Haryana State Industrial and Infrastructure Development Corporation Limited & Ors. v. Rameshwar Dass (Dead) & Ors.

Case / Petition Number:
Misc. App. Nos. 926-930 of 2019; Civil Appeal Nos. 363, 388, 413, 475 & 485 of 2019 (arising out of Civil Appeal Nos. 343-592 of 2019)

Case Synopsis & Summary

This Supreme Court order addresses Miscellaneous Applications filed by landholders from Bas Khusla, Bas Haria and Dhana seeking clarification on the Court’s earlier decision in Wazir v. State of Haryana and connected matters. The core issue concerns compensation for land acquired under the Land Acquisition Act, 1894 for Phases II–IV of the Industrial Model Township, Manesar, Gurgaon. The Court’s 2019 Wazir decision fixed a minimum market value for lands from certain villages and directed payment of statutory benefits; it remitted certain aspects to the High Court with directions for payment and avoidance of middlemen. Earlier High Court adjudications, notably Madan Pal II and Madan Pal III, had fixed much higher compensation (around Rs 37–41 lakh per acre). Post-Wazir, the landholders argued that they had already received Rs 37.40 lakh per acre and should not be required to refund; concerns about recovery from subsequent allottees were raised, including potential revenue recovery. The State and HSIDC contended the appropriate rate for the concerned villages was Rs 29,77,333 per acre, with statutory benefits. The Court used Article 142 to relieve landholders from refunds of excess amounts and clarified that the compensation fixed at Rs 29,77,333 per acre remains unchanged for the concerned villages, while allowing others to proceed under Wazir’s framework. The order disposes of the applications without costs, guiding future actions accordingly.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Landmark Cases
Hon'ble Judges
  • Uday Umesh Lalit
  • Dhananjaya Y. Chandrachud
Judgment Date
2021-04-08
Court Decision / Holding
The Court allows the applications and directs: (a) The compensation fixed at Rs. 29,77,333 per acre for lands from the three concerned villages remains unchanged; (b) Landholders who had received Rs. 37,40,000 per acre are not required to refund the excess amounts; (c) The direction (e) in the Wazir judgment stands modified; (d) Subsequent allottees will not have action for refunds. The petitions are disposed of in these terms without any costs.
Final Disposition
Disposed of in terms of the directions set out above; no costs.

Parties to the Case

Appellants / Petitioners

  • Haryana State Industrial and Infrastructure Development Corporation Limited & Ors.

Respondents

  • Rameshwar Dass (dead) & Ors.

Legal Representation & Advocates

Counsels for Petitioners

  • • Dr. Rajeev Dhawan
  • • Shri Jasbir Malik

Counsels for Respondents

  • • Shri Gopal Subramanium

Provisions of Law Cited

Section 4 of the Land Acquisition Act, 1894Section 18 of the Land Acquisition Act, 1894Section 54 of the Land Acquisition Act, 1894Article 142 of the Constitution of India

Legal Doctrines & Maxims

  • Article 142 of the Constitution of India (constitutional power to do complete justice)

Submissions & Arguments

Contentions of Appellants / Petitioners

The landholders argued that after the Court’s Wazir judgment, the compensation for lands from the three villages should stand at Rs. 29,77,333 per acre with statutory benefits, and that the earlier fixation of Rs. 37.40 lakh per acre (and any excess paid) need not be refunded. They contended that substantial sums had already been disbursed and that requiring repayment would impose hardship; invocation of Article 142 was sought to relieve them from refund obligations and to protect subsequent allottees from recovery actions.

Contentions of Respondents

HSIDC and State authorities argued for adherence to the Wazir framework, maintaining that the three villages’ compensation should be Rs. 29,77,333 per acre with statutory benefits. They argued that past decisions (Madan Pal II/III) were to be reconsidered in light of Wazir, but ultimately the appropriate corrective framework must reflect the post-Wazir orders and the overall scheme of compensation and recovery.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (7)

