Supreme Court of IndiaSupreme Court · 2022Single JudgeAppeal allowed. No costs. Pending application, ...

Government of NCT of Delhi v. Subhash Jain and Ors.

Case / Petition Number:
Civil Appeal No. 8937 of 2022
Neutral Citation:[2022] 16 S.C.R. 630

Case Synopsis & Summary

This Supreme Court judgment concerns a Civil Appeal filed by the Government of NCT of Delhi challenging a High Court order that held the land acquisition proceedings under the Land Acquisition Act, 1894, for the land in question to be deemed as having lapsed under Section 24(2) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (the 2013 Act). The High Court, relying on Pune Municipal Corporation and Anr. v. Harakchand Misirimal Solanki and Ors., declared that the proceedings had lapsed. The Court, however, analyzes the interplay between possession, payment of compensation, and inaction, drawing guidance from Indore Development Authority v. Manoharlal and Ors. (2020) 8 SCC 129, para 366, to interpret Section 24(2) and related provisions. It clarifies that deemed lapse under Section 24(2) arises when authorities fail to take possession and pay compensation for five years or more prior to 1-1-2014, but that pendency of proceedings or possession not taken due to ongoing challenges does not automatically render the proceedings lapsed. The Court rules that the High Court’s interpretation is unsustainable, quashes the impugned order, and allows the appeal. The decision outlines the nuanced criteria for lapse, including proviso implications, and confirms that non-deposit of compensation does not alone trigger lapse. The matter is resolved with no costs and pending applications, if any, disposed of.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • M. R. Shah
  • C. T. Ravikumar
Judgment Date
2022-12-02
Court Decision / Holding
Appeal allowed. The impugned judgment and order declaring that the land acquisition proceedings with respect to the land in question have lapsed under Section 24(2) of the 2013 Act is unsustainable and is quashed and set aside. The original landowners’ challenge is not accepted; no costs. Pending application, if any, disposed of.
Final Disposition
Appeal allowed. No costs. Pending application, if any, also disposed of.

Parties to the Case

Appellants / Petitioners

  • GOVERNMENT OF NCT OF DELHI

Respondents

  • Subhash Jain and Ors.

Legal Representation & Advocates

Counsels for Petitioners

  • • Atul Kumar
  • • Rahul Pandey
  • • Amitabh Ranjan
  • • Rajiv Ranjan

Counsels for Respondents

  • • Ms. Sunieta Ojha
  • • Akansh Singh

Provisions of Law Cited

Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013, s.24(2)Land Acquisition Act, 1894Section 24(1)(a)Section 24(1)(b)Section 24(2)Section 4Section 31Section 34

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant contends that the High Court erred in holding that the land acquisition proceedings under the Act of 1894 are deemed to have lapsed under Section 24(2) of the 2013 Act. It emphasizes that the pendency of challenges by landowners prevented possession from being taken, and that such pendency cannot lead to a deemed lapse. The 2013 Act’s five-year inaction standard is to be applied with regard to possession and payment, not to a scenario where possession is prevented by litigation. The cautionary interpretation in Indore Development Authority (2020) 8 SCC 129 is urged, including the proviso to Section 24(2) and the non-deposit of compensation. It argues that tendering under Section 31 of the 1894 Act, where accepted, extinguishes the lapse claim. The argument asks the Court to quash the High Court’s order and restore the regularity of the acquisition process while recognizing that pendency does not automatically invalidate proceedings.

Contentions of Respondents

The respondents contend that the High Court correctly held the land acquisition proceedings to have lapsed under Section 24(2) due to prolonged inaction and failure to secure possession or deposit compensation within the window framed by the 2013 Act. They rely on the statutory structure and prior decisions to assert that lapse arises where authorities fail to act for five years; they contend that the 2013 Act did not revive stale claims and that the deprivation has a constrained remedy within those provisions.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
Indore Development Authority v. Manoharlal and Ors.(2020) 8 SCC 129PositiveCourt followed this decision’s interpretative framework for Section 24(2), including the five-year inaction rule and proviso interpretation, as reflected in para 366.
Pune Municipal Corporation and Anr. v. Harakchand Misirimal Solanki and Ors.(2014) 3 SCC 183Mentioned OnlyCited by High Court as reference; not adopted as ratio by the present judgment.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•1,704 words•~8 min read

In The Court Record

Government of NCT of Delhi v. Subhash Jain and Ors.

