Case Synopsis & Summary

This appeal arises from a Delhi High Court writ petition challenge to an 1960 notification and 1969 declaration under the Land Acquisition Act, 1894, and an award declared in 1983. Respondent No.1 sought a declaration that the acquisition with respect to the land had lapsed under Section 24(2) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (the 2013 Act). The High Court allowed the writ petition, stating that the acquisition had lapsed for non-tendering compensation. The Supreme Court reverses, relying on Indore Development Authority v. Manoharlal (Constitution Bench, 2020), which clarified that lapse under Section 24(2) requires twin conditions to be satisfied: (i) not taking over possession and (ii) not tendering/paying compensation. If one condition is not satisfied, there is no lapse. On the facts, possession of the land was taken over on 04.03.1983 and handed over to DDA, which defeats the High Court’s lapse finding. Pune Municipal Corporation (2014) 3 SCC 183, relied upon by the High Court, has been overruled by Indore Development Authority. The Court quashes the impugned judgment, allows the Government’s appeal, and disposes of pending applications with no costs. The decision clarifies Section 24(2)’s operation for proceedings pending as on 1-1-2014 and affirms the twin-conditions doctrine.”

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • M. R. Shah
  • S. Ravindra Bhat
Judgment Date
2022-12-15
Court Decision / Holding
Appeal allowed. The impugned High Court judgment declaring lapse under Section 24(2) of the 2013 Act is quashed and set aside. The possession having been taken on 04.03.1983 and handed to DDA means no lapse, and the 2013 Act, along with Indore Development Authority, governs; the Government’s appeal is allowed without costs. Pending applications are disposed of.
Final Disposition
Appeal allowed; No costs; Pending applications disposed of.

Parties to the Case

Appellants / Petitioners

  • Government of NCT of Delhi

Respondents

  • Mohd. Maqbool and others

Legal Representation & Advocates

Counsels for Petitioners

  • • Chandra Prakash
  • • C. P. Rajwar
  • • Vivek Singh
  • • Pushkar Anand

Counsels for Respondents

  • • Nishit Agrawal
  • • Ishaan Sharma
  • • Ms. Kanishka Mittal

Provisions of Law Cited

Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 – Section 24(2)Land Acquisition Act, 1894 – Sections 4, 6, 16, 31, 34 (and related provisions)

Legal Doctrines & Maxims

  • Twin-conditions test for lapse under Section 24(2) of the 2013 Act: non-takeover of possession and non-payment/tendering of compensation.
  • The word 'or' in Section 24(2) read as 'nor' or 'and' in certain contexts; lapse occurs when both possession is not taken and compensation is not paid for five years prior to the 2014 Act.
  • Proviso to Section 24(2) treated as part of Section 24(2) (not part of Section 24(1)(b)).
  • Non-deposit of compensation in court does not by itself cause lapse; compensation must be paid or tendered as per 31(1) of the 1894 Act; if compensation is tendered, lapse cannot be claimed.
  • Possession taken under the 1894 Act vests land in the State, with no divesting under Section 24(2).
  • The 2013 Act applies to proceedings pending on 1-1-2014; five-year clock excludes interim court orders.

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant contends that possession of the disputed land was taken over on 04.03.1983 and handed over to DDA. The challenge in the writ petition was not about the legality of the acquisition but about lapse under Section 24(2) of the 2013 Act. Relying on Indore Development Authority, the twin-conditions test requires both non-possession and non-payment of compensation for lapse; here possession has been taken, hence there is no lapse. The High Court erred in following Pune Municipal Corporation (2014) 3 SCC 183, which the Constitution Bench overruled in Indore Development Authority. The 2013 Act is applicable to pending proceedings, and since possession was already taken, the acquisition cannot lapse under Section 24(2).

