GOVT. OF NCT OF DELHI AND ANR. v. SHIV DUTT SHARMA AND ANR.

Case / Petition Number:
Civil Appeal No. 8198 of 2022; Civil Appeal No. 8248 of 2022
Neutral Citation:[2022] 15 SCR 686

Case Synopsis & Summary

This Court decides Civil Appeals challenging a Delhi High Court order declaring that land acquisition under the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (Act 2013) has lapsed under Section 24(2). The High Court relied on Pune Municipal Corporation v. Harakchand Misirimal Solanki (2014) 3 SCC 183 to hold lapse because compensation had not been paid, despite possession having been taken. The Supreme Court overrules that approach, reaffirming the constitutional bench’s position in Indore Development Authority v. Manoharlal and Ors. (2020) 8 SCC 129 that lapse under Section 24(2) does not arise where possession has been taken and compensation remains unpaid, nor where compensation is paid but possession has not been taken. It also clarifies that non-deposit of compensation in court does not automatically cause lapse, and explains how to treat the proviso to Section 24(2). The Court holds that the 2013 Act does not revive stale claims and that possession and compensation dynamics under the 1894 Act interact with the 2013 Act in specific ways, excluding certain older precedents. Following Indore Development Authority (supra), the High Court’s judgment is set aside and the appeals are allowed. No costs. Pending applications, if any, are disposed of.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • M. R. Shah
  • M. M. Sundresh
Judgment Date
2022-11-24
Court Decision / Holding
Appeals allowed. The judgment and order of the High Court declaring lapse under Section 24(2) of the 2013 Act is set aside; the acquisition is not deemed to have lapsed. No costs. Pending applications, if any, are disposed of.
Final Disposition
Appeals allowed; High Court judgment set aside; No costs; Pending applications disposed.

Parties to the Case

Appellants / Petitioners

  • Government of NCT of Delhi
  • Anr.

Respondents

  • Shiv Dut Sharma
  • Anr.

Legal Representation & Advocates

Counsels for Petitioners

  • • Ms. Astha Tyagi
  • • Dinesh Chander
  • • Ms. Diksha Narula
  • • Nirmal Prasad
  • • Ms. Jasleen Chahal
  • • Nishit Agrawal
  • • Ishaan Sharma
  • • Ms. Kanishka Mittal

Counsels for Respondents

  • • Shri Manish K. Bishnoi

Provisions of Law Cited

Section 24(2) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013Section 24(1)(a) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013Section 24(1)(b) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013Proviso to Section 24(2) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013Section 4 of the Land Acquisition Act, 1894Section 16 of the Land Acquisition Act, 1894Section 31 of the Land Acquisition Act, 1894Section 34 of the Land Acquisition Act, 1894

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants contend that the High Court erred in applying the Pune decision (Pune Municipal Corporation v. Harakchand Misirimal Solanki, 2014) which this Court later overruled by Indore Development Authority v. Manoharlal. They emphasize that, under Section 24(2) of Act 2013, lapse arises only in specific circumstances; if possession has been taken but compensation remains unpaid, there is no lapse; the proviso to Section 24(2) and the interaction with the 1894 Act must be read in light of Indore. They argue the acquisition remains alive and that the encroachment status does not negate the earlier taking of possession and the need to pay compensation under the transitional framework.

Contentions of Respondents

The respondent No.1 argued that actual possession was never taken as the land is occupied by encroachers in Sanjay Mohalla; consequently, there is no deemed lapse under Section 24(2). They contend the High Court’s reliance on the Pune decision is valid insofar as it reflected the understanding at that time, but the Constitution Bench later overruled it. They rely on the encroachments to claim that possession or payment did not occur as required to trigger lapse, and seek affirmance of the High Court’s order declaring lapse.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (4)

Case NameCitationTreatmentExplanation
Pune Municipal Corporation and Anr. v. Harakchand Misirimal Solanki and Ors.2014 (3) SCC 183OverruledConstitution Bench in Indore Development Authority v. Manoharlal overruled Pune decision and others following it.
Indore Development Authority v. Manoharlal and Ors.2020 (8) SCC 129Positive Constituent authority relied upon and followed; holds no lapse where possession taken and compensation unpaid.
Sree Balaji Nagar Residential Assn. v. State of Tamil Nadu2015 (3) SCC 353OverruledCannot be said to be good law; overruled by subsequent decisions.
Indore Development Authority v. Shailendra(2018) 3 SCC 412Partly Overruled / LimitedNot placed for consideration in the present judgment; cannot prevail in light of the discussion herein.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•1,995 words•~10 min read

In The Court Record

GOVT. OF NCT OF DELHI AND ANR. v. SHIV DUTT SHARMA AND ANR.

