Tenetowl LogoTenetowl
High Court of KeralaKerala High Court · 2009Single JudgeWrit petition disposed of; the petitioner is no...

Hindustan Organic Chemicals Ltd. v. Regional Provident Fund Commissioner, Employees’ Provident Fund Organization, Sub Regional Office, Bhavishya Nidhi Bhavan; Assistant Provident Fund Commissioner, Employees’ Provident Fund Organization, Sub Regional Office, Bhavishya Nidhi Bhavan; Employees’ Provident Fund Appellate Tribunal

Case / Petition Number:
WP(C).No. 12165/07

Case Synopsis & Summary

The petitioner Hindustan Organic Chemicals Ltd., a central government company engaged in manufacturing phenol and hydrogen peroxide, challenged amendments introducing the Employees’ Pension Scheme (EPS) 1995, which replaced the earlier Employees’ Family Pension Scheme and required employers to contribute 8.33% of pay to the Employees’ Pension Fund, with 1.16% contributed by the government. The EPS amendments were enacted by Ordinance No. 13 of 1995 and stayed by this Court in O.P. Nos. 3250/1996 and 23043/1997. During the stay, the company credited contributions in a separate account with interest, and later transferred them to the Provident Fund Organization after stay vacatur. Damages under Section 14B of the Employees’ Provident Funds and Miscellaneous Provisions Act, 1952, were then sought by respondents 1 and 2, and confirmed by the Employees’ Provident Fund Appellate Tribunal (R3). The petitioner contended that damages are not automatic; they arise only upon deliberate non-payment, with attendant circumstances to be considered, citing Indian Telephone Industries Ltd. v. Astt. P.F. Commnr. (2006 (3) KLT 698) (confirmed by WA No.2182/2006). The court held that, for the pre-stay period, no damages were payable, as the stay neutralized liability. For post-stay delay, nominal damages of Rs. 2,00,000 were awarded to be paid within one month, after which the petition was disposed of.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • S. Siri Jagan
Judgment Date
2009-12-23
Court Decision / Holding
The writ petition is disposed of as above: there is no damages for the period up to the date of vacation of the stay; after the stay is vacated, there is delay for which nominal damages are awarded in the amount of Rs. 2,00,000, to be paid within one month.
Final Disposition
Writ petition disposed of; the petitioner is not liable to damages for the period before the stay was vacated; for the post-stay period, nominal damages of Rs. 2,00,000 are awarded to be paid within one month.

Parties to the Case

Appellants / Petitioners

  • Hindustan Organic Chemicals Ltd., Ambalamugal, Ernakulam, represented by its Chief Personnel & Administration Manager

Respondents

  • Regional Provident Fund Commissioner, Employees’ Provident Fund Organization, Sub Regional Office, Bhavishya Nidhi Bhavan
  • Assistant Provident Fund Commissioner, Employees’ Provident Fund Organization, Sub Regional Office, Bhavishya Nidhi Bhavan
  • Employees’ Provident Fund Appellate Tribunal

Legal Representation & Advocates

Counsels for Petitioners

  • • Adv. U.K. Ramakrishnan, Senior Advocate

Counsels for Respondents

  • • Adv. S. Gopakumaran Nair, Senior Counsel (P.F.)

Provisions of Law Cited

Employees' Provident Funds and Miscellaneous Provisions Act, 1952 – Section 17 (exemption) and Section 14B (damages)Ordinance No. 13 of 1995 (amending the EPF Act)Employees' Pension Scheme, 1995Clause 32A of the Employees Provident Fund Scheme

Legal Doctrines & Maxims

  • Damages under Section 14B are not automatic; deliberate default is required and attendant circumstances must be considered (cited Indian Telephone Industries Ltd. v. Astt. P.F. Commnr. & Ors., 2006 (3) KLT 698).
  • Stay orders can affect liability; damages may be mitigated where court orders prevent timely payment; after vacating a stay, delays are subject to scrutiny and may attract damages.
  • The judgment in WA No.2182/2006 confirms the above approach.

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioner contends that damages under Section 14B are not automatic and must be based on deliberate non-payment, with a court's interim stay and the attendant circumstances to be considered. It argues that the amendments were stayed, preventing non-payment while the matter was in court; funds were kept in a separate account with interest and later transferred after stay vacatur. The delay after stay is minimal and not due to wilful default; thus, damages should be limited (or null for pre-stay periods) and only nominal damages for post-stay delay should be imposed to avoid protracted litigation. The petitioner relies on Indian Telephone Industries Ltd. v. Astt. P.F. Commnr. (2006) and WA 2182/2006 to emphasize the need for a fact-intensive assessment of conduct before damages.