630 SUPREME COURT REPORTS[2022] 16 S.C.R. 630 [2022] 16 S.C.R. A ## GOVERNMENT OF NCT OF DELHI ## v. ## SUBHASH JAIN AND ORS. ## (Civil Appeal No. 8937 of 2022) B DECEMBER 02, 2022 ## **[M. R. SHAH AND C. T. RAVIKUMAR, JJ.]** - _Right to Fair Compensation and Transparency in Land_ - _Acquisition, Rehabilitation and Resettlement Act, 2013: s.24(2) – High Court declared that the acquisition of lands in question deemed_ - C _to have lapsed under s.24(2) of the Act, 2013 – Held: High Court failed to notice and consider the specific case on behalf of the State that at the relevant time, the possession could not be taken over due to the pending proceedings at the instance of the landowners challenging the acquisition proceedings, which ended_ - D _upto this Court – Original landowners failed in challenge to the acquisition proceedings upto this Court – Under the circumstances, when due to pendency of the land acquisition proceedings, the possession could not be taken over, thereafter, it will not be open for the landowners to contend that as the possession was not taken over, the land acquisition proceedings be deemed to have lapsed_ - E _under s.24(2) of the Act, 2013 – In view of_ Indore Development Authority v. Manoharlal and Ors., _the impugned judgment passed by the High Court declaring that the land acquisition proceedings with respect to the land in question has lapsed under s.24(2) of the Act, 2013 is unsustainable – Land Acquisition Act, 1894._ ## F **Allowing the appeal, the Court** **HELD: The original landowners failed in challenging the acquisition proceedings upto this Court. Under the circumstances, when due to pendency of the land acquisition proceedings, the possession could not be taken over, thereafter, it will not be open** G **for the landowners to contend that as the possession was not taken over, the land acquisition proceedings be deemed to have lapsed under Section 24(2) of the Act, 2013. The impugned judgment and order passed by the High Court declaring that the land acquisition proceedings with respect to the land in question** H **has lapsed under Section 24(2) of the Act, 2013 is unsustainable** 630 GOVERNMENT OF NCT OF DELHI v. SUBHASH JAIN AND 631 ORS. **and the same deserves to be quashed and set aside and is** A **accordingly quashed and set aside. [Paras 2.1, 3][632-B-C; 634D]** _Indore Development Authority v. Manoharlal and Ors._ **(2020) 8 SCC 129 : [2020] 3 SCR 1** _**–**_ **followed.** _Pune Municipal Corporation and Anr. v. Harakchand Misirimal Solanki and Ors._ **(2014) 3 SCC 183 : [2014] 1 SCR 783 – referred to.** B ## **Case Law Reference** |**[2014]**|**1**|**SCR**|**783**|**referred to**|**Para**|**2**|C| |---|---|---|---|---|---|---|---| |**[2020]**|**3**|**SCR**|**1**|**followed**|**Para**|**2.2**|| CIVIL APPELLATE JURISDICTION: Civil Appeal No. 8937 of 2022. From the Judgment and Order dated 20.07.2015 of the High Court of Delhi at New Delhi in Writ Petition (C) No. 2709 of 2015. D Atul Kumar, Rahul Pandey, Amitabh Ranjan, Rajiv Ranjan, Advs. for the Appellant. Ms. Sunieta Ojha, Akansh Singh, Advs. for the Respondents. E The Judgment of the Court was delivered by ## **M. R. SHAH, J.** 1. Feeling aggrieved and dissatisfied with the impugned judgment and order passed by the High Court of Delhi at New Delhi in Writ F Petition(C) No. 2709 of 2015 by which the High Court has allowed the said writ petition and has declared that the land acquisition proceedings under the Land Acquisition Act, 1894 (hereinafter referred to as “Act, 1894”) with regard to the land in question is deemed to have lapsed under Section 24(2) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 G (hereinafter referred to as “Act, 2013”), the Government of NCT of Delhi and Anr. have preferred the present appeal. 2. From the impugned judgment and order passedby the High Court, it appears that while declaring that the acquisition proceedings under the Act, 1894 is deemed to have lapsed under Section 24(2) of the H 632 [2022] 16 S.C.R. SUPREME COURT REPORTS - A Act, 2013, the High Court has heavily relied upon the decision of this Court in the case of **Pune Municipal Corporation and Anr. Vs. Harakchand Misirimal Solanki and Ors., (2014) 3 SCC 183** . 2.1 However, the High Court has failed to notice and consider the specific case on behalf of the appellants that at the relevant time, the B possession could not be taken over due to the pending proceedings at the instance of the landowners challenging the acquisition proceedings, which ended upto this Court. The original landowners failed in challenging the acquisition proceedings upto this Court. Under the circumstances, when due to pendency of the land acquisition proceedings, the possession could not be taken over, thereafter, it will not be open for the landowners C to contend that as the possession was not taken over, the land acquisition proceedings be deemed to have lapsed under Section 24(2) of the Act, 2013. 2.2 In the case of **Indore Development Authority Vs. Manoharlal and Ors., (2020) 8 SCC 129,** in paragraph 366, the D Constitution Bench of this Court has observed and held as under:- **“366.