Supreme Court of IndiaSupreme Court · 1996Single JudgeAppeals allowed

Haryana State Industrial Development Corporation Ltd. v. Inderjeet Sawhney

Case / Petition Number:
Civil Appeal Nos. 2078-79 of 1996
Neutral Citation:[1996] 1 S.C.R.

Case Synopsis & Summary

The Haryana State Industrial Development Corporation (HSIDC) invited applications for industrial plots in Gurgaon. The respondent, Inderjeet Sawhney, deposited 15% and was offered a one-acre plot at Rs. 120 per sq metre with a provisional allotment letter dated 27-12-1984, clearly stating no legal right to allotment would arise unless a final allotment was issued. The respondent failed to complete prerequisites and to deposit further amounts, but a mutual agreement subsequently led to a letter on 5-1-1989 offering half an acre at the old rate, with an express statement that requests for additional space would be considered on a fresh application and that this case would be treated as closed thereafter. The respondent accepted, while reserving the right to claim a further half acre. A formal provisional allotment on 24-2-1989 offered two plots totalling 2000 sq metres at Rs. 120 per sq metre, and a final letter of allotment dated 6-7-1990 followed with possession on 4-9-1990. In 1994, the High Court directed the HSIDC to allot the remaining half acre. The Supreme Court held that the respondent was not entitled to any additional half acre; the correspondence shows the respondent was estopped from claiming more after accepting 2000 sq metres, and the provisional letter did not confer a vested right. The appeal is allowed; the writ petition is dismissed; each party bears its own costs.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • J.S. Verma
  • B.N. Kirpal
Judgment Date
1996-01-18
Court Decision / Holding
Appeals allowed. The appellant was not liable to allot an additional half acre of land to the respondent; the High Court’s directions directing such allotment are set aside; the writ petition stands dismissed; parties to bear their own costs.
Final Disposition
Appeals allowed

Parties to the Case

Appellants / Petitioners

  • Haryana State Industrial Development Corporation Ltd.

Respondents

  • Inderjeet Sawhney

Legal Representation & Advocates

Counsels for Petitioners

  • • Dr. A.M. Singhvi
  • • Sumant Batra
  • • Ashok K. Mahajan

Counsels for Respondents

  • • Ranbir Yadav

Legal Doctrines & Maxims

  • Estoppel

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant contends that the provisional and subsequent letters of allotment did not create a vested right to an additional half acre; no final allotment letter was issued for such extra land; after mutual agreement the respondent accepted 2000 sq m of land and the 5-1-1989 offer stated the case would be treated as closed thereafter, with the right to seek further space subject to new rates. The 27-12-1984 provisional letter expressly stated that it did not confer a legal right unless a final allotment was issued, and the appellant argues that the final allotment in 1990 strictly conformed to the two plots and that estoppel prevents further claims.

Contentions of Respondents

The respondent argues that the provisional letter created a legitimate expectation of a larger allotment; subsequent correspondence and the acceptance of 2000 sq m under the 5-1-1989 letter, along with the 6-7-1990 final allotment, reflect an entitlement to at least a half acre. The respondent asserts that the High Court correctly directed allotment of the remaining half acre and that estoppel should not bar a legitimate expectation arising from the correspondence and actions surrounding the allotment process.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,010 words•~14 min read

