GOVT. OF A.P. v. H.E.H. THE NIZAM, HYDERABAD

Case / Petition Number:
Civil Appeal No. 5083 of 1996
Neutral Citation:[1996] 3 SCR 772

Case Synopsis & Summary

This Supreme Court decision revolves around the acquisition of urban land within the Hyderabad Urban Agglomeration and the interplay between two statutory regimes: the Land Acquisition Act, 1894 (LA Act) and the Urban Land Ceiling and Regulation Act, 1976 (ULCRA). Land acquired in 1978 was challenged by the respondent, leading to an award by the Land Acquisition Officer and subsequent proceedings under the Reference Court and the High Court which ultimately upheld a compensation rate of Rs. 30 per square yard. The appellant-State contends that the land lies within the Hyderabad Urban Agglomeration and should be governed by ULCRA, which would vest excess vacant land in the State and require compensation under ULCRA’s Section 11, rather than under the LA Act. It was argued that after a declaration under ULCRA Section 10(3), the land becomes vested in the State from a specified date, and the State should not be obliged to pay LA Act compensation; moreover, the Government had exempted the excess land from ULCRA, thus depriving itself of Section 11 compensation. The Court clarified that when vacant land is declared excess under ULCRA, the State need not acquire under the LA Act; vesting is effected from the notified date and, in the ordinary course, compensation would be under ULCRA. However, due to GOMs exempting the excess land from ULCRA, the State failed to obtain the benefit of Section 11. The Court allowed the Government’s appeal, holding that compensation should be determined under the LA Act, and set aside the High Court’s award, fixing compensation at Rs. 8 per square yard plus 30% solatium and 9% interest for one year (and 15% thereafter) with no addition under Section 23(1-A). The decision thus resolves the liability for compensation by balancing ULCRA’s vesting mechanics and the Government’s exemptions, and clarifies the permissible scope of compensation where ULCRA is involved.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • K. RAMASWAMY
Judgment Date
1996-03-22
Court Decision / Holding
Appeal allowed. The Court held that where excess urban land has vested in the State under ULCRA, compensation in respect of such land would ordinarily be governed by ULCRA. However, because the Government had exempted the excess vacant lands from ULCRA (thereby denying the benefit of Section 11), the Government is to determine compensation under the Land Acquisition Act. The Court awarded the respondent Rs. 8 per square yard, with a statutory solatium of 30% and interest of 9% for one year from possession (June 2, 1984) and 15% thereafter till deposit, and held that no additional amount under Section 23(1-A) was payable due to the pending High Court writ. The appeal was allowed without costs to the appellant.
Final Disposition
Appeal Allowed

Parties to the Case

Appellants / Petitioners

  • GOVT. OF A.P.

Respondents

  • H.E.H. THE NIZAM, HYDERABAD

Legal Representation & Advocates

Counsels for Petitioners

  • • G. Prabhakar (for the Appellants)

Counsels for Respondents

  • • K. Madhava Reddy, Prakash Reddy, and Mrs. D. Bharathi (for the Respondents)

Provisions of Law Cited

Land Acquisition Act, 1894: 4(1), 5A, 6, 10(3), 11, 18, 48, 23(1-A)Urban Land Ceiling and Regulation Act, 1976: 3, 4, 6, 9, 10(1), 10(3), 11

Legal Doctrines & Maxims

  • Deemed vesting under Section 10(3) takes effect from the date specified in the declaration.
  • The Ceiling Act is a self-contained Code with overriding effect on other statutes.
  • A deeming provision can create artificial constructions or extend effect to ensure policy objectives.
  • Vest takes varied colours depending on context (as explained in Vattichenkurn Village Panchayat).
  • When excess land is declared under ULCRA, compensation in respect of that land is normally governed by ULCRA, not the LA Act, subject to statutory exemptions.

Submissions & Arguments

Contentions of Appellants / Petitioners

The land within the Hyderabad Urban Agglomeration falls under ULCRA; excess vacant land is deemed acquired by the State under ULCRA Section 10(3), such vesting would preclude LA Act compensation; the Development costs and market values justify compensation under ULCRA, not the LA Act, particularly since GOMs exempted the excess land from ULCRA, and Section 11 should apply to determine compensation.