686 SUPREME COURT REPORTS[2022] 15 S.C.R. 686 [2022] 15 S.C.R. A GOVT. OF NCT OF DELHI AND ANR. v. SHIV DUTT SHARMA AND ANR. (Civil Appeal No. 8198 of 2022) B NOVEMBER 24, 2022 ## **[M. R. SHAH AND M. M. SUNDRESH, JJ.]** - _Right to Fair Compensation and Transparency in Land_ - _Acquisition, Rehabilitation and Resettlement Act, 2013 – s.24(2) – High Court relied upon the Supreme Court decision in case of_ Pune - C Municipal Corporation and Anr. v. Harakchand Misirimal Solanki _and Ors. and gave a specific finding that the possession of the subject land was taken, however compensation was not paid, therefore, declared the acquisition with respect to the land in question has lapsed u/s. 24(2) of the Act of 2013 – Held: The case relied on by_ - D _High Court has been overruled by the subsequent decision in_ Indore Development authority v. Manoharlal and Ors. _in which the Constitution Bench of the Supreme Court held that in case possession has been taken and compensation has not been paid then there is no lapse – Therefore, judgment of the High Court set aside – Appeals allowed._ - E _Indore Development Authority v. Manoharlal and Ors._ **(2020) 8 SCC 129 : [2020] 3 SCR 1** _**–**_ **followed** _**.**_ - _Pune Municipal Corporation and Anr. v. Harakchand Misirimal Solanki and Ors._ **(2014) 3 SCC 183 : [2014] 1 SCR 783 – referred to.** ## F **Case Law Reference** |**[2014]**|**1**|**SCR**|**783**|**referred to**|**Para**|**3**| |---|---|---|---|---|---|---| |**[2020]**|**3**|**SCR**|**1**|**followed**|**Para**|**3.1**| - CIVIL APPELLATE JURISDICTION: Civil Appeal No. 8198 - G of 2022. From the Judgment and Order dated 05.02.2018 of the High Court of Delhi at New Delhi in Civil Writ Petition No. 1870 of 2016. With H 686 GOVT. OF NCT OF DELHI AND ANR. v. SHIV DUTT SHARMA 687 AND ANR. Civil Appeal No. 8248 of 2022. A Ms. Astha Tyagi, Dinesh Chander, Ms. Diksha Narula, Manish K. Bishnoi, Nirmal Prasad, Ms. Jasleen Chahal, Nishit Agrawal, Ishaan Sharma, Ms. Kanishka Mittal, Advs. for the appearing parties. The Judgment of the Court was delivered by B ## **M. R. SHAH, J.** 1. Feeling aggrieved and dissatisfied with the impugned judgment and order passed by the High Court of Delhi at New Delhi in Writ Petition (C) No. 1870 of 2016 by which the High Court has allowed the said writ petition preferred by the respondent No.1 herein and has declared that the acquisition with respect to the land in question has lapsed under Section 24(2) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (hereinafter referred to as “Act, 2013”), the Government of NCT of Delhi as well as the Land Acquisition Collector have preferred the present appeals. C D 2. We have heard Ms. Astha Tyagi and Shri Nishit Agrawal, learned counsel appearing on behalf of the respective appellants and Shri Manish K. Bishnoi, learned counsel appearing on behalf of the respondent No.1. 3. At the outset, it is required to be noted that while passing the impugned judgment and order, the High Court has relied upon the decision of this Court in the case of **Pune Municipal Corporation and Anr. Vs. Harakchand Misirimal Solanki and Ors. (2014) 3 SCC 183** and has declared that the acquisition with respect to the land in question has lapsed under Section 24(2) of the Act, 2013 as the compensation has not been paid/tendered to the original writ petitioner. However, there is a specific finding given by the High Court that the possession of the subject land has been taken over, however, the compensation has not been paid to the recorded owner. 3.1 It is the case on behalf of the respondent No.1 that the actual possession of the land in question has not been taken over as the land in question is occupied by the encroachers and that the area in question is known as ‘Sanjay Mohalla’. However, it is required to be noted and as observed hereinabove, in paragraph 8, the High Court has specifically observed that there is a categorical assertion made in the counter affidavit filed by the Land Acquisition Collector that the possession of the subject E F G H 688 SUPREME COURT REPORTS [2022] 15 S.C.R. - A land has been taken over, however, the compensation has not been paid to the recorded owner. It may be that there may be **illegal occupants and / or encroachers** , but that does not mean that the possession of the land in question was taken over and/or handed over to the beneficiary department on 21.06.1973. As per the case on behalf of the Land Acquisition Collector, in any case, the landowner can be permitted to - B take the benefit of the encroachment made on the land in question. Be that it may, as observed hereinabove, while passing the impugned judgment and order, the High Court has relied upon the decision of this Court in the case of **Pune Municipal Corporation and Anr. (supra)** and the said decision in the case of **Pune Municipal Corporation and** - C **Anr. (supra)** has been subsequently specifically overruled by the Constitution Bench of this Court in the case of **Indore Development Authority Vs. Manoharlal and Ors. (2020) 8 SCC 129.** In paragraphs 365 and 366, it is observed and held as under:- - “ **365.** Resultantly, the decision rendered in Pune Municipal - D Corpn. [Pune Municipal Corpn. v. Harakchand Misirimal Solanki, (2014) 3 SCC 183] is hereby overruled and all other decisions in which Pune Municipal Corpn. [Pune Municipal Corpn. v. Harakchand Misirimal Solanki, (2014) 3 SCC 183] has been followed, are also overruled. The decision in Sree Balaji Nagar Residential Assn. [Sree Balaji Nagar Residential Assn. v. State - E of T.N., (2015) 3 SCC 353] cannot be said to be laying down good law, is overruled and other decisions following the same are also overruled. In Indore Development Authority v. Shailendra [(2018) 3 SCC 412], the aspect with respect to the proviso to Section 24(2) and whether “or” has to be read as “nor” or as - F “and” was not placed for consideration. Therefore, that decision too cannot prevail, in the light of the discussion in the present judgment. **366.