Supreme Court of IndiaSupreme Court · 1952Division BenchAppeal allowed; decree of the trial court resto...

Ganga Saran v. Ram Charan Ram Gopal

Case / Petition Number:
Civil Appeal No. 56 of 1951

Case Synopsis & Summary

This is an appeal by special leave from a decree of the Allahabad High Court reversing a trial court’s denial of damages claimed by the plaintiff for breach of contract. Between 10 and 18 April 1941 the parties entered into five contracts for delivery of cloth manufactured by the Victoria Mills and Raza Textile Mills. The agreement fixed 61 bales to be delivered by 17 November 1941, with the clause: “we shall continue sending goods as soon as they are prepared to you up to Magasar Badi 15 Sambat 1998… We shall go on supplying goods to you… as soon as they are supplied to us by the said Mills.” Only 99 bales were delivered; 61 bales were not. The appellant sued for damages, claiming loss due to market price rise. The respondents pleaded that performance was frustrated by circumstances beyond their control, making the contract void under sections 32 and 56 of the Indian Contract Act, 1872. The trial court rejected the plea; the High Court allowed the respondents’ argument. The Supreme Court held that the contract was not contingent on the Mills’ supply and that the language described the delivery process, not a condition precedent. It rejected the doctrine of frustration here, noted the Mills’ continued existence and production, and emphasized that no evidence showed a binding order with the Mills. The appeal was allowed; damages due to non-delivery were recoverable by the appellant and the decree of the trial court was restored, with the appellant’s costs.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • Harilal Kania C.J.
  • Fazl Ali J.
  • Mehr Chand Mahajan J.
Judgment Date
1951-11-01
Court Decision / Holding
Appeal allowed.
Final Disposition
Appeal allowed; decree of the trial court restored; appellant entitled to costs.

Parties to the Case

Appellants / Petitioners

  • Ganga Saran

Respondents

  • Ram Charan
  • Ram Gopal

Legal Representation & Advocates

Counsels for Petitioners

  • • P. S. Safeer

Counsels for Respondents

  • • S. P. Sinha
  • • K. N. Aggarwala

Provisions of Law Cited

Section 32, Indian Contract Act, 1872Section 56, Indian Contract Act, 1872

Legal Doctrines & Maxims

  • Doctrine of frustration of contract
  • Principle of impossibility of performance
  • No court has an absolving power; it can infer from the nature of the contract a foundation on which the parties contracted

Submissions & Arguments

Contentions of Appellants / Petitioners

Appellant contends the contract did not make performance contingent on Victoria Mills’ delivery. The wording ‘as soon as they are prepared’ and ‘as soon as they are supplied to us by the said Mills’ describe the delivery process, not a condition precedent. The appellant argues the true contract was to procure 61 bales at an agreed price irrespective of immediate Mills’ production, so non-delivery is a breach for damages, not impossibility. They challenge the High Court’s application of sections 32 and 56 as too broad, and rely on Privy Council and doctrine-based precedents emphasizing the contract’s terms and market realities; seeking damages for price rise and costs.

Contentions of Respondents

Respondents contend performance became legally impossible due to supervening events beyond their control—the Mills’ inability to supply within the contract period. They rely on sections 32 and 56 to claim discharge by impossibility. They argue the language indicates a conditional delivery linked to the Mills’ supplies, implying the fundamental assumption ceased to exist, discharging obligations. They maintain the High Court correctly applied the doctrine of frustration given Mills’ non-performance and market volatility, and question the appellant’s evidence of orders with the Mills.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (3)

Case NameCitationTreatmentExplanation
Harnandrai v. PragdasL.R. 15 I.A. 9DistinguishedPrivy Council negatived that line of reasoning; its approach governs the construction of the contract in this case.
British Movietone News v. London Cinemas[1951] 2 A.E.R. 617PositiveCited for the modern articulation of the doctrine of frustration and the principle that courts examine contract and surrounding circumstances to determine if performance was contemplated to continue.
F. A. Tamplin S.S. Co. Ltd. v. Anglo-Mexican Petroleum Co., Ltd.(2) A.C. 403PositiveQuoted for the principle that a court infers a foundational term from the nature of the contract and surrounding circumstances rather than granting an absolving power.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,610 words•~12 min read