Contentions of Respondents

The respondents argued that because compensation was not tendered, the acquisition lapses under Section 24(2) of the 2013 Act. They relied on Pune Municipal Corporation, which held that non-tendering of compensation leads to lapse. The High Court correctly applied that approach, given the long pendency and the formalities under the 1894 Act, and that non-deposit of compensation in court affects the remedy under the 2013 Act without negating the lapse due to non-tendering. They contended that the 2013 Act’s purpose is to ensure prompt payment and finality, and the lapse principle should be applied strictly.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (4)

Case NameCitationTreatmentExplanation
Indore Development Authority v. Manoharlal and Others(2020) 8 SCC 129; [2020] 3 SCR 1PositiveConstitution Bench followed; held that lapse under Section 24(2) requires twin conditions (possession and compensation). Overruled Pune and related precedents.
Pune Municipal Corporation and Anr. v. Harakchand Misirimal Solanki and Ors.(2014) 3 SCC 183; [2014] 1 SCR 783OverruledConstitution Bench overruled this decision; it cannot prevail to justify lapse where one condition is missing.
Sree Balaji Nagar Residential Assn. v. State of Tamil Nadu(2015) 3 SCC 353OverruledCannot be said to be laying down good law; overruled.
Indore Development Authority v. Shailendra(2018) 3 SCC 412OverruledNot placed for consideration; cannot prevail per the present judgment.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,472 words•~12 min read

In The Court Record

GOVT. OF NCT OF DELHI v. MOHD. MAQBOOL & ORS.