Contentions of Respondents

The respondents argue damages are statutory under Section 14B and the EPF Scheme; delay in remittance justifies damages irrespective of the stay; even post-stay delays may be attributable to systemic or administrative factors, and the statutory liability remains intact. They contend the petitioner's stay did not absolve liability for delays after the stay was vacated and that Clause 32A of the EPF Scheme supports damages for the extent of delay; Ext.P10 and Ext.P11 orders justify damages; the appellate tribunal's findings should stand and damages should be enforced.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
Indian Telephone Industries Ltd. v. Astt. P.F. Commissioner & Ors.2006 (3) KLT 698PositiveThe court relies on this decision to hold that damages under Section 14B are not automatic and depend on deliberate default, with attendant circumstances to be considered.
WA No.2182/2006W.A.No.2182/2006PositiveThe court notes that the Indian Telephone Industries principle was confirmed in this appeal, reinforcing that damages depend on deliberate default and the stay context.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•1,840 words•~9 min read

In The Court Record

Hindustan Organic Chemicals Ltd. v. Regional Provident Fund Commissioner, Employees’ Provident Fund Organization, Sub Regional Office, Bhavishya Nidhi Bhavan; Assistant Provident Fund Commissioner, Employees’ Provident Fund Organization, Sub Regional Office, Bhavishya Nidhi Bhavan; Employees’ Provident Fund Appellate Tribunal