In The Court Record

Haryana State Industrial Development Corporation Ltd. v. Inderjeet Sawhney

A # HARYANA STATE INDUSTRIAL DEVELOPMENT CORPORATION LTD. _v._ # INDERJEET SAWHNEY JANUARY 18, 1996 B [J.S. VERMA AND B.N. KIRPAL, JJ.] ## _llldust1ial Development :_ ) c _Industrial land-Allotment of Haiyana State lndustJial Development Corporation issuing provisional letter of allotment of one acre plot to allottee mentioning that it would not give any legal 1ight of a/lotme11t unless final letter of allotment was issued-Allottee not complying with tenns under provisions of allotment lette1-Later, on a mutual agreement allottee accepti11g half-acre plot-After taking possession thereof allottee claiming further half acre land_ D _on old rates under earlier letter of provisional allotment-Held, Corporation 1101 liable lo allot additio11al half acre of la11d to allottee-Al/ottee was estopped from c/aimi11g further half acre of land 011 old rates-Estoppel._ The respondent applied to the appellant-Corporation for an inE dustrial plot for setting up a unit to manufacture reinforced concrete cement pipes and accessories. On his having deposited 15% of the cost of land he was offered an industrial plot measuring one acre at the tentative rate of Rs. 120 per sq. metre, and a provisional letter of allotment dated 27.12.1984 was issued requiring him to fulfil certain pre-requisites within the stipulated period before the final allotment could be made in his F favour. It was also made clear that the provisional letter of allotment would not give any legal right of allotment unless the final allotment letter was issued. The respondent neither complied with the pre-requisites within the stipulated time, nor did he deposit any further amount with the Corporation, However, on the basis of a mutual agreement between the parties a letter dated 5.1.1989 was issued to the respondent offering him a G half, acre plot at the old rate of Rs. 120 per sq. metre. It was stated in the letter that request for further space would be considered on submission of a fresh application on new rates. Later, a formal letter of provisional allotment of two plots measuring 1000 sq. metres each at the tentative rate of Rs. 120 per sq. metre was issued to the respondent on 24.2.1989 requirH 713 E F _(_ 714 ./ ## SUPREME COURT REPORTS [1996] 1 S.C.R. - A ing him to complete the pre-requisites. The Corporation reiterated its stand taken in the letter dated 5.1.1989 regarding allotment of further space. On receipt of letter of acceptance from the respondent, a final letter of allotment was issued to him on 6.7.1990. The parties signed an agreement and possession of the two plots was handed over to the respondent. ## B Later, in 1994 was respondent filed a writ petition before the High Court seeking a direction to the Corporation to allot him remaining half-acre of plot on the basis of provisional allotment letter dated 27 .12.1984. The Corporation contended that the said letter had been superseded and the res1wndent accepted 2000 sq. metres of land under a C fresh agreement. The High Court allowed the writ petition. The review petition filed by the Corporation was dismissed. Aggrieved, the Corporation filed the present appeals. • ## Allowing the appeals, this Court H£LD : The appellant was not liable to allot an additional half acre of land to the respondent. The correspondence on record clearly shows that the respondent was estopped from making the claim for a further area of half acre after he had accepted the allotment of two plots measuring 2000 sq. metres in total. [720-A, 718-F·G] ## D E CIVIL APPELLATE JURISDICTION: Civil Appeal Nos. 2078-79 of 1996. From the Judgment and Order dated 19.8.95 of the Punjab & Haryana High Court in R.A. No. 41/95 read \vith judgment/order dated 14.11.94 in C.W.P. No. 5123 of 1994. F ' Dr. A.M. Singhvi, Sumant Batra for Ashok K. Mahajan for the Appellant. Ranbir Yadav for the Respondent. G The Judgment of the Court was delivered by ## KIRPAL, J. Leave granted. In this appeal, by special leave, there is challenge to two judgments H of the Punjab & Haryana High Court, the first being judgment dated H.S. INDL. DEV. CORPN. LTD. _v._ I. SAWHNEY [KIRPAL,J.j 715 • _J_ 14.11.1994 whereby the respondent's writ petition was allowed and the appellant was directed to allot a plot of land measuring half acre and the second judgment is dated 9.8.1995 whereby