802 SUPREME COURT REPORTS[2022] 17 S.C.R. 802 [2022] 17 S.C.R. A GOVT. OF NCT OF DELHI v. ## MOHD. MAQBOOL & ORS. (Civil Appeal No. 9229 of 2022 ) B DECEMBER 15, 2022 ## **[M. R. SHAH AND S. RAVINDRA BHAT, JJ.]** - _Right to Fair Compensation and Transparency in Land_ - _Acquisition, Rehabilitation and Resettlement Act, 2013: s.24(2) – Land acquisition proceedings under Land Acquisition Act, 1894 –_ - C _Respondent no.1 filed a writ petition before the High Court challenging the acquisition proceedings and also for a declaration that the acquisition with respect to the land is deemed to have been lapsed by virtue of s.24(2) of the Act, 2013 – According to the Land Acquisition Collector and so stated in the counter affidavit before_ - D _the High Court, the possession of the disputed land in question along with the other lands were taken over and handed over to DDA on 04.03.1983 – High Court, on the ground, that the compensation was not tendered to the land owner, allowed writ petition and declared that the acquisition with respect to the land in question is deemed to have lapsed under s.24(2) of the Act, 2013 –_ - E _Hence instant appeal – Held: As per the recent decision of the Constitution Bench of this Court in the case of_ Indore Development Authority v. Manoharlal and others _for the purpose of lapse under s.24(2) of the Act, 2013, twin conditions of not taking over possession and not tendering/paying the compensation are required_ - F _to be satisfied and that if one of the conditions is not satisfied, there shall not be lapse of the acquisition proceedings under s.24(2) of the Act, 2013 – According to the possession certificate and the specific case on behalf of the appellant and the Land Acquisition Collector that the possession of the land in question was taken over on 04.03.1983 and handed over to DDA, the impugned judgment_ - G _and order passed by the High Court is unsustainable and the same deserves to be quashed._ ## **Allowing the appeal, the Court** **HELD: 1. As per the recent decision of the Constitution** H **Bench of this Court in the case of** _**Indore Development Authority**_ 802 803 GOVT. OF NCT OF DELHI v. MOHD. MAQBOOL & ORS. _**v. Manoharlal and others**_ **for the purpose of lapse under Section** A **24(2) of the Act, 2013 twin conditions of not taking over possession and not tendering/paying the compensation are required to be satisfied. As per the decision in the case of** _**Indore Development Authority**_ **if one of the conditions is not satisfied, there shall not be lapse of the acquisition proceedings under** B **Section 24(2) of the Act, 2013. In the case of** _**Indore Development Authority**_ **, the Constitution Bench of this Court has specifically overuled the decision of this Court in the case of** _**Pune Municipal Corporation and Anr.**_ **which has been relied upon by the High Court while passing the impugned judgment and order. [Para 3.1][805-C-E]** C **2. According to the possession certificate and the specific case on behalf of the appellant and the Land Acquisition Collector that the possession of the land in question was taken over on 04.03.1983 and handed over to DDA, the impugned judgment and order passed by the High Court is unsustainable and the same deserves to be quashed and set aside. [Para 4][807-H; 808A]** D _Indore Development Authority v. Manoharlal and Ors._ **(2020) 8 SCC 129 : [2020] 3 SCR 1 – followed.** _Pune Municipal Corporation and Anr. v. Harakchand Misirimal Solanki and Ors._ **(2014) 3 SCC 183 : [2014] 1 SCR 783 – referred to.** E ## **Case Law Reference** |**[2014]**|**1**|**SCR**|**783**|**referred to**|**Para**|**2**|F| |---|---|---|---|---|---|---|---| |**[2020]**|**3**|**SCR**|**1**|**followed**|**Para**|**3.1**|| CIVIL APPELLATE JURISDICTION: Civil Appeal No. 9229 of 2022 From the Judgment and Order dated 01.12.2015 of the High Court of Delhi at New Delhi in Writ Petition (C) No. 27 of 2015. G Chandra Prakash, C. P. Rajwar, Vivek Singh, Pushkar Anand, Advs. for the Appellant. Nishit Agrawal, Ishaan Sharma, Ms. Kanishka Mittal, Advs. for the Respondents. H 804 SUPREME COURT REPORTS [2022] 17 S.C.R. A The Judgment of the Court was delivered by ## **M. R. SHAH, J.** 1. Feeling aggrieved and dissatisfied with the impugned judgment and order dated 01.12.2015 passed by the High Court of Delhi at New Delhi in Writ Petition (C) No.27 of 2015 by which the High Court has B allowed the said writ petition preferred by the respondent no.1 – original writ petitioner and has declared that the acquisition with respect to the land in question is deemed to have lapsed under Section 24(2) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (hereinafter referred to as C ‘the Act 2013’), the Government of NCT of Delhi has preferred the present appeal. 2. A Notification under Section 4 of the Land Acquisition Act, 1894 (hereinafter referred to as ‘the Act, 1894) with respect to the land in question was issued as far as back on 10.11.1960 followed by the D declaration under Section 6 of the Act, 1894 dated 06.01.1969. The award was declared on 31.01.1983. According to the Department and the Land Acquisition Collector and so stated in the counter affidavit on behalf of the original respondent nos. 1 & 2 before the High Court the possession of the disputed land in question along with the other lands were taken over and handed over to DDA on 04.03.1983. That in the year 2015 the E respondent no.1 filed a writ petition before the High Court challenging the acquisition proceedings including the Notification under Section 4 of the Act, 1894 and also for a declaration that the acquisition with respect to the land in question is deemed to have been lapsed by virtue of Section 24(2) of the Act, 2013. F 2.1 Though it was the specific case on behalf of the appellant and the Land Acquisition Collector and so stated in the counter affidavit before the High Court that the possession of the land was taken on 04.03.1983 and the same was handed over to DDA, without going into the controversy of the physical possession, by the impugned judgment G and order and relying upon the decision of this Court in the case of **Pune Municipal Corporation and Anr. Vs. Harakchand Misirimal Solanki and Ors., (2014) 3 SCC 183** and on the ground that the compensation has not been tendered to the land owner, the High Court has allowed the writ petition and has declared that the acquisition with respect to the land in question is deemed to have lapsed under Section H 24(2) of the Act, 2013. Hence, the present appeal. 805 GOVT. OF NCT OF DELHI v. MOHD. MAQBOOL & ORS. [M. R. SHAH, J.] 3. As observed hereinabove, it was the specific case on behalf of A the appellant and the Land Acquisition Collector before the High Court that the possession of the land in question was taken over on 04.03.1983 and the same was handed over to the DDA. It is required to be noted that the original acquisition is of the year 1960 and the writ petition was preferred challenging the acquisition in the Notification under Sections 4 B & 6 after a period of almost 55 years. By the impugned judgment and order the High Court has allowed the writ petition relying upon the decision of this Court in the case of **Pune Municipal Corporation (supra)** observing that the compensation has not been tendered. 