Contentions of Respondents

The land is subject to ULCRA; once excess vacant land is deemed acquired by the State, compensation is governed by ULCRA; the State cannot compel compensation under the LA Act, especially given past notifications and vesting orders; market comparisons and development charges under adjacent lands support higher compensation under LA Act.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (8)

Case NameCitationTreatmentExplanation
Maharao Sahib Sri Bhim Singhji etc. etc. v. Union of India & Ors. etc.,[1985] Supp. 1 SCR 862PositiveSupports the Ceiling Act’s self-contained framework and its overriding effect on related acquisition mechanisms.
Union of India v. Valluri Basavaiah Chaudhary[1979] 3 SCR 892PositiveCited to illustrate core rulings on ULCRA and land vesting concepts.
State of Gujarat v. Parsottamdas Ramdas[1988] 1 SCR 997PositiveUsed to reinforce the protective scheme of ULCRA in relation to land acquisition and compensation.
Dattatraya Shankarbhat Ambalgi & Ors. v. State of Maharashtra & Ors.AIR (1989) SC 1796PositiveSupport for the principle that ULCRA governs excess land and that the Act is a self-contained Code.
Vattichenkurn Village Panchayat v. Nori Venkatarama Deekshithulu & Ors.[1991] Supp. 2 SCC 228PositiveCited for the varied interpretation of the word 'vest' and related deeming concepts.
Consolidate Coffee Ltd. & Anr. etc. v. Coffee Board Bangalore etc. etc.[1980] 3 SCR 625PositiveDiscusses the use of 'deemed' in statutory contexts; supports deeming provisions.
State of M.P. v. Surendra Kumar & Anr.[1995] 2 SCC 627Mentioned OnlyReferred to in the context of two possible courses for government action; not a primary basis for the decision.
Parsottamdas Ramdas (Supra)(citation earlier as Parsottamdas’s case)PositiveUsed to support the principle that the Government may withdraw from acquisition under LA Act when Lands could be acquired under ULCRA.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•4,300 words•~20 min read

