Tenetowl LogoTenetowl
Supreme Court of IndiaSupreme Court · 1997Division BenchAppeals allowed; writ petitions dismissed; no c...

Hindustan Machine Tools Ltd. v. M.S. Kang/P.N. Kashyap

Case / Petition Number:
Civil Appeal No. 626 of 1997; CA No. 627/97
Neutral Citation:[1997] 1 SCR 569

Case Synopsis & Summary

The case concerns a dispute over a special Voluntary Retirement Scheme (VRS) instituted by Hindustan Machine Tools Ltd. in 1989 for regular employees aged 45 and above with at least 15 years of service. Respondents accepted the VRS and retired under it. Subsequently Office Order No. 45/90 (dated March 1, 1991) revised pay scales for existing employees and those who had retired or were to retire. The respondents claimed relief for revision of their pay scales under the revised scales. The Punjab & Haryana High Court allowed the writ petitions challenging the revision, prompting appeals to the Supreme Court. The core issue was whether employees who retired under the Special Scheme are entitled to the benefits of the revised pay scales and whether those who retired under the Conduct, Discipline and Appeal Rules (Rule 24.2) should be treated the same as those who retired under the Special Scheme. The Court held that there is a clear distinction between employees who retire under the Conduct, Discipline and Appeal Rules and those who retire under the Special Voluntary Retirement Scheme. Those who retired under the Special Scheme are not covered by voluntary retirement under Rule 24.2. Hence, they are not entitled to the revised pay scales under Office Order No. 45/90. The High Court’s directions to recompute compensation were, accordingly, not correct. The Supreme Court allowed the appeals and dismissed the writ petitions, with no costs.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • K. RAMASWAMY
  • G. T. NANAVATI
Judgment Date
1997-01-27
Court Decision / Holding
Appeals allowed; writ petitions dismissed; no costs.
Final Disposition
Appeals allowed; writ petitions dismissed; no costs.

Parties to the Case

Appellants / Petitioners

  • Hindustan Machine Tools Ltd.
  • Anr.

Respondents

  • M.S. Kang
  • P.N. Kashyap

Legal Representation & Advocates

Counsels for Petitioners

  • • V. R. Reddy
  • • O. C. Mathur
  • • Meera Mathur

Counsels for Respondents

  • • Manoj Swarup

Provisions of Law Cited

Conduct, Discipline and Appeal Rules, Rule 24.2(b) and (c)Office Order No. 45/90 dated March 1, 1991Clause 2.2.2 of Office Order 45/90Voluntary Retirement Scheme – Scheme A and Scheme BPara VIPara IXPara XII

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants submitted that the Voluntary Retirement Scheme (VRS) is a special scheme with its own mode of payment of compensation. There is a clear distinction between employees who retired under the Conduct, Discipline and Appeal Rules (Rule 24.2) and those who retired under the VRS, and the latter are not covered by the voluntary retirement under Rule 24.2. Office Order No. 45/90 (1 March 1991) provides revised pay scales for those enumerated in Clause 2.2.2 and does not automatically extend to employees who retired under the Special Scheme. The appellants argued that Para IX excludes medical and certain retirements from the scheme, and that the Chairman and Managing Director reserve power to amend or withdraw the scheme; hence, the scheme’s terms govern the computation of compensation. They argued that the decision in Prantiya Vidhyut Mandal Mazdoor Federation v. Rajasthan State Electricity Board (1992) 2 SCC 723 has no direct applicability to the facts, and that the High Court erred in directing recomputation of pay under the revised scales.

Contentions of Respondents

The respondents contended that the term 'salary' includes revised pay and related components under the Office Order, and that the revised scales should apply to those who retired under the Special Scheme. Citing Prantiya Vidhyut Mandal Mazdoor Federation v. Rajasthan State Electricity Board (1992) 2 SCC 723, they argued that revised wages must be reflected in PF and other terminal benefits, and that the court should grant the benefit of pay revision to those who retired under the Scheme. They argued that Office Order No. 45/90 contemplates revision in pay scales, which should be applicable on a pro-rata basis to those on the rolls and who retired under the Scheme, and that the High Court erred by distinguishing between Scheme retirees and Rule 24.2 retirees. They urged that the respondents are entitled to the revised pay scales and related benefits.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (1)

Case NameCitationTreatmentExplanation
Prantiya Vidhyut Mandal Mazdoor Federation & Ors. v. Rajasthan State Electricity Board & Ors.(1992) 2 SCC 723DistinguishedThe Court noted that the ratio of this decision has no application to the facts and held that the case was distinguishable from the present matter.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,429 words•~12 min read