In The Court Record

Ganga Saran v. Ram Charan Ram Gopal

_1951_ _Nov._ _J,_ 36 SUPREME COURT REPORTS [1952} GANGA SARAN _v._ RAM CHARAN RAM GOPAL [HARILAL KANIA C.J., FAZL Au AND MEHR CHAND MAHAJAN JJ.] _Indian Contract_ _Act_ (/ _of_ 1872)', _s._ _56--Contract_ _for_ _delivery_ _of_ _goods manufactured_ _by_ _particular Mill_ _as_ _soon_ _as_ _they are supplied_ _-Construction_ _of_ _contract-Non-receipt_ _of_ _goods_ _from Mill within_ _time-Whether_ _excuses_ _performance-Doctrine_ _of_ _frustration._ The respondents agree to deliver 61 bales of cloth to the appellant by the 17th November, 1941. The agreement provided "we shall continue sending the goods as soori as they are prepared to you up to Magsar Badi 15, Sambat 1998...... We shall go on supplying goods to y_ou of the Victoria Mills as soon as they are supplied to us by the said Mills. . . . . . We shall go on delivering the goods to you ...... out ·of the goods noted above which will be prepared by the Mill." In a suit for damages for non-delivery of the goods the respondents pleaded that as they had not received the goods from the Victoria Mill~ before the 17th of November, 1941, performance of the contract had become impossible by reason of an event which they could not prevent and the contract had therefore become void under Sec. 56, Indian Contract Act : _Held,_ (i) that, on a proper construction of the contract, delivery of the goods was not made contingc;nt on their being supplied to the respondents by the Victoria Mills. The words "prepared by the Mills" were only a description of the goods to be supplied, and the expressions "as soon as they are prepared" and "as soon as they are supplied to us by the said Mill" simply indi~ cated the 'process of delivery. This was not therefore a case in which the doctrine of frustration of contract could be invoked. (ii) Even apart from the construction of the agreement, as the respondents had not shown that they had placed an order for the goods with the Victoria Mills and yet the Mills had failed to supply, there was a clear breach of contract to deliver and the appellant was entitled to recover damages. _l-Iarnaf}drai_ v. _Pragdas_ (L. R. 15 I.A. 9) and _British Nfovietont:_ _News_ v. _London Cinemas_ [1951] (2 A.E.R. 617) relied on. CIVIL APPELLATE JuRISDICTION : Civil Appeal No. 56 of 1951. Appeal from a judgment and decree of the High Court of Allahabad (Malik and Wali Ullaha JJ.) dated _f_ 14th February 1946, in Appeal No. 240 of 1943 which 1t 1951 .. _Ganga Sarar_ \'.' _Ram_ _Charan-·_ _Ram_ Gopal~. t S.C.R. SUPREME COURT REPORTS 37 arose out of a decree dated 19th January, 1943, of the Court- of the Civil and Sessions Judge, Kanpur, in Original Suit No. 34 of 1942. _Ac41iru_ _Ram_ (P. _S. Safeer,_ with him) for the appellant. _S._ _P._ _Sinha_ _(K.._ _N._ _Aggarwala,_ with him) for the respondent. 1951. November 1. The Judgement of the Court was delivered by FAzL Au J .-This is an appeal by special leave agaimt a decision of,the High Court at Allahabad, reversing the decision of the trial court, in a suit instituted by the appellant to recover damages from the respondent-firm for breach of a contract. It appears that between the 10th and 18th April, 1941, - the parties entered into 5 contracts, by which the respondent-firm undertook to supply to the appellant 184 bales of cloth of certain specifications manufactured by the New Victoria Mills, Kanpur, and the Raza Textile Mills, Rampur. Only 99 bales were taken up and there was a dispute about the remaining 85 bales. On the 17th October, 1941, a settlement was arrived at between the parties, and it was agreed that the respondent-firm should deliver to the appellant 61 bales, and that the goods should be delivered by the 17th November, 1941. The