Haryana State Industrial & Infrastructure Development Corporation Limited & Others v. Satpal and Others

Case / Petition Number:
/
Neutral Citation:/

Case Synopsis & Summary

This appeal concerns compensation for land acquired for the Kundli–Manesar–Palwal Expressway and for the expansion of industrial sector 39 in Sonipat, Haryana. The lands were acquired by notifications dated 30.06.2005 and 05.03.2007. The Land Acquisition Officer awarded Rs.16,00,000 per acre; the Reference Court enhanced some parcels, while the High Court, in the first round, raised compensation substantially. This Court later disposed of related appeals on 6.9.2017 and 28.11.2017, remitting matters for fresh decision and directing that land values must reflect the locality’s value prior to 13.08.2004, rather than applying belts or ad hoc multipliers. On remand, the High Court fixed Rs.29,54,000 per acre for lands under notification 30.06.2005 and Rs.45,00,000 per acre for lands under 05.03.2007. The appellant-HSIIDC challenges these figures, arguing the High Court erred by relying on sale deeds (Exs. P43–P44) and applying a 50% cut, instead of considering the pre-2004 local values and the correct time-related increases. Landowners rely on other sale deeds and precedents to contend that higher fair market value should be adopted. The Court ultimately partly allows the appeals, revising compensation to Rs.24,50,000 per acre (30.06.2005) and Rs.30,73,280 per acre (05.03.2007), with statutory benefits and no costs.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Landmark Cases
Hon'ble Judges
  • M.R. Shah
Judgment Date
2023-02-09
Court Decision / Holding
The present appeals are partly allowed. For lands acquired on 30.06.2005, compensation is fixed at Rs. 24,50,000 per acre (instead of Rs. 29,54,000). For lands acquired on 05.03.2007, compensation is fixed at Rs. 30,73,280 per acre (instead of Rs. 45,00,000). All other statutory benefits under the 1894 Act remain applicable. There shall be no order as to costs.
Final Disposition
Partly allowed with modifications; No costs

Parties to the Case

Appellants / Petitioners

  • Haryana State Industrial & Infrastructure Development Corporation Limited & Others

Respondents

  • Satpal and Others, etc.

Provisions of Law Cited

Land Acquisition Act, 1894Section 25 of the Land Acquisition Act, 1894

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants contended that the High Court seriously erred in enhancing compensation to Rs.29,54,000 per acre for lands acquired on 30.06.2005. They argued the High Court relied on Exs. P43–P44 (sale deeds) while ignoring state sale deeds and misread Section 25 of the Land Acquisition Act, 1894. They emphasized that the lands were agricultural and that the surrounding acquisitions’ values prior to 13.08.2004 should govern the assessment, per the Court’s remand observations. Citing the main sale deeds (Exs. P43–P44) and a 50% cut, they calculated a potential value around Rs.24,43,693 per acre; hence Rs.29,54,000 per acre was wrong. For the 05.03.2007 notification, they urged applying expected indexation (8–12% per annum) from the earlier award, rather than a straight 10% cut on Ex. P4-based figures, yielding Rs.30,73,280 per acre rather than Rs.45,00,000 per acre. They conclude the Court should modify to reflect fair market value and the remand guidance.

Contentions of Respondents

The respondents argued that the High Court rightly relied on nearby sale exemplars and adjusted them with a cautious uplift. They contended the market value for compensation should reflect fair market value in the relevant locality as of the pre-notification period, and should account for ongoing development, particularly given the Expressway project. They relied on decisions (e.g., General Manager, ONGC v. Patel; Mehrawal Khewaji Trust v. Punjab) to support higher compensation where warranted and argued that additional sale deeds from Oct 2005–2006 indicated higher land values. They urged that the High Court’s belting approach was justified for complex public projects and that the enhanced amounts for 30.06.2005 and 05.03.2007 were not arbitrary, but grounded in market evidence and statutory benefits under the 1894 Act.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
General Manager, Oil and Natural Gas Corporation Limited v. Rameshbhai Jivanbhai Patel and Another(2008) 14 SCC 745Mentioned OnlyCited by the landowners to support fair market value, but the Court does not adopt or overrule this authority in its operative reasoning.
Mehrawal Khewaji Trust (Registered), Faridkot and others v. State of Punjab and others(2012) 5 SCC 432Mentioned OnlyReferenced for its discussion on fair compensation, not applied as a controlling rule in the present judgment.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,809 words•~13 min read

In The Court Record

Haryana State Industrial & Infrastructure Development Corporation Limited & Others v. Satpal and Others

## REPORTABLE IN THE SUPREME COURT OF INDIA CIVIL APPELLATE JURISDICTION CIVIL APPEAL NOS. OF 2023 (Arising out of SLP(C) Nos.18428-18432, 18434-18438, 18440-18454, 18456-18494, 18496, 18498-18501, 18503-18509, 18511-18572 & 18574-18584/2021) Haryana State Industrial & Infrastructure Development Corporation Limited & Others …Appellants Versus Satpal & Others Etc. Etc. …Respondents ## J U D G M E N T M.R. SHAH, J. 1. Feeling aggrieved and dissatisfied with the impugned common judgment and order dated 05.07.2019 passed by the High Court of Signature Not Verified Punjab & Haryana at Chandigarh in the respective first appeals, by Digitally signed by Neetu Sachdeva Date: 2023.02.09 16:10:32 IST Reason: which for the land acquired _vide_ notification dated 30.06.2005 for villages Badh Malik, Pritampura and Rasoi, the High Court has 1 HSIIDC v. Satpal & Others Etc. enhanced the compensation to Rs. 29,54,000/- per acre and for the land acquired _vide_ notification dated 05.03.2007 for the aforesaid villages, the High Court has assessed and awarded the compensation @ Rs. 45,00,000/- per acre, the Haryana State Industrial and Infrastructure Development Corporation Limited (for short, ‘HSIIDC’) has preferred the present appeals. 2. A large chunk of land situated at villages Badh Malik, Jatheri, Pritampura, Akbarpur Barota, Rasoi etc. in District Sonipat, Haryana came to be acquired for the purpose of construction of the Express Highway known as “Kundli – Manesar – Palwal Highway (for short, ‘KMP’) connecting National Highway No.1 in District Sonipat, Haryana, by different notifications. In the present appeals, we are concerned with the land acquired _vide_ notifications dated 30.06.2005 and 5.3.2007 of villages Badh Malik, Pritampura and Rasoi. The lands were acquired for the expansion of industrial sector 39 also. 2.1 The Land Acquisition Officer determined and awarded compensation @ Rs.16,00,000/- per acre. The Reference Court enhanced the compensation to Rs. 19,00,000/- per acre for villages Badh Malik and Rasoi with respect to the land acquired _vide_ notification dated 30.06.2005. The Reference Court did not enhance the amount of compensation so far as village Pritampura is concerned. 2 HSIIDC v. Satpal & Others Etc. With respect to the land acquired _vide_ notification dated 5.3.2007, the Reference Court did not enhance the amount of compensation in respect of villages Badh Malik and Pritampura, however, enhanced the amount of compensation to Rs. 23,00,000/- per acre for village Rasoi. 2.2 In the first round of litigation before the High Court, the High Court enhanced the amount of compensation to Rs. 40,00,000/- per acre up to depth of 4 acres and Rs.30,40,000/- per acre beyond that with respect to the land acquired _vide_ notification dated 30.06.2005. Similarly, in the first round of litigation before the High Court, the High Court enhanced the amount of compensation to Rs. 50,00,000/per acre up to depth of 4 acres and Rs. 38,00,000/- per acre beyond that with respect to the land acquired _vide_ notification dated 5.3.2007. The judgments and orders passed by the High Court were the subject matter of Civil Appeals before this Court being Civil Appeal No. 12847/2017 and Civil Appeal No. 20050/2017 along with other allied appeals. By judgments and orders dated 6.9.2017 & 28.11.2017, this Court disposed of the appeals and set aside the orders passed by the High Court and remitted the matters to the High Court for a fresh decision. This Court did not approve adoption of belting system by the High Court by observing that being an acquisition for an Express Way passing through different parcel of land, there is no need or justification for adopting the 3 HSIIDC v. Satpal & Others Etc. belting system. This Court also observed that if the land value is to be fixed for KMP project acquisition, the relevant factors which are to be noted are mainly the value that was prevalent in the locality prior to 13.08.2004. 2.3 That thereafter on remand, in the second round of litigation before the High Court, by the impugned common judgment and order, the High Court has assessed and determined and awarded compensation @ Rs. 29,54,000/- per acre with respect to the land acquired _vide_ notification dated 30.06.2005 and has enhanced the amount of compensation to Rs. 45,00,000/- per acre with respect to the land acquired _vide_ notification dated 5.3.2007. 2.4 Being aggrieved and dissatisfied with the impugned common judgment and order passed by the High Court with respect to the lands acquired _vide_ notifications dated 30.06.2005 and 5.3.2007, HSIIDC has preferred the present appeals. At this stage, it is required to be noted that so far as the landowners’ appeals against the very impugned common judgment and order are concerned, the same had been dismissed earlier by this Court _vide_ order dated 13.01.2010 passed in Special Leave Petition (Civil) Diary No. 36995/2019 and other allied special leave petitions. Therefore, so far as the landowners are concerned, the impugned 4 HSIIDC v. Satpal & Others Etc. common judgment and order passed by the High Court had attained finality and the present appeals are required to be considered at the instance of HSIIDC only. ## **Arguments of the learned counsel for the land acquired** _**vide**_ **notification dated 30.06.2005** 3. Learned counsel appearing on behalf of the appellants has vehemently submitted that the High Court has seriously erred in enhancing the amount of compensation to Rs. 29,54,000/- per acre with respect to the land acquired _vide_ notification dated 30.06.2005. It is submitted that while enhancing the amount of compensation to Rs. 29,54,000/- per acre for the land acquired _vide_ notification dated 30.06.2005, the High Court has relied upon the builder’s sale deeds produced as Exhibits P43 & P44 and has not considered the sale deeds produced by the State. It is submitted that the High Court has wrongly interpreted Section 25 of the Land Acquisition Act, 1894 (for short, ‘the 1894 Act’) and has not considered the sale deeds produced by the State. 3.1 It is further submitted that even otherwise the High Court ought to have appreciated that the lands acquired were all agricultural lands and therefore while assessing the compensation, the High Court ought not to have relied upon and/or considered the builder’s sale deeds. 5 HSIIDC v. Satpal & Others Etc. 3.2 It is further submitted that the High Court has not properly appreciated the fact that in the surrounding areas, the lands were already under acquisition commencing from the notification dated 13.08.2004. It is submitted that therefore the market price/value of the lands as on 13.08.2004 ought to have been considered. It is submitted that even while remanding the matters to the High Court, this Court specifically observed that the value of the lands as on 13.08.2004 shall be the determinative factor. It is submitted that instead while assessing the compensation, the High Court has relied upon the sale deeds produced as Exhibits P43 & P44 dated 15.4.2005. 3.3 It is further submitted that even otherwise and assuming that the High Court was right in relying upon the sale deeds produced as Ex. P43 & P44, even in that case also and even as observed and held by the High Court in giving a 50% cut, the High Court ought not to have enhanced the amount of compensation to Rs. 29,54,000/- per acre. It is submitted that if the main of two sale deeds (Ex. P43 & P44) is taken and thereafter 50% cut, as adopted by the High Court, is applied, in that case, the compensation assessed would come to Rs. 24,43,693/- per acre. It is submitted that therefore the High Court has committed a very serious and grave error in determining and awarding compensation @ 6 HSIIDC v. Satpal & Others Etc. Rs. 29,54,000/- per acre for the lands acquired _vide_ notification dated 30.06.2005. ## **Arguments of the learned counsel for the land acquired** _**vide**_ **notification dated 05.03.2007** 3.4 It is further submitted by the learned counsel appearing on behalf of the HSIIDC that the High Court has materially erred in enhancing the amount of compensation to Rs. 45,00,000/- per acre with respect to the land acquired _vide_ notification dated 5.3.2007. 3.5 It is submitted that considering the time gap of approximately one year and nine months and granting 8 to 12 percent cumulative increase on the compensation awarded for the land acquired _vide_ notification dated 30.06.2005, the compensation awarded by the High Court @ Rs. 45,00,000/- per acre is too excessive and can be said to be on much higher side. 3.6 It is submitted that as such for the land acquired _vide_ notification dated 13.08.2004 of the very villages Badh Malik and Pritampura, the High Court earlier determined and awarded compensation @ 21,00,000/- per acre and therefore considering the time gap of approximately two and half years and granting 8 to 12 percent increase, 7 HSIIDC v. Satpal & Others Etc. the amount awarded by the High Court at Rs. 45,00,000/- per acre is unsustainable. 4. All these appeals are vehemently opposed by the learned counsel appearing on behalf of the original claimants/landowners. 4.1 Learned counsel appearing on behalf of the original landowners have vehemently submitted that in fact while determining the compensation for the land acquired under both the notifications, the High Court has not considered the other sale deeds except Ex. P43 & P44. It is submitted that if other sale deeds would have been considered and the development in the surrounding areas would have been considered, the amount of compensation awarded by the High Court can be said to be on the lower side. It is submitted that as it is a case of compulsory acquisition, the landowners are entitled to the just compensation on the basis of the fair market value. Reliance is placed on the decisions of this Court in the cases of _**General Manager, Oil and Natural Gas Corporation Limited v. Rameshbhai Jivanbhai Patel and Another, reported in (2008) 14 SCC 745 (paras 13 & 14); Mehrawal Khewaji Trust (Registered), Faridkot and others v. State of Punjab and others, reported in (2012) 5 SCC 432 (para 17)**_ . 4.2 Learned counsel appearing on behalf of the original landowners have relied upon the sale deeds produced as Ex. P4, P3, P6, P7 & P5 of 8 HSIIDC v. Satpal & Others Etc. village Badh Malik and Badh Khalsa in support of their submission that in October 2005 and in the year 2006, the market value of the land was much much higher. 4.3 Making above submissions, it is prayed to dismiss the present appeals. 5. We have heard learned counsel for the respective parties at length. We have gone through the impugned common judgment and order passed by the High Court in detail and have also considered the reasoning given by the High Court by assessing and determining the compensation @ Rs. 29,54,000/- per acre for the land acquired _vide_ notification dated 30.06.2005 and at Rs. 45,00,000/- per acre for the land acquired _vide_ notification dated 5.3.2007. 5.1 At the outset, it is required to be noted that in the present case the lands were acquired of villages Badh Malik, Pritampura and Rasoi in District Sonipat, Haryana, which were all agricultural lands and acquired for the purpose of industrial sector 39, Sonipat. It is also required to be noted that as such the time gap between the two notifications dated 30.06.2005 and 5.3.2007 would be approximately one year nine months. However, it is required to be noted that the acquisition with respect to the land situated at villages Badh Malik and Pritampura came to be acquired 9 HSIIDC v. Satpal & Others Etc. initially _vide_ notification dated 13.08.2004 and thereafter from time to time the notifications were issued and the lands came to be acquired for different public purposes. At this stage, it is required to be noted that even while remanding the matter to the High Court, this Court _vide_ judgment and order dated 6.9.2017 specifically observed that if the land value is to be fixed for KMP project acquisition, the relevant factors which are to be noted are mainly the value that was prevalent in the locality prior to 13.08.2004. However, in the present case, the lands acquired are for the expansion of industrial sector 39, Sonipat and therefore the amount of compensation assessed and determined for the land acquired _vide_ notification dated 30.06.2005 acquired of very villages Badh Malik, Pritampura and Rasoi can be said to be the governing factor even while determining the compensation for the land acquired _vide_ notification dated 5.3.2007 as under both the notifications the lands acquired are for the same public purpose, namely, development of industrial sector 39, Sonipat, Haryana. 6. Now so far as the land acquired _vide_ notification dated 30.06.2005 is concerned, the High Court has assessed and determined compensation @ Rs. 29,54,000/- per acre. While assessing and determining the compensation @ Rs. 29,54,000/- per acre for the land 10 HSIIDC v. Satpal & Others Etc. acquired _vide_ notification dated 30.06.2005, the High Court has considered the sale deeds produced as Ex. P43 & P44. The High Court took into consideration the following sale deeds which are tabulated as under: |Exhibit|Sale<br>deed/con<br>veyance<br>No.|Date of sale<br>deed|Area<br>sold in<br>sale<br>deed|Sale<br>considerati<br>on|Amount<br>per acre|Village| |---|---|---|---|---|---|---| |Ex.P-4|5368|10.12.03|0-10|656000|19,20,000|Pritampura| |Ex.P-14|2931|2.6.05|0-13|7500000|92,30,769|Badh Malik| |Ex.P42<br>& 106|12387|7.3.05|32-3|19290000|4802239|Rasoi| |Ex.P43<br>& 108|516|15.4.05|37-16|23625000|5000000|Do| |Ex.P44|517|15.4.05|21-4|13250000|4774775|Do| |Ex.P45|871|25.4.2005|24-0|14400000|4800000|Do| |Ex.P46|2755|30.5.05|5-2|3060000|4800000|Do| |Ex.P47|3342|13.6.05|47-5|23625000|4473373|Do| |Ex.P48|3358|13.6.05|21-5|11953200|4722252|Do| |Ex.P-15<br>& P-62|8811|24.10.05|35-8|49123700|11101401|Do| |Ex.P-16<br>& P63|8812|24.10.05|35-8|49123700|11101401|Do| Thereafter, the High Court has observed that Ex. P43 & P44 would be safe sale exemplars to fall back upon and after applying the cut off of 50%, the High Court has assessed the compensation @ Rs. 29,54,000/per acre. 7. If we consider the main Ex. P43 & P44, which are the sale deeds dated 15.04.2005 and thereafter applying the cut off of 50%, the market value of the land would come to Rs. 24,43,693/- per acre. Instead, without any adequate reasons, the High Court has assessed and 11 HSIIDC v. Satpal & Others Etc. enhanced the amount of compensation @ Rs. 29,54,000/- per acre. Therefore, the High Court has committed a very serious error in assessing and determining the compensation @ Rs. 29,54,000/- per acre for the land acquired _vide_ notification dated 30.06.2005. After making the round figure, the landowners/claimants shall be entitled to compensation @ Rs.24,50,000/- per acre with respect to the land acquired _vide_ notification dated 30.06.2005, with all other statutory benefits, which may be available under the provisions of the 1894 Act. 8. Now so far as the land acquired _vide_ notification dated 5.3.2007 is concerned, there shall be a corresponding increase looking to the time gap of approximately one year and nine months and giving 8 to 12 percent cumulative increase. However, the High Court has determined the compensation @ Rs. 45,00,000/- per acre on the basis of the sale deed (Ex. P4) by applying 10% cut. It is to be noted that so far as the first notification dated 30.06.2005 is concerned, the High Court has applied the cut of 50%. Even otherwise, it is to be noted that the sale deed produced as Ex. P4 is dated 2.11.2006 and the acquisition of the same villages commenced _vide_ notification dated 30.06.2005 and therefore the sale deed after the first notification dated 30.06.2005 could not have been the basis for assessing/determining the compensation with respect to the subsequent acquisition. On the contrary, giving 8 to 12 HSIIDC v. Satpal & Others Etc. 12 percent cumulative increase on the amount of compensation awarded for the land acquired _vide_ notification dated 30.06.2005, would be a safe and guiding factor. If that be so, compensation with respect to the land acquired _vide_ notification dated 5.3.2007, would come to Rs. 30,73,280/per acre (Rs. 24,50,000/- + 12% increase = Rs.27,44,000/- + 12% increase = Rs.30,73,280/-). To the aforesaid extent, the impugned common judgment and order passed by the High Court is required to be modified and the present appeals are required to be partly allowed accordingly. 9. In view of the above and for the reasons stated above, the present appeals succeed in part. The impugned common judgment and order passed by the High Court insofar as the land acquired _vide_ notification dated 30.06.2005 is concerned, is modified and it is ordered that the landowners/claimants shall be entitled to compensation @ Rs. 24,50,000/- per acre (instead of Rs. 29,54,000/- per acre), with all other statutory benefits which may be available under the provisions of the 1894 Act. 9.1 Insofar as the land acquired _vide_ notification dated 5.3.2007 is concerned, the impugned common judgment and order is modified and it is ordered that the landowners/claimants shall be entitled to compensation @ Rs. 30,73,280/- per acre (instead of Rs. 45,00,000/- 13 HSIIDC v. Satpal & Others Etc. per acre) with all other statutory benefits which may be available under the provisions of the 1894 Act. 10. The present appeals are partly allowed to the aforesaid extent. However, in the facts and circumstances of the case, there shall be no order as to costs. ………………………………..J. [M.R. SHAH] NEW DELHI; …………………………………J. FEBRUARY 09, 2023. [HIMA KOHLI] 14 HSIIDC v. Satpal & Others Etc.
End of Judgment Record
Browse All Landmark Cases Judgments
2019-01-22

State of Himachal Pradesh & Anr. v. Pinju Ram & Others; State of Himachal Pradesh & Ors. v. Ganesh Dutt & Anr.

This batch of appeals concerns regularisation and monetary benefits of part‑time employees in Himachal Pradesh who were converted to daily‑wage status. The State had issued a policy on 27 February 2004: part‑time Class‑IV employees who had completed ten years of continuous service as on 31 December 2003 would be made daily wagers with prospective effect, and posts vacated by such employees would stand abolished; Education and Ayurveda were excluded from the policy. Revenue Chowkidars, engaged by Panchayats, were not covered by that policy and received separate treatment. Following writ petitions and an order of the Himachal Pradesh High Court and in light of later developments, the State drew‑up directions in 2011 (22 September) to give seniority to Revenue Chowkidars on the basis of ten years of service, but with wages from the date of actual appointment and without back‑dated monetary benefits; 7 July 2012 further instructions reiterated this stance for remaining part‑time employees, with monetary benefits not guaranteed in the interregnum. The respondents pressed for back wages dating from 1 January 2007 and broader coverage. The Supreme Court held that the 2007 back‑pay direction was unsustainable, clarified that seniority would count from ten years without past benefits, and that the 2011 policy and Moti Singh principle should guide the approach. The appeals are allowed; no costs. The related writ petitions are to be disposed of consistent with these directions.

2018-08-14

Union Bank of India and Others v. C.G. Ajay Babu and Anr.

This is a Supreme Court of India appeal concerning the forfeiture of gratuity under the Payment of Gratuity Act, 1972. The respondent was a branch manager of the appellant bank and was dismissed on 3 June 2004 after disciplinary proceedings. A show-cause notice sought to forfeit gratuity due to misconduct involving moral turpitude, which was ordered on 20 April 2004. The High Court upheld the dismissal but held that gratuity could be paid since there was no financial loss to the bank, and that a bipartite settlement between the bank and employees permitted forfeiture only where misconduct caused financial loss. The Division Bench, however, held that forfeiture under Section 4(6) must be read together with Section 4(5) and that no loss was proven, thus entitling the employee to gratuity in accordance with the bipartite settlement. The Supreme Court agreed with the High Court that forfeiture is not automatic; it is controlled by Sections 4(5) and 4(6) of the Act and by the bipartite settlement, which requires loss to justify forfeiture. The Court emphasized that an act must constitute an offence involving moral turpitude and that conviction is generally required for forfeiture under 4(6)(b)(ii). The appeal is dismissed with no costs.

2018-09-25

Reema Salkan v. Sumer Singh Salkan

This is a Supreme Court of India criminal appeal under the Criminal Appellate Jurisdiction arising from a maintenance dispute under Section 125 Cr.P.C. The parties, married in 2002, had a protracted litigation history. The Family Court granted maintenance to the wife from 17 July 2003 to 8 December 2010, and held no maintenance thereafter. The High Court, in revision, partly allowed the application, directing Rs.9,000 per month from 9 December 2010 onward, while upholding the earlier period’s Rs.10,000 per month. This Court had earlier granted interim maintenance of Rs.20,000 per month in 2014 (Criminal Appeal Nos. 2347-2349 of 2014). The appellant contends there has been no change in circumstances since the interim order and that the respondent’s substantial assets, education, and overseas earnings establish the capacity to pay higher maintenance. The respondent defends the High Court’s reasoning, arguing that the Family Court’s assessment, demeanor observations, and the principle that maintenance should not be perpetual require careful scrutiny, and that the notional minimum wage approach used by the High Court is flawed. The overarching issue is the quantum of monthly maintenance payable to the appellant and whether the interim amount should be augmented beyond the period up to 2010.”

2019-12-03

M/s Embassy Property Developments Pvt. Ltd. v State of Karnataka & Ors.

This judgment concerns three Civil Appeals filed by a Resolution Applicant, the Corporate Debtor (through its Resolution Professional) and the Committee of Creditors, challenging an Interim Order of the Karnataka High Court staying an NCLT order in proceedings under the Insolvency and Bankruptcy Code, 2016. The NCLT Chennai had admitted an application under Section 7 of the IBC against M/s Tiffins Barytes Asbestos & Paints Ltd. and directed a moratorium under Section 14. The Interim Resolution Professional then sought a deemed extension of a mining lease under MMDR Act, 1957 and the Government of Karnataka rejected it. The NCLT, by an order dated 11.12.2018, set aside the Government’s order and directed execution of Supplement Lease Deeds for the period up to 31.03.2020. The Government of Karnataka challenged this in a High Court writ petition, which stayed the impugned NCLT order. The core issues were: (i) whether the High Court may interfere under Article 226/227 with an NCLT order in IBC when an appeal lies to the NCLAT, and (ii) whether fraud can be inquired into by NCLT/NCLAT in CIRP. The Court reiterates that IBC is a complete, umbrella code with a three‑tier mechanism (NCLT, NCLAT, Supreme Court) and that public‑law disputes arising from MMDR Act obligations lie outside IBC. It ultimately holds that while NCLT/NCLAT may inquire into fraud, they cannot adjudicate MMDR‑related public legal disputes; and the High Court’s writ jurisdiction in public‑law contexts remains permissible. The appeals are dismissed.