** In view of the aforesaid discussion, we answer the questions as under: - G **366.1.** Under the provisions of Section 24(1)(a) in case the award is not made as on 1-1-2014, the date of commencement of the 2013 Act, there is no lapse of proceedings. Compensation has to be determined under the provisions of the 2013 Act. **366.2.** In case the award has been passed within the H window period of five years excluding the period covered by an ## GOVT. OF NCT OF DELHI AND ANR. v. SHIV DUTT SHARMA 689 AND ANR. [M. R. SHAH, J.] interim order of the court, then proceedings shall continue as A provided under Section 24(1)(b) of the 2013 Act under the 1894 Act as if it has not been repealed. **366.3.** The word “or” used in Section 24(2) between possession and compensation has to be read as “nor” or as “and”. The deemed lapse of land acquisition proceedings under Section 24(2) of the 2013 Act takes place where due to inaction of authorities for five years or more prior to commencement of the said Act, the possession of land has not been taken nor compensation has been paid. In other words, in case possession has been taken, compensation has not been paid then there is no lapse. Similarly, if compensation has been paid, possession has not been taken then there is no lapse. **366.4.** The expression “paid” in the main part of Section 24(2) of the 2013 Act does not include a deposit of compensation in court. The consequence of non-deposit is provided in the proviso to Section 24(2) in case it has not been deposited with respect to majority of landholdings then all beneficiaries (landowners) as on the date of notification for land acquisition under Section 4 of the 1894 Act shall be entitled to compensation in accordance with the provisions of the 2013 Act. In case the obligation under Section 31 of the Land Acquisition Act, 1894 has not been fulfilled, interest under Section 34 of the said Act can be granted. Non-deposit of compensation (in court) does not result in the lapse of land acquisition proceedings. In case of non-deposit with respect to the majority of holdings for five years or more, compensation under the 2013 Act has to be paid to the “landowners” as on the date of notification for land acquisition under Section 4 of the 1894 Act. **366.5.** In case a person has been tendered the compensation as provided under Section 31(1) of the 1894 Act, it is not open to him to claim that acquisition has lapsed under Section 24(2) due to non-payment or non-deposit of compensation in court. The obligation to pay is complete by tendering the amount under Section 31(1). The landowners who had refused to accept compensation or who sought reference for higher compensation, cannot claim that the acquisition proceedings had lapsed under Section 24(2) of the 2013 Act. B C D E F G H 690 SUPREME COURT REPORTS [2022] 15 S.C.R. A B C D E F G H **366.6.** The proviso to Section 24(2) of the 2013 Act is to be treated as part of Section 24(2), not part of Section 24(1)(b). **366.7.** The mode of taking possession under the 1894 Act and as contemplated under Section 24(2) is by drawing of inquest report/memorandum. Once award has been passed on taking possession under Section 16 of the 1894 Act, the land vests in State there is no divesting provided under Section 24(2) of the 2013 Act, as once possession has been taken there is no lapse under Section 24(2). **366.8.** The provisions of Section 24(2) providing for a deemed lapse of proceedings are applicable in case authorities have failed due to their inaction to take possession and pay compensation for five years or more before the 2013 Act came into force, in a proceeding for land acquisition pending with the authority concerned as on 1-1-2014. The period of subsistence of interim orders passed by court has to be excluded in the computation of five years. **366.9.** Section 24(2) of the 2013 Act does not give rise to new cause of action to question the legality of concluded proceedings of land acquisition. Section 24 applies to a proceeding pending on the date of enforcement of the 2013 Act i.e. 1-1-2014. It does not revive stale and time-barred claims and does not reopen concluded proceedings nor allow landowners to question the legality of mode of taking possession to reopen proceedings or mode of deposit of compensation in the treasury instead of court to invalidate acquisition.” 4. In view of the above and for the reasons stated above, and, more particularly, considering the subsequent decision of the Constitution Bench of this Court in the case of **Indore Development Authority (supra)** , the impugned judgment and order passed by the High Court is unsustainable and the same deserves to be quashed and set aside and is accordingly quashed and set aside. The submission on behalf of the respondents that the encroachment on the land in question is being regularized is concerned, that is not the subject matter before this Court. It is ultimately for the appropriate court to take appropriate decision. However, so far as the impugned judgment and order passed by the High Court is concerned, the same is GOVT. OF NCT OF DELHI AND ANR. v. SHIV DUTT SHARMA 691 AND ANR. [M. R. SHAH, J.] unsustainable in view of the decision of this Court in the case of **Indore** A **Development Authority (supra)** and as observed hereinabove. The present appeals are accordingly allowed. No costs. Pending application, if any, also stands disposed of. Ankit Gyan (Assisted by : Aarsh Choudhary, LCRA) Appeals allowed. B C D E F G H
End of Judgment Record
Browse All Supreme Court of India (2022) Decisions
2022-12-09