actual text of the agreement (exhibit 4) was as follows: "61 bales as noted below are rto be giiven to you by us. we shall continue sending goods as soon as they are prepared to you upto Magsar Badi 15 Sambat 1998. We shall go on supplying. goods to you of the Victoria Mills as soon as they are supplied · to us by the said Mill. (Specifications of cloth given here). We shall go on delivering the goods to you upto Magsar Badi 15 out of the goods noted above which will be prepared by the Mill." · ## _)_ ' / 1951 _**Ganga**_ _**Saran**_ v. _Ram_ _Charan_ _Ram Gopal._ _Fazl_ _Ali_ _J._ 38 SUPREME COURT REPORTS [1952] As the 61 bales were not supplied, the appellant sent a telegraphic notice to the respondent-firm on 20th November, 1941, to the following effect: "Give delivery of our 61 bales through Bank. Otherwise suing within 3 days." The appellant did not receive any reply to this notice, and so he instituted the suit which has given rise to this appeal, on the 23rd Apfil, 1942, claiming a sum of Rs. 9,808 1 and odd, which, according to him, represented the loss sustained by him on account of the rise in the market rate of the contracted goods, and he also claimed · costs and interest. The respondent-firm resisted the suit on a number of grounds, but their main plea, with which alone we are concerned in this appeal, was that the performance of the contract had been frustrated by circumstances beyond their control and hence the appellant's claim must fail. This plea was negatived by the trial court, but it was upheld by the High Court, and hence this appeal. The only point which arises in this appeal is whether the circumstances of the case afford any ba,is for the application of the doctrine of frustration of contract, a doctrine which is embodied, so far as this country is concerned, in sections 32 and 56 of the Indian Contract Act, 1872. The main grounds of attack against the judgment of the High Court are:( I) that it has misread the agreement (exhibit 4) dated the 17th October, 1941, on which both parties rely; and (2) that it has paid more attention to an abstract legal doctrine than to the facts of the case. In our opinion, both these contentions are correct. The construction placed by the High Court upon the agreement and its conclusion based thereon, are set out in the following passage in the leading judgment of Wali Ullah J: •· "It seems to me that the parties clearly intended ;;. that the defendant was to supply the goods to the ~ l ### + # _)_ #### _)_ ... S.C.R. SUPREME COURT REPORTS 39 Plaintiff 'if and when'-and only In that event-the particular goods were prepared by the · Victoria Mills and were supplied to the defendant between the 17th of October, 1941, and 17th of November, 1941. As the fundamental assumption on which the contract was made ceased to exist during the time of performance and consequently it became impossible for the defendant to fulfil the contract, it must be held that the contract was discharged by supervening impossibility." The construction suggested by the High Court is precisely the construction which was attempted to be put on a similar contract by the defendant-respondents in the case of _Harnandrai_ v. _Pragdas(1),_ but the Privy Cooncil negatived it. In that case, the provision as to delivery of goods ran as follows : "The said goods are to be taken delivery of as and when the same may be received from the Mills." The Mills failed to perform their co.ntract with the defendants as they were engaged in fulfilling certain contracts with the Government, and consequently - the defendants could not supply the goods to the plaintiffs. The questions raised before the Privy Counci:l were as to the meaning of the contract and whether its performance had been frustrated,· and the