the Review Application filed by the appellant herein, was dismissed. The relevant facts are that the appellant is a Government company B **which is, inter alia, engaged in carrying out activities towards the advance-** ment of industrial development in the State of Haryana. Jn the course of its activities, in 1983 it invite applications for allotment of certain plots of land to set up industrial units in Gurgaon. The respondent applied for an industrial plot in Phase-IV, Udyog Vihar, Gurgaon for setting up a unit to manufacture reinfored concrete cement pipe and assessories. Allotment of C plot of one acre in favour of the respondent was approved and he was requested to deposit 15% of the cost of land vide letter dated 27.10.1983. On the said 15% having been deposited by the respondent, he was offered an industrial plot No. 359 measuring one acre in Udyog Vihar, Phase-IV, Gurgaon at the tentative rate of Rs. 120 per sq. metre. A provisional letter D of allotment dated 27.12.1984 was issued and it was made clear therein that the respondent was required to fulfil certain pre-requisites connected with the implementation of the proposed project before the final allotment could be made in his favour. These pre-requisites were to be completed within 120 days of the date of allotment. This letter further stipulated that the provisional letter of allotment will not give any legal right of allotment E unless the final allotment letter is issued. It is the case of the appellant that the respondent neither complied with the formalities, as contemplated by the aforesaid letter dated 27.12.1984, within the time schedule nor deposited any further amount with F the appellant. According to the appellant. for administrative reasons the industrial plot No. 359 which had been allotted to the respondent was changed to two plots measuring half acres each and renumbered as Plot Nos. 374-375. Another provisional letter of allotment dated 5.11.1986 was written to the respondent stating therein that it had been decided to offer G him industrial plot Nos. 374-375 measuring one acre at the tentative rate of Rs. 120-60 Sq. yard. But, before the allotment was issued in his favour, he was required to comply with certain pre-requisites enumerated in the said letter of allotment which were connected with the implementation of the respondent's proposed project. These pre-requisites included the unit being registered with the appropriate authority, drawing of the unit apH _f_ I [1996] 1 S.C.R. ## 716 ## SUPREME COURT REPORTS A proved, building and machinery being sanctioned and list of plant and machinery to be installed at the unit. The..'e pre-requisite formalities were required to be completed within 120 days of the said letter dated 5.11.1986 and it was stipulated that if this was not done within the specified time, then the provisional letter of allotment shall be treated as having been B withdrawn unless its validity was extended in writing by the Corporation. It was again mentioned in letter dated 5.11.1986 that the said letter shall not give the respondent any legal right for allotment unless the final allotment is issued. Soon after the despatch of the letter dated 5.11.1986, the appellant C learnt that the aforesaid plot Nos. 374-375 were not available and had been wrongly offered to the respondent. The re..,pondent was, accordingly, informed vide letter dated 10.11.1986 that the plot Nos. 374-375 had been wrongly mentioned in the provisional letter of allotment dated 5.11.1986 and that the respondent's case for allotment of alternative plot of one acre D had been considered and approved but the plot number would be intimated shortly. Thereafter, it seems that discussion took place between the appellant and the respondent regarding the allotment of one acre plot. The case of the appellant is that a mutual agreement was arrived at as a result of which letter dated 5.1.1989 was written by the appellant to the respondent whereby the respondent was offered a half acre plot in Udyog Vihar, E Phase-IV at the old rate of Rs. 120 per sq. metre. It was further stated in this letter that with this offer half acre of plot at Rs. 120 per sq. metre "the present case will be treated as closed thereafter" and request for additional space would be considered on submission of a fresh application, but the rate of land will be at the rate prevailing at that time. The ;espondent was requested to confirm the acceptance of an area of 2000 sq. metres for the F proposed'project and this acceptance was required to be given within 15 days of the issue of the said letter. Vide letter dated 14.1.1989 the respondent conveyed his acceptance of half acre plot and observed as follows : G "However, 1 accept 1J2 acre plot as desired by you in the letter dated 5.1.1989 mentioned above at the original rates, but reserve the right to claim further 1/2 acre plot. It may be mentioned that I have deposited the required money for 1 acre plot." On the receipt of the aforesaid reply, a formal provisional letter of H allotment dated 24.2.1989 was issued to the respondent whereby two in- H.S. INDL. DEV. CORPN. LTD. _v._ I. SA WHNEY [KIRP AL, J.] 717 dustrial plot Nos. 1 & 2 measuring 1.000 sq. metres each al U dyog Vihar. A Phase-IV at the tentative rate of Rs. 120 per sq. metre was proposed to be allotted to the respondent. By this letter, the respondent was again required to complete the pre-requisites connected with the implementation of the respondent's project and he was also asked to convey his acceptance to the conditions within 30 days. B In this letter, it was further stated as under _:_ _"Reveiting to your letter of 14th January, 1989 we would like to clmify here that this offer for I_ /2 _acre size plot has been made in your favour as per the consent )•ou given to our Managing Director dwing the course of discussion on 3rd December and it will not be possible to give you any" more plot against this application._ However, you are at liberty to apply for plot against our further advertisement on new rates and on terms and conditions prevalent at that time and in that event your case will be considered alongwith others on merits. C D You may please note that since the plot has been offered to you at the old rate of Rs. 120 per sq. metre, the corporation shall not be in a position to accede to any of your request for transfer of plot and that you are required to implement your project within E one year from the date of issue of allotment letter. In the end, we remind you to complete the conditions mentioned at (i) to (iii) and furnish us proof thereof within the stipulated period to enable us to issue the allotment letter." (emphasis added) > In response to the aforesaid provisional letter of allotment dated F 24.2.1989, the respondent wrote a letter dated 4.3.1989 in which it was stated as follows _:_ "Offer of half acre plot Nos. 1 & 2 measuring 1000 sq. metres each (total 2000 sq. metres) is acceptable. I am in touch with the District Industries Centre Divisional Town Planner and Haryana Financial Corporation. I hope to complete all the formalities very **11 soon.** On the receipt of the aforesaid letter, a final letter of allotment dated 6.7.1990 was issued to the respondent. This was followed by the signing of H / _f_ [1996] 1 S.C.R. 718 ## SUPREME COURT REPORTS - A an agreement between the parties after which the possession of the said plots was handed over to the respondent on 4.9.1990. The respondent then filed a Writ Petition No. 5123 of 1994 in the Punjab and Haryana High Court. Basing his claim on the earlier provisional allotment letter dated 27.12.1984 the respondent, inter alia, B prayed that the appellant herein should and ought to deliver the remaining half acre of plot. The appellant herein contended that the letter dated 27.12.1984 had been superseded and a fresh agreement had been entered into between the parties after the respondent herein had accepted 2000 sq. metres of land which had been allotted to him. It was also stated that one C of the conditions of allotment vide letter dated 6.7.1990 was that the unit was to be set up within two years from the date of allotment put the respondent had even failed to utilise the plots of land which had been handed over to him. B The High Court by its judgment dated 14.11.1994 came to the conD clusion that there was no reason shown by any correspondence on record as to why the area of the plot which was to be allotted to the respondent vide allotment letter dated 24.12.1984 had been reduced. It did not accept the contention of the appellant herein that while accepting plot Nos. 1 & 2 measuring 1000 sq. metres each, the respondent had given up his right · E for the remaining half acre of land. The High Court, accordingly, directed the appellant to allot the