3.1 However, as per the recent decision of the Constitution Bench of this Court in the case of **Indore Development Authority versus Manoharlal and others** reported in **(2020) 8 SCC 129** for the purpose of lapse under Section 24(2) of the Act, 2013 twin conditions of not taking over possession and not tendering/paying the compensation are required to be satisfied. As per the decision in the case of **Indore Development Authority (supra)** if one of the conditions is not satisfied, there shall not be lapse of the acquisition proceedings under Section 24(2) of the Act, 2013. In the case of **Indore Development Authority (supra)** the Constitution Bench of this Court has specifically over-ruled the decision of this Court in the case of **Pune Municipal Corporation and Anr. (supra)** which has been relied upon by the High Court while passing the impugned judgment and order.In paragraphs 365 and 366, the Constitution Bench of this Court has observed and held as under:- “ **365.** Resultantly, the decision rendered in Pune Municipal Corpn. [Pune Municipal Corpn. v. Harakchand Misirimal Solanki, (2014) 3 SCC 183] is hereby overruled and all other decisions in which Pune Municipal Corpn. [Pune Municipal Corpn. v. Harakchand Misirimal Solanki, (2014) 3 SCC 183] has been followed, are also overruled. The decision in Sree Balaji Nagar Residential Assn. [Sree Balaji Nagar Residential Assn. v. State of T.N., (2015) 3 SCC 353] cannot be said to be laying down good law, is overruled and other decisions following the same are also overruled. In Indore Development Authority v. Shailendra [(2018) 3 SCC 412], the aspect with respect to the proviso to Section 24(2) and whether “or” has to be read as “nor” or as “and” was not placed for consideration. Therefore, that decision too cannot prevail, in the light of the discussion in the present judgment. C D E F G H 806 SUPREME COURT REPORTS [2022] 17 S.C.R. A B C D **366.** In view of the aforesaid discussion, we answer the questions as under: **366.1.** Under the provisions of Section 24(1)(a) in case the award is not made as on 1-1-2014, the date of commencement of the 2013 Act, there is no lapse of proceedings. Compensation has to be determined under the provisions of the 2013 Act. **366.2.** In case the award has been passed within the window period of five years excluding the period covered by an interim order of the court, then proceedings shall continue as provided under Section 24(1)(b) of the 2013 Act under the 1894 Act as if it has not been repealed. **366.3.** The word “or” used in Section 24(2) between possession and compensation has to be read as “nor” or as “and”. The deemed lapse of land acquisition proceedings under Section 24(2) of the 2013 Act takes place where due to inaction of authorities for five years or more prior to commencement of the said Act, the possession of land has not been taken nor compensation has been paid. In other words, in case possession has been taken, compensation has not been paid then there is no lapse. Similarly, if compensation has been paid, possession has not been taken then there is no lapse. E F G **366.4.** The expression “paid” in the main part of Section 24(2) of the 2013 Act does not include a deposit of compensation in court. The consequence of non-deposit is provided in the proviso to Section 24(2) in case it has not been deposited with respect to majority of landholdings then all beneficiaries (landowners) as on the date of notification for land acquisition under Section 4 of the 1894 Act shall be entitled to compensation in accordance with the provisions of the 2013 Act. In case the obligation under Section 31 of the Land Acquisition Act, 1894 has not been fulfilled, interest under Section 34 of the said Act can be granted. Non-deposit of compensation (in court) does not result in the lapse of land acquisition proceedings. In case of non-deposit with respect to the majority of holdings for five years or more, compensation under the 2013 Act has to be paid to the “landowners” as on the date of notification for land acquisition under Section 4 of the 1894 Act. H 807 GOVT. OF NCT OF DELHI v. MOHD. MAQBOOL & ORS. [M. R. SHAH, J.] **366.5.** In case a person has been tendered the compensation A as provided under Section 31(1) of the 1894 Act, it is not open to him to claim that acquisition has lapsed under Section 24(2) due to non-payment or non-deposit of compensation in court. The obligation to pay is complete by tendering the amount under Section 31(1). The landowners who had refused to accept compensation B or who sought reference for higher compensation, cannot claim that the acquisition proceedings had lapsed under Section 24(2) of the 2013 Act. **366.6.** The proviso to Section 24(2) of the 2013 Act is to be treated as part of Section 24(2), not part of Section 24(1)(b). **366.7.** The mode of taking possession under the 1894 Act and as contemplated under Section 24(2) is by drawing of inquest report/memorandum. Once award has been passed on taking possession under Section 16 of the 1894 Act, the land vests in State there is no divesting provided under Section 24(2) of the 2013 Act, as once possession has been taken there is no lapse under Section 24(2). **366.8.** The provisions of Section 24(2) providing for a deemed lapse of proceedings are applicable in case authorities have failed due to their inaction to take possession and pay compensation for five years or more before the 2013 Act came into force, in a proceeding for land acquisition pending with the authority concerned as on 1-1-2014. The period of subsistence of interim orders passed by court has to be excluded in the computation of five years. **366.9.** Section 24(2) of the 2013 Act does not give rise to new cause of action to question the legality of concluded proceedings of land acquisition. Section 24 applies to a proceeding pending on the date of enforcement of the 2013 Act i.e. 1-1-2014. It does not revive stale and time-barred claims and does not reopen concluded proceedings nor allow landowners to question the legality of mode of taking possession to reopen proceedings or mode of deposit of compensation in the treasury instead of court to invalidate acquisition.” 4. In view of the above and according to the possession certificate and the specific case on behalf of the appellant and the Land Acquisition Collector that the possession of the land in question was taken over on C D E F G H 808 SUPREME COURT REPORTS [2022] 17 S.C.R. - A 04.03.1983 and handed over to DDA, theimpugned judgment and order passed by the High Court is unsustainable and the same deserves to be quashed and set aside. - Accordingly, the impugned judgment and order passed by the High - Court allowing the Writ Petition (C) No.27 of 2015 and declaring the - B acquisition proceedings with respect to the land in question is deemed to have lapsed under Section 24(2) of the Act, 2013 is hereby quashed and set aside. Present appeal is accordingly allowed. No costs. C Pending applications, if any, also stand disposed of. Devika Gujral Appeal allowed. D E F G H
End of Judgment Record
Browse All Supreme Court of India (2022) Decisions
2022-12-09