J>rivy Council disposed of them in these words: "It was also suggested that the words 'as and when the same may be received from the Mills' should be construed, as if they were 'if and when the same may be received from the Mills.' This is to convert words, which fix the quantities and times for deliveries by instalments into a· condition precedent to the obli_gation_ to deliver at all, and virtually makes a new contract. The words certainly regulate the manner of performance, but they do not reduce the fixed quantity sold to a mere maximum, · or limit the sale to such goods, not exceeding 864 . bales, as the Mills might deliver to the defendants during the remainder of the year.'' Their Lordships .then proceeded to observe: (!) (1888) L.R. 15 I.A. 9. 1951 _Ganga_ _Saran_ v. _Ram_ _Charan_ _Ram_ _<jopal._ _Fazl Ali_ /. \ **1951** _Ganga Saran_ v. _Ram_ _Charan_ _Ram_ _Gopal._ _Fazl_ _Ali_ /. 40 SUPREME COURT REPORTS [1952] "The Mills, from which the goods were to come, no doubt were contemplated as continuing to exist, though it does not follow that, in a bargain and sale such as this, the closing or even the destruction of the Mills would affect a contract between third parties, which is in terms absolute; but the Mills did continue to exist and did continue to manufacture the goods m question, only they were ma:de for and delivered to somebody else. We agree with the reasoning of the Privy Council, and it seems to us that the considerations which prevailed with them must govern the construction of the agreement with which we are concerned in this case. The agreement does not seem to us to convey the meaning that the delivery of the goods was made contingent on their being supplied to the respondentfirm by the Victoria Mills. We find it difficult to hold that the parties ever contemplated the possibility of the goods not being supplied at all. The words "prepared by the Mill" are only a description of the goods to be supplied, and the expressions "as soon as they are prepared" and "as soon as they are supplied to us by the said Miil" simply indicate the process of delivery. It should be remembered that what we have to construe is a commercial agreement entered into in a somewhat common form, and, to use the words of Lord Sumner in the case to which reference has been made, "there is nothing surprising in a merchant's bindmg himself to procure certain goods at all events, it being a matter of price and of market expectations". Since the true construction of an agreement must depend upon the import of the words used and not upon what the parties choose to say afterwards, ic is unnecessary to refer to what the parties have said about it. Even apart from the construction of the agreement it seems to us that the plea of the respondents must fail on their own admissions. The defendent has stated in his evidence that he had not sold the 61 bales of cloth to any other person at the time he received the1 1 [telegraphic notice of the 20th November, ] [1941, ] (exhibit I). On his own admission, therefore, he was \ ###### _f_ - _).I_ ## _)_ ##### _)_ - ' S.C.R. SUPREME COURT REPORTS 41 in a position to supply 61 bales of the contracted goods at the time when the breach of the agrnement is alleged to have happened. That being so, we are unable to hold that the performance of the contract had become . impossible. The matter however does not rest there. Guruprasad, a clerk of the Mills Compapy, who is the second witness for the defendants, has made an important statement to the following effect: "The customers all place their requirements before. the sales manager. If the goods required are ready, they are sold to the customers and if they are _not ready and if the customer want> them to be manufactured they are delivered to