplained delay, standing alone, is the relevant factor, and that the prosecution need not answer every hypothetical question. It faulted the High Court’s approach, upheld the credibility of witnesses, reversed the acquittal, and restored the trial court’s verdict, directing the respondents to serve their sentences.

2003-05-01

Parwati Bai v. Radhika

This Supreme Court decision concerns eviction of a sub-tenant from municipal non-residential premises in Khargaon, Madhya Pradesh. The appellant (Parwati Bai) had leased the premises from the Municipal Council and sub-let to the respondent (Radhika). The ownership of the premises vested in the municipality, and the landlord sought eviction on the ground of non-payment of rent and need for self-occupation under the Transfer of Property Act, while contending that the Madhya Pradesh Accommodation Control Act, 1961 should not apply since the property is owned by a local authority used for non-residential purposes. The Trial Court and the First Appellate Court, and the High Court, held that the accommodation-control Act applied and dismissed the eviction suit for lack of proven grounds under Section 12. The Supreme Court held that the premises, being owned by a local authority, are immune from the Act itself, and between the landlord (appellant) and sub-tenant (respondent), the landlord-tenant relationship arises with the municipality as the landlord. The key issue is whether tenancy was terminated validly under Section 106 of the Transfer of Property Act; there is no infirmity in the notice. Consequently, the appeal is allowed: the suit for eviction is decreed, the respondent to vacate within six months (with undertaking), rent arrears to be determined by the Executing Court, and no order as to costs. The decision aligns with existing rulings on premiss-based immunity and the applicability of transfer-only remedies.

2003-03-31

T. Lakshmipathi v. P. Nithyananda Reddy

This Supreme Court judgment deals with an eviction challenge under the Andhra Pradesh Buildings (Lease, Rent and Eviction) Control Act, 1960, over a property in Chittoor whose ownership status arose from a partition among co-owners. Respondent No. 1, P. Nithyananda Reddy, remained a co-owner and landlord after partition, while several co-owners sold their interests. Tenants of the property temporarily yielded possession to transferees (appellants Nos. 3–5) and later to appellants Nos. 1–2 through sale deeds; eviction petitions were filed on grounds of bona fide need and rent arrears. The Rent Controller decreed eviction, confirmed by the Appellate Authority and High Court. The central issue was whether eviction could proceed when tenancy rights persisted despite transfers, and whether the doctrine of merger could terminate the tenancy. The Court held that merger requires complete coalescence of the lessee’s and lessor’s interests in the whole property at the same time in one person; because the appellants acquired only a portion of the co-owners’ interests, there was no merger, and tenancy rights remained. Demolition of the superstructure by tenants did not destroy the tenancy since the land continued. The judgment relies on several precedents concerning co-ownership, merger, and estoppel, reinforcing that partial acquisitions do not extinguish tenancy. Consequently, the appeal was dismissed and the eviction decree upheld with costs.

2003-11-17

Nair Service Society v. District Officer, Kerala Public Service Commission and Ors.

Nair Service Society (NSS) challenged a Kerala High Court order directing the Kerala Public Service Commission (KPSC) to advise candidates from the Muslim supplementary list against not-joining-duty vacancies (NJD) in the recruitment for Sub-Engineers for the Kerala State Electricity Board (KSEB). The case turns on the Kerala State and Subordinate Service Rules, 1958, particularly Rules 14–17, which provide a rotating chain of appointments between open competition (merit) and reserved categories (SC/ST/OBC) with a 50% aggregate ceiling for reservation in any recruitment year. KPSC had prepared a main rank list of 177 and a supplementary list of 62 to satisfy reservation requirements. After the main list exhausted, KPSC advised Muslims from the supplementary list for NJD vacancies, prompting NSS to file petitions. The High Court and Division Bench had held that the supplementary list could continue to operate, even after the main list expired, to fill NJD vacancies, thereby potentially breaching the 50% ceiling. The Supreme Court held that the supplementary list has no survival once the main list is exhausted and that advising from it would violate the 50:50 rule, as envisaged by Article 16(4) and related provisions. Nevertheless, appointments already made pursuant to the impugned judgment were not to be disturbed. The appeals were disposed of with no costs.