In The Court Record

Hindustan Machine Tools Ltd. v. M.S. Kang/P.N. Kashyap

_**:1-**_ , > ·-~ _-r_ J # HINDUSTAN MACHINES TOOLS LTD. AND ANR. _v._ ## M.S. KANG/P.N. KASHYAP -.. JANUARY 27, 1997 _'r_ [K. RAMASWAMY AND G.T. NANAVATI, JJ.] _Service Law :_ _Voluntary retiremenf--Company-Hindustan Machine Tools-Special Scheme fonnulated for voluntary retirement of employee-Respondents ac-_ c _cepted the scheme and retired thereunder-Thereafter Company issued office order 45/90 dated March 1, 1991-Revision of pay scales thereunder-Claim for revision of pay by re;pondents-Writ allowed by High Court-Appeal before Supreme Court-Held there was distinction between employees who voluntarily retired under Conduct, Discipline and Appeal Rules and those who retired under the Special Scheme-Respondents having retired under the_ **D** _Special Scheme are not employees covered under the voluntary retirement under Rule 24.2 of the Conduct, Discipline and Appeal Rules-Accordingly, the High Court was not right in directing recomputation of the compensation under Office Order No. 45 dated March, 1, 1991._ i _Prantiya Vidhyut Manda! Mazdoor Federation & Ors._ v. _Rajasthan_[E ] _State Electricity Board & Ors.,_ **[1992] 2** SCC 723, **held inapplicable.** CIVIL APPELLATE JURISDICTION : Civil Appeal No. 626 of 1997 Etc. -I From the Judgment and Order dated 19.4.96 of the Punjab & Haryana High Court L.P.A. No. 2 of 1996. F V.R. Reddy, Additional Solicitor General, 0.C. Mathur and Ms. Meera Mathur for the Appellants. Manoj Swarup for the Respondent in C.A. No. 627/97 G The following Order of the Court was delivered : "" Leave granted. > These appeals by special leave arise from the judgment of the High **H** 569 570 (1997]1 S.C.R. I ## SUPREME COURT REPORTS A Court of Punjab&. Haryana, made on 19.4.1996 in LPA Nos. 2 and 3 of 1996. The admitted facts are that the appellants have formulated a Scheme for voluntary retirement of the employees who have completed 45 years of age, effective from April, 1989 for a period of three months subject to the B conditions specified in the scheme. The respondents had accepted the scheme and retired thereunder. Thereafter by Office Order No. 45/90 dated March 1, 1991 pay scales were revised in respect· of existing employees and those who retired from time to time. In furtherance thereof, the respondents claimed and revision of the scale of pay was sought to be C given effect by the office by the audit objection to the payment thereof was raised. Consequently, the respondents filed the writ petitioners in the High , Court and the learned Single Judge allowed the writ petition and appeals were dismissed. Thus, these appeals by special leave. B D Shri V. Reddy, learned Additional Solicitor General, contends that the Scheme is a special scheme containing the mode of payment of compensation as calculated in terms of the Scheme. There is a distinction between those employees who retired voluntarily under Conduct Discipline and Appeal Rules and those who retired under the Scheme. The revised scales of pay are applicable to those persons who are enumerated in Clause E 2.2.2 of the office orders providing for Revision of Pay Scales. Proceedings Dated March 1, 1991 refers to the candidates who retired voluntarily. Under Rule 24.2. of the Conduct, Discipline and Appeal Rules, the revision of the Provident Fund would be effected only in respect of those employees who retired under the special scheme; the scale and gratuity F have to be revised in terms of the revised scales of pay but not the payment of the difference of pay. On the other hand, Shri Manoj Swamp, learned counsel for the respondents, contends that no distinction had been draw in the proceedings dated March 1, 1991 between the employees who retired under the Conduct, Discipline and Appeal Rules or under the Special Scheme and those who retired voluntarily under the Scheme and are G entitled to the same benefit of the revision of the pay scales as contemplated under the Office Order dated March 1, 199.1. He also contends that even clause 2.3 negatively puts that they are disentitled to the payment. The word 'salary' is linked to the other component, namely, additional dearness allowance, _ad hoc_ pay, additional pay etc. Therefore, the word H 'pay' would include revised pay. Thereby the respondents are entitled to 571 HINDUSfANMACHINES TOOLS LTD. _v._ M.S. KANG/P.N. KASHYAP A the benefit of the revised pay scales. In support thereof, he placed reliance on the judgment of this Court **in** _Prantiya Vidhyut Mandal Mazdoor Federation & Ors._ v. _Rajasthan State Electricity Board & Ors.,_ (1992] 2 SCC 723. Therein the dispute relating to the revision of the pay was pending before the Industrial Tribunal. Pending **B** dispute, the wages were revised. Consequently, after the award was made, the revision of the wages was effected. The question was : whether the P.F. was required