** In view of the aforesaid discussion, we answer the questions as under: E F G H **366.1.** Under the provisions of Section 24(1)(a) in case the award is not made as on 1-1-2014, the date of commencement of the 2013 Act, there is no lapse of proceedings. Compensation has to be determined under the provisions of the 2013 Act. **366.2.** In case the award has been passed within the window period of five years excluding the period covered by an interim order of the court, then proceedings shall continue as provided under Section 24(1)(b) of the 2013 Act under the 1894 Act as if it has not been repealed. **366.3.** The word “or” used in Section 24(2) between possession and compensation has to be read as “nor” or as “and”. The deemed lapse of land acquisition proceedings under Section 24(2) of the 2013 Act takes place where due to inaction of authorities for five years or more prior to commencement of the said Act, the possession of land has not been taken nor compensation has been paid. In other words, in case possession has been taken, compensation has not been paid then there is no lapse. Similarly, if compensation has been paid, possession has not been taken then there is no lapse. GOVERNMENT OF NCT OF DELHI v. SUBHASH JAIN AND 633 ORS. [M. R. SHAH, J.] **366.4.** The expression “paid” in the main part of Section 24(2) of the 2013 Act does not include a deposit of compensation in court. The consequence of non-deposit is provided in the proviso to Section 24(2) in case it has not been deposited with respect to majority of landholdings then all beneficiaries (landowners) as on the date of notification for land acquisition under Section 4 of the 1894 Act shall be entitled to compensation in accordance with the provisions of the 2013 Act. In case the obligation under Section 31 of the Land Acquisition Act, 1894 has not been fulfilled, interest under Section 34 of the said Act can be granted. Non-deposit of compensation (in court) does not result in the lapse of land acquisition proceedings. In case of non-deposit with respect to the majority of holdings for five years or more, compensation under the 2013 Act has to be paid to the “landowners” as on the date of notification for land acquisition under Section 4 of the 1894 Act. **366.5.** In case a person has been tendered the compensation as provided under Section 31(1) of the 1894 Act, it is not open to him to claim that acquisition has lapsed under Section 24(2) due to non-payment or non-deposit of compensation in court. The obligation to pay is complete by tendering the amount under Section 31(1). The landowners who had refused to accept compensation or who sought reference for higher compensation, cannot claim that the acquisition proceedings had lapsed under Section 24(2) of the 2013 Act. A B C D E **366.6.** The proviso to Section 24(2) of the 2013 Act is to be treated as part of Section 24(2), not part of Section 24(1)(b). **366.7.** The mode of taking possession under the 1894 Act and as contemplated under Section 24(2) is by drawing of inquest report/memorandum. Once award has been passed on taking possession under Section 16 of the 1894 Act, the land vests in State there is no divesting provided under Section 24(2) of the 2013 Act, as once possession has been taken there is no lapse under Section 24(2). **366.8.** The provisions of Section 24(2) providing for a deemed lapse of proceedings are applicable in case authorities have failed due to their inaction to take possession and pay compensation for five years or more before the 2013 Act came into force, in a F G H 634 [2022] 16 S.C.R. SUPREME COURT REPORTS A proceeding for land acquisition pending with the authority concerned as on 1-1-2014. The period of subsistence of interim orders passed by court has to be excluded in the computation of five years. **366.9.** Section 24(2) of the 2013 Act does not give rise to new cause of action to question the legality of concluded proceedings B of land acquisition. Section 24 applies to a proceeding pending on the date of enforcement of the 2013 Act i.e. 1-1-2014. It does not revive stale and time-barred claims and does not reopen concluded proceedings nor allow landowners to question the legality of mode of taking possession to reopen proceedings or mode of deposit of compensation in the treasury instead of court to invalidate C acquisition.” 3. In view of the above and for the reasons stated above, the impugned judgment and order passed by the High Court declaring that the land acquisition proceedings with respect to the land in question has lapsed under Section 24(2) of the Act, 2013 is unsustainable and the D same deserves to be quashed and set aside and is accordingly quashed and set aside. Present appeal is accordingly allowed. No costs. Pending application, if any, also stands disposed of. E Devika Gujral (Assisted by : Mahendra Yadav, LCRA) Appeal allowed. F G H
End of Judgment Record
Browse All Supreme Court of India (2022) Decisions
2022-12-09