Case NameCitationTreatmentExplanation
Wazir v. State of Haryana(2019) 13 SCC 101PositiveDirectly followed/ applied in the present judgment to govern compensation and related directions.
HSIDC v. UDAL(2013) 14 SCC 506Partly Overruled / LimitedParagraph 34 (Afresh determination) is used to permit fresh consideration; para 36 is cited but the resultant relief modifies earlier positions.
Pran Sukh v. Haryana State Industrial Development Corporation Ltd.N/AMentioned OnlyCited as background precedent for earlier higher compensation in another land acquisition; not directly followed.
Madan Pal (II) v. State of Haryana2015 SCC OnLine (P&H) 20321DistinguishedThe present judgment rejects the Madan Pal II approach as controlling, distinguishing it in favor of Wazir’s framework.
Madan Pal (III) v. State of Haryana(2018) SCC OnLine P&H 2871OverruledMadan Pal III’s higher compensation framework is not sustained; Wazir’s valuation is applied.
Satish Kumar Gupta v. State of Haryana and Others(2017) 4 SCC 760PositiveAuthorities that post-acquisition allottees cannot be treated as necessary party are followed to support final order.
Madan Pal v. State of Haryana(2010) 11 SCC 175Mentioned OnlyEarlier reference in the narrative; not controlling in the present order.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,895 words•~18 min read

In The Court Record

Haryana State Industrial and Infrastructure Development Corporation Limited & Ors. v. Rameshwar Dass (Dead) & Ors.