to be re-calculated on the basis of the revised scales? This Court had held that **in** view of the revision of the pay scales, the P.F. requires to be decision on the basis of the revised wages payable to the employees as was recalculated. The ratio therein has no application to the c facts **in** these cases. ~ The question, therefore, is : whether the respondents arc entitled to the benefit of the revised scales of under the Office Order No. 45/90 dated March 1, 1991? It is not in dispute that the respondent have not completed 50 years of age for voluntary retirement under clause (b) or clause (c) of **D** Rule 24.2. on attaining the age of Superannuation. They contemplate thus: - "(b) An employee may at time after completing the age of 50 years voluntarily retire by giving the month's notice in writing." - -<. E - (c) The Competent Authority may also retire an employee at any time after he completes 50 years by giving one month's notice or one month's salary/wages in lieu of the notice, if it is considered in the interest of the Company." **F** Thus, an employee who is normally entitled to remain in service until he reaches the age of superannuation of 58 years, is entitled to retire either voluntarily by giving one month's notice on attaining the age of 50 years and the Company may, if it considers it necessary, in the interest of the Company, retire an employee by giving one month's notice or one month's Salary/wages in lieu thereof. Thus, those who retired under the above Rule G would be construed to have voluntarily retired from service. It is seen that a special voluntary retirement scheme had been introduced by the Company. The objective of the Voluntary Retirement Scheme is to achieve the optimum level of manpower with the desirable average age-mix as per the changing needs ·of the Company. In regard to the respondents, they come under the Scheme 'B' which contains that the scheme is applicable to all **H** -+ 572 > SUPREME COURT REPORTS [1997) 1 S.C.R. A regular/permanent employees of the Company as notified from time to time who have put in 15 years of service or more in the Company and who are of the age of 45 years and above as on the date of the submission of the application for voluntary retirement. · _-r_ It is, thus, seen that there is a distinction between the employees who B retire under the Conduct, Discipline and Appeal Rules on attaining the age of _50_ years and the employees who accept voluntary retirement on completion of 15 years of service or more in the Company and who are _of_ the age of 45 years and above. In other words, before attaining the age of _50_ years as contemplated under the Conduct, Discipline and Appeal Rules, C the benefits enumerated for such of the employees who opt for and where option is accepted by the Company, are postulated in Clause {b) of Scheme 'B' which says that the eligible employees requesting for voluntary retirement, subject to acceptance of their requests by the Company/Competent Authority, shall be entitled to receive benefits at the following rates for the D remaining period of service prior to the date of retirement on superannuation from the service of the Company. The computation thereof :1as been enumerated in the scheme which reads as under : E F G H "It has been decided to introduce a Voluntary Retirement Scheme for the employees of the Company as per the enclosed copy of comprising of two parts viz., Scheme 'A' and Scheme 'B'. The . scheme will be in operation from 1.4.1989 for a period of three months, subject to the following further conditions : (i) Scheme A shall be applicable only to the employees of Lamp unit, Hyderabad in WG Cadre with the terms and Conditions specified in Scheme. A for a period of three months from 1.4.1989. (ii) Scheme B shall be applicable to all the Units/Divisions (including Lamp), Business Group Directorates, other offices and Corporate Office with the terms and condition specified in the enclosed scheme, for a period of three months from 1.8.1989. (iii) The scheme does not confer any right or any employees to have his request for voluntary retirement accepted by the competent authority right to accept or reject the application for voluntary retirement shall entirely vest the Company. ,,:( .. 