In The Court Record

GOVT. OF A.P. v. H.E.H. THE NIZAM, HYDERABAD

' _!_ I ~ A THE GOVT. OF ANDHRA PRADESH _v._ H.E.H., THE NJZAM, HYDERABAD. MARCH 22, 1996 B [K. RAMASWAMY AND G.B. PATTANAIK, JJ.J _La11d Acquisitio11 Act, 1894:_ _Ss. 4, 6, 23( 1-A)-La111is falli11g withi11 Hyderabad Urban Agglomera-_ C _tion under Urban Land Ceiling a11d Regulation Act-Declared excess-Acquisition of-Held, vacant land whe11 declared excess and vesti11g in State under Ceiling Act 11eed not be acquired-However, having exempted excess la11d from purview of Ceiling Act, State de11ied itself benefit of s.11 of Ceili11g Act--Compensati011 to be detennined u11der Land Acquisition Act-La11d owner himself havi11g delayed award of compe11sation 1101 elltitled to be11efit_ D _of s.23( 1-A)_ _Urba11 La11d Ceiling and Regulatio11 Act, 1978 :_ _S.3, 10(3)-La11ds falling within Hyderabad Urban Agglomeratio11-Ac-_ E _quisitio11 of u11der Land Acquisitio11 Act-Held, vacant land declared excess ·11eed 11ot be acquired by State--co111pe11satio11 to be awarded under s.11._ Certain urban lands belonging to the respondent were acquired under the Land Acquisition Act in 1978. The respondent challenged the acquisition by filing a writ petition in the High Court, and ultimately the F Land Acquisition Officer made the award in June 1983 determining the compensation at the rate of Rs. 10,000 per acre. The Reference Court determined the compensation @ Rs. 30 per square yard which was confirmed by the High Court. Aggrieved, the State Government filed the present appeal. G It was contended for the appellant that the land in dispute fell within the Hyderabad Urban Agglomeration covered by Urban Land Ceiling and Regulation Act 1976, and by operation of Section 3 and of the Ceiling Act which came into force in respect of the land in dispute on February 17, 1976. The land would be deemed to have been vested in the State and as H such the courts below had no jurisdiction to determine the compensation 772 \ GOVT. OF AP. _v._ H.E.H. THE NIZAM, HYDERABAD 773 under the Land Acquisition Act. It was also contended that the Reference A Court and the High Court erred in determining the value of the land @ 35 per sq. yard and in awarding the compensation at the rate of Rs. 30 per sq. yard inasmuch as the market rate of the lands sold at the relevant time was Rs. 6 per square yard only and the remaining price of Rs. 29 was for development. B ## Allowing the appeal, this Court HELD : 1.1. When the vacant land is declared excess under the Urban Land Ceiling and Regulation Act, 1976 it is not necessary for the State to acquire under the Land Acquisition Act, the excess vacant land C vested in it. [780-F] _Maharao Sahib Sri Bhim Singhji etc. etc._ v. _Union of India & Ors. etc. etc.,_ [1985] Supp. 1 SCR 862, _Union of India_ v. _Va//uri Basavaiah Chaudha1y,_ [1979] 3 SCR 892, _State of Gujarat_ v. _Parashottamdas Ramdas,_ [1988] 1 SCR 997 and _Dattatraya Shankarbhat Ambalgi & Ors._ v. _State of_ D _Maharashtra & Ors.,_ AIR (1989) SC 1796 relied on. _y_ 1.2. The vesting of excess land in the State takes effect from the date of publication of notification under sub-section (3) of s. 10 of the Ceiling Act in the State Gazette' with effect from the date specified therein. The competent authority by notification under Section 10(3) of the Ceiling Act E published in the State Gazette may declare that the excess land published under sub-section (1) shall be deemed to have been acquired by the State Government with effect from the date specified in the declaration and such land shall 'be deemed to have vested absolutely in the State Government free from all encumbrances with effect from the date so specified". The F word "deemed" is used to give effect to the operation of Section 3 from the date the Act was brought into force. The deemed vesting under Section , 10(3) would date back to 7.2.1976 and the date specified under Section 10(3). [779-C; 778-E-F] G _Vattichernkurn Village Panchayat_ v. _Nori Venkatarama Deekshithulu &_ 01~., [1991] Supp. 2 SCC 228 and _Consolidate Coffee Ltd. & Anr. etc._ v. _Coffee Board Bangalore etc. etc.,_ [1980] 3 SCR 625, referred to. 1.3. Ju the instant case the State acquired absolute right, title and interest in the excess urban vacant land from the date of the publication H 774 [1996] 3 S.C.R. * ## SUPREME COURT REPORTS A of the notification under Section 10(3) of the Ceiling Act and from that date viz February 28, 1983 the State Government became absolute owner of the excess vacant land free from all encumbrances. (779-D] 1.4. However, the Government by GOMs. No. 1552/MA dated May 20, 1981, had permitted RUDA to acquire the surplus land under the B provisions of the Land Ac11uisition Act, and as such, having exempted the excess vacant lands from the purview of the Ceiling Act, the appellant had denied to itself the benefit of paying compensation under section 11 of the Ceiling Act. Resultantly, the appellant would determine the compensation