MOHD. SABEER @ SHABIR HUSSAIN v. RM, U. P. STATE ROAD TRANSPORT CORP.

The appellant, Mohd. Sabeer (also known as Shabir Hussain), a scrap dealer, was a passenger in a UP State Road Transport Corporation bus when the driver rashly and negligently drove the vehicle, causing a collision near Ghaziabad in 2009. He sustained grave injuries including an amputation of the right lower limb and other bodily injuries. The Motor Accident Claims Tribunal (MACT) awarded Rs. 15,76,465 with interest; the High Court of Delhi enhanced the amount to Rs. 16,70,932. The Disability Certificate recorded 70% permanent disability. The High Court had treated the claimant’s functional disability as 35%, relying on post‑accident income reflected in IT returns, and erred in not adequately recognizing the impact on earning capacity of a self‑employed person who cannot drive. The Supreme Court held that the appellant’s functional disability should be treated as 60% for loss of future earning capacity and that permanent disablement warrants consideration of future prospects in addition to future income. It invoked National Insurance Co. v. Pranay Sethi to apply a 40% addition for future prospects, and directed compensation for prosthetic limb purchase and maintenance, as well as enhanced non‑pecuniary damages. The final award was increased to Rs. 38,70,120 with 9% interest from the date of application, and the appeals were allowed, emphasizing liberal, holistic justice to restore the claimant to his pre‑accident position in light of socio‑economic factors.

2022-01-25

Intercontinental Hotels Group (India) Pvt. Ltd. & ANR. v. Waterline Hotels Pvt. Ltd.