IN THE HIGH COURT OF KERALA AT ERNAKULAM THE HONOURABLE MR. JUSTICE S.SIRI JAGAN WEDNESDAY, THE 23RD DECEMBER 2009 / 2ND POUSHA 1931 WP(C).No. 12165 of 2007(W) -------------------------- THE HINDUSTAN ORGANIC CHEMICALS LTD, AMBALAMUGAL, ERNAKULAM, REPRESENTED BY ITS CHIEF PERSONNEL & ADMINISTRATION MANAGER. BY ADV. SRI.U.K.RAMAKRISHNAN, SENIOR ADVOCATE 1. THE REGIONAL PROVIDENT FUND COMMISSIONER EMOLOYEES PROVIDENT FUND ORGANIZATION, SUB REGIONAL OFFICE, BHAVISHYA NIDHI BHAVAN, 2. THE ASST.PROVIDENT FUND COMMISSIONER, EMPLOYEES PROVIDENT FUND ORGANIZATION, SUB REGIONAL OFFICE, BHAVISHYA NIDHI BHAVAN, 3. THE EMPLOYEES PROVIDENT FUND APPELLATE ADV. SRI.S.GOPAKUMARAN NAIR, SC, P.F. THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON 23/12/2009, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING: ## W.P.(C).No. 12165/07. ## APPENDIX PETITIONER(S)' EXHIBITS - P1. COPY OF THE ORDER DTD.27.2.96 IN O.P.No. 3250/96. P2. COPY OF THE ORDER DTD.22.8.96 OF THIS COURT. P3. COPY OF THE ORDER DTD.30.12.97 OF THIS COURT. P4. COPY OF THE ORDER DTD.5.8.97 OF THIS COURT. - P5. COPY OF THE JUDGMENT IN O.P.No. 3250/96 AND CONNECTED CASES. P6. COPY OF THE JUDGMENT DTD.17.1.01 ON O.P.No. 23043/97 OF THIS COURT. - P7. COPY OF THE SHOW CAUSE NOTICE DTD.5.3.01. - P8. COPY OF THE REPLY STATEMENT. - P9. COPY OF THE NOTICE DTD.19.8.04 BY R2. - P10. COPY OF THE ORDER DTD.4.2.05 BY R2. - P11. COPY OF THE ORDER DTD.4.5.05 BY R2. - P12. COPY OF THE BALANCE SHEET FOR 2003-04. P13. COPY OF THE ORDER DTD.23.3.05 OF THIS COURT IN W.P.(C).No. 9684/05. - P14. COPY OF THE MEMORANDUM OF APPEAL DTD.16.4.05 TO R3. - P15. COPY OF THE ORDER DTD.4.5.05 OF R3. - P16. COPY OF THE COUNTER AFFIDAVIT BY R1 BY R3. - P17. COPY OF THE REPLY AFFIDAVIT. - P18. COPY OF THE LETTER DTD.2.11.05 TO R1. - P19. COPY OF THE LETTER DTD.19.1.06 OF R2. - P20. COPY OF THE LETTER DTD.4.3.06 TO R1 - P21. COPY OF THE PETITION DTD.29.8.05 BEFORE R3. P22. COPY OF THE ORDER DTD.24.5.05 OF THE ASST.PROVIDENT FUND COMMISSIONER. - P23. COPY OF THE ORDER DTD.22.2.07 BY R3. sdk+ ///True copy/// P.A. to Judge S.SIRI JAGAN, J. ================== W.P.(C).No. 12165 of 2007 ================== Dated this the 23[rd] day of December, 2009 J U D G M E N T The petitioner is a Central Government company engaged in the business of manufacture of phenol and hydrogen peroxide. The employees of the petitioner company are covered under the Employees' Provident Funds and Miscellaneous Provisions Act, 1952. But the petitioner was exempted from the provisions of the Act under Section 17 thereof in so far as they were having a separate provident fund trust in respect of their employees. By ordinance No.13 of 1995, the Central Government amended the Employees' Provident Funds and Miscellaneous Provisions Act by introducing the Employees' Pension Scheme, 1995, which replaced the existing Employees' Family Pension Scheme, which was in force till the amendment. As per the Employees' Pension Scheme, an Employees' Pension Fund was to be constituted in accordance with the amended provisions and a part of the contributions representing 8.33 per cent of the employees' pay was to be remitted by the employer to the Employees' Pension Fund within 15 days of the close of every month. The Central Government was also to contribute 1.16 per cent of the pay of the members to the Pension Scheme to be credited to the fund. The employees of the petitioner company challenged the amendment by filing writ petitions, viz. O.P.No.3250/1996 and O.P.No. 23043/1997. O.P.No.3250/1996 was filed by the regular employees of the company and the other original 2 w.p.c.12165/07 petition was filed by ex-servicemen who were employed by the petitioner company. In O.P.No.3250/2006 this Court granted a stay of operation of the Ordinance introducing the Employees' Pension Scheme, on 27.2.1996, by Ext.P1 order, for a limited period. That stay was extended until further orders, by Ext.P2 order. But that stay was vacated on 5.8.1997, by Ext.P4 order. In the meanwhile, the petitioner credited contributions payable by them in accordance with the amened provisions in a separate account bearing interest. After the stay was vacated on 5.8.1997, the entire amounts credited to the account maintained by the petitioner along with interest accrued thereon were transferred to the Provident Fund Organization. In O.P.No.23043/1997 a stay was granted by Ext.P3 order on 30.12.1997. That stay continued till January, 2001 when the original petition itself was disposed of. Thereafter, the amount accruing in the account separately maintained by the petitioner was transferred to the Provident Fund Organization on 22.3.2001 (interest was transferred subsequently after obtaining permission from the Provident Fund Organization). Thereafter, in respect of the regular employees, for delay in remittance of contributions for the period 12/95 to 1/98 and in respect of the exservicemen employed, for delay in remittance for the period from 11/95 to 1/2000, respondents 1 and 2 initiated proceedings for recovery of damages under Section 14B of the Employees' Provident Funds and Miscellaneous Provisions Act, which ended in Ext.P10 order 3 w.p.c.12165/07 directing the petitioner to pay damages amounting to Rs.20,04,909/-. For delay in payment of the damages, interest amounting to Rs.93,043/- was demanded by Ext.P11 order. The petitioner challenged the said orders before the Employees Provident Fund Appellate Tribunal by filing an appeal, which was dismissed by Ext.P23 order. The petitioner is challenging Exts.P10, P11 and P23 orders in this writ petition. 