1 REPORTABLE IN THE SUPREME COURT OF INDIA CIVIL APPELLATE JURISDICTION ## MISCELLANEOUS APPLICATION NOS. 926-930 OF 2019 ## IN CIVIL APPEAL NOS.363, 388, 413, 475 & 485 OF 2019 (ARISING OUT OF CIVIL APPEAL NOS.343-592 OF 2019) HARYANA STATE INDUSTRIAL AND INFRASTRUCTURE DEVELOPEMNT CORPORATION LIMITED & ORS. …APPLICANT(S)/ PETITIONER(S) ## VERSUS RAMESHWAR DASS (DEAD) & ORS. …RESPONDENT(S) ## WITH IA No.118262 of 2019 in SLP (C) Nos.22234 -22241 of 2018 ## **O R D E R** ## **Uday Umesh Lalit, J.** Signature Not Verified Digitally signed by Dr. Mukesh NasaDate: 2021.04.09 1. Miscellaneous Application Nos.926-930 of 2019 and I.A. 20:32:20 IST Reason: No.118262 of 2019 are preferred by landholders from villages Bas Khusla, Bas Haria and Dhana (‘the concerned villages’, for short) seeking clarification with regard to the Judgment[1] passed by this Court in Civil Appeal Nos.264 – 270 of 2019 and other connected matters ( _**Wazir vs. State of Haryana[2]**_ ). 2. The facts leading to the aforesaid Judgment have been set out in sufficient detail in the Judgment and for the purposes of these applications, the relevant facts are: - A) In respect of acquisition initiated pursuant to notifications dated 06.03.2002, 07.03.2002 and 26.02.2002 issued under Section 4 of the Act[3] with regard to Phases II, III and IV respectively of Industrial Model Township, Manesar, Gurgaon, corresponding awards were made by the Sub-Divisional Officer (C)-cum-Land Acquisition Collector, Gurgaon on 22.07.2003, 24.12.2003 and 20.05.2004. B) While dealing with the References preferred under Section 18 of the Act, by orders dated 16.12.2009 and 27.01.2010 compensation in respect of lands covered under Phases II and III respectively was assessed at Rs.28,15,356/- per acre and Rs.28,15,849/- per acre respectively. - 1 Dated 11.01.2019 as modified by Order dated 08.02.2019. - 2 (2019) 13 SCC 101 - 3 The Land Acquisition Act, 1894 3 C) By order dated 17.08.2010 passed in _**Haryana State Industrial Development Corporation vs. Pran Sukh & Ors.[4]**_ , in relation to acquisition of some other lands from villages Manesar, Naharpur Kasan, Khoh and Kasan, this Court assessed the compensation at the rate of Rs.20 lakhs per acre. In that case the notification under Section 4 of the Act was issued on 15.11.1994. D) Relying on the decision of this Court in _**Pran Sukh[4]**_ , the Reference Court by order dated 30.11.2010 assessed the compensation at Rs.37,40,230/- per acre in respect of land from Phase IV in the instant acquisition. E) The matters concerning acquisition for Phases II and III of the instant case, were considered by the High Court in RFA No.2373 of 2010 ( _**Madan Pal vs. State of Haryana)**_ and the landholders were held entitled to the compensation at the rate of Rs.37,40,000/- per acre along with other statutory benefits. This decision of the High Court was subject matter of challenge in this Court at the instance of HSIDC[5] and some landowners. While issuing notices by its order dated 10.08.2011, this Court directed: - > 4 (2010) 11 SCC 175 > 5 Haryana State Industrial Development Corporation Ltd. now Haryana State Industrial and Infrastructure Development Corporation Ltd . 4 “The Haryana State Industrial Development Corporation shall, within four months from today, deposit the amount of compensation at the rate of Rs.28,15,356/- per acre along with other statutory benefits in terms of judgment dated 27.1.2010 of Additional District Judge, Gurgaon. With a view to obviate intervention of middle man in the matter of payment of compensation to the land owners we direct that: 1. The Land Acquisition Collector shall depute an officer not below the rank of Tehsildar of the area, who shall contact the landowners and/or legal representatives and apprise them about their entitlement to receive compensation determined by the Reference Court. 2. The concerned officials shall also ask the landowners and/ or legal representatives to open bank accounts if they have already not done so. This exercise must be completed within one month from the date of receipt of copy of this order. 3. The concerned Tehsildar shall give the list of landowners and/or their legal representatives along with their bank account numbers to the Land Acquisition Collector within fifteen days. 4. Within next fifteen days, the Land Acquisition Collector shall deposit the amount of compensation in the accounts of the landowners and/or legal representatives. Fifty per cent of this amount be deposited in the form of Fixed Deposit Receipt, the validity of which shall be one year in the first instance.” F) As there was no compliance of the aforesaid directions, Contempt Petition (Civil) Nos.70-75 of 2012 and other connected petitions were preferred. While dealing with the Contempt Petitions, this Court in its Order dated 07.05.2012 observed:- “We have heard Dr. Rajeev Dhawan, learned senior counsel appearing for the applicants and Shri Gopal 5 Subramanium, learned senior counsel appearing for the respondents and perused the record. In our view, the explanation given by the respondents for non-compliance of the directions contained in order dated 10.08.2011 is not satisfactory. However, we accept the oral request made by learned senior counsel appearing on their behalf and grant them six weeks further time to deposit the amount in terms of order dated 10.08.2011.” Thereafter, the Contempt Petitions were disposed of on 05.09.2012 after recording:- “Shri H.P. Raval, learned Additional Solicitor General appearing for the non petitioners, invited our attention to affidavit dated 18.7.2012 of non petitioner no.1. Shri Jasbir Malik, learned counsel for the petitioners, fairly admitted that his clients have received fifty per cent amount in terms of the directions given by the Court and remaining fifty per cent has been deposited in the fixed deposits. In view of the above development, the contempt petitions are disposed of as infructuous.” G) The appeals from the decision of the High Court were finally disposed of by this Court by its decision dated 02.07.2013 ( _**Haryana State Industrial Development Corporation Limited vs. UDAL and Others[6]**_ ). This Court found that the High Court had erred in granting annual increase at a flat rate of 12 % over the compensation determined by this Court in _**Pran Sukh[4]**_ and that it had not considered Ex. PW9/A dated 23.11.1999. This Court, therefore, remitted the matters to the High Court for fresh > 6 (2013) 14 SCC 506 6 consideration without being influenced by any observations made by this Court. The relevant paragraphs from the decision were as under:- “ **33.