MOHD. SABEER @ SHABIR HUSSAIN v. RM, U. P. STATE ROAD TRANSPORT CORP.

The appellant, Mohd. Sabeer (also known as Shabir Hussain), a scrap dealer, was a passenger in a UP State Road Transport Corporation bus when the driver rashly and negligently drove the vehicle, causing a collision near Ghaziabad in 2009. He sustained grave injuries including an amputation of the right lower limb and other bodily injuries. The Motor Accident Claims Tribunal (MACT) awarded Rs. 15,76,465 with interest; the High Court of Delhi enhanced the amount to Rs. 16,70,932. The Disability Certificate recorded 70% permanent disability. The High Court had treated the claimant’s functional disability as 35%, relying on post‑accident income reflected in IT returns, and erred in not adequately recognizing the impact on earning capacity of a self‑employed person who cannot drive. The Supreme Court held that the appellant’s functional disability should be treated as 60% for loss of future earning capacity and that permanent disablement warrants consideration of future prospects in addition to future income. It invoked National Insurance Co. v. Pranay Sethi to apply a 40% addition for future prospects, and directed compensation for prosthetic limb purchase and maintenance, as well as enhanced non‑pecuniary damages. The final award was increased to Rs. 38,70,120 with 9% interest from the date of application, and the appeals were allowed, emphasizing liberal, holistic justice to restore the claimant to his pre‑accident position in light of socio‑economic factors.

2022-01-25

Intercontinental Hotels Group (India) Pvt. Ltd. & ANR. v. Waterline Hotels Pvt. Ltd.