Intercontinental Hotels Group (India) Pvt. Ltd. & Anr. v Waterline Hotels Pvt. Ltd. is a Supreme Court decision addressing appointment of a sole arbitrator under Section 11(6) read with Section 11(12)(a) of the Arbitration and Conciliation Act, 1996, in a dispute arising from a Hotel Management Agreement (HMA) for renovating the Holiday Inn & Suites Bengaluru, Whitefield. The petitioners allege breach by Waterline Hotels, including non-payment of incentive management fee and related charges, culminating in Waterline’s email termination of the HMA on 12 October 2018 after rebranding the hotel as Miraya. The petitioners invoked arbitration; Waterline challenged the enforceability of the arbitration clause on the ground that the HMA is an unstamped instrument under the Karnataka Stamp Act. A Karnataka High Court ad‑interim relief was granted in 2018, but the Supreme Court’s judgment focuses on the scope of judicial interference at the pre‑appointment stage. The Court reiterates a pro‑arbitration stance, noting that arbitrability/validity are generally matters for the arbitrators, with a narrow exception to cut deadwood or to refer for authoritative settlement where necessary, invoking Vidya Drolia. It also analyzes stamp duty, observing that stamp duty has been paid (albeit disputed) and that the question of the correct stamp duty may be resolved later, not as a precondition to appointing an arbitrator. Consequently, the Court appoints Justice A. V. Chandrashekara as a sole arbitrator, directs SIAC to proceed under its rules, and allows the petition in terms stated, while leaving stamp duty issues for arbitration to determine later.

2022-02-01

The State of Sikkim v. Jasbir Singh & ANR

This appeal by the State of Sikkim challenges a High Court judgment upholding a Sessions Judge’s order directing a written notice to the Army’s commanding officer to transfer the case to a court-martial. The case concerns concurrent jurisdiction between a court-martial and an ordinary criminal court under the Army Act for an offence allegedly committed by Lance Naik Jasbir Singh during active service in Sikkim, with the FIR under IPC 302 and related charges. The High Court held that the procedure under Sections 125/126 Army Act, the 1978 Rules (Rules 3-5) and CrPC Rule 475 had not been observed and that the Army authorities had exercised their discretion to prefer a court-martial; thus, the court-martial alone would have jurisdiction. The Supreme Court, however, held that the offence falls into a category with concurrent jurisdiction under Sections 69 and 70 of the Army Act, and that where there is concurrent jurisdiction, the first instance discretion to choose the forum lies with the designated officer under Section 125. In the present case there was no decision by the designated officer to institute proceedings before a court-martial, and the sequence of events showed significant cooperation with the CrPC process. Consequently, the Sessions Judge’s competence to proceed in the criminal court was not in error, the High Court’s order is set aside, and the respondent-accused is to be transferred to civil custody to face trial in the criminal court. The appeal is allowed.

2022-07-22

Hemant Kumar Verma & Ors. v. Employees State Insurance Corporation & Ors.

This writ petition concerns whether junior resident doctors in ESIC-run medical colleges should be eligible for the 50% in-service reservation for postgraduate medical courses, a benefit presently available to Insurance Medical Officers Grade-II (IMO-II) recruited through competitive selection. ESIC recruits IMO-II and provides a 50% in-service quota for PG seats; however junior residents, who complete MBBS under bond and serve as part of ESIC's residency scheme, are not deemed in-service doctors. The petitioners argued parity with IMO-II because their qualifications, duties, and work environment are similar, and urged the Court to treat them as in-service to extend the 50% reservation to their batch. ESIC contends that junior residents are contractual, bond-based appointees governed by the ESIC Residency Scheme; IMO-II is a permanent post governed by the ESIC Staff and Condition of Service Regulations 1959; the bond reduction in 2020 and the 2018/2020 memoranda cannot convert junior residents into in-service doctors. The Court relies on precedents establishing institutional preference in PG admissions—Saurabh Chaudri v. Union of India, Yatin Kuma Jasubahi v. State of Gujarat, and Pradeep Jain v. Union of India — to acknowledge the legitimacy of institutional preference, but ultimately holds that junior residents and regular ESIC doctors are distinct categories and the in-service quota cannot be equitably extended to junior residents. The petition is dismissed.