573 H!NDUSfANMACHINESTOOLSLID.v.M.S.KANG/P.N.KASHYAP ; (iv) Acceptance of application for Voluntary Retirement shall depend _inter alia_ availability of funds in the respective Units/Divisions/Business Group Directorates, other Offices and Corporate Officer. (v) The eligible employees requesting for voluntary retirement, subject to acceptance of their requests by the competent authority shall be en}itled to such benefits are specified in the scheme. Such employees may be persuaded to deposit the benefits received, in the Company Fixed Deposit Scheme. B c 2. The existing medical retirement Scheme and Voluntary.Retirement Scheme introduced for Hyderabad based Units of the Company shall stand discontinued with the introduction of the above Voluntary Retirement Scheme. D 3. the Units and areas within the Units, where the Scheme could be implemented will separately be intimated by the DPS. 4. The progress of implementation of the Scheme with regard to the number of employees in each cadre and the total amount paid on account compensation shall be reported to DPS every month." . For the computation of the payment of the compensation in terms of the calculation, the 'Note' postulates that the salary mentioned under Scheme A and B shall mean basic pay, Dearness Allowance, Interim Relief/ad _hoc_ Relief and Personal Pay, if any, and shall be calculated on · F the basis of a calendar month. In other words, this contract has expressly omitted to mention the revised scale of pay from time to time. The reason would be obvious. An employee who retires on completing the age of 50 years but before the age of 58 years, is not entitled to the payment of any special component of the salary as indicated hereinbefore. On the other G hand, he will be entitle only to the retire benefits as are available under the normal Rules. If the company, in public interest, instead of giving one month's notice makes payment of salary in lieu thereof then employee would be entitled to nothing more except other retrial benefit like pension, gratuity etc. The procedure in regard to the calculation of the payment of the compensation and method of computing the compensation has been H 574 SUPREME COURT REPORTS [1997] 1 S.C.R. _A_ provided in Para VI; the details whereof are not material for the purpose of these case. Para IX of the Special Scheme postulates that retirement on medical grounds in terms of clause 24.1 and voluntary retirement **in** terms of clause 24.2(b) and (c) of the Conduct, Discipline and Appeal Rules of the Company shall fall outside the purview of the scheme. In other words, **B**[the special scheme excluded such of the employees who voluntarily retired ] under Rule 24.1 or 24.2(b) and ( c) of the Conduct, Discipline and Appeal Rules of the Company, Para XII in this behalf is more relevant wherein it says that the Chairman and Managing Director shall have power to amend, modify, alter or withdraw the above Scheme either in whole or in part, at his directions, if the circumstances so warrant. In other words, whatever C components are enumerated thereunder would be binding on the parties until the Chairman and the Managing Director before acceptance amends, modifies, alters or withdraws the above scheme. It is seen that the Office Order No. 45 dated March **1,** 1991 provides **D** that the revised pay scales shall be effective from 1.1.1987 and will remain in force for the period of five years upto 31.12.1991. Clause 2.2. provides that the revised pay scales shall also be applicable on a pro-rata basis to those categories of employees who were on the rolls of the company as on 31.12.1986 but have subsequently separated due to superannuation and E voluntary retirement etc. Those who retired on attaining the age of 58 years or voluntarily retired under Rule 24.2. (b) or (c), as the case may be, under the Conduct, Discipline and Appeal Rule referred to hereinbefore, are the persons referred to in clause 2.2.2 of the office order. The benefits of the revision of pay scales shall not be applicable to those persons who were on the rolls of the Company as on 31.12.1986 but subsequently left the service **F** of the company before the date of issue of Office Order No 45/90 for any reason, whatsoever, including resignation except the category mentioned in clause 2.2 above. Thereby, the necessary implication is that all those who are cm cred and stand on the same footing are excluded except to the extent of gratuity, revision of the terminal benefits as mt!ntioned in para G 6.13 which postulates that gratuity paid or payable to employees covered under Clause 2.2 \viii be recalculated on the revised pay subject to the prescribed ceiling. Thus, it could be seen that the distinction has been drawn between employees who retired voluntarily under Rule 24.2 of the Conduct, Discipline and Appeal Rules or the employees who retired under **H** the Special Scheme operating form time to time. The respondents having 'f •" HINDUSTAN MACHINES TOOLS LlD. _v._ M.S. KANG/P.N. KASHYAP 575 -,, retired under the Special Scheme are not employees covered under the voluntary retirement under Rule . 24.2 of the Conduct, Discipline and Appeal Rules referred to hereinbefore. Accordingly, the High Court was not right in directing recomputation of the compensation under Office Order No. 45 dated March 1, 1991. The appeals arc accordingly allowed. Consequently, the writ petiB tions stand dismissed. No costs. · T.N.A. Appeal are allowed.
End of Judgment Record
Browse All Supreme Court of India (1997) Decisions
1997-12-17