the customers after manufacture. An order book is maintained at the Mills". Such being the practice which prevailed in the Victoria, Mills, it was for the defendants to show that an order for the manufacture of the contracted goods was placed with the Mills and yet the Mills1 failed to supply the goods. No such evidence has however ·been offered by the defendants. The High Court has surmised that it might not have been possible to supply the goods within the period mentioned in the agreement, but there ' is no material to support that statement. In these circumstances, 'this ii~ obviously no~ a case in which the doctrine of frustration of contract can be invoked. That doctrine has been explained in a number of cases, some of which are referred to in the judgment of the High Court, but the latest pronoucement with reg-ard to it is to be found in the speech of Viscount Simon in _British Movietone News_ v. _London Cinemas(1)_ in which the •Lord Chancellor referred with approval to the following enunciation of the doctrine by Earl Loreburn in a previous case _F._ _A._ _Tamplin_ _S._ _S._ _Co._ _Ltd._ v. _Anglo-Maxican_ _Petroleum Products_ _Co.,_ _Ltd.(2)_ :~ " ... a court can and ought to examine the cop.tract and the circumstances in which it was made, not _of course (1) [ 1951 J A.E.L.R. 617 (2) [ 1916] 2 A.C. 403, .404. 1951 _Ganga Saran_ v. _Ram_ _Charan_ _Ram Gopal._ _Fazl_ _Ali_ _f._ 42 SUPREME COURT REPORTS [1952] 1951 _**Ganga Saran**_ v. _Ram_ _Charan_ _Ram_ _Gopal._ _Faz!_ _Ali_ _J._ to vary, but only to explain it, in order to see whether or not from the nature of it the parties must have made their bargain on the footing that a particular thing or state of th'ings would continue to exist. And if they must have done so, then a term tlo that effect will be implied, though it be not expressed in the contract. ..... no court has an absolving power, but it can infer from the nature of the contract and the surrounding circumstances that a condition which is not expressed was a foundation on which the parties **contracted."** It seems necessary for us to emphasise that so far as the courts in this country are concerned, they must look primarily to the law as embodied in section 32 and 56 of the Indian Contract Act, 1872. These sections run as follows:- . **"32. Contingent contracts to do** **or** **not to do anything** **if** **an uncertain** **future event happens cannot** **be** **enf0rced** **by** **law unless and until that** **event** **has** **happened.** **If the event becomes impossible** **[1]** **such contracts become** **voi<l."** **"56. An agreement to do** **an** **act** **impossible in itself is void.** **A** **contract to** **do an act which, after the contract** **is** **made,** **becon1es im-** **possible, or,** **by** **reason** **of** **some event which the promiser could not** **prevent, unlawful, becomes void when the act becomes impossible or** **unlawful.** ... ". The enforcement of the agreement in question _was,_ as we have already pointed out, not contingent on the happening of an uncertain future event, nor does the present case fall within the second paragraph of sec tion 56, which is the only provision which may be said to have any relevancy to the plea put forward by the respondents. ·Clearly, the doctrine of frustration <:annot avail a defendant when the non-performance of a contract is attributable to his own default. We accordingly allow the appeal, set aside the judgment of the High Court, and restore the decree of the trial court. The appellant will be entitled to his costs throughout. _Appeal allowed._ Agent for the appellant: _R._ S. _Narula._ Agent for the respondent: S. S. _Sukla._ ..
End of Judgment Record
Browse All Supreme Court of India (1952) Decisions
1952-11-07