** In view of the above conclusions, we do not consider it necessary to deal with the other points argued by the learned counsel for the parties/intervenors and feel that the ends of justice will be served by setting aside the impugned judgment and remitting the matters to the High Court for fresh disposal of the appeals and cross-objections filed by the parties subject to the rider that the State Government/HSIIDC shall pay the balance of Rs 37,40,000 to the landowners along with other statutory benefits. **34.** In the result, the appeals are allowed, the impugned judgment[1] is set aside and the matter is remitted to the High Court for fresh disposal of the appeals filed by the parties under Section 54 of the Act as also the cross-objections. The parties shall be free to urge all points in support of their respective cause and the High Court shall decide the matter uninfluenced by the observations contained in this judgment. … … … **36.** The State Government/HSIIDC shall pay the balance of compensation determined by the High Court i.e. Rs 37,40,000−Rs 28,15,356 = Rs 9,24,644 per acre to the landowners and/or their legal representatives along with all statutory benefits within a period of four months from today. The payment shall be made to the landowners and/or their legal representatives by following the procedure laid down in the interim orders passed by this Court.” 7 H) Post remand, the matters were dealt with by the High Court by its decision dated 06.10.2015 ( _**Madan Pal (II) vs. State of Haryana[7]**_ and other connected matters). The High Court was of the view that the beneficiaies of acquisition, such as Maruti Suzuki India Limited ought to have been given a chance to place relevant material before the Court. It, therefore, remitted the matters back to the Reference Court for fresh disposal giving liberty to all the concerned parties to produce relevant evidence in support of their submissions. I) The ruling of the High Court was not accepted by this Court and in its decision in _**Satish Kumar Gupta and Others Vs. State of Haryana and Others[8]**_ , this Court held that the post-acquisition allottees could not be treated as a necessary or proper party for determining matters concerning compensation. It, therefore, set aside the view taken by the High Court in _**Madan Pal (II)[7]**_ and remanded the matters back to the High Court for a fresh decision. J) Consequently, by its decision in _**Madan Pal (III) vs. State of Haryana and Another etc**_ .[9] the High Court assessed the compensation in respect of lands from all the villages at Rs.41.40 lakhs per acre which - 7 2015 SCC OnLine P&H 20321 - 8 (2017) 4 SCC 760 - 9 2018 SCC OnLine P&H 2871 8 decision was subject matter of challenge before this Court; and by the Judgment in Civil Appeal Nos.264-270 of 2019 and other connected matters ( _Wazir vs. State of Haryana[2]_ ) this Court concluded: - ## “32. In the circumstances, we direct: a) In respect of lands under acquisition from villages Naharpur Kasan and Kasan, the market value shall be Rs.39,54,666/- per acre. Additionally, all statutory benefits would be payable. b) In respect of lands under acquisition from Villages Bas Kusla, Bas Haria and Dhana, the market value shall be Rs.29,77,333/- per acre. Additionally, all statutory benefits would be payable. c) In respect of lands from village Manesar the market value shall be Rs.59,31,999/- per acre. Additionally, all statutory benefits would be payable. d) M/s. Kohli Holdings Private Limited shall not be entitled to any severance charges. e) If any sum in excess of what has been found in this Judgment to be the entitlement of any landowner from any of the villages under acquisition was made over to him, the same shall be returned by the landowner to the State by 30th June, 2019. If the excess sum is returned by 30th June, 2019, no interest on said sum shall be payable by the landowner. However, if the sum is not returned by said date, the said sum shall carry interest @ 9% per annum from 1st July, 2019 till realisation and can be realised in a manner known to law.” 3. The compensation in respect of lands from the concerned villages was thus assessed at Rs.29,77,333/- per acre. 4. This has led to the filing of instant applications, submitting _inter_ _alia:-_ 9 a) The lands coming from all the villages were always considered by the Reference Court and the High Court without any _inter se_ distinction between two sets of villages. b) Paragraph 36 of the decision in _**HSIDC vs. UDAL[6 ]**_ contemplated award of compensation at the minimum rate of Rs.37,40,000/- per acre. c) After the decision of this Court in _**HSIDC vs. UDAL[6 ]**_ the only issue was to consider whether landholders were entitled to increased compensation and that there could not be any decrease in the rate of compensation. d) In view of Orders dated 10.08.2011, 07.05.2012 and 05.09.2012 all the landholders had received compensation at the rate of Rs.28,15,356/per acre with other statutory benefits. Moreover, in terms of paragraph 36 of the decision of this Court in _**HSIDC vs. UDAL[6]**_ , additional compensation at the rate of Rs.9,24,644/- per acre was also received by the landholders. e) The landholders spent all the compensation money that they received and it would be impossible for them to pay the difference as directed by this Court in terms of the Judgment in _**Wazir vs. State of Haryana[2]**_ . f) The burden of additional compensation paid to the landholders in terms of the paragraph 36 of the decision in _**HSIDC vs. UDAL[6]**_ , was passed 10 on by the authorities and recovered from the subsequent allottees of the land. 5. After considering rival submissions, this Court framed some questions with respect to which response from HSIIDC was called for, which response was to the following effect: - ## “Query (a) What is the extent of land from three villages for which the compensation has been determined @ Rs.29,77,333/- per acre by the Hon’ble Supreme Court. Ans. The extent of land covered from three villages i.e. Bas Haria, Bas Khusla and Dhana is 980.70625 acres. |Dhana is|980.70625 acres.