Sharad Vasant Kotak and Ors. v. Ramniklal Mohanlal Chawda and Anr.

This Supreme Court judgment concerns the maintainability of a suit for dissolution of partnership and accounts under the Indian Partnership Act, 1932, as amended by the Maharashtra Amendment of 1984 (Section 69(2A)). The Paramount Builders partnership, registered in 1980 with seven partners (Kotak family and Chawda family), underwent changes after the death of partner Mohanlal Chawda in 1986, when his widow was inducted as a partner. A series of deeds (1986, 1992) reconstituted the firm without informing the Registrar of Firms, raising questions about registration and the applicability of Section 69(2A), which restricts suits to registered firms where the suing partner is shown in the Register of Firms. The Bombay High Court Division Bench held that reconstitution does not cancel registration and that amendments to pleadings were permissible; it concluded that Section 69(2A) does not bar the suit. The appellants argued that induction of a new partner dissolves the old firm and requires a fresh registration, while the respondents contended that dissolution and reconstitution are distinct concepts and that registration continues despite changes. The Supreme Court ultimately held that the firm was merely reconstituted, not dissolved; non‑compliance with registration provisions may attract penalties, but does not erase registration. The Special Leave Appeal was dismissed, with no costs.

1997-11-18

National Insurance Co. Ltd. v. Santro Devi and Ors.

National Insurance Co. Ltd. v. Santro Devi deals with a motor-accident compensation claim under the Motor Vehicles Act. A Tribunal found that the offending vehicle was driven by a person who held a valid driving licence, which had been renewed on the date of the accident, and the claimants were accordingly awarded compensation. The Punjab and Haryana High Court affirmed this finding on appeal but then referred the matter to a full Bench to decide a legal question: whether a forged or fake licence, if renewed, would be treated as a valid licence for purposes of liability. The full Bench answered that a forged licence would not become valid under the Motor Vehicles Act and that an insured, bonafide believing in the licence’s validity, would still incur liability toward third parties under the policy; several related conclusions regarding insurer liability were laid down. The Insurance Company challenged these High Court observations. The Supreme Court allowed the appeal in part, holding that the claimants were rightly granted compensation on the facts, and that the High Court’s observations on forged licences were obiter and not binding precedents since there was concurrent factual finding that the driver held a valid licence renewed on the date of the accident. The Court affirmed the substantive order and dismissed the related Special Leave Petition.

1997-02-03

JAIPUR DEVELOPMENT AUTHORITY v. SITA RAM AND ORS.

This appeal concerns the validity of notifications under Section 52 of the Rajasthan Urban Improvement Act, 1959, by which the Jaipur Development Authority sought to continue land acquisition even after the repeal of the 1959 Act, and after a fresh notification was issued in 1984 under the Jaipur Development Authority Act. The Rajasthan High Court had held that unless the master plan scheme under the JDA Act had been properly framed, the notification issued under Section 52 was not valid in law. The appellants challenge this proposition, contending that framing of a scheme is not a mandatory pre-condition for acquisition and that the 1984 notification cannot be quashed solely for lack of a sanctioned scheme. The matter traces several precedents: Pratap v. State of Rajasthan; State of Tamil Nadu v. Mohd. Yousef; Narain v. State of Rajasthan; and Urban Improvement Trust v. State of Rajasthan. The decision ultimately clarifies that framing of a scheme is not a required pre-condition for land acquisition; overruled or distinguished interpretations in earlier decisions, especially Tamil Nadu Yousef, Krishnan’s later formulation and Narain’s approach. The Court endorses the view that the notification for acquisition cannot be invalidated on account of non-framing of a scheme, and thus allows the appeals, setting aside the High Court’s judgment and dismissing the writ petitions, with no costs to either side.

1997-07-07

Delhi Administration (Now Govt. of N.C.T. Delhi) through the Chief Secretary, Delhi and Ors. v. Nand Lal Pant and Anr.

Delhi Administration v. Nand Lal Pant concerns the scope of promotion from the cadre of Trained Graduate Teachers (TGT) to Post-Graduate Teachers (Sanskrit) in the Delhi education cadre, and the remedy when a sanctioned channel does not exist. Pant, appointed as a TGT in 1974 and confirmed, was asked to officiate in the PGT (Sanskrit) post when it became vacant after the retirement of S.N. Sastri, a Sanskrit-qualified officer. He repeatedly sought promotion to the PGT position, which the Delhi High Court granted in 1996, directing promotion with effect from 1986 and ordering payment of consequential benefits. The Delhi Administration appealed on the ground that there was no direct promotional channel from TGT (General) to PGT (Sanskrit), and that the SC caste reservation for the post should be respected. The Supreme Court accepted that there is no direct channel, but noted Pant’s extended officiation in the PGT post since 1986. It held that justice required a workable remedy: creation of a supernumerary PGT (Sanskrit) post in any school or directorate, allowing Pant to continue there until retirement, with pay from the date of creation. The decision clarifies it as a discretionary remedy and not a general precedent, and it disposed of the appeal with no costs.