remaining half acre of plot within a specified period. Thereafter, Review Application No. 41 of 1995 was filed by the appellant herein but the same was dismissed by judgment dated 9.8.1995. F From the facts as narrated above, it appears that the High Court erred in directing that a further plot of half acre should be allotted to the respondent. The High Court did not appreciate that the correspondence on record of the case clearly shows that the respondent was estopped from G making the claim for a further area of half acre after he had accepted the allotment of plot Nos. 1 & 2 measuring 2000 sq. metres in total. In the present case even though in the letter dated 27.12.1984 the respondent had been offered a plot of land measuring one acre yet by subsequent letter dated 5.1.1989, a revised offer was made whereby he was offered a plot measuring half acre at the old rate of Rs. 120 per sq. metres as a special H case. In this letter, it was stated that while making this offer, the case would H.S. INDL. DEV.CORPN. LTD.1·. I. SAWHNEY[KIRPAL,J.) 719 ·\ be considered as closed and the respondent was requested to confirm the A acceptance of the area of 2000 sq. metres. Vide letter dated 14.1.1989, a conditional acceptance was conveyed by the respondent whereby he had stated that he accepted the half acre of plot but he reserve the right to claim further half acre of plot. To this, the appellant wrote letter dated 24.2.1989 again stating that half acre of land was offered to him and that B he was clarified that this offer was made in his favour as per the consent given by him to the appellant's Managing Director during the course of discussion on 3.12.1990. It is in response to this letter seeking the aforesaid clarification that the respondent wrote the letter dated 4.3.1989 wherein he unconditionally accepted the plot Nos. 1 and 2. It is only thereafter that the formal allotment letter dated 6.7.1990 was issued to him which was c followed by a formal agreement and handing over possession of the said plot Nos. 1 and 2 to the respondent. There can be no manner of doubt that the appellant had categorically stated that it was unable to offer the respondent an area larger than half an acre and acceptance of this was insisted upon and the same was given by the respondent vide letter dated D 4.3.1989. Had this unconditional acceptance not been given, it would appear, the appellant would not have made the allotment in favour of respondent. c It is further to be borne in mind that the letter dated 27.12.1984, on which reliance is placed by the respondent and on the basis of which the High Court had given relief, it was stated that the said letter was only a provisional letter of allotment and it was specifically mentioned therein that the same shall not give you any legal right for allotment unless a final **11 allotment letter is issued • There was, therefore, no final commitment to** allot one acre of land to the respondent and the High Court clearly misconstrued the said provisional letter of allotment to mean as if the respondent had acquired a vested right to obtain an allotment of one acre of land. F The respondent was not only estopped from claiming an additional G half acre of land but even the letter dated 27.12.1984 did "not give the respondent any legal right to insist upon the allotment of one acre of land because the only letter of final allotment which was issued in favour of the respondent, was the one dated 6.7.1990 whereby only half acre of land was allotted and the said allotment was accepted by the respondent without demure, till he chose to file the Writ Petition four year thereafter. H _t_ I I • ## 720 SUPREME COURT REPORTS [1996] 1 S.C.R. A In view of the above, the appellant was not liable to allot .an additional half acre of land to the respondent to whom plot Nos. 1 & 2 at Udyog Yihar. Phase-IV, Gurgaon measuring 2000 sq. metres had already been validly allotted. - For the aforesaid reasons, this appeal is allowed and the judgments - B of the High Court dated 14.11.1994 in C.W.P. No. 5123/1994 and dated 18.8.1995 in Review Petition No. 41 of 1995 are set aside, the result of which would be that the Writ Petition filed by the respondent before the High Court would stand dismissed. Parties to bear their own costs. - R.P. ## Appeals allowed. •
End of Judgment Record
Browse All Supreme Court of India (1996) Decisions
1996-08-16