|| |---|---|---| |Sr. No.|Name of village|Area<br>of<br>land<br>acquired (in acres)| |1|Bas Haria|133.88125| |2|Bas Khusla|435.50625| |3|Dhana|411.31875| ||**Total**|980.70625| Query (b) How much compensation was paid to each of the individual landholders coming from these three villages. (Rs. In Crores) |Ans.|(i)|Paid<br>enhanced<br>compensation to each<br>of<br>individual<br>landholder<br>(Area<br>912.439 acre) Copy<br>of<br>summary<br>of<br>enhanced<br>compensation paid to<br>the<br>landowners<br>is<br>annexed<br>herewith<br>and<br>marked<br>as<br>Annexure A-1 [Page|749.50| |---|---|---|---| 11 |||no.4 to 130]|| |---|---|---|---| ||(ii)|Balance<br>enhanced<br>compensation<br>payable<br>out<br>of<br>912.439 acre of land<br>is in process and to<br>be released shortly.<br>Copy of summary of<br>enhanced<br>compensation<br>payable<br>to<br>the<br>landowners<br>is<br>annexed<br>herewith<br>and<br>marked<br>as<br>Annexure A-2. [Page<br>No.131 to 169]|51.17| ||(ii)|Amount<br>pending<br>decision<br>of<br>ADJ<br>Court / DRO u/s 30<br>& 28 (A) of Land<br>Acquisition<br>Act,<br>1894 (balance area<br>68.26725<br>acres)<br>Copy of details of<br>pending payments of<br>enhanced<br>compensation<br>is<br>annexed<br>herewith<br>and<br>marked<br>as<br>Annexure A-3. [Page<br>No.170 to 171.]|124.59| |||**Total**|**925.26**| Query (c) Ans. Query (d) Whether the entire extent of land coming from these villages has been allotted to any of the allottees and if so at what rate. The entire extent of salable land coming from these three villages (except 3.75 acre) has been allotted at different stages/ rates and the average weighted selling rate per sqm. is Rs.2784/-. What was the sum demanded by way of additional compensation from the allottee in question after the compensation in 12 terms of para 36 of judgment in (2013) 14 SCC 506 was made over. Ans. The sum demanded by way of additional compensation from the allottees in question in plots falling in these villages is Rs.921.41 Crore + proportionate interest of Rs.135.99 Crore from the date of payment to the DRO-cum-LAC, till the date of demand notice of recovery issued to the allottees after the judgment in 2013.” ## 6. In reply to the details submitted by HSIIDC, one of the applicants has responded as under:- “5. … In this affidavit in para 2 the HSIIDC has disclosed that the total land acquired in 3 villages was 980.70625 acres. In para 2 itself in reply to Query (b) the HSIIDC has disclosed that they paid a sum of Rs.925.26 crores to the land owners for the said acquisition. Similarly, in the same para in reply to Query (c) the HSIIDC has disclosed that the entire extent of saleable land coming from the said 3 villages had been allotted at an average rate of Rs.2784 per sq.meter. Thus, calculated at the said rate a sum of Rs.1100.25 crore (i.e. Rs.2784 X 976.95 X 4046). Against Query (d) the HSIIDC has disclosed that a total sum of Rs.1057.40 crore (i.e. Rs.921.41 crore + Rs.135.99 crore) has been collected by it by way of additional compensation pursuant to para 36 of judgment (2013) 14 SCC 506. 6. It is submitted that as per its own disclosure by HSIIDC, a sum of Rs.2157.65 crore (i.e. Rs.1100.25 crore + Rs.1057.40 crore) has been collected by HSIIDC from the subsequent allottees and whereas, only a sum of Rs.925.26 crore has been paid by HSIIDC to the land owners pursuant to various orders of the hon’ble courts including para 36 of judgment (2013) 14 SCC 506. Thus, admittedly a sum of Rs.2157.65 crore has been collected by HSIIDC for the acquired land from the subsequent allottees. Thus, as per its own admission, HSIIDC has earned a profit of Rs.1232.39 crore (Rs.2157.65 crore – Rs.925.26 crore) from the acquired land in the said 3 villages. 13 7. In view of the above, it is clear that if the land owners are not directed to refund the excess amount of compensation as determined by this Hon’ble Court vide order dt.11-1-2019 as amended by order dt.8-2-2019, no prejudice or financial loss will be caused to the HSIIDC, whereas, if the land owners are directed to refund the excess amount paid to them they will be driven to misery and penury as explained in additional affidavit dt.11-122019 filed by one of the applicants.” 7. The submissions that after the decision of this Court in _**HSIDC vs. UDAL[6] ,**_ the only issue pertained to the upward revision in the compensation payable to the landholders and that there could be no occasion to scale down the rate of compensation, are not correct. Paragraph 34 of the decision in _**HSIDC vs. UDAL[6 ]**_ expressly left all the points to be decided afresh uninfluenced by any of the observations made in said decision. The appeals preferred by HSIDC, therefore, had to be considered on their own merits and in the process, if the facts on record justified, there could be fixation of compensation at a reduced rate for the lands from the concerned villages. We, therefore, reject submissions (a), (b) and (c). 