MOHD. SABEER @ SHABIR HUSSAIN v. RM, U. P. STATE ROAD TRANSPORT CORP.

The appellant, Mohd. Sabeer (also known as Shabir Hussain), a scrap dealer, was a passenger in a UP State Road Transport Corporation bus when the driver rashly and negligently drove the vehicle, causing a collision near Ghaziabad in 2009. He sustained grave injuries including an amputation of the right lower limb and other bodily injuries. The Motor Accident Claims Tribunal (MACT) awarded Rs. 15,76,465 with interest; the High Court of Delhi enhanced the amount to Rs. 16,70,932. The Disability Certificate recorded 70% permanent disability. The High Court had treated the claimant’s functional disability as 35%, relying on post‑accident income reflected in IT returns, and erred in not adequately recognizing the impact on earning capacity of a self‑employed person who cannot drive. The Supreme Court held that the appellant’s functional disability should be treated as 60% for loss of future earning capacity and that permanent disablement warrants consideration of future prospects in addition to future income. It invoked National Insurance Co. v. Pranay Sethi to apply a 40% addition for future prospects, and directed compensation for prosthetic limb purchase and maintenance, as well as enhanced non‑pecuniary damages. The final award was increased to Rs. 38,70,120 with 9% interest from the date of application, and the appeals were allowed, emphasizing liberal, holistic justice to restore the claimant to his pre‑accident position in light of socio‑economic factors.

2022-01-25

Intercontinental Hotels Group (India) Pvt. Ltd. & ANR. v. Waterline Hotels Pvt. Ltd.