under the Land Acquisition Act. (780-F·G] c _State of M.P._ v. _Surendra Kumar & Anr.,_ (1995] 2 SCC 627, referred to. 2.1. Since the lands required development and there is evidence show· ing tentative developmental charges of Rs. 29 per sq. yd. incurred in 1975· 76, the respondent is entitled to compensation @ Rs. 8 per sq. yd. with a D statutory rate of solatium on the enhanced compensation @ 30% and 9% interest for one year from the date of taking possession, i.e. June 2, 1984 and after expiry of one year@ 15% till the date of deposit. (781-D-E] 2.2. The respondent is not entitled to additional amount under Section 23(1-A) as he had filed the writ petition in the High Court and kept E the matter pending till the Amendment Act became operative. (781 ·E·F] CIVIL APPELLATE JURISDICTION: Civil Appeal No. 5083 of 1996. From the Judgment and Order dated 11.11.92 of the Andhra Pradesh F High Court in AS. No. 2470 of 1986. ## G. Prabhakar for the Appellants. K. Madhava Reddy, Prakash Reddy and Mrs. D. Bharathi for the Respondents. G The Judgment of the Court was delivered by ## K. RAMASWAMY, J. Leave granted. This appeal by special leave arises from the judgment and decree H dated November 11, 1992 made in AS. No. 2470/86 by the High Court of ## GOVf. OF A.P. _v._ H.E.H. THE NIZAM, HYDERABAD [K. RAMASWAMY, J.] 775 Andhra Pradesh. Notification under Section 4(1) of the Land Acquisition A Act 1894 (for short, the 'Act') was published in the State Gazette on July 27, 1978 for public purpose, namely, construction of Residential-cum-Commercial Complex in Saroonnagar, Phase-II in out-skirts of Hyderabad city by the Hyderabad Urban Development Authority. The total extent of the land notified for acquisition was 25 acres 12 gunthas. After conducting B enquiry under Section _5A_ declaration under Section 6 was published on May 1979. The respondent filed Writ Petition No. 2510/82 in the High Court to quash the notification under Section 4(1). A learned single Judge by Order dated June 30, 1983 directed the Land Acquisition Officer (LAO) dther to pass an award or issue notification under Section 48 withdrawing the acquisition within a period of six weeks from that date. In C furtherance thereof, the LAO by his award dated August 6, 1983 determined the compensation @ Rs. 10,000 per acre. On reference under Section 18, the District Judge by his award and decree dated March 31, · 1986 determined the compensation @ Rs. 30 per square yard: On appeal it was confirmed by the Division Bench of the High Court. Hence this D appeal by special leave. It may be relevant to notice at this stage that the lands are within the Hyderabad Urban Agglomeration covered by Urban Land Ceiling and Regulation Act, 1976 (for short, the 'Ceiling Act') which came into force on February 17, 1976. The respondent filed the statement under Section 6 E thereof. By notification dated November 27, 1982, the competent authority under the Ceiling Act issued notice under Section 9 of the Act determining excess vacant land to be acquired by the Government. By further State Gazette notification dated February 23, 1983 published under Section 10(3) of the Ceiling Act the competent authority declared the acquired land F notified on November 4, 1982 in the State Gazette under Section 10(1) of the Act as excess land with effect from the said date to be deemed to have acquired by and vested in the State Government and that it stood vested absolutely in it free from all encumbrances. Possession of the acquired land was taken on June 2, 1984 and the G compensation of a sum of Rs. 8,43,778 was paid in From No. Con June 7, 1984. The first contention raised by Shri Sitharamaiah, learned senior counsel for the appellant is that by operation of Section 3 of the Ceiling H r , 776 SUPREME COURT REPORTS [1996] 3 S.C.R. A Act which came into force in relation to Andhra Pradesh on February 17, 1976, no person shall be entitled "to hold" any vacant land in excess of the ceiling limit on and and from that date. Section 4 envisages ceiling limit and every holder of vacant land in excess of the ceiling limit shall file a statement on or before six months from February 17, 1976, By conjoint B operation of Section 6, Rule 3 and Form I, holder must specify vacant land which he desires to retain within the ceiling limit. A draft statement should be filed before competent authority who, after considering the objections to the draft statement, makes necessary alteration in the draft statement and prepares a final statement made under Sections 8 and 9 of the Act giving particulars of the vacant land in excess of the ceiling limit which C should be published under Section 10(1) of the Act. If any person interested in the vacant land makes claim under Section 10(2), the competent authority, after considering the same will determine the nature and extent of the right. Section 10(3) requires the competent authority to publish a declaration that the excess vacant land shall be deemed to have