2. The petitioner's contention is that as held by this Court in _Indian Telephone Industries Ltd. v. Astt. P.F Commnr. & Ors_ . [2006 (3) KLT 698] imposition of damages is not automatic and damages would be attracted only if there is deliberate failure on the part of the employer to pay contributions under the Act, for deciding which the circumstances which contributed to the delay in payment have to be taken into account. According to the petitioner, there was no voluntary laches on the part of the petitioner in paying contributions in accordance with the amened provisions of the Act. By order of this Court, the petitioner was prevented from paying contributions. Therefore, the petitioner did the next best thing, keeping the contributions payable by the petitioner in a separate account bearing interest. After this Court vacated the stay orders, the amount was paid in one case within five months and in the other case within two months, which cannot be stated to be deliberate delay in payment. The delay occurred only because of unavoidable delay in getting orders of 4 w.p.c.12165/07 the Court and taking appropriate steps to transfer the amount standing in the account to the Provident Fund Organization. They would, therefore, contend that there is no deliberate delay in paying contributions, which would attract damages under S.14B. 3. A statement has been filed by the 1[st] respondent seeking to controvert the contentions of the petitioner. According to respondents 1 and 2, liability to pay contributions is statutory and for delay in payment, liability for damages is also statutory. Once there is delay, damages have to be calculated as per clause 32A of the Employees Provident Fund Scheme, depending on the extent of delay. Here the statutory liability has not been discharged by the petitioner. Therefore, respondents 1 and 2 were perfectly justified in imposing damages in accordance with the provisions of the Act and Scheme, is the contention raised by respondents 1 and 2. They would further submit that even assuming that they could not have paid contributions because of stay, there was in fact delay even after vacating the stay and, therefore, they cannot escape from the liability to pay damages under Section 14B. 4. I have considered the rival contentions in detail. 5. The facts are not disputed before me. The amended provisions were challenged by the petitioner and there was stay of operation of the provisions by this Court. Therefore, the petitioner could not have, under law, paid the amount since, had they done so, 5 w.p.c.12165/07 they would have been hauled up for contempt by this Court. As rightly pointed out by the counsel for the petitioner, in _Indian Telephones Industries' case_ (supra) this Court has held that imposition of damages under Section 14B is automatic only if there is deliberate intention not to pay contributions, for deciding which question, all the attendant circumstances leading to the delay in payment have to be taken into account. That judgment stands confirmed in W.A.No.2182/2006. That being so, that judgment is binding on me. Therefore, what I have to consider in this case is as to whether there was deliberate non-payment of contributions by the petitioner in defiance of law. Admittedly, the amending provisions were stayed by this Court in the writ petition filed by the employees. During the period of stay, the petitioner could not have paid the amount. That being so, it cannot be said that there was deliberate defiance of law in nonpayment of the contributions within time. On the other hand, the petitioner was only obeying the orders of this Court, which they were bound to do under law. The petitioner had in fact done the next best thing by keeping the contributions in a separate account bearing interest. Admittedly, the amounts in the said account and the interest accrued thereon have also been transferred to the Provident Fund Organization shortly after the stay was vacated. As such, at least till the date of vacating the stay, there was no fault on the part of the petitioner attracting Section 14B of the Act. Therefore, I do not think 6 w.p.c.12165/07 that for the delay in payment till that date any damages are payable by the petitioner. In fact in identical cases, the 2[nd] respondentAssistant Provident Fund Commissioner himself had passed Ext.P22 order exonerating another employer from paying damages on the ground the since there was stay by this Court, there was no fault on the part of the employer attracting Section 14B of the Act and levied damages only to the extent of interest on the amount. In this case, the petitioner themselves had paid the interest also. That being so, I am of opinion that at least for the period upto the date when the stay was vacated, the petitioner is not liable to pay damages. However, I find that after vacating the stay, there was some delay in payment, for which nominal damages should be paid by the petitioner. Instead of remanding the matter to the 2[nd] respondent for fixation of damages for that short delay, in order to avoid a further protracted litigation, I fix the damages payable on that count at Rs.2 lakhs. The same shall be paid within one month. The writ petition is disposed of as above. Sd/- sdk+ S.SIRI JAGAN, JUDGE ///True copy/// P.A. to Judge 7 w.p.c.12165/07 . Therefore, I do not think that for the delay in payment till that date any damages are payable by the petitioner. In fact in an identical case the 2[nd] respondent-Assistant Provident Commisisner, had passed Ext.P22 order exhonrateing another employee from damages on the ground that sicne there was say by this court, there was no deliberate defiance of law by the employer
End of Judgment Record
Browse All High Court of Kerala (2009) Decisions
2009-06-26