8. However, the fact remains that during the pendency of challenge against the decision of the High Court in _**Madan Pal vs. State of Haryana**_ , in terms of orders dated 10.08.2011, 07.05.2012 and 05.09.2012 passed by this Court, compensation at the rate of Rs.28,15,356/- per acre was released to landholders from all the villages 14 including the concerned villages. Further, paragraph 36 of the decision in _**HSIDC vs. UDAL[6 ]**_ directed that the balance at the rate of Rs.9,24,644/per acre be made over to all the landholders including those from the concerned villages. Consequently, everyone has received compensation at the rate of Rs.37,40,000/- per acre. The compensation finally awarded in _**Wazir vs. State of Haryana[2]**_ for villages other than the concerned villages, being greater than the figure of Rs.37,40,000/- per acre, no difficulty arises on that score. But, with respect to the lands from the concerned villages, the anomaly definitely stares in the face. 9. The record now indicates that about Rs.750 crores have already been made over as compensation to the landholders from the concerned villages at the rate of Rs.37,40,000/- per acre. As against their entitlement of Rs.29,7,333/- per acre as found in _**Wazir vs. State of Haryana[2] ,**_ the landholders have thus received Rs.7,62,667/- per acre over and above their entitlement. On a rough estimate, an amount of Rs.152 crores out of the disbursed sum of Rs.750 crores is thus beyond their entitlement. It is also clear that the concerned authorities have passed on the entire burden to the subsequent allottees of the acquired land and have 15 received amounts in excess of what have been made over to the landholders of the concerned villages by way of compensation. 10. The compensation as aforesaid, was made over to the landholders from the concerned villages, without they being required to furnish any security. Any adjustment in terms of direction (e) in the Judgment in _**Wazir vs. State of Haryana[2] ,**_ at this length of time, will thus entail in recovery of money from the landholders through revenue recovery proceedings and in recalculating and conferring the corresponding benefits upon the allottees of the acquired land. 11. Considering the entirety of circumstances, in our view, the instant case calls for exercise of powers vested in this Court under Article 142 of the Constitution of India, to relieve the landholders from the burden of returning the amounts over and above their entitlement. 12. We, therefore, allow the instant applications and direct:- - a) The amount of compensation fixed at Rs.29,77,333/- per acre in respect of lands from the concerned villages as held in the Judgment in _**Wazir vs. State of Haryana[2 ]**_ remains unchanged. 16 - b) As the compensation at the rate of Rs.37,40,000/- per acre has been received by the landholders from the concerned villages in the circumstances stated hereinabove, such landholders need not return the amounts over and above what has been found due to them. - c) To the extent as indicated above, direction (e) in the Judgment in _**Wazir vs. State of Haryana[2]** ,_ stands modified. - d) The subsequent allotees of the lands in question will not be entitled to maintain any action for refund only on account of Orders passed in these proceedings. 13. The instant applications are disposed of in aforesaid terms without any order as to costs. ……………..…………………..J. [Uday Umesh Lalit] ………..………………………..J. [Dr. Dhananjaya Y Chandrachud] New Delhi; April 08, 2021. 17 REPORTABLE IN THE SUPREME COURT OF INDIA CIVIL APPELLATE JURISDICTION ## SLP (Civil) No.5987 of 2021 (Arising out of SLP(C) Diary No.14296 of 2019) MUKESH KUMAR …. PETITIONER VERSUS STATE OF HARYANA THROUGH COLLECTOR, GURGAON & ORS. …. RESPONDENTS ## WITH ## SLP (Civil) Nos.22234-22241 of 2018 ## SLP (Civil) No.5992 of 2021 (Arising out of SLP(C) Diary No.14297 of 2019) ## SLP (C) No. 5998 of 2021 (Arising out of SLP (C) Diary No.15662 of 2019) ## SLP (C) No.5995 of 2021 (Arising out of SLP (C) Diary No.15663 of 2019) ## SLP (C) No.5986 of 2021 (Arising out of SLP (C) Diary No.15664 of 2019) ## SLP (C) No.5993 of 2021 (Arising out of SLP (C) Diary No.15665 of 2019) SLP (C) No.5990 of 2021 (Arising out of SLP (C) Diary No.15666 of 2019) SLP (C) No.5999 of 2021 (Arising out of SLP (C) Diary No.15667 of 2019) 18 SLP (C) No.6000 of 2021 (Arising out of SLP (C) Diary No.15668 of 2019) ## SLP (C) No.6001 of 2021 (Arising out of SLP (C) Diary No.15669 of 2019) ## SLP (C) No.5997 of 2021 (Arising out of SLP (C) Diary No.15691 of 2019) ## SLP (C) No.5989 of 2021 (Arising out of SLP (C) Diary No.15700 of 2019) ## SLP (C) No.5988 of 2021 (Arising out of SLP (C) Diary No.15702 of 2019) ## SLP (C) No.5994 of 2021 (Arising out of SLP (C) Diary No.15939 of 2019) ## SLP (C) No.5996 of 2021 (Arising out of SLP (C) Diary No.15943 of 2019) ## **O R D E R** ## **Uday Umesh Lalit, J.** 1. These special leave petitions filed by various land holders seek to challenge the decision dated 09.03.2018 passed by the High Court of Punjab and Haryana at Chandigarh in RFA No.2373 of 2010 (O&M) and other connected matters) i.e. in _**Madan Pal-III v. State of Haryana and another**_[9] . This decision of the High Court was subject matter of challenge in this Court which was dealt with by the Judgment in _**Wazir**_ v. _**State of Haryana**_[2] _._ 19 2. In all these cases there has been delay in preferring special leave petitions. However, considering the facts on record, we condone the delay. 3. The Judgment passed by this Court in _**Wazir v. State of Haryana**_[2] as explained by the instant Order in M.A. Nos.926-930 of 2019 and IA No.118262 of 2019 herein above is to apply to all cases of land holders from the concerned villages under the present acquisition. 4. Since all the issues already stand dealt with by the Judgment in _**Wazir v. State of Haryana**_[2] , nothing further need be done in the present petitions except to state that these cases shall be governed in every respect by the directions issued by this Court in its Judgment in _**Wazir v. State of Haryana**_[2] , as explained by the instant Order. 5. The petitions stand disposed of in above terms. ……………..…………………..J. [Uday Umesh Lalit] ………..………………………..J. [Dr. Dhananjaya Y Chandrachud] New Delhi; April 08, 2021.
End of Judgment Record
Browse All Landmark Cases Judgments
2019-01-22