been D acquired by the Government with effect from the date specified therein and that the same shall be deemed to have been vested in the Government free from all encumbrances. Under Section 10(5), the competent authority may order any person in possession of the vacant land to surrender or deliver possession of the excess land within thirty days of service of notice. E If he refuses, the competent authority is empowered under Section 10(6) .to take possession by using such force as may be necessary. Section 11 envisages payment of compensation for the excess land deemed to have been acquired. By operation of the declaration under Sections 10(3) and 10( 1) referred to hereinbefore, such !arid, the subject of the acquisition is deemed to have been vested in the State free from all encumbrances. The F respondent/claimants are entitled only to the payment of compensation as provided in Section 11 of the Ceiling Act. The Civil Conrt, therefore, is devoid of jurisdiction to determine the compensation under the Act, since the field is already occupied by the Ceiling Act. Determination of compensation at the enhanced rate by the Civil Court, therefore, is clearly an error G apparent on the face of the record. The Government, therefore, does not have to acquire land since the land already vested in it under Section 10(3) free from all encumbrances. The vesting shall be deemed to have taken place from February 17, 1976, the date on which the Urban Ceiling Act came into force. Sri Sitamaraiah also contended that the District Court and H the High Court committed grave error in determining the market value @ _x_ ## GOVT. _OFA.P.v._ H.E.H. THENIZAM, HYDERABAD (K.RAMASWAMY,J.j 777 Rs. 35 per square yard. In Ex. Al to A4, the market rate of the lands sold A was Rs. 6 per square yard only the remaining price of Rs. 29 was for development. The courts below, therefore, were in error in awarding the compensation @ Rs. 30 per square yard. Shri K. Madhava Reddy, learned senior counsel for the respondent, contended that the appellant having proceeded to acquire the land under B the Act, has no power, unless the acquisition is withdrawn under Section 48, to contend that the excess vacant land under the Ceiling Act vests in the Government. The notification pubJi,hed under Section 6 of the Act is conclusive of the public purpose which would be crystalised by making an award under Section 11. Compensation having been determined under C Section 11, as directed by the High Court and possession thereof having been taken, it is no longer open to the appellant to contend that they are not required to pay compensation under Section 23 of the Act nor is the respondent entitled to fall back upon Section 11 of the Ceiling Act which is contrary to the Scheme of the Act. It cannot, therefore, be contended D that the respondent is entitled to compensation only under Section 11 of the Ceiling Act. He also contended that the Government that the Government had exempted the lands from the Ceiling Act. Therefore, the High Court was right in determining the compensation under the Act. He further contended that the Hyderabad Urban Development Authority (for short, 'HUDA') itself had sold the lands in the neighbourhood @ Rs. 30 per E square yard and, therefore, that would from basis for determination of the compensation in respect of the acquired land. The reference Court, therefore, was right in placing reliance on that piece of evidence. The rival contentions give rise to the primary question : whether the F excess vacant land covered by the Ceiling Act stood vested in the State is liable to be acquired under the Act. ? It is seen that Section 3 in Chapter Ill of the Ceiling Act declares that except as otherwise provided in the Act, on and from the commencement of the Act (February 17,. 1976 in relation to Andhra Pradesh) "no person shall be entitled to hold any vacant land in excess of the ceiling limit'. The ceiling limit for Hyderabad Urban G Agglomaration is 1,000 sq. meters prescribed in category 'B' of Schedule I referred in Section 4. "Hold" means own. This expression connotes two concepts, i.e., physical possession or legal title to the vacant lands. Both the concepts stand attracted to the concept 'hold' under the Ceiling Act. The owner of excess vacant land in excess of the ceiling limit is required H 778 SUPREME COURT REPORTS (1996] 3 S.C.R. A to file a statement under Section 6 and by operation of Section 3, he ceases to hold the said vacant land subject to the operation of the provisions of the Ceiling Act. Section 5 prohibits transfer of vacant land in excess of the ceiling B limit at any time between commencement of the appointed dey and the commencement of the Act. Section 6 enjoins the holder of the vacant land in excess of ceiling limit to file a statement within the prescribed time in the manner laid under the Act the rules and in the form prescribed therefore. Section 8 enjoins the competent authority to prepare a draft