Nishana Mol.N v Alappuzha Municipality & Secretary, Alappuzha Municipality

This writ petition concerns the registration of a marriage under the Kerala Registration of Marriages (Common) Rules, 2008 (Common Rules). The petitioner Nishana Mol.N, whose marriage was solemnized on 8 March 2009, sought registration of her marriage by the Local Registrar. Her husband was abroad, and she submitted Form No. 1 along with documents; however, the Local Registrar demanded the presence of both spouses for registration, a point contested by the petitioner. The court recalls the apex court’s directions in Seema v. Ashwani Kumar (2006) to frame rules ensuring compulsory registration to protect women and provide evidence of marriage, while noting that registration under the Rules does not itself create a marriage but evidences one solemnized otherwise. The Rules specify that registration is mandatory for marriages solemnized within the state, with various procedural requirements (Rules 5, 6, 9, 10, 11, 13, 16, 17) and mechanisms for correction, appeal, and re-registration. The court clarifies that the presence of both parties is not ordinarily required; the registrar may require appearance only in cases where there is reasonable doubt about identity, and even then as an exception rather than a rule. Ultimately, the court directs that registration and certificate issuance be completed within one month from copy of the judgment, without insisting on joint appearance, provided the memorandum is in order.

2009-07-27

Abdul Majeed Kalathil v. District Collector, Malappuram & Others

This batch of writ petitions concerns the constitutional validity of Section 17 of the Kerala Anti-Social Activities (Prevention) Act, 2007, and the power of District Magistrates to confiscate vehicles used in anti-social activities. The petitions challenge the absence of a substantive prohibition against using vehicles for anti-social activities and the lack of a defined procedure for confiscation or an appellate remedy. In W.P.C. No. 9925 of 2009 (the lead case), Abdul Majeed Kalathil contends that his goods carriage KL 11-B/6651 was seized by the Sub Inspector of Pandikkad Police and reported to the District Collector, Exts.P1–P2. The court scrutinizes Section 17's scope, defining anti-social activity (Section 2(a)) and whether the District Collector’s power to confiscate is constitutionally tenable. It finds Section 17 to be vague and violative of Articles 14, 19(1)(g) and 21, as it rests on subjective police satisfaction with no clear standards or process. It also notes environmental objectives but concludes that fundamental rights must prevail. The court does not sustain confiscation under Section 17; instead, it directs that such vehicles be dealt with under the Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001 and Rules, with interim release under specified conditions. It further directs initiation of Sand Act proceedings within a month and finalization within another month. The writ petitions are disposed of accordingly, preserving the rule of law and environmental protection.

2009-06-11

WA No. 671 of 2006 (Fertilizers and Chemicals Travancore Ltd v Union of India)

This writ appeal concerns the pay revision and pensionary benefits of employees of the Fertilizers and Chemicals Travancore Ltd (FACT). The long-term settlement covering terms of employment expired on 31 December 1996. A fresh settlement was concluded (notified 28 August 2001) and made retroactive to 1 January 1997, with revisions in wages and benefits. Clause 29 of Ext. P1 provides that arrears relating to wage revision and dearness allowance for the period 1 January 1997 to 30 June 2001 will be reviewed and decided by management/government only when the company earns profits for at least three consecutive years; Clause 33.1 provides that employees who retired on or after 1 January 1997 will be eligible for arrears calculated from 1 January 1997 to the date of retirement, subject to adjustments for interim relief already paid, with any unclaimed amount transferred to a Welfare Fund. The appellants—the retirees who fall in the 1 January 1997 to 1 July 2001 window—argue that they were denied arrears and were paid pensionary benefits at pre-revised rates, creating discrimination. Respondents contend Ext. P1 binds the parties and arrears depend on profits, and that pay revision administered to others does not compel retroactive change. The court held that Ext. P1 terms survive as terms of employment and directed the management to consider terminal benefits at revised rates within two months and to release arrears when paid to current workers, with connected matters following."

2009-05-29

M/S. Palm Fibers & Yars Trading Co. v. State of Kerala & Others

The petitioner, a Small Scale Industrial unit, ran two LT power connections (No.13070 and No.13427) with commercial production starting in July 1994 and July 1995. On 06/02/1992, the Government issued Ext.P1 guaranteeing concessional tariffs (pre-1992 tariff) for five years from the date of commencement or substantial capacity expansion, certified by the District Industries Centre. Ext.P2 certified eligibility for this concession. Subsequently, the petitioner increased power demand to 300 KVA and was reclassified/advised to HT status from 15/05/1998, converting LT supply to HT. The petitioner argued that Ext.P1 benefits should extend for the full five-year period, covering the LT quantities certified in Ext.P2, and that the HT conversion was a mere reclassification directed by the Board, not a cessation of eligibility. The Board argued Ext.P1 targets only those who commenced production during 1992–1996 and that HT conversion from 15/05/1998 falls outside the Ext.P1 window, rendering the petitioner eligible only up to 15/05/1998. Earlier orders (Ext.P3) had set aside a cut-off date for merits, and Ext.P6/Ext.P4 handled appeals. Ultimately, the Court held that the HT conversion was outside Ext.P1’s period, but directed that the LT benefits for the two LT connections be extended only until 23/05/1998 (LT dismantling date) and without reimbursement from the Industries Department, as held in OP No.7622/1998. The petition was disposed of as above.