Intercontinental Hotels Group (India) Pvt. Ltd. & Anr. v Waterline Hotels Pvt. Ltd. is a Supreme Court decision addressing appointment of a sole arbitrator under Section 11(6) read with Section 11(12)(a) of the Arbitration and Conciliation Act, 1996, in a dispute arising from a Hotel Management Agreement (HMA) for renovating the Holiday Inn & Suites Bengaluru, Whitefield. The petitioners allege breach by Waterline Hotels, including non-payment of incentive management fee and related charges, culminating in Waterline’s email termination of the HMA on 12 October 2018 after rebranding the hotel as Miraya. The petitioners invoked arbitration; Waterline challenged the enforceability of the arbitration clause on the ground that the HMA is an unstamped instrument under the Karnataka Stamp Act. A Karnataka High Court ad‑interim relief was granted in 2018, but the Supreme Court’s judgment focuses on the scope of judicial interference at the pre‑appointment stage. The Court reiterates a pro‑arbitration stance, noting that arbitrability/validity are generally matters for the arbitrators, with a narrow exception to cut deadwood or to refer for authoritative settlement where necessary, invoking Vidya Drolia. It also analyzes stamp duty, observing that stamp duty has been paid (albeit disputed) and that the question of the correct stamp duty may be resolved later, not as a precondition to appointing an arbitrator. Consequently, the Court appoints Justice A. V. Chandrashekara as a sole arbitrator, directs SIAC to proceed under its rules, and allows the petition in terms stated, while leaving stamp duty issues for arbitration to determine later.

2022-02-01

The State of Sikkim v. Jasbir Singh & ANR

This appeal by the State of Sikkim challenges a High Court judgment upholding a Sessions Judge’s order directing a written notice to the Army’s commanding officer to transfer the case to a court-martial. The case concerns concurrent jurisdiction between a court-martial and an ordinary criminal court under the Army Act for an offence allegedly committed by Lance Naik Jasbir Singh during active service in Sikkim, with the FIR under IPC 302 and related charges. The High Court held that the procedure under Sections 125/126 Army Act, the 1978 Rules (Rules 3-5) and CrPC Rule 475 had not been observed and that the Army authorities had exercised their discretion to prefer a court-martial; thus, the court-martial alone would have jurisdiction. The Supreme Court, however, held that the offence falls into a category with concurrent jurisdiction under Sections 69 and 70 of the Army Act, and that where there is concurrent jurisdiction, the first instance discretion to choose the forum lies with the designated officer under Section 125. In the present case there was no decision by the designated officer to institute proceedings before a court-martial, and the sequence of events showed significant cooperation with the CrPC process. Consequently, the Sessions Judge’s competence to proceed in the criminal court was not in error, the High Court’s order is set aside, and the respondent-accused is to be transferred to civil custody to face trial in the criminal court. The appeal is allowed.

2022-07-22

Hemant Kumar Verma & Ors. v. Employees State Insurance Corporation & Ors.

This writ petition concerns whether junior resident doctors in ESIC-run medical colleges should be eligible for the 50% in-service reservation for postgraduate medical courses, a benefit presently available to Insurance Medical Officers Grade-II (IMO-II) recruited through competitive selection. ESIC recruits IMO-II and provides a 50% in-service quota for PG seats; however junior residents, who complete MBBS under bond and serve as part of ESIC's residency scheme, are not deemed in-service doctors. The petitioners argued parity with IMO-II because their qualifications, duties, and work environment are similar, and urged the Court to treat them as in-service to extend the 50% reservation to their batch. ESIC contends that junior residents are contractual, bond-based appointees governed by the ESIC Residency Scheme; IMO-II is a permanent post governed by the ESIC Staff and Condition of Service Regulations 1959; the bond reduction in 2020 and the 2018/2020 memoranda cannot convert junior residents into in-service doctors. The Court relies on precedents establishing institutional preference in PG admissions—Saurabh Chaudri v. Union of India, Yatin Kuma Jasubahi v. State of Gujarat, and Pradeep Jain v. Union of India — to acknowledge the legitimacy of institutional preference, but ultimately holds that junior residents and regular ESIC doctors are distinct categories and the in-service quota cannot be equitably extended to junior residents. The petition is dismissed.