statement as regards vacant land held in excess of the ceiling limit. Section C 9 envisages final statement after disposal of objections, if any, received in that behalf and service of the notice in that behalf on the person concerned as envisaged therein. Under Section 10(1), after service of the statement under Section 9 on the concerned person, the competent authority should cause publication of a notification in the State Gazette with particulars of D the vacant land in excess of the ceiling limit, for information of the general public. After considering claims, if any, laid under sub-Section (2) and disposal thereof, the competent authority shall determine the nature and extent of such claim and pass such orders as it deems fit. Thereafter the competent authority by notification under Section 10(3) published in the State Gazette may declare that the excess land published under Sub-section E (1) shall be deemed to have been acquired by the State Government with effect from the date specified in the declaration and such land shall "be deemed to have vested absolutely in the State Government free from all encumbrances with effect from the date so specified". The word "deemed" is used to give effect to the operation of Section 3 from the date the Act F was brought into force. In other words, the deemed vesting under Section 10(3) would date back to February 17, 1976 and the date specified under Section 10(3). In _Vattichemkum Village Panchayat_ v. _Nori Venkatarama Deehhithulu & Ors.,_ (1991) Supp. 2 SCC 228 at 239 this Court in para 10 had held that the word "vest" takes varied colours from the context and situation in which the word came to be used in the Statute. It is common G knowledge that under the Act, the acquired lands vest in the State from the date of taking possession under Section 16 of 17 (2). Under the land reforms like abolition of estate and taking over thereof, the vesting takes effect from the date of publication of the notification in the official gazette. In _Consolidate Coffee Ltd. & Anr. etc._ v. _Coffee Board, Bangalore etc. etc.,_ H [1980] 3 SCR 625 at 645 this Court had held the word 'deemed' is used a \ _'(_ ## GOVT. OF A.P. _v._ H.E.H. TIIE NIZAM, HYDERABAD IK. RAMASWAMY, J.J 779 great deal in modern legislation in different senses and it is not that a A deeming provision is every time made for the purpose of creating a fiction. A deeming provision is made to include what is obvious or what is uncertain or to impose for the purpose. of a statute an artificial construction of a word or phrase that would not otherwise prevail, but in each case it would be a question as to with what object the Legislature has made such a B deeming provision. It would thus be seen that determination of the exce;s ceiling land pursuant to the statement filed under Section 6 becomes conclusive by publication of the notification under sub-Section (3) of Section 10 and the excess lands were prohibited to be held under sub-Sec, tion 3 on and from the date of the commencement of the Act. Such excess land shall vest in the State only from a date specified in the notification. C The vesting under Section 10(3) takes effect from the date of publication of the notification under sub-Section (3) of Section 10 in the State Gazette from the date specified therein. It would thus be apparent that the State acquired absolute right, title and interest in the excess urban vacant land in the State from the date of the publication of the notification under D Section 10(3) of the Ceiling Act and from February 28, 1983 that date the State Government became absolute owner of the excess vacant land free from all encumbrances. The question, therefore, is : whether it is necessary for the Government to determine compensation under Section 23 of the Ceiling Act for E the land which already vested in it under the Ceiling Act. In _Maharao Sahib Sri Bhim Singhji etc. etc._ v. _Union of llldia_ & _Ors. etc. etc.,_ (1985] Supp. 1 SCR 862, where the constitutionality of the Ceiling Act was questioned, the Constitution Bench had held that the primary object and purpose of the Ceiling Act is to acquire such land as may be in excess of the ceiling limit p with a view to prevent concentration of urban land in the hands of a few persons and speculations and profiteering therein and also to bring about an equitable distribution of land in urban agglomerations to subserve the common good in furtherance of Article 39( c) and (b) respectively of the Constitution. This view was reiterated in _Union of India_ v. _Valluri Basavaiah Chaudhary,_ (1979] 3 SCR 802 and _Stale of Gujarat_ v. _Pars/IOI-_ G _tamdas Ramdas,_ (1988] 1 SCR 997. In _Dattatraya Shankarohat Ambalgi_ & _Ors._ v. _State of Maharashtra_ & _Ors.,_ AIR (1989) SC 1796, a Bench of two Judges of this Court had held that the land to the extent which falls within the ceiling area stands as a class different from the land which is in excess of the ceiling area. It is liable to be