State of Himachal Pradesh & Anr. v. Pinju Ram & Others; State of Himachal Pradesh & Ors. v. Ganesh Dutt & Anr.

This batch of appeals concerns regularisation and monetary benefits of part‑time employees in Himachal Pradesh who were converted to daily‑wage status. The State had issued a policy on 27 February 2004: part‑time Class‑IV employees who had completed ten years of continuous service as on 31 December 2003 would be made daily wagers with prospective effect, and posts vacated by such employees would stand abolished; Education and Ayurveda were excluded from the policy. Revenue Chowkidars, engaged by Panchayats, were not covered by that policy and received separate treatment. Following writ petitions and an order of the Himachal Pradesh High Court and in light of later developments, the State drew‑up directions in 2011 (22 September) to give seniority to Revenue Chowkidars on the basis of ten years of service, but with wages from the date of actual appointment and without back‑dated monetary benefits; 7 July 2012 further instructions reiterated this stance for remaining part‑time employees, with monetary benefits not guaranteed in the interregnum. The respondents pressed for back wages dating from 1 January 2007 and broader coverage. The Supreme Court held that the 2007 back‑pay direction was unsustainable, clarified that seniority would count from ten years without past benefits, and that the 2011 policy and Moti Singh principle should guide the approach. The appeals are allowed; no costs. The related writ petitions are to be disposed of consistent with these directions.