Intercontinental Hotels Group (India) Pvt. Ltd. & Anr. v Waterline Hotels Pvt. Ltd. is a Supreme Court decision addressing appointment of a sole arbitrator under Section 11(6) read with Section 11(12)(a) of the Arbitration and Conciliation Act, 1996, in a dispute arising from a Hotel Management Agreement (HMA) for renovating the Holiday Inn & Suites Bengaluru, Whitefield. The petitioners allege breach by Waterline Hotels, including non-payment of incentive management fee and related charges, culminating in Waterline’s email termination of the HMA on 12 October 2018 after rebranding the hotel as Miraya. The petitioners invoked arbitration; Waterline challenged the enforceability of the arbitration clause on the ground that the HMA is an unstamped instrument under the Karnataka Stamp Act. A Karnataka High Court ad‑interim relief was granted in 2018, but the Supreme Court’s judgment focuses on the scope of judicial interference at the pre‑appointment stage. The Court reiterates a pro‑arbitration stance, noting that arbitrability/validity are generally matters for the arbitrators, with a narrow exception to cut deadwood or to refer for authoritative settlement where necessary, invoking Vidya Drolia. It also analyzes stamp duty, observing that stamp duty has been paid (albeit disputed) and that the question of the correct stamp duty may be resolved later, not as a precondition to appointing an arbitrator. Consequently, the Court appoints Justice A. V. Chandrashekara as a sole arbitrator, directs SIAC to proceed under its rules, and allows the petition in terms stated, while leaving stamp duty issues for arbitration to determine later.

2022-02-01

The State of Sikkim v. Jasbir Singh & ANR

This appeal by the State of Sikkim challenges a High Court judgment upholding a Sessions Judge’s order directing a written notice to the Army’s commanding officer to transfer the case to a court-martial. The case concerns concurrent jurisdiction between a court-martial and an ordinary criminal court under the Army Act for an offence allegedly committed by Lance Naik Jasbir Singh during active service in Sikkim, with the FIR under IPC 302 and related charges. The High Court held that the procedure under Sections 125/126 Army Act, the 1978 Rules (Rules 3-5) and CrPC Rule 475 had not been observed and that the Army authorities had exercised their discretion to prefer a court-martial; thus, the court-martial alone would have jurisdiction. The Supreme Court, however, held that the offence falls into a category with concurrent jurisdiction under Sections 69 and 70 of the Army Act, and that where there is concurrent jurisdiction, the first instance discretion to choose the forum lies with the designated officer under Section 125. In the present case there was no decision by the designated officer to institute proceedings before a court-martial, and the sequence of events showed significant cooperation with the CrPC process. Consequently, the Sessions Judge’s competence to proceed in the criminal court was not in error, the High Court’s order is set aside, and the respondent-accused is to be transferred to civil custody to face trial in the criminal court. The appeal is allowed.

2022-07-22

Hemant Kumar Verma & Ors. v. Employees State Insurance Corporation & Ors.

This writ petition concerns whether junior resident doctors in ESIC-run medical colleges should be eligible for the 50% in-service reservation for postgraduate medical courses, a benefit presently available to Insurance Medical Officers Grade-II (IMO-II) recruited through competitive selection. ESIC recruits IMO-II and provides a 50% in-service quota for PG seats; however junior residents, who complete MBBS under bond and serve as part of ESIC's residency scheme, are not deemed in-service doctors. The petitioners argued parity with IMO-II because their qualifications, duties, and work environment are similar, and urged the Court to treat them as in-service to extend the 50% reservation to their batch. ESIC contends that junior residents are contractual, bond-based appointees governed by the ESIC Residency Scheme; IMO-II is a permanent post governed by the ESIC Staff and Condition of Service Regulations 1959; the bond reduction in 2020 and the 2018/2020 memoranda cannot convert junior residents into in-service doctors. The Court relies on precedents establishing institutional preference in PG admissions—Saurabh Chaudri v. Union of India, Yatin Kuma Jasubahi v. State of Gujarat, and Pradeep Jain v. Union of India — to acknowledge the legitimacy of institutional preference, but ultimately holds that junior residents and regular ESIC doctors are distinct categories and the in-service quota cannot be equitably extended to junior residents. The petition is dismissed.