declared surplus to give effect to the H _r_ 780 (1996[ 3 S.C.R. ## SUPREME COURT REPORTS A purpose and object envisages under the Act. The Ceiling Act is a self-contained Code. As far as the acquisition of surplus of ceiling land and payment of compensation is concerned, it is governed by the provisions of the Ceiling Act. It was, therefore, held that it would not be necessary to acquire the land under the Maharashtra Act No. 37 of 1966 resulting in B[misuse of public funds ][by ][granting higher compensation, when the purpose ] of acquisition could he achieved on payment of lesser amount of compensation prescribed in Section 11 of the Ceiling Act. In _Parsltottamdas's_ case (supra), the same question had arisen. Another Bench of two Judges had held therein at page 1007 that it is open to the State Government to withdraw from acquisition under the Land Acquisition Act and when the C lands under the Ceiling Act could be acquired "by "paying compensation as provided thereunder, it would not be proper to compel the Government to acquire them under the provisions of the Land Acquisition Act, 1894. As already stated, the Act has the overriding effect on all other laws". Jn _State of M.P._ v. _Surendra Kumar&Anr.,_ (1995[ 2 SCC 627; a Bench of two Judges D (to which one of us, K. Ramaswamy, J., was a member) was to consider whether it would be open to the Government to purchase the land pending proceeding under the Ceiling Act and publication of the declaration under Section 10(3). This Court at page 629 in para 3 had held that two courses were open to the Government in that situation. The Government could return the application for permission for sale; finalise the process in E Chapter III or it could purchase the lands. It was held that there was no prohibition for the State to purchase the property though the declaration was not finalised. It would, thus, be clear that when the vacant land is declared under F the Ceiling Act, it is not necessary for the State acquire the excess vacant land vested in it under the Act. But unfortunate to the appellant that benefit of the declaration was unavailable for the reason that the Government in GOMs No. 1552/MA dated May 20, 1981 had permitted HUDA to acquire the surplus land under the provisions of the Act. In consequence, having exempted the excess vacant land from the purview of the G Ceiling A,ct, the appellant had cjenied itself of the benefit of Section 11 of the Ceiling Act to pay compensation as prescribed thereunder. The result is that the appellant would determine the compensation under the Land Acquisition Act. H The next question is : whether determination of market value at Rs. \ ## GOVT. OF A.P. _v._ H.E.H. TIIE NIZAM, HYDERABAD [K RAMASWAMY, J.J 781 30 per sq. yd. is valid in law? The District Judge proceeded on the premise A that the HUDA had acquired adjacent land under Act and had sold @ Rs. 35 per sq. yd. and that, therefore, the compensation claimed at Rs. 30 per square yard should be paid to the respondents. That found favour with the High Court. It is stated in the evidence adduced on behalf of the appellant that out of the sale consideration of Rs. 35 sq. yd., the cost of B the land was Rs. 6 per sq. yd. and Rs. 29 was collected towards tentative development charges. They were tentative prices fixed thereunder. In other words, Rs. 29 was incurred towards developmental charges and Rs. 6 per sq. yd. was the actual cost. The sales took place in the year 1976. It is seen that the lands were being used as horse-stable. The respondent claimed compensation @ Rs. 30 per sq. yd. It is seen that the notification under C Section 4(1) of the Act was issued on July 27, 1978. The sales by the HUDA of the plots of the neighbouring lands took place in the year 1976 after full development. The lands required development. It is well-settled law that deduction of developmental charges varies between 33, 1/3% to 65%, depending on facts and circumstances in each case. In view of the fact that D we have in evidence the tentative developmental charges of Rs. 29 per sq. yd. incurred in 1975-76, taking a pragmatic view we hold that after deducting developmental charges, the respondent is entitled to compensation @ Rs. 8 per sq. yd. with a statutory rate of solatium on the enhanced compensation @ 30% and 9% interest for one year from the date of taking possession, i.e., June 2, 1984 and after expiry of one year, @ 15% till the E date of deposit. The respondent is not entitled to additional amount under Section 23 (1-A) for the reason that the respondent had filed W.P. No. 2510 of 1982 and kept the matter pending till the Amendment Act became operative. The award could not be account of the pending proceedings in the High Court and the same was made as per the directions of the High F Court. The appeal is accordingly allowed but, in the circumstances, without costs. R.P. Appeal allowed. G
End of Judgment Record
Browse All Supreme Court of India (1996) Decisions
1996-08-16