Ganesh Lal v. Joti Pershad

This judgment deals with a partition and redemption dispute among co-mortgagors in a Punjab setting where the Transfer of Property Act, 1882 is not in force. The plaintiffs, Joti Pershad, sought partition and possession of their two-fifths shares, while Ganesh Lal, who redeemed the mortgage in 1920 by paying Rs. 5,800, claimed the right to be reimbursed for the sum he paid and to secure his share in the mortgage debt. The trial court and the Punjab High Court found that the mortgage was a joint family obligation and that Ganesh Lal’s redemption was on his own account, entitling him to contribution from co-mortgagors only for the excess of his payment over his own share, after adjusting for amounts already received and taxes. The Supreme Court affirmed these conclusions, rejecting the appellant’s broad claim for the entire Rs. 11,200 debt under section 92 of the Transfer of Property Act. It held that subrogation is an equitable doctrine, allowing reimbursement only to the extent necessary to cover the excess actually paid by the redeemer, with due regard to fairness among co-mortgagors. While recognizing the concept of substitution in the mortgagee’s place, the Court emphasized that equity requires proportionate contribution and refuses to allow preference to the redeemer over other co-mortgagors. The matter was remanded to effect partition and delivery of possession according to shares."

1952-03-27

Dattatreya Moreshwar Pangarkar v. The State of Bombay and Others

This is a constitutional challenge to detention under the Preventive Detention Act, 1950 (as amended). The petitioner, Dattatreya Moreshwar Pangarkar, was detained under an order dated 13 February 1951, confirmed on 28 April 1951, after the Advisory Board reported sufficient cause for detention. He sought a writ under Article 32 alleging illegality in detention, alleging that (i) the government failed to specify the period for which further detention would continue at the time of confirmation under section 11(1), and (ii) the confirmation order was not in the name of the Governor as required by Article 166(1). The court examined the ambit of section 11(1): the Advisory Board’s report allows the appropriate government to confirm and continue detention “for such period as it thinks fit.” The question was whether there must be a definite period specified and whether the form of the order complied with Article 166. The court held that the omission to specify duration does not render the detention null, since the act is temporary and the period may be implied up to expiry of the act; however, it emphasized that the initial order must be read with the life of the act and can be extended before expiry under section 13. On the Governor-name requirement, the court found that Article 166 is directory and not mandatory, and non-compliance does not automatically void the action where the authority and formal authorization exist. The petitions were dismissed, sustaining the detention pending the Act’s life. The decision clarifies the balance between executive power, procedural formality, and the temporary statutory framework governing preventive detention.

1952-12-10

Ajmer Singh v. The State of Punjab

Ajmer Singh, a young man about 22, was tried for the murder of his first cousin Bagher Singh and was acquitted by the Sessions Judge in May 1950. The State Government appealed, and the High Court of Punjab reversed the acquittal, convicting him under section 304 of the Indian Penal Code and sentencing him to ten years’ rigorous imprisonment. This is an appeal by special leave challenging that reversal. The central issue is whether faults in the trial, particularly the examination under section 342 CrPC, could justify overturning an acquittal, or whether such defects are curable irregularities that do not automatically vitiate the trial. The Court cites Tara Singh v. The State to emphasize that the object of section 342 is to provide a fair opportunity for the accused to explain circumstances appearing against him, and that errors in compliance must be weighed for prejudice rather than treated as automatic grounds to discard proceedings. It finds the Sessions Judge’s examination defective in form but not so prejudicial as to vitiate the case, given the simple nature of the issue and the credibility of witnesses. The High Court’s conclusions regarding the credibility of witnesses and the identity of the assailant are affirmed. Consequently, the appeal is dismissed and the High Court’s conviction stands, with the sentence intact. The judgment cautions against hypercritical reading of minor discrepancies in the evidence where the defendant had a fair opportunity to explain the circumstances.

1952-02-27

Kathi Raning Rawat v. The State of Saurashtra

This case concerns the constitutional validity under Article 14 of the Saurashtra State Public Safety Measures Ordinance (Third Amendment), 1949, which amended the earlier Public Safety Measures Ordinance (1948) to create Special Courts and to appoint a Special Judge to try ‘offences or classes of offences’ in designated areas by a simplified procedure. The appellant Rawat was convicted by such a Special Court and challenged the measure on the ground that it discriminates against individuals in other areas or under the ordinary procedure, contravening Article 14. The court analyzes the doctrine of permissible classification, distinguishing the West Bengal decision on similar legislation (which struck down its provisions), by arguing that the Saurashtra framework ties its differential treatment to a concrete objective—public safety and maintenance of order—and to a rational nexus with the areas and offences identified as threatening. The judgment canvasses the distinction between discrimination with reason and without reason, and emphasizes that Article 14 permits classification that is rationally related to the objective. While the proceedings discuss many precedents, the judgments, including those of Fazl Ali, Mukherjea, Chandrasekhara Aiyar, Bose and others, converge on the proposition that the impugned ordinance is valid within its special context, and where necessary, leave room for retrial under the ordinary procedure. The ultimate operative order, however, sets aside the conviction and directs retrial under the ordinary procedure, thereby remitting the matter for merits and a fresh decision consistent with due process.