2018-08-14

Union Bank of India and Others v. C.G. Ajay Babu and Anr.

This is a Supreme Court of India appeal concerning the forfeiture of gratuity under the Payment of Gratuity Act, 1972. The respondent was a branch manager of the appellant bank and was dismissed on 3 June 2004 after disciplinary proceedings. A show-cause notice sought to forfeit gratuity due to misconduct involving moral turpitude, which was ordered on 20 April 2004. The High Court upheld the dismissal but held that gratuity could be paid since there was no financial loss to the bank, and that a bipartite settlement between the bank and employees permitted forfeiture only where misconduct caused financial loss. The Division Bench, however, held that forfeiture under Section 4(6) must be read together with Section 4(5) and that no loss was proven, thus entitling the employee to gratuity in accordance with the bipartite settlement. The Supreme Court agreed with the High Court that forfeiture is not automatic; it is controlled by Sections 4(5) and 4(6) of the Act and by the bipartite settlement, which requires loss to justify forfeiture. The Court emphasized that an act must constitute an offence involving moral turpitude and that conviction is generally required for forfeiture under 4(6)(b)(ii). The appeal is dismissed with no costs.

2018-09-25

Reema Salkan v. Sumer Singh Salkan

This is a Supreme Court of India criminal appeal under the Criminal Appellate Jurisdiction arising from a maintenance dispute under Section 125 Cr.P.C. The parties, married in 2002, had a protracted litigation history. The Family Court granted maintenance to the wife from 17 July 2003 to 8 December 2010, and held no maintenance thereafter. The High Court, in revision, partly allowed the application, directing Rs.9,000 per month from 9 December 2010 onward, while upholding the earlier period’s Rs.10,000 per month. This Court had earlier granted interim maintenance of Rs.20,000 per month in 2014 (Criminal Appeal Nos. 2347-2349 of 2014). The appellant contends there has been no change in circumstances since the interim order and that the respondent’s substantial assets, education, and overseas earnings establish the capacity to pay higher maintenance. The respondent defends the High Court’s reasoning, arguing that the Family Court’s assessment, demeanor observations, and the principle that maintenance should not be perpetual require careful scrutiny, and that the notional minimum wage approach used by the High Court is flawed. The overarching issue is the quantum of monthly maintenance payable to the appellant and whether the interim amount should be augmented beyond the period up to 2010.”

2019-12-03

M/s Embassy Property Developments Pvt. Ltd. v State of Karnataka & Ors.

This judgment concerns three Civil Appeals filed by a Resolution Applicant, the Corporate Debtor (through its Resolution Professional) and the Committee of Creditors, challenging an Interim Order of the Karnataka High Court staying an NCLT order in proceedings under the Insolvency and Bankruptcy Code, 2016. The NCLT Chennai had admitted an application under Section 7 of the IBC against M/s Tiffins Barytes Asbestos & Paints Ltd. and directed a moratorium under Section 14. The Interim Resolution Professional then sought a deemed extension of a mining lease under MMDR Act, 1957 and the Government of Karnataka rejected it. The NCLT, by an order dated 11.12.2018, set aside the Government’s order and directed execution of Supplement Lease Deeds for the period up to 31.03.2020. The Government of Karnataka challenged this in a High Court writ petition, which stayed the impugned NCLT order. The core issues were: (i) whether the High Court may interfere under Article 226/227 with an NCLT order in IBC when an appeal lies to the NCLAT, and (ii) whether fraud can be inquired into by NCLT/NCLAT in CIRP. The Court reiterates that IBC is a complete, umbrella code with a three‑tier mechanism (NCLT, NCLAT, Supreme Court) and that public‑law disputes arising from MMDR Act obligations lie outside IBC. It ultimately holds that while NCLT/NCLAT may inquire into fraud, they cannot adjudicate MMDR‑related public legal disputes; and the High Court’s writ jurisdiction in public‑law contexts remains permissible. The appeals are dismissed.