Pfizer Ltd. v Mazdoor Congress and ors.

Pfizer Ltd. v Mazdoor Congress and ors is a Supreme Court appeal arising from writ petitions under Article 227 challenging the Bombay High Court’s reversal of Labour Court and Industrial Court findings that Pfizer had not committed an unfair labour practice in terminating two security staff, Waman S. Surve and R.B. Sail. The matter centers on the terminations of Surve and Sail after arrests in a theft case involving Pfizer property and the company’s loss of confidence in their suitability as watch and ward personnel. The Labour Court dismissed the complaints under Section 28 of the MRTU & PULP Act, and the Industrial Court upheld that dismissal; the High Court, however, intervened in a petition under Article 227, allowing an unfair labour practice claim under Item 1(1) of Schedule IV on the grounds of undue haste and ordering reinstatement with back wages. The apex court reverses, holding that undue haste is a question of fact to be determined on evidence and that no case under Item 1(1) was pleaded or proven before the lower fora or the High Court. It stresses that new arguments cannot be introduced at the Article 227 stage absent prior pleadings and evidence. The Court restores the Labour Court’s and Industrial Court’s decisions and allows Pfizer’s appeals, clarifying the evidentiary and pleading boundaries for unfair labour practices in industrial relations law.

1996-01-09

Union of India v. S.S. Uppal and Anr.

This appeal concerns the fixation of seniority for an officer absorbed into the Indian Administrative Service (IAS) from a state civil service quota. Respondent No.1, S.S. Uppal, a Development Officer in Madhya Pradesh’s Commerce and Industry Department, was considered for IAS absorption under Rule 8(2) of the IAS (Recruitment) Rules, 1954. A panel of four officers was prepared for vacancies arising up to 1 February 1989, with Uppal placed at serial No.4, making him eligible only for the February 1989 vacancy. Although the vacancy arose earlier, he was not appointed until 15 February 1989, and on 3 February 1989 the IAS (Regulation of Seniority) Rules were amended to introduce a weightage-based method for determining Year of Allotment (YOA) for those appointed by selection. Uppal challenged Rule 2 of the 1989 Amendment Rules as ultra vires and argued his seniority should be determined by the rules in force on 1 February 1989. The Central Administrative Tribunal accepted that the vacancy occurred before the amendment, so unamended rules should apply. The Supreme Court held that seniority in the IAS is determined by the rules in force on the date of appointment, not the date of vacancy, and that weightage cannot be retrospective unless provided. It emphasized that mere inclusion in a panel does not guarantee appointment and that the Central Government may amend seniority rules from time to time. The appeal was allowed, and the Tribunal’s order set aside.

1996-03-29

Thimmappa v. Siddaramakka

Thimmappa v. Siddaramakka concerns a deed of reconveyance attached to a sale of land. The reconveyance deed provided that if the respondent vendor repaid Rs. 5,000 within eight years from the sale date (July 20, 1968), the sale deed would be executed and registered in her favor. The respondent contended she offered payment before the eight-year period expired and sought specific performance through reconveyance; the appellant allegedly refused. The trial court accepted the respondent's evidence of offer within the period; the appellate court reversed, holding time was the essence of the contract and thus the suit was barred by limitation. The Karnataka High Court then set aside the appellate decree and restored the trial court’s decree. The Supreme Court held that, unless the deed of agreement of sale fixes a date for performance, time is not necessarily the essence of the contract. It found that Thimmappa had agreed to reconveyance conditioned on repayment within eight years, and that the respondent offered payment before expiry while the appellant refused to reconvey. The cause of action arose on expiry of eight years from July 20, 1973, but the suit was filed on July 20, 1976, within the period from the date of refusal (July 19, 1976). The Court concluded the suit was not barred by limitation, dismissed the appeal, and upheld the High Court’s restoration of the trial court’s decree.

1996-11-19

STATE OF UTTAR PRADESH AND ORS. v. V.K. JAIN

State of Uttar Pradesh and Ors. v. V.K. Jain concerns the regulation of compounded entertainment tax for cinema theatres under the Uttar Pradesh Entertainments and Betting Tax Act, 1979 and related Rules. The respondent cinema proprietor sought to reduce seating capacity from 540 to 450 for the 1995-96 year and to opt for the compounded tax system under Rule 24-A. The District Magistrate rejected both applications; the Allahabad High Court quashed that rejection, holding that the District Magistrate had no power to ignore or alter the seating capacity indicated in the option application. The State appealed to the Supreme Court. The Court held that a proprietor cannot enter into a composite agreement indicating a reduced seating capacity from the maximum stated in the licence, and the District Magistrate cannot adopt any seating capacity other than the maximum in the licence for Rule 24-A purposes. To reduce seating capacity, the proprietor must approach the licensing authority under Rule 14 of the U.P. Cinematograph Rules, 1951 to amend the licence, and only then can the amended capacity be used for Rule 24-A calculations. The decision emphasizes that the maximum seats fixed in the licence, not ad hoc figures, determine the governing base for taxation and that post-composition adjustments require proper licensing amendments. The Government suggests a clarifying recast of sub-rule (4) for the post-composition period to avoid litigation.