Pfizer Ltd. v Mazdoor Congress and ors.

Pfizer Ltd. v Mazdoor Congress and ors is a Supreme Court appeal arising from writ petitions under Article 227 challenging the Bombay High Court’s reversal of Labour Court and Industrial Court findings that Pfizer had not committed an unfair labour practice in terminating two security staff, Waman S. Surve and R.B. Sail. The matter centers on the terminations of Surve and Sail after arrests in a theft case involving Pfizer property and the company’s loss of confidence in their suitability as watch and ward personnel. The Labour Court dismissed the complaints under Section 28 of the MRTU & PULP Act, and the Industrial Court upheld that dismissal; the High Court, however, intervened in a petition under Article 227, allowing an unfair labour practice claim under Item 1(1) of Schedule IV on the grounds of undue haste and ordering reinstatement with back wages. The apex court reverses, holding that undue haste is a question of fact to be determined on evidence and that no case under Item 1(1) was pleaded or proven before the lower fora or the High Court. It stresses that new arguments cannot be introduced at the Article 227 stage absent prior pleadings and evidence. The Court restores the Labour Court’s and Industrial Court’s decisions and allows Pfizer’s appeals, clarifying the evidentiary and pleading boundaries for unfair labour practices in industrial relations law.

1996-01-09

Union of India v. S.S. Uppal and Anr.

This appeal concerns the fixation of seniority for an officer absorbed into the Indian Administrative Service (IAS) from a state civil service quota. Respondent No.1, S.S. Uppal, a Development Officer in Madhya Pradesh’s Commerce and Industry Department, was considered for IAS absorption under Rule 8(2) of the IAS (Recruitment) Rules, 1954. A panel of four officers was prepared for vacancies arising up to 1 February 1989, with Uppal placed at serial No.4, making him eligible only for the February 1989 vacancy. Although the vacancy arose earlier, he was not appointed until 15 February 1989, and on 3 February 1989 the IAS (Regulation of Seniority) Rules were amended to introduce a weightage-based method for determining Year of Allotment (YOA) for those appointed by selection. Uppal challenged Rule 2 of the 1989 Amendment Rules as ultra vires and argued his seniority should be determined by the rules in force on 1 February 1989. The Central Administrative Tribunal accepted that the vacancy occurred before the amendment, so unamended rules should apply. The Supreme Court held that seniority in the IAS is determined by the rules in force on the date of appointment, not the date of vacancy, and that weightage cannot be retrospective unless provided. It emphasized that mere inclusion in a panel does not guarantee appointment and that the Central Government may amend seniority rules from time to time. The appeal was allowed, and the Tribunal’s order set aside.

1996-03-29

Thimmappa v. Siddaramakka

Thimmappa v. Siddaramakka concerns a deed of reconveyance attached to a sale of land. The reconveyance deed provided that if the respondent vendor repaid Rs. 5,000 within eight years from the sale date (July 20, 1968), the sale deed would be executed and registered in her favor. The respondent contended she offered payment before the eight-year period expired and sought specific performance through reconveyance; the appellant allegedly refused. The trial court accepted the respondent's evidence of offer within the period; the appellate court reversed, holding time was the essence of the contract and thus the suit was barred by limitation. The Karnataka High Court then set aside the appellate decree and restored the trial court’s decree. The Supreme Court held that, unless the deed of agreement of sale fixes a date for performance, time is not necessarily the essence of the contract. It found that Thimmappa had agreed to reconveyance conditioned on repayment within eight years, and that the respondent offered payment before expiry while the appellant refused to reconvey. The cause of action arose on expiry of eight years from July 20, 1973, but the suit was filed on July 20, 1976, within the period from the date of refusal (July 19, 1976). The Court concluded the suit was not barred by limitation, dismissed the appeal, and upheld the High Court’s restoration of the trial court’s decree.

1996-11-19

STATE OF UTTAR PRADESH AND ORS. v. V.K. JAIN

State of Uttar Pradesh and Ors. v. V.K. Jain concerns the regulation of compounded entertainment tax for cinema theatres under the Uttar Pradesh Entertainments and Betting Tax Act, 1979 and related Rules. The respondent cinema proprietor sought to reduce seating capacity from 540 to 450 for the 1995-96 year and to opt for the compounded tax system under Rule 24-A. The District Magistrate rejected both applications; the Allahabad High Court quashed that rejection, holding that the District Magistrate had no power to ignore or alter the seating capacity indicated in the option application. The State appealed to the Supreme Court. The Court held that a proprietor cannot enter into a composite agreement indicating a reduced seating capacity from the maximum stated in the licence, and the District Magistrate cannot adopt any seating capacity other than the maximum in the licence for Rule 24-A purposes. To reduce seating capacity, the proprietor must approach the licensing authority under Rule 14 of the U.P. Cinematograph Rules, 1951 to amend the licence, and only then can the amended capacity be used for Rule 24-A calculations. The decision emphasizes that the maximum seats fixed in the licence, not ad hoc figures, determine the governing base for taxation and that post-composition adjustments require proper licensing amendments. The Government suggests a clarifying recast